Anda di halaman 1dari 71

midasGTS Applications

Selected case studies

www.midas-diana.com/gts 1
2 www.midas-diana.com/gts
Table of content

Underground PC Culvert water line connection to shoreline dock................................................ 4


Underground path construction at a new building......................................................................... 6
Sosa ~ Nogsan new roadway ....................................................................................................... 8
Train car depot construction for Busan subway line 3 ................................................................ 10
Sosa ~ Nogsan tunnels ............................................................................................................... 12
New expressway route 60 ........................................................................................................... 14
Busan subway line 3 tunnel – zone 321...................................................................................... 16
South coast highway expansion (Sachun – SaIn)....................................................................... 18
New building construction ........................................................................................................... 20
Sosa – Nogsan roadway construction......................................................................................... 22
Excavated tunnel construction .................................................................................................... 24
Analysis for effects on subway tunnels due to construction of a new building ........................... 26
Overflow weir construction .......................................................................................................... 28
Mining shaft/tunnel construction.................................................................................................. 30
Tunnel stability analysis through a weak zone............................................................................ 32
High speed train track construction ............................................................................................. 34
Kosack – Soowon new roadway.................................................................................................. 36
High speed train track construction ............................................................................................. 38
Sewage discharge network construction..................................................................................... 40
Sewage pipe network construction ............................................................................................. 42
Sewage pipe network construction ............................................................................................. 44
Temporary railway bridge 1......................................................................................................... 46
Temporary railway bridge 2......................................................................................................... 48
A new roadway construction ....................................................................................................... 50
Seismic design through dynamic analysis .................................................................................. 52
Bridge – Foundation design......................................................................................................... 54
A new subway line construction .................................................................................................. 56
Analysis check for a weak fault zone .......................................................................................... 58
Bridge and underpath design ...................................................................................................... 60
A new roadway construction ....................................................................................................... 62
Kosack – Soowon new roadway.................................................................................................. 64
Y22 new development project ..................................................................................................... 66
Seoul new City Hall ..................................................................................................................... 68
Dubai Tower, Doha, Qatar .......................................................................................................... 70

www.midas-diana.com/gts 3
MIDAS/GTS Program Application [1]

Engineer Freyssinet

Project Overview Project Image


Underground PC Culvert water line
Title
connection to shoreline dock

Project Design for construction

TechSpan design for buried culvert


connection

Scope - Construction stage analysis


- Differential soil pressure due to
varying backfill levels
- Effects from non-uniform live loads
- Check for PC culvert connection

The underground structure, which is prefabricated concrete segments in the form


Overview of an arch, is analyzed in construction stages to reflect sequential backfill and
pavements while fully accounting for soil-structure interaction.

Typical section

4 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Global model overview Native soil mesh generation

Post-processing

Vert. displ. under culvert structure After backfill (Iso Surface)

Axial forces of plate elements Displacements due to live loads

www.midas-diana.com/gts 5
MIDAS/GTS Program Application [2]

Engineer Bu Kyoung Geo-Consultant

Project Overview Project Image

Underground path construction at


Title
a new building

Project Design for construction

Investigation of effects on
Scope surrounding structures and
facilities

Overview 1. Stability analysis for an underground path at an urban construction site


2. Excavation – Messer Shield Tunnel advancing construction method

Typical section

6 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
3-D finite element mesh Messer Shield Tunnel excavation

Post-processing

Horiz. Displ. at connection (at stair) History of displ. at connection path

Moment diagram for ventilation part Shear force diagram for entrance part

www.midas-diana.com/gts 7
MIDAS/GTS Program Application [3]

Engineer ChungSuk Engineering

Project Overview Project Image


Title Sosa ~ Nogsan new roadway

Project Turnkey Design


Stability analysis of tunnels over a
100m length represented by a
typical section of connection
between main and utility tunnels.
Scope Investigation for adequacy of
shotcrete & rock bolts by checking
stress concentration,
displacements & member forces at
connection zones.
Numerical analysis of shotcrete & rock bolt pattern and excavation method at main
Overview
& utility tunnel connections

Typical section

Layout of shotcrete and rock bolts

Analysis section

8 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Analysis model Geometry - Solid

Post-processing

Displacements (Z) Ground Principal Stresses

Shotcrete Stresses Rock bolt Axial forces

www.midas-diana.com/gts 9
MIDAS/GTS Program Application [4]

Engineer Hakyung Engineering

Project Overview Project Image


Train car depot construction for
Title
Busan subway line 3

Project Design for construction

Analysis for effects on and stability


of underground sewage box
Scope structure under a train depot
construction site due to new
structures and fill placement
3-D numerical analysis for foundation soil replacement & fill placement to check
Overview
existing sewage box structure

Typical section

10 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Sewage box placement
Analysis model
(Construction stage)

Post-processing

Vert. displ. after 1st phase fill Vert. displ. after 2nd phase fill

Clipping Plane (vert stresses) Min. principal stresses

www.midas-diana.com/gts 11
MIDAS/GTS Program Application [5]

Engineer Daejeong Consultants

Project Overview Project Image

Title Sosa ~ Nogsan tunnels

Project Turnkey design

Investigation for stability of


tunnels, shotcrete & rock bolts by
Scope
analyzing stress concentration at
the transverse tunnel connection

Displacements & stresses of tunnels, shotcrete and rock bolts were expected to
Overview increase significantly in the fault zone. 3-D construction stage analysis was
performed.

Typical section

12 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Model for tunnels, shotcrete & rock
Total analysis model
bolts

Post-processing

Displacements (x)

Shotcrete stresses Rock bolt axial forces

www.midas-diana.com/gts 13
MIDAS/GTS Program Application [6]

Engineer Kaya ENG

Project Overview Project Image

Title New expressway route 60

Project Turnkey design

Analysis for stability of foundation


Scope
adjacent to a fault zone

Stability of bridge foundation in a fault zone was examined. The support strata
Overview
were examined in detail relative to severely weathered faults.

Typical section

14 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
3-D finite element mesh Pile model

Post-processing

Horizontal displacements Vertical displacements

Pile axial forces Pile moment diagram

www.midas-diana.com/gts 15
MIDAS/GTS Program Application [7]

Engineer Orum Engineering

Project Overview Project Image

Title Busan subway line 3 tunnel – zone 321

Project Design for construction

This new tunnel construction takes


place beneath major existing
Scope
structures for which their stability must
be ensured.

The zone 321 (STA.1+440~+580) intersects with an underground path, a waterway


Overview
and another subway line. An existing bridge also exists in the longitudinal direction.

Plan & Typical section

16 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Underground structure model Micropile foundation reinforcement

Post-processing

Settlement analysis results for Subway Settlement analysis results for


Line 1 piers bridge piers

Shotcrete flexural axial stresses Rockbolt axial forces

www.midas-diana.com/gts 17
MIDAS/GTS Program Application [8]

Engineer Manyoung Eng

Project Overview Project Image

South coast highway expansion


Title
(Sachun – SaIn)

Project Design for construction

Scope 3-D blast vibration analysis

1. Modeling blast loads in surrounding mass due to blasting at a center cut hole
2. Time history analysis was performed to analyze the dynamic behavior of the
Overview
ground mass. Vibration effects on the existing tunnels and ground surface
were investigated.

Typical section

18 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Analysis model Existing tunnel shotcrete

Post-processing

Displacements at new tunnel Displacements at new tunnel


(0.01sec) (1.0sec)

Expanded tunnel blast (0.01sec) Expanded tunnel blast (1.0sec)

www.midas-diana.com/gts 19
MIDAS/GTS Program Application [9]

Engineer Jinyoung E & C

Project Overview Project Image

Title New building construction

Project Design for construction

Investigation of existing subway


Scope structure subjected to excavation for
new building construction

Safety investigation for 2-Arch tunnels and 1-Arch type tunnel where a large scale
Overview excavation for a new building foundation takes place with temporary shoring within
the proximity of a 2D (D=tunnel diameter) distance

Underground structures

20 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Subway station & tunnel model Excavation zone with temp. shoring

2-Arch / 1-Arch connection part Temp. shoring detail model

Subway station zone Temp. shoring detail model

www.midas-diana.com/gts 21
MIDAS/GTS Program Application [10]

Engineer Daejung Consultants

Project Overview Project Image

Title Sosa – Nogsan roadway construction

Project Turnkey design

Scope 3-D tunnel stability analysis

1. Tunnel exits are situated in weak layers of alluvial and weathered soils within 15m
from the ground surface.
Overview 2. Since the tunnel exits are constructed after excavating the sloped surface, the
surrounding ground will experience new stress fields, which exhibit different
behaviors than the initial state of stresses.

Main sections

22 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Total analysis model Tunnel model

Post-processing

Displacements (Dxyz)

Displacements (Dxyz) shotcrete &


Shotcrete stresses
rock bolts

www.midas-diana.com/gts 23
MIDAS/GTS Program Application [11]

Engineer Seoyeoung Engineering

Project Overview Project Image

Title Excavated tunnel construction

Project Design for construction

3-D FEM analysis was performed to


investigate stability of tunnel and
Scope
ground. Applicability of cover
slab and arch was examined.

1. Excavated tunnel construction is applied where ground cover ranges from 0.7 to
Overview 5.8m passing underneath a valley.
2. Bedrock is sand stone with layers of shale underlain by shallow hard rock.

Typical sections

„ Cover slab

„ Cover arch

24 www.midas-diana.com/gts
MIDAS/GTS Modeling
Pre-processing
Cover slab Cover arch

Post-processing

Results after construction of cover


Results after construction
slab

Stresses after construction of cover


Stresses at tunnel excavation
arch

www.midas-diana.com/gts 25
MIDAS/GTS Program Application [12]

Engineer Bu Kyoung Geo-Consultant

Project Overview Project Image


Analysis for effects on subway
Title tunnels due to construction of a
new building

Project Design for construction

Scope Stability check for existing subway

Overview 1. Design of temporary shoring for excavation for a new building


2. Check existing subway in the proximity of new excavation

Main section

26 www.midas-diana.com/gts
MIDAS/GTS Modeling
Pre-processing
3-D finite element mesh Temporary structure model

Post-processing
Ground & temp. structure stresses
Tunnel center line stresses
after completion of construction

Temp structure (Strut & H-Pile)


Shotcrete stresses
analysis results

www.midas-diana.com/gts 27
MIDAS/GTS Program Application [13]

Engineer Tejo Engineering

Project Overview Project Image

Title Overflow weir construction

Project Preliminary design

3-D numerical analysis of an


overflow weir structure in which
Scope settlement under the weir is
reflected in the design of the
structure
Check displacements, settlement and stresses of an overflow weir through 3-D
Overview
numerical analysis

Elevation & sections

Overflow Roadway

28 www.midas-diana.com/gts
MIDAS/GTS Modeling
Pre-processing
Analysis model Overflow weir

Post-processing
Displacements (XYZ) Principal stresses in vert. direction

Vertical displacements Horizontal displacements

www.midas-diana.com/gts 29
MIDAS/GTS Program Application [14]

Engineer Daehan Consultant

Project Overview Project Image

Title Mining shaft/tunnel construction

Project Design for construction

Mine facilities (vert. shaft / machine


Scope room / explosives storage etc.)
design

Overview 1. Complex excavation from horizontal tunnels to vertical shaft to machine room
2. 3-D staged analysis

Main section

30 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Analysis model Underground facilities model

Post-processing

Clipping plane Vertical shaft connection

Analysis results for underground


Principal stresses
facilities

www.midas-diana.com/gts 31
MIDAS/GTS Program Application [15]

Engineer Pyunghwa Engineering

Project Overview Project Image


Tunnel stability analysis through a
Title
weak zone

Project Design for construction

Fault zone and ground conditions


are closely examined to perform
Scope analysis for tunnel construction in
the weak zone while reflecting
reinforcement.

Displacements & stresses of tunnels, shotcrete and rock bolts were expected to
Overview increase significantly in the fault zone. 3-D construction stage analysis was
performed.

Main section

32 www.midas-diana.com/gts
MIDAS/GTS Modeling
Pre-processing
Reinforcement zone at exits
Analysis model
(shotcrete & rock bolts model)

Post-processing
Clipping Plane Analysis results at reinf. zone

Displacements Stresses

www.midas-diana.com/gts 33
MIDAS/GTS Program Application [16]

Engineer SunKoo Engineering

Project Overview Project Image

High speed train track


Title
construction

Project Design for construction

Analysis of train track base for


Scope
train vibration

Numerical analysis of ground vibration characteristics with varying train moving


Overview
speeds relative to different thicknesses of track base

Key plan

34 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Analysis model Ground & Loadcase

Post-processing

Displacements Displacements for moving train

LSS-22 standard liveload Time history graph

www.midas-diana.com/gts 35
MIDAS/GTS Program Application [17]

Engineer Dongshin Tech Development

Project Overview Project Image

Title Kosack – Soowon new roadway

Project Design for construction

2/3-D numerical analysis of bridge


Scope
foundation

1. Abutment and backfill exhibit 3-D behavior, and as such construction stage

Overview analysis is required.


2. Pier P1 is constructed within a temporarily shored excavation, which requires
construction stage analysis.

Plan, section & elevation

36 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Analysis model Close-up of foundation

Post-processing

Vertical displacements after


Close-up of displacements
construction

Analysis results of abutment fdn. Abutment model isolated

www.midas-diana.com/gts 37
MIDAS/GTS Program Application [18]

Engineer Daehan Consultant

Project Overview Project Image


High speed train track
Title
construction

Project Design for construction

Investigation of effects on
existing highway bridge pier and
Scope
sewage box structure due to
tunnel excavation

1. Tunnel excavation beneath an existing highway bridge and a large section


sewage box structure
Overview
2. Investigation for needs for reinforcing both structures
3. Check movements and stability of both structures

Plan

Potential damage assessment was performed for tunnel excavation, which


crosses the existing structures at STA. 271km 240~380 (L=140m zone).

38 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
3-D finite element mesh Pier foundation & box (side)

Pier foundation & box (front) Flying view

Post-processing

Vertical stress diagram Horizontal stress diagram

www.midas-diana.com/gts 39
MIDAS/GTS Program Application [19]

Engineer Dongshin Tech Development

Project Overview Project Image


Sewage discharge network
Title
construction

Project Private sector financed project

Stability check for open cut


Scope
excavation method

1. After assembling panels, excavation & placement take place simultaneously Î


very fast operation
Overview
2. No hammering, vibration & noise process Î pollution & disturbance minimized
3. For high ground water level Î SCW method employed to cut off water

Typical section

Temp shoring (double slide rail)


(Excavation depth: 4.0~6.0m)

40 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Excavation & temp structure
Initial stabilization
erection

Post-processing

Vertical displacements Stresses in temp structures

Clipping plane Hor. Stresses in temp structures

www.midas-diana.com/gts 41
MIDAS/GTS Program Application [20]

Engineer Dongshin Tech Development

Project Overview Project Image

Title Sewage pipe network construction

Project Private sector financed project

Stability check based on semi-


Scope
shielded excavation method

1. Advancing with a specifically fabricated shield head


Overview 2. Possibility of excavating a long distance
3. Advantageous in weak soil and high ground water table

Setup

„ Semi-shield
method

42 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Initial stage Advancing pipe

Post-processing

Ground displacements after pipe


Close-up of displacements
advanced

Stresses at tunnel excavation Close-up of stresses

www.midas-diana.com/gts 43
MIDAS/GTS Program Application [21]

Engineer Dongshin Tech Development

Project Overview Project Image

Title Sewage pipe network construction

Project Private sector financed project

Structural analysis of buried pipe in


Scope
weak ground

1. Pipe support base Î 180° sand bed


Overview
2. Depth of pipe Î within 1.0~6.5m

Typical section

44 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Analysis model Polyethylene pipe

Post-processing

Embedded pipe Total displacements

Max principal stresses Ground principal stresses

www.midas-diana.com/gts 45
MIDAS/GTS Program Application [22]

Engineer DongA Geotechs

Project Overview Project Image

Title Temporary railway bridge 1

Project Design for construction

Check settlement of soil


Scope retained by shored walls during
excavation

1. For pedestrian path construction, JES and open cut shoring methods are used.
2. Existing railway slope consists of retaining walls at front, which is further sloped
Overview
at the top.

Key plan

Path zone A: H = 4.4 ~ 13.2m

46 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Initial stage Temp structure erection

Post-processing

Vertical displacements Earth anchor axial forces

Total displacements Temp structure moments

www.midas-diana.com/gts 47
MIDAS/GTS Program Application [23]

Engineer DongA Geotechs

Project Overview Project Image

Title Temporary railway bridge 2

Project Design for construction

Check settlement of soil


Scope retained by shored walls
during excavation

1. For pedestrian path construction, JES and open cut shoring methods are used.
3. Existing railway slope consists of retaining walls at front, which is further sloped
Overview
at the top.

Key plan

Path zone A: H = 4.4 ~ 13.2m

48 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Initial stage Final excavation

Post-processing

Vertical displacements Soldier pile moment diagram

Settlement graphs by distances Tie load & nailing axial forces

www.midas-diana.com/gts 49
MIDAS/GTS Program Application [24]

Engineer Moojin NeoTech

Project Overview Project Image

Title A new roadway construction

Project Turnkey design

Investigation for stability of


Scope adjacent tunnel due to blasting for
a new tunnel

1. When modeling ground, which is infinite in mass, normal boundary conditions


result in reflecting waves. So viscosity boundary is used instead.
Overview 2. Dynamic properties are found through eigenvalue analysis.
3. Time history analysis is carried out to investigate dynamic behaviors of
structures due to dynamic blast load

Key plan

Calculation of blast loads

50 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Initial stage Blast load

Post-processing

Vertical displacements Vibration history speed curve

Shotcrete axial forces Stresses after erecting cover arch

www.midas-diana.com/gts 51
MIDAS/GTS Program Application [25]

Engineer

Project Overview Project Image


Seismic design through dynamic
Title
analysis

Project Preliminary design

Seismic analysis of pipe by time


Scope
history method

1. Pipe design based on dynamic analysis of pipe and connections


Overview 2. True earthquake records such as Hachinohe wave or Ofunato wave and
artificial earthquake are used as input.

Waves & section

Artificial wave

Analysis section

Hachinohe wave (long period)

52 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Eigenvalue analysis results – 1st & Time history analysis (ground
2nd periods movement)

Post-processing

Perpendicular to the pipe axis (X,Y) Hachinohe ground movement

Clipping plane Stresses inside the pipe

www.midas-diana.com/gts 53
MIDAS/GTS Program Application [26]

Engineer Tejo Engineering

Project Overview Project Image

Title Bridge – Foundation design

Project Preliminary design

Structure & foundation


Scope
interaction analysis

3-D numerical analysis for a bridge structure was performed, which reflected
Overview
settlement of the abutment foundation.

Plan & perspective views

54 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Analysis model Close-up of bridge

Post-processing

Displacements after construction


After foundation construction
(XYZ)

Displacements after foundation


Displacements (XYZ)
construction (XYZ)

www.midas-diana.com/gts 55
MIDAS/GTS Program Application [27]

Engineer Undisclosed

Project Overview Project Image

Title A new subway line construction

Project Design for construction

Structural analysis for subway tunnel


Scope
& utility tunnel crossing

3-D analysis was performed to investigate anticipated stress concentration at the


Overview crossing of a main subway tunnel and a utility tunnel. Effects on the utility tunnel
were focused during the subway tunnel excavation.

Key plan & section

Extent of analysis

56 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Analysis model Shotcrete-rock bolt in analysis

Post-processing

Yield Ratio Rock bolt axial forces

Stresses at crossing Stresses at vertical connection

www.midas-diana.com/gts 57
MIDAS/GTS Program Application [28]

Engineer Yongma Engineering

Project Overview Project Image

Title Analysis check for a weak fault zone

Project Design for construction

Stress-seepage coupled analysis in a


Scope
fault zone

1. The strike and slope of a fault affect the behavior of tunnels. Ground
configuration properties and stratification in the fault zone are reflected in a
numerical analysis model to design shotcrete and rock bolts.

Overview 2. Geological investigation identified undesirable physical properties and high


permeability of the rock in the fault zone. Development of pore pressure and
decrease in groundwater level are expected to adversely affect the shotcrete
and rock bolts.

Main section

58 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Analysis model Shotcrete-rock bolts model

Post-processing

Horizontal displacements Rock bolt axial forces

Pattern of waterhead distribution Water pressure distribution

www.midas-diana.com/gts 59
MIDAS/GTS Program Application [29]

Engineer Kaya ENG

Project Overview Project Image

Title Bridge and underpath design

Project Value engineering

Abutment foundation design by


Scope
construction stage analysis

Analysis of vertical and horizontal displacements of abutments and pile caps


Overview

Section, key plan & perspective view

60 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Analysis model Flying view

Post-processing

Displacements On-curve diagram

Vertical displacements of abutment


Analysis results in Flying view
piles

www.midas-diana.com/gts 61
MIDAS/GTS Program Application [30]

Engineer Dongshin Tech Development

Project Overview Project Image

Title A new roadway construction

Project Design for construction

Differential settlements check for a


Scope traffic underground path supported
on different soil stratification

Design of underground path and its foundation support for its own weight &
Overview
backfill. Design of the concrete structure to reflect differential settlements.

Typical sections

Strut+Earth Anchor Removable Earth Anchor

62 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Analysis model Close-up at abutment foundation

Post-processing

Vertical displacements at final


Temporary support structure
excavation

Horizontal displacements at final Horizontal stresses at final


excavation excavation

www.midas-diana.com/gts 63
MIDAS/GTS Program Application [31]

Engineer Dongshin Tech Development

Project Overview Project Image

Title Kosack – Soowon new roadway

Project Design for construction

Seismic analysis of bridge


Scope
substructure

1. Seismic analysis (equivalent static, dynamic & response spectrum analyses)


Overview
2. Construction stage analysis of bridge

Design Criteria

Artificial earthquake waves

Design earthquake wave

64 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Analysis model Close-up of pier

Post-processing
Vert. displacements after
Vert. displacements of pier piles
excavation

Pile moment diagram Pattern of vert. displacements

www.midas-diana.com/gts 65
MIDAS/GTS Program Application [32]

Engineer midasIT for Ove Arup, Singapore

Project Overview Project Image

Title Y22 new development project

Project Design for construction

stability of subway structure when


Scope excavating the building site

The development project is the construction of a 70 stories high twin building in the
Yeouido district of Seoul, Korea. The excavation site is located nearby the subway
Overview
line 5. The effects of excavation on the existing subway tunnel are investigated by
construction stage analysis.

Key plan

66 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Preliminary 2D model 3D model

Post-processing
Vert. displacements after
Vert. displacements of the shaft
excavation

Stresses in subway lining Axial forces in the rock bolts

www.midas-diana.com/gts 67
MIDAS/GTS Program Application [33]

Engineer Samsung Engineering & Construction

Project Overview Project Image

Title Seoul new City Hall

Project Design for construction

Excavation stability
Scope

Overview

Key plan

68 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Geometry Mesh

Excavation layers Columns

www.midas-diana.com/gts 69
MIDAS/GTS Program Application [34]

Engineer Hyder Consulting Ltd, UK

Project Overview Project Image

Title Dubai Tower, Doha, Qatar

Project Piled-raft foundation design

Analysis results for design:

Scope - Settlements
- Raft forces and bending moments
- Pile forces and bending moments

The proposed development for the Dubai Tower project comprises the
construction of an approximately eighty floor high rise tower with mezzanine,
Overview ground floor and five basement levels and will be the tallest structure in Qatar
when it is complete. The tower is founded on a piled raft. In order to fully
understand the behaviour of the foundation, a 3D finite element model is required.

Pile scheme

70 www.midas-diana.com/gts
MIDAS/GTS Modeling

Pre-processing
Podium and basement levels Side view, Piles and Basement

Post-processing

Quarter cut on settlement results Bending moments in the raft

Vertical stress in the rock layers Pile axial forces

www.midas-diana.com/gts 71