Anda di halaman 1dari 2

ANSAL PROPERTIES & INFRASTRUCTURE Ltd. REVISED PRICE LIST OF BUILT-UP -PHASE-1 W.E.F 01.10.

11
PLOT AREA S.No. CATEGORY IN MTS. IN SQ.FT. IN MTS. IN SQ.FT. BUILT-UP AREA BASIC PRICE (IN RS LACS) CURRENT SCHEME DISCOUNT (IN RS LACS) NET SALES PRICE (IN RS. LACS) BOOKING AMOUNT(5% OF THE NET SALES PRICE)

CHARMWOOD (DUPLEX) CHARMWOOD II (DUPLEX)

242

2606

262

2815

85.45

100000

84.45

4.22

300

3229

288.5

3084

97.77

100000

96.77

4.84

External Development charges Inclusive sales Price Preferential location Charges Extra As applicable details given below

Preferntial location Charges (PLC) One Preferential location Two Preferential location Three Preferential location Sector Road facing/Abutting 1.25% of the Net Sale Price 2.50% of the Net Sale Price 3.75% of the Net Sale Price Rs. 2.00 Lacs 1 2 3 4

PLC extra for


Units facing or adjoining the park Units facing or adjoining green belt/open space Units abutting/accessible on 24 mtr and above wide road Corner/two sides open units

ANSAL PROPERTIES & INFRASTRUCTURE LTD. SUSHANT GOLF CITY LUCKNOW


PAYMENT PLAN POSSESSION PERIOD : 24 MONTHS
PLAN-A Down Payment Plan 5% At The time of Allotment 90% within 45 Days from The Date of Allotment (Less Down Payment Discount of 14%) 5% at the time of Allotment PLAN-B Interest Free Installment Plan

5% within 2 months from the date of allotment

5% within 4 months from the date of allotment 5% at The Time of Possession 5% within 6 months from the date of allotment

10% within 8 months from the date of allotment 10% On Commencement of construction

Cash down Discount 14 %

10% on construction reaching plinth level 10% On Commencement of ground floor roof slab 10% On start of internal plumbing & electrical works 10% On start of Internal Plaster 10% On start of flooring of rooms 5% On start of external plaster 5% at the time of offer of possession

The installments stages can be called for payment in any sequence depending upon construction stage. Other term & Conditions.

Cheque(s)/Draft(s) to be issued in favor of "Ansal Properties & infrastructure Ltd" payable at Delhi/Lucknow only. Prices are subject to revision without notice and price ruling on the date of allotment and acceptance by the company only shall be applicable. The scheme can be closed at the sole discretion of the company The company shall endeavor to the complete construction of house allotted within two years from the date of sanction of plans. In case intending allotee fails to take possession of the house within a period of sixty days from the date of offer of posse The other terms and conditions of sale would be as per the standard allotment letter of the company. The registration charges, ECC charges, Freehold Charges, stamp duty, legal documentation charges and any other govt. levies are in addition to the aforesaid Price All the other conditions of the scheme will be applicable. Actual Size may marginally vary. This price list supersedes all previous price list.

Anda mungkin juga menyukai