Installation Check List and Request for Commissioning Engineer

York Branch Office Address :DUBAI Customer :Macair L.L.C York Contract No.: Customer Order No.: P010002820 DUCAB project Equipment Type: S/N.: RECIPROCATING chiller- Model: YAEP7777UC9C

Address :DUBAI Site DUCAB extension project The following check list must be completed prior to Commissioning Engineers presence on site. Please mark in appropriate box and add any necessary remarks in space provided. A YORK EQUIPMENT E ELECTRICAL WIRING 1. 2. 3. 4. B 1. 2. Equipment clean and undamaged Equipment damaged (attach report) Loose items available Unit placed on correctly set A.V. Ms COOLER & CONDENSER WATER PIPINIG Piping installed between cooler, condenser, pumps, cooling tower and cooling coils. Strainers are to be installed as near as possible to the cooler / condenser inlet with a minimum 40 mesh basket. Make-up and fill lines installed to chilled liquid system & operational. Binder type test points in addition to the thermometer wells and gauge connections installed in chilled liquid lines Dedicated water flow switch in chiller / condenser leaving liquid line (all units, minimum Wired direct to York control panel (**) or PD Switch All water piping checked for strain piping should not spring when connections are broken at unit Piping leak tested and flushed through by pass loop and strainers cleaned after flushing. Piping systems filled and trapped air vented WATER FLOW RATE (*) Cooler / Condenser water flow rates available to meet unit design requirements Note : Do not apply flow rates above York design maximums REFRIGERANT PIPING (Where required) Refrigerant relief piping (with flexible connection) Installed from unit to atmosphere Refrigerant pipe work correctly sized and installed. Pressure tested, evacuated and with a R holding charge added.

1. 2. 3. 4.

Main & control power supply available Wiring completed from main power supply to starter Wiring completed from starter to compressor motor (if required) Fusing installed in accordance with York instructions (DO NOT OPERATE COMPRESSOR MOTOR, FOR ANY REASON) All wiring and earthing fitted in accordance with relevant regulations Incoming supply completed to Control center

5.

6.

3. 4.

7.

5.

8.

6. 7.

External control wiring completed from Control Center to flow switch(s), pump motor starters, BMS etc., in accordance with York wiring diagram NOTE : All control wiring to be in screened cable as per York instructions Power available and wiring completed to chilled water / liquid pumps starters and motors, and the rotation of each checked Note : Do not check compressor motor rotation SITE CONDITIONS Service available for testing equipment Sufficient load available for testing and operating unit Personnel available for final field wiring check

F 1.

C 1.

2. 3.

D 1. 2.

4. 5. G 1. 2. H 1. 2.

General Remarks:

Owners operating personnel available for instruction NAMES. Special entry requirements, security or safety requirements YES/NO (Details if YES) WATER TREATMENT Treatment system in place for chilled water and condenser water Chilled water/Condenser water quality is satisfactory (*) COOLING TOWER Fan Rotation Check Cooling Tower sump in clean condition

* York takes no responsibility for inadequate water flows, water quality, or condenser water temperatures. * Do not install flow control orifice plate at the inlet of the cooler or condenser. **Flow switch should be installed on straight piping 5times the pipe dia before and after the flow switch. The work detailed above is, in progress and will be completed by /completed ..(Delete).. Failure to comply with the recommendations made within the installation, Operational & Maintenance Manual or the above will invalidate the equipment warranty.

Form No. SER167. 2.

With reference to the above contract, we are requesting the presence of the York Commissioning engineer at the job site and agree to meet all charges for aborted, prolonged or repeated site visits made through no fault of York International Limited. Date..Time....Site Contact..... Name (Printed).Signed..Position held...Date....