3A = 60 +A or 2A =60 or A = 30 and B =
90.
www.afterschoool.tk AFTERSCHOOOL MATERIAL FOR PGPSE PARTICIPANTS
Solution continued . . .
Now A’s one day’s work is 1/30 and B’s one
day’s work is 1/90. but A’s speed changes
and instead of 1/30, we have have 1/3 added
to it thus we have 1/30+1/3*1/30 or
1/30+1/90 = 4/90 and in the case of B
1/90+1/2*1/90 or 1/90+1/180 = 3/180 or 1/60.
Add these we have 4/90+1/60 = (8+3)/180 or
180/11 = 16.36 = they will complete the work
in 16.36 days.