Anda di halaman 1dari 5

C L

E N

T E

5%

.2

C L

0.5m

0.5m

0 %

0.3m2

8%
6 .2

( )m 2m

.0 m

E T

R O .6

M I N 6 I .0 M 0 O M

( (

) )

m m

( )m

m 2 m

M A M P OS T E R I A P I E D R A B O L ON

8% 8%

E T

R O .6

4 m

.2

5%
E

M I N

I M O 0 .2 m 0 .2 m

8%

0.2m0.2m

0.2m0.2m

D E D I E N T E P R O Y EC P R C O IO Y EC N C IO N D E D IE D N E T D E IE N T E M A M P OS T E R I A P I E D R A B O L ON D E

R OY E C

C I ON

0.3m22m

1.8m

1.8m

( )m

R EM A T R E EM D A E T E L O D E S A L O S D A E D 2 E 2 C M C M D E ES P D ES E ES O P R ES C O O R N C O M N O M R O T R ER T ER O O D E P R O D P E O P R R O C P IO O R N C IO 1 N : 4 1 : 4
R E M A T E D E L OS A D 2 C M D E E S P E S OR C ON M OR T E R O D E P R OP OR C I ON 1 :4 E

4m

4m

M A M P O M S A T M ER P O S IA T ER D IA E P IE D R A P IE B D O R L A O B N O L O N

L A D E

R E L A 6 0 %

C I ON D E L A D E P I E D R A

M A M P OS T E R I A S E R A B OL ON Y 4 0 % D E M OR T E

R O

M A M P O S T ER M A IA M P D O S E T ER IA P IE D R A B O L P IE O D N R A B O L O N

( )m

.2

PAST-DANIDA, RAAS CALCULO Y EVALUACION DE MATERIALES DE OBRAS NO TIPICAS Proyecto: Puente Vado Nawawasito Municipio: El Ayote Obra: Estacionamiento: Volumen de mampostera: Volumen de mortero: Volumen de concreto 1:2:3: Volumen total por alcantarilla: Excavacin: 1. Cantidad de materiales en mampostera Volmen total de mampostera: ESTIMADO Costo Costo total Cantidad unitario 140.00 107,198.00 550.00 54,340.00 450.00 72,247.50 10.00 790.40 10.00 2,470.00 60.00 15,840.00 120.00 14,400.00 50.00 4,800.00 60.00 3,840.00 40.00 720.00 10.00 3,000.00 247.00 8.10 105.00 360.10 125.00 m m m m m Nota: Puente Vado de 45 m x 4 m, debiendose, clcular las dimensiones reales de la clave central, cuando se haga el diseo definitivo, para presentar a aprobacion por parte de AP o APM. Longitud: Fecha de elaboracin: 13 / 10 / 2005

247.00 m
REAL Costo unitario Costo total

Unidad de Cantidad medida por m Cemento bolsa 3.10 Arena m 0.40 Piedra boln m 0.65 Agua para mezcla barril 0.32 Agua p/lavado de piedra barril 1.00 Piezas de 1" x 6" x 14 unidad Tablas 1" x 12" x 12 unidad Piezas de 2" x 4" x 8 unidad Piezas de 2" x 4" x 10 unidad Piezas de 2" x 2" x 8 unidad Clavos libra Sub-total Material

Cantidad 765.70 98.80 160.55 79.04 247.00 264.00 120.00 96.00 64.00 18.00 300.00

279,645.90

2. Cantidad de materiales en mortero para remates Volmen total de mortero:


Material Cemento Arena Agua Sub-total Unidad de Cantidad medida por m bolsa 7.60 m 1.00 barril 0.78 Cantidad 61.56 8.10 6.32 ESTIMADO Costo unitario 140.00 550.00 10.00 Costo total 8,618.40 4,455.00 63.20 Cantidad

8.10 m
REAL Costo unitario Costo total

13,136.60 Volmen total de concreto:1:2:3


ESTIMADO Unidad de Cantidad medida por m bolsa m m qq qq qq qq barril 6.30 0.40 0.55 Costo unitario 140.00 550.00 1,600.00 600.00 650.00 700.00 1,000.00 10.00

3. Cantidad de materiales en concreto 105.00 m


REAL Costo total 92,610.00 23,100.00 92,400.00 37,800.00 7,150.00 34,440.00 6,160.00 672.00 Cantidad Costo unitario Costo total

Material Cemento Arena Piedra triturada de 3/4" Hierro de 1/2" Hierro de 1" Hierro de 3/8" Alambre de amarre Agua Sub-total

Cantidad 661.50 42.00 57.75 63.00 11.00 49.20 6.16 67.20

0.64

294,332.00

151490907.xls.ms_office

Pgina 1

4. Agua para curado Area total a curar:


Material Agua Sub-total Unidad de Cantidad medida por m barril 0.52 Cantidad 295.88 ESTIMADO Costo unitario 10.00 Costo total 2,958.80 Cantidad

569.00 m
Costo unitario Costo total

2,958.80

5. Resumen de materiales
ESTIMADO Material Cemento Arena Piedra boln Hierro de 1/2" Hierro de 1" Piedra triturada de 3/4" Hierro de 3/8" Alambre de amarre Agua Piezas de 1" x 6" x 14 Tablas 1" x 12" x 12 Piezas de 2" x 4" x 8 Piezas de 2" x 4" x 10 Piezas de 2" x 2" x 8 Clavos Total Unidad de medida bolsa m m qq qq m qq qq barril unidad unidad unidad unidad unidad libra Cantidad 1488.76 148.90 160.55 63.00 11.00 57.75 49.20 6.16 695.44 264.00 120.00 96.00 64.00 18.00 300.00 Costo unitario 140.00 550.00 450.00 600.00 650.00 1,600.00 700.00 1,000.00 10.00 60.00 120.00 50.00 60.00 40.00 10.00 Costo total 208,426.40 81,895.00 72,247.50 37,800.00 7,150.00 92,400.00 34,440.00 6,160.00 6,954.40 15,840.00 14,400.00 4,800.00 3,840.00 720.00 3,000.00 590,073.30 Cantidad REAL Costo unitario Costo total

Gasto total 6. Mano de Obra

C$

590,100.00

ESTIMADO Actividad Mejorar terreno de asiento Excavacin Volumen total (mampostera, mortero y concreto) Unidad de Volumen medida planificado m m 125.00 m 360.10 TRE 2.00 0.28 HD total 62.50 1,286.07 Volumen Ejecutado

REAL TRR HD total

1,348.57

151490907.xls.ms_office

Pgina 2

DIBUJO Y DIMENSIONES DE LA ESTRUCTURA


5.00 m

0.20 m

0.70 m 0.50 m

A
Guarda via de concreto de 0.70m x 0.15m x 0.15m @ 0.50m. Clave de concreto de 0.38m x 0.30m x 0.35m

0.25 m

Losa superior de concreto 31.00m x 4.0 m x 0.25m acero refuerzo 3/8" @0.20 m

Losa inferor de concreto 31.00m x 6.0 m x 0.20m acero refuerzo 1/2" @0.20 m

Acceso de mamposteria de 5.0m x 4.0m x 0.20 m

0.20 m

dio

Ra

Muro de proteccin

Diente de 0.60 m

Ra

dio

2.

00

2.

4.00 m 1.00 m 1.00 m

4.00 m

4.00 m 1.00 m 1.00 m 31.00 m

4.00 m 1.00 m

4.00 m 1.00 m

4.00 m 1.00 m

Puente vado de perfil


Mamposteria Concreto reforzado 1:2:3 Concreto simple 1:2:3
Guarda via de concreto de 0.70m x 0.15m x 0.15m @ 0.50m.

Losa superior de concreto 31.00m x 4.0 m x 0.25m acero refuerzo 3/8" @0.20 m

5.00 m 0.20 m 4.80 m

Acceso de mamposteria de 5.0m x 4.0m x 0.20 m

26

4.00 m

0.20 m

3.60 m

5% B B

5%

0.20 m

2.00 m

0.60 m

1.00 m

Losa de concreto

Delantal y diente de mamposteria

0.40 m

Diente de mamposteria

31.00 m

Puente vado en planta

26
B=0.38 m

L=

h=0.35 m

2.80 m

b=0.30 m

5.0 m
0.30 m

Detalle de clave

Detalle de muro de proteccin Detalle de muro de proteccin

Clculo de delantal y acceso


Volumen delantal mamposteria Volumen= [(1.0x0.20)+(0.4x0.6)]x45.00= 19.8m 3 Volumen= 19.8 x 2 delantales = 39.6 m3 Volumen acceso de mamposteria Volumen= (4.0 x 5.0 x0.2)x2 accesos = 8.0 m3 Volumen diente en accesos= (13.60x0.2x0.4)x2= 2.18m3

Calculo del cuerpo del vado


Volumen bruto= 45.00x2.10x4.0= 378.0m 3 Volumen de clave= ((0.38+0.3)/2)x0.35x4=0.476 m 3 Volumen de clave= 0.476 m 3 x10 claves= 4.76 m3 Volumen de los arcos= ((d2)/8) x 4 x 10 arcos Volumen arcos= ((3.52)/8) x 4 = 19.24m3 Volumen arcos= 19.24 m 3 x 10 arcos = 192.40 m3 Volumen neto= 378.0 - 4.76 -192.4= 180.84 m3

Volumen de muro de proteccin


Volumen=((2.80+2.55)/2)x5.0x0.3= 4.01 m3 Volumen = 4.01 m3 x 4 muros = 16.04 m3

12 11

Volumen total de mamposteria Volumen total de mamposteria= 39.6+8.0+2.18+180.84+16.05 = 246.67 m3 247.00 m3

Volumen de mortero en cuerpo del arco


Area del cuerpo del vado= 45.00x2.10= 94.50 m 2 Area del semi circulo= ((3.52)/8)= 4.81 m2 Area del semi circulo= 4.81 x 10 arcos= 48.10 m 2 Area neta= (94.50-48.10)x 2 lados= 92.8 m
2

Volumen de mortero en interior de arcos


Longitud de la semi circulo= r Longitud de la semi circulo=(3.1416)x1.75= 5.50m Area del semi circulo= 5.50 x 4 = 22.0 m2

Volumen de mortero en delantales


Area= 1x45.00x2 delantales = 90.00 m 2 Volumen= 90.00 x 0.02 = 1.80 m3

Volumen de mortero= 92.80x0.02= 1.86 m3

Volumen = 22.0x 10 arcos x 0.02 = 4.40 m3

Volumen total de mortero= 1.86+4.40+1.80= 8.06 m3 8.10 m3

151490907.xls.ms_office

3.05 m

m 4 .0

4.00 m

diente de 0.40 m

losa de 0.20 m

3.05 m

2.85 m

2.80 m

0.35 m

2.00 m

2.80 m

00

Pgina 3

DIBUJO Y DIMENSIONES DE LA ESTRUCTURA


Mamposteria Concreto reforzado 1:2:3 Concreto simple 1:2:3

0.25 m

Losa superior de concreto 31.00m x 4.0 m x 0.25m acero refuerzo 3/8" @0.20 m

Guarda via de concreto de 0.70m x 0.15m x 0.15m @ 0.50m. Clave de concreto

26 30 29

2.80 m

0.35 m

2.00 m

Altura del arco

Losa inferior de concreto 31.00m x 6.0 m x 0.25m acero refuerzo 1/2" @0.20 m Delantal y diente de mamposteria

0.20 m

26 26 30 29

0.60 m

0.40 m 1.00 m

1.00 m 0.60 m

4.00 m 6.00 m

1.00 m 0.60 m 1.00 m 0.40 m

Corte A - A Seccin transversal del puente vado

0.80 m

inferior de concreto LosaLosa inferior de concreto reforzado reforzado

Losa superior de concreto Losa superior de concreto reforzado reforzado

26

0.05 m

0.05 m

0.05 m

0.20 m 0.05 m

0.15 m 0.25 m

0.15 m

0.20 m

0.2

0.25 m

0.2 m 0.2 m

0.2 m 0.2 m

m 0.2 m

12 11
m m 0.2 0.2 m m 0.2 0.2
0.20 m m 0.20 m 0.20 0.20 m 0.20 0.20 m m

m m 0.2 0.2

0.15 m

0.15 m

0.20 0.20 m m 0.20 0.20 m m 0.20 m 0.20 m

Acero refuerzo de 3/8" @ o.20 Acero refuerzo de 3/8" @ o.20 m m

0.05 m

0.05 m

Acero refuerzo de 3/8" @ o.20 Acero refuerzo de 3/8" @ o.20 m m

Detalle del acero reforzado losa inferior Detalle del acero reforzado enen losa inferior

Detalle del acero reforzado en losa superior Detalle del acero reforzado en losa superior

Clculo de losa inferior


Clculo de concreto Volmen de Concreto losa inferior= 45.00x6.0x0.20= 54.00 m3

Clculo de losa superior


Clculo de concreto Volmen de Concreto losa superior= 45.00x4.0x0.25= 45.00 m3 Volumen de concreto clave= (((0.38+0.30)/2)x0.35)x 4.0 x 10 unid.= 4.76 m3 Numero de guarda vias=(45.0/1.2)x2= 78 unid. Volumen de concreto de guarda via= 0.15x0.15x0.70x78= 1.23 m3 Volumen total de concreto= 54.00+45.00+4.76+1.23= 104.99 m3 105.00 m3

Clculo de refuerzo Losa Inferior Numero de piezas= (longitud/separacin)+1 Numero de piezas= (45.00 m /0.20 m )+1= 226 Pza de 6.0 m Longitudinal= 226 pza x 6 = 1,356.00 m Numero de piezas= (longitud/separacin)+1 Numero de piezas= (6.0 m /0.20 m )+1= 31 Pza de 45.00 m Transversal= 31 pza x 45.00 = Longitud comercial de varilla = 6.0 m Cantidad de varilla de 1/2" por quintal = 8 var. Acero1/2"=((1,356+1,395)/6 m) / 8 var = 57.00 qq x 1.10 63.0 qq 1,395.00 m

Clculo de refuerzo Losa Superior Numero de piezas= (longitud/separacin)+1 Numero de piezas= (45.00 m /0.20 m )+1= 226 Pza de 4.0 m Longitudinal= 226 pza x 4m x 2 parrillas = 1,808.00 m Numero de piezas= (longitud/separacin)+1 Numero de piezas= (4.0 m /0.20 m )+1= 21 Pza de 45.00 m Transversal= 21 pza x 45.00 m x 2 parrillas = 1,890.00 m Longitud comercial de varilla = 6.0 m Cantidad de varilla de 3/8" por quintal = 14 var. Acero 3/8" = ((1,808 +1,890) / 6 m) / 14 var. = 44.00 qq x 1.10 48.0 qq

151490907.xls.ms_office

Pgina 4

DIBUJO Y DIMENSIONES DE LA ESTRUCTURA

0.70 m 0.10 m 0.50 m 0.10 m

0.05 m

0.15 m

0.10 m

Acero de #3

26 30 29
0.25 m

Guarda via de concreto de 0.70m x 0.15m x 0.15m @ 0.50m.

0.20 m

detalle de refuerzo de guarda via

0.05 m

Losa superior de concreto con sus parillas de refuerzo 3/8" @ 0.20


0.25 m

26 30 29
2.80 m

Ra dio

2.0 0m

2.35 m

0.30 m 0.20 m

0.30 m 0.20 m

3 dovelas de 1" de 0.80 cm @0.30 m, en 5 hiladas= 15 dovelas


Mamposteria

0.60 m

Concreto reforzado 1:2:3 Concreto simple 1:2:3

0.20 m

Losa inferor de concreto 31.00m x 6.0 m x 0.20m acero refuerzo 1/2" @0.20 m

detalle de refuerzo de dovelas

Corte B - B Detalle refuerzo de dovelas y guarda vias


Clculo de acero para dovelas
Longitud total de dovelas= 0.8x15 dovelas x 11 = 132.00 m Longitud comercial de varilla = 6.0 m Cantidad de varilla de 1 por quintal = 2 var. Acero 1" = ((132.00) / 6 m) / 2 var. = 11.00 qq Longitud comercial de varilla = 6.0 m Cantidad de varilla de 3/8" por quintal = 14 var. Acero 3/8" = ((93.60) / 6 m) /14 var. = 1.11 qq 1.20 qq Excavacion Losa Inferior = (45x6x0.2) = 54 .00 m 3 Excavacion delantal + diente = ((0.8x0.4x45)+(0.6x0.2x45))x2 lados = 39.60 m 3 Excavacion accesos + diente = ((5x4x0.2)+(5x0.2x0.4x2)+(3.6x0.2x0.4))x 2 lados= 10.18 m 3 Volumen excavacin = (54+39.60+10.18)= 103.78 m3 Ademas de este volumen se estima un 20 % ms, debido a excavaciones no contempladas (ampliacin de cauce y sobre excavacion en accesos) Total Volumen de excavacin= 103.78 x 1.20 = 124.54 m 3 125.00 m3

Clculo de acero para guarda via


Longitud varila de refuerzo= [(0.2x2)+(0.15x2)+0.5]x78 guarda via = 93.60 m