PILOT PROJECT 3: Detention Storage Cum Rainwater Harvesting System at DID Headquarters, Kuala Lumpur

THE HEADQUARTERS OF DEPARTMENT OF IRRIGATION AND DRAINAGE(DID), KUALA LUMPUR

Underground storage tank under construction

MAIN COMPONENT OF RAINWATER HARVESTING SYSTEM


Catchments area (roof)

Gutter Downspouts and piping

Underground Storage Tank

Underground storage tank

DEPARTMENT OF IRRIGATION AND DRAINAGE (DID) HEAD-QUARTERS COMPLEX


Roof as catchments area

Storage tank

Underground storage tank

DID HEAD-QUARTERS COMPLEX


Consists of a block of 4-storied which is the standard office building with flat roof Downpipe

Roof of this building is attached via central gutter (size of 600 mm in depth) 60% of the water collected will flow into central gutter

Rainwater flow into two of 150 mm rainwater downpipe. Collected water will discharge to the perimeter drain at ground level

Roof as catchments area

The system uses a header tank on the roof of the building

Header tank

Rainwater from downpipe The water is store in underground storage tank Underground storage tank

Toilet flushing

Tank installation

Main component of rainwater harvesting system


Catchments system Header tank Filtering system

Internal plumbing

Conveyance system

pump

Storage tank

Components of rainwater harvesting system distribution network


External

Toilet flush

Internal Plumbing (Diagrammatic)

Installation of Detention Storage Cum Rainwater Harvesting System at DID Headquarters, Kuala Lumpur

JPS Hq. Hq. Building Roof Area: Total JPS Hq. Hq. staff: Average water use per person: Total water use per day: storage tank size:
(Say 3 days water storage):

1,688.85 m2 (calculated) 250 (est.) 25 liters/day. 250 x 25 = 6,250 liters/day.

6,250 x 3 = 18,750 lit 6.3 litres/m2/day(est.)

Water for plants (25m.sq):

Installation of Detention Storage Cum Rainwater Harvesting System at DID Headquarters, Kuala Lumpur

Tank Size (m3) 40 50 60 70 80 90 100 110 120

Reliability (%) 57.53 60.74 63.64 66.31 67.95 69.67 70.93 72.02 72.98
Reliabilty (%)
100 90 80 70 60 50 40 30 20 10 0 0 20 40 60 80 100 120 140 Reliability (%)

Tank Size Vs Reliability

Tank Size (cu. m)

Installation of Detention Storage Cum Rainwater Harvesting System at DID Headquarters, Kuala Lumpur

To determine the critical storm duration for Detention Storage Size Required
Cs = 1 Qbefore (PSD)
c d 6.09 17.61 33.39 53.05 76.33 103.09 133.20 166.59 203.18 242.93 285.77 331.67 380.60 SSR (m3) 40.81 52.04 57.46 60.14 61.26 61.40 60.88 59.92 58.66 57.20 55.61 53.94 52.25

td (min) 5 10 15 20 25 30 35 40 45 50 55 60 65

I (mm/h) T= 10 yr
380 263 208 175 152 135 122 111 103 95 89 84 79

Runoff Coeff 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91

Area (m2) 1688 1688 1688 1688 1688 1688 1688 1688 1688 1688 1688 1688 1688

Qd (l/s) 162.2 112.3 88.8 74.5 64.7 57.5 51.9 47.5 43.8 40.7 38.0 35.8 33.8

41.1 41.1 41.1 41.1 41.1 41.1 41.1 41.1 41.1 41.1 41.1 41.1 41.1

124.94 237.61 340.61 434.88 520.94 599.14 669.75 732.95 788.90 837.74 879.56 914.46 942.52

Site Storage Requirement (SSR) = c= d=

0.06(Qdtd-c-d) 0.675PSDtd(1-0.392PSD/Qd) 0.117tdPSD2/Qd