ADVANCED CONSTRUCTION SCH EDULING

Course Objective
Programming and scheduling is likely to be the first task that graduates will be required to perform for various employers in the construction and other industries. The purpose of this course is to provide the students with the
necessary skills to adequately schedule and control construction and business projects. Each student will generate bar charts; critical path networks; including early start, late start, early finish, late finish, durations, float, and identification of the critical activities that affect the timely completion of the project. The students will also

correlate manpower loading and costs to the schedule and learn how to control and accurately report progress of the project. The students will be introduced to advanced schedullng software tools used in the scheduling of construction projects and be required to schedule using computers, analyze data, and generate reports.

l. 1.1.1 1.1.2 1.1.3 1.1.4 1.1.5 1.1.6 ll. L.ll.1 L.ll.2 L.ll.3 L.ll.4 L.ll.5 L.ll.6 L.ll.7

IMPORTANCE OF ptANNtNG AND SCHEDUUNG [Shrs]

lntroduction

Schedullng as part of project Management Effort lnput Data for the Project Schedule: Defining Activities, Durations, and Determining Sequencing Activity Durations: How to Determine

Probability Distributions for Work Activities Productivity; Factors That lmpact Activity Duration and productivity
SCHEDUTE CALCUTATIONS AND ANATYSIS

DrawingNetworks
CPMCalculations
Calendar Day CPM

[21+hrs]

PrecedenceDiagramcalculations
PERTCalculations

computerization of planning Management (MS project and primavera p6)


Updating Project Schedules and project Control

L.lll.10 WindowAnalysis L.lll.11 Graphical Presentation of Schedules for L.lll.12 Legal Language Regarding Schedules L.lll.13 Compensable and Excusable Delays

III. APPTICATIONS AND USING THE SCHEDUIE As A MANAGEMENT TooL [15+hrs] L.lll.1 Resource Allocation and Resource Levelling L.lll.2 Resource Loaded Schedules L.lll.3 LimitedResourceAlgorithms L.lll.4 ResourceLevelingAlgorithms L.lll.5 Schedule Compression and Time Cost Trade Off L.lll.6 LlnearScheduling L.lll.7 Cash Management and Scheduling L.lll.8 The Earned Value Method L.lll.9 constructlon Delay and other claims (Disputes and claims Management)
Delay Analysis

lV.

L.lV.1 Designing and Structuring Schedule L.lV.2 Project Status and Health L.lV.3 Generating and Printing Reports L.lV.4 The Power of presentation L.lV.5 Skills necessary for good presentation

Reports and Presentation [3+hrs]

Assignments

Activity Durations, Building and Heavy Highway Proiect'


prepare Gnaft Chart using the activitie.s narnes, durations,
the major work category headings and do on subcategory

ind

sequencing with the data attached. Also prepare a Timeline for

2.0 Excel Assignment and 3.0 MS Project f1 4.0 MS Proiect #2 5.0 MS Project #3 6.0 Primavera # I
7.O PV#2

MS Visio Assignment

8.0 PVf3 9.0 PV#4