Anda di halaman 1dari 2

;

e(Y)

\I \ 1 '/ tnGCh

T-~pril.-tI-~

I 7-- 6-11Ir

-J- n6Ju.::,\roICM.

;"1

1..:::J'j ~ '-t"--

~n\L:<P1~

P-SOtllY(.

f~r1n)1n ~
RK-4539

Con. 3725-11.

(REVISED COURSE)

( 3 Hours)
N.S.

[ Total Marks: 100

(1) Question NO.1 is compulsory.


(2) Attempt any fourquestions (3) Assume suitable (4) Figures from the remaining six questions. necessary. data wherever

to the right indicate full marks. 20 and Productivity Improvement

1.

Give short notes on (any four) :(a) (b) (c) (d) (e) (f) Techniques of Industrial Engineering Value Engineering Techniques of Method Study and Work Measurement and Value Analysis and SQC Inventory Management ERP Systems Overview.

Lean and Agile Manufacturing

2.

(a)

The normal cycle time for an operation is 114 minutes.

It is estimated that 405' 10 Determine of business

minutes of 480 minutes day are available to the operator for production purposes. Determine the standard time and the number of production purposes. the standard time and the number of pieces for a standard hour. (b) Discuss the evaluation enterp rises. 3. (a) (b) What is the use of value engineering? Engineering. Define Waste Management. Discuss the objectives and types of wastes in detail. 10 in brief. ' Every casting Also state the waste reduction techniques 4. (a) Ten castings were inspected Discuss the steps and principles of value 10 of cultural fit on mergers and acquisitions

10

in order to locate defects in them.

10

was found to contain certain number of defects as given below. It is required to plot a C-chart and draw the conclusions. Casting 1 2 No. of defects found 2 4 1 5 5 on inspection{C).

3
4 5

6 7
8 g' 10

6 3
4 0

7
[TURN OVER

VTApril,l~.

227

Con. 3726-RK-4539-11.
(b) Explain (i) (ii) (Iii) Given:

2
1\.

the heuristic method of line balancing for the following data (given), Draw the precedence diagram Minimum no. of workstations Balancing efficiency. The maximum time available at any workstation is 10 minutes. Predecessor Duration of the stask (minutes) 3 4
2
<

The data given is as follow: Steps or elemental Immediate task 1 2 3 4 5 6


7 8

1 2 3 5 4 6
8
r

5 4
8

9 5. (a) (b)

2 4 6

Discuss the need of computers in industrial engineering. Explain its development 10 of integrated systems (system design). Explain the following terms in brief :10 MRP, MRP-II, JIT, BPR, SCM and EPR. Discuss the evolution and architecture of ERP in detail. 10 Discuss the implementation methodologies of ERP. Also explain the various 10 ERP Modules. Define ergonomics. Discuss the objectives of human engineering and human 10 factors affected by environment. Give short notes on (any four) :10 (i) Motion economy principles (ii) PMTS (iii) Layout design techniques I I (iv) Computer packages for layout analysis / (v) ERP systems in India (vi) Mergers and acquisitions in ERP systems.
'"

6.

(a) (b)

7.

(a) (b)

***********

Anda mungkin juga menyukai