CORPORATE PRESENTATION
Version 13.0
Block 1, 20%, 22,247 km2 Block 2B, 100%, 7,807 km2 7.43 million gross and 3.03 million net acres Net unrisked prospective resources 530 mmbbls
There have only been 42 wells drilled in Kenya vs. 17 wells planned to be drilled in the next 18 months by Tullow Oil, Africa Oil Corporation, Marathon Oil and Afren. Taipan is planning to drill its first well in the first half of 2014 Taipan is the fourth largest, gross acreage holder in Kenya with 30,054 km2 Block 1 (20%) Block 2B (100%) Management of Taipan has discovered over 2 billion barrels of oil equivalent in similar early-stage basins The Anza Basin is one of the largest Tertiary-age rift-basins of the East African Rift system which contains multi-billion barrel oil discoveries Taipan believes Block 2B is located in the "sweet spot" of the Anza Basin and plans to drill its first well in 2014 targeting the Tertiary Taipan is currently farming down its 100% interest in Block 2B Marathon Oil recently paid $57 mm for a 50% interest in Block 9 which is contiguous to Block 2B Two analogue wells for Block 2B will be spudded by Africa Oil later this year on Block 9: Bahasi-1 (formerly Kinyonga) High Estimate 656 mmbbls Sala (formerly Pundamilia) High Estimate 952 mmbbls
Block 1 & 2B include multiple exploration plays in different basins Only 42 wells drilled onshore Kenya to date Vastly under-explored + 20 year hiatus in drilling All new wells drilled so far - all discoveries or have hydrocarbon shows Significant new oil discoveries in onshore Kenya in 2 separate basins (Ngamia & Twiga Lokichar, Sabisa Turkana Basins) All acreage tightly held. New blocks will have +$20 million commitments according to the MOE. Recent corporate activity in the Tertiary play amounts to ~ $117 million The Block 2B farm-out campaign is well advanced & is generating substantial industry interest
Source: NOCK
2012
Surrounded By Success
Muglad & Melut Basins 6 bn bbls oil in Cretaceous plays Ogaden Basin
Heglig+Unity Field 594 mmbbl of oil
Uganda
Lokichar Basin Ngamia & Twiga Oil discoveries in Tertiary sediments +200 mmbbls Anza Basin All 10 wells drilled in basinproper have oil/gas shows
Kubwa well Oil shows
Lamu/Offshore Basins
Potential for Billions bbls oil+gas in the Cretaceous & Tertiary
Sabisa-1 Drilling
(Spud 15th January 2013) Oil Shows
Paipai-1 Twiga South-1 Oil Discovery 98 ft. net pay, 2,812 bopd Potential 5000 bopd Ngamia-1A Oil Discovery >328 ft. net pay FARO 281 bopd further tests Block 2B Spud 2014 Etuko 1 to Spud
Spud within 3 months (formerly Kamba)
Light oil shows, 180ft sand, 656ft Cretaceous source rock interval
Block 3A+B 2 well commitments Spud 2Q-3Q/2013 Block L4/L13 Spud 2013
Bahasi-1 Prospect*
spud 2H/13 320 mmbbls
Sala prospect** 15 10
Wells
Historic Drilling
**402 mmbls
Bogal-1 Gas
Cretaceous 1-4Tcf
5 0 50's 60's 70's 80's 90's Decade 00's 10's *formerly Kinyonga Prospect **formerly Pundamilia Prospect
Kubwa well
Oil shows
Drilling planned
(9 18 months)
The Normal & Transform Branches of the East African Rift System
Late Tertiary (Oligo-Miocene) Basins of the East African Rift System shown The normal opening braches of the rift system are readily recognised (East + West Complexes & Ethiopia branch)
The transform branch of the Late Tertiary rift system (Anza Basin) has been overlooked The Anza Basin is one of the largest basins of the East African Rift System
Block 2B
Taipan 100% Operator Area 7,807 km2 Initial Exploration Period Elected to enter First Additional Exploration Period
11
The Millennium Atlas: Petroleum Geology of the central and northern North Sea.
Block 2B
km
500
Block 2B equivalent to 43 North Sea Blocks Anza Basin is comparable in size to the Central Graben of the North Sea Anza Basin ~ 10 wells drilled in basin North Sea ~2408 wells drilled in basin and found multi-billion barrels of oil Remains very early stage with world-wide potential
0
Block 2B
Anza Basin for size comparison
km 200
Central Graben
12
13
>200? mmbbls
~130 km
14
Block 9
Sala Prospect
402 mmbbls
Bahasi Prospect
Oil discoveries & shows Drilling imminent
(within next 9 months)
Block 2B
Drilling planned
(9 18 months)
Residual Gravity
(200km High-pass filter)
kilometres
200
15
16
Sirius-1
(Cretaceous Source)
Pseudo-well 1 Loperot-1
(Source rocks) (Modelled pseudo Well)
Lokichar Basin
Ngamia-1A Oil Discovery >328 ft. net pay
Hothori-1
(Modelled Well)
Bahati-1
(Oligo-Miocene Source)
Potential sources and oil shows from the Anza & Lokichar basins have been reviewed Both basins have a similar Tertiary history moreover, there appears to be compatible coeval source horizons in both basins Important analysed wells are shown Source rock study indicates the Block 2B area of the Anza Basin is oil prone
17
Hothori-1 = 9500ft of Tertiary & oil/gas shows, 12 to 15,000 down dip against bounding fault Additional Potential from the extension of the oilproducing Cretaceous Melut - Muglad basins trend on to Block 2B 387 mmbbls mean unrisked prospective resources (NI 51-101 report, Sproule)
17 prospective leads so far Largest lead 128 mmbbl unrisked Management estimates significantly higher
Block 2B
Lead Summary
439 km 2D seismic program completed March 13 FTG survey completed April 13 Drilling anticipated mid 2014 End of Initial Exploration Period 1st June 2013 Two further extensions of 2 years each Development Licence for 25 years
Block 2B
Exploration Timeline
18
19
439 km of new 2D seismic, high-fold (560-fold), acquired January-March 2013 The New Block 2B seismic data is obviously clearer and easier to interpret Full pre-stack time migration processing completed only 2 weeks after acquisition
20
12,173 km block-wide FTG gravity survey completed April 2013 Line spacing : 500m x 2000m to 2000m x 6000m Survey results already revealing additional information of the detailed structure of Block 2B; E.g. the previously unrecognised rugosity of the basin bounding Lagh-Bogal fault, which helps to create the roll-over structures in the string of pearls along the basin margin
21
Scale & Prospectivity Comparison of Block 2B & Blocks 10BB/13T (Twiga / Ngamia Discoveries)
22
Comparison of String of Pearls Plays in Block 2B & Block 13T (Twiga discovery)
Block 2B Anza Basin Miocene Basin Stratigraphy
23
Comparable scale examples of the Twiga discovery structure and similar structures in Block 2B Both blocks contain string of pearls plays in Miocene age basins
Comparison of String of Pearls Plays in Block 2B & Block 10BB (Ngamia discovery)
Block 2B Anza Basin Miocene Basin Stratigraphy
24
Comparable scale examples of the Ngamia discovery structure and similar structures in Block 2B Both blocks contain string of pearls plays in Miocene age basins
Comparison of String of Pearls Plays in Block 2B & South Omo Block (Sabisa discovery)
Block 2B Anza Basin Miocene Basin Stratigraphy
25
Comparable scale examples of the Sabisa discovery structure and similar structures in Block 2B Both blocks contain string of pearls plays in Miocene age basins
Comparison of Tilted Fault-Block Plays in Block 2B & Block 10BB (Etuko Prospect)
Block 2B Anza Basin Miocene Basin Stratigraphy
26
Comparable scale examples of the Etuko prospect and similar structures in Block 2B Both blocks contain Tilted Fault Block plays in Miocene age basins
Older Exploration wells did not test the plays. Deviated drilling is required
20 15 10 5 0
27
Block 1
Taipan 20% Area 22,247 km2 First Additional Exploration Period
Block 1 Summary
20% working interest, 22,247 km2 Acreage
Block 1, 22,247 km2, 20% working interest, Afren 80%, operator. Afren carried Taipan through $12 million of a 1,900 km seismic program Basin is the southward extension of the hydrocarbon-proven Ogaden Basin. Karoo, Jurassic & Cretaceous plays Surrounded by oil seeps/discoveries Genale oil seep, El Kuran oil discovery (72); Tarbaj oil seep Afren has reported gross unrisked prospective resources 715 mmbbl (Net to Taipan = 143 mmbbl) Gravity and magnetic data acquired 1,900 km 2D seismic acquisition program complete Seismic interpretation on-going New Age to drill El Kuran-3 in 2013 estimated 45 days prospect P50 1.3 BBO Drilling anticipated 2014 Seismic Base-camp
Genale Oil Seep
28
Wells & Seismic Map
El Kuran Oil Discovery (1972) Well to be spudded June 2013
Ramu
Tarbaj-2
km
100
29
Exploration Plays
30
Conclusions
31
Taipan Resources Inc. through its 100% subsidiary, Lion Petroleum Corp has completed the three year exploration work program on Block 2B in 8 months without incident and within budget The Sabisa well proves up that three Tertiary basins in the region can produce oil. We believe that the Anza Tertiary Basin will be the next The certified resource estimate on Block 2B is 387 million barrels unrisked prospective resources. Management estimate post new seismic and FTG is likely to be significantly higher Regarding the farm-out, although this has taken longer we are receiving significant interest in the block. Management believes that an agreement will be concluded shortly Africa Oil plans to drill 1 well on block 9 which is contiguous to block 2B in 2013. Three other commitment wells expected to be drilled in 2013/14 Company is set to enter the First Additional Exploration Period (2 years) and plans to drill an exploration well on Block 2B in mid 2014
Share Structure
As at 28th April 2013
32
84,699,363 53,953,886
6,300,000 144,953,249
Disclaimer
This presentation does not constitute or form part of any offer for sale or solicitation of any offer to buy or subscribe for any securities in Taipan Resources Inc., nor shall it or any part of it form the basis of or be relied on in connection with or act as any inducement to enter into any contract or commitment whatsoever. No reliance may be placed for any purpose whatsoever on the information or opinions contained in this presentation or on any other document or oral statement or on the completeness accuracy or fairness of any such information and/or opinions. No undertaking, representation, warranty or other assurance express or implied is made or given by or on behalf of Taipan Resources Inc. or any of its directors, employees or advisors, as to the accuracy or completeness of the information or opinions contained in this presentation and, save in the case of fraud, no responsibility or liability is accepted by any of them for any such information or opinions or for any errors, omissions, misstatements, negligence or otherwise contained or referred to in this presentation. This presentation includes "forward-looking statements" including forecasts, estimates, expectations and objectives relating to the Companys exploration activities in Africa that are subject to a number of assumptions, risks and uncertainties, many of which are beyond the control of the Company. Statements regarding future exploration activities, financings and capital expenditures are subject to all of the risks and uncertainties normally incident to the exploration for and development and production of oil and gas. Investors are cautioned that any such statements are not guarantees of future performance and that actual results or developments may differ materially from those projected in the forwardlooking statements. Such forward-looking information represents management's best judgment based on information currently available. No forward-looking statement can be guaranteed and actual future results may vary materially. The Company does not assume the obligation to update any forward-looking statement except as required by applicable law.
33
Contact Information
Max Birley, CEO
+254 70564 3745 (Kenya) +1 830 998 2252 (USA) mbirley@taipanresources.com
Edward Blunt
+44 (0)1491 835 550 (UK) +44 (0)772 070 7591 (UK) edward.blunt@pdf.ltd.uk
34
2013-04-25_TPN_CorpPres_V13.0
35
Uganda
36
Block 2B is located in an area with a very low population Most active areas are along roads and in areas of major population Security breaches do occur, however they are relatively low in frequency Security uncertainties are mitigated by armed Administration Police and Community relations work
Location of Block 2B
37
Contractor Share % 45 40 37 32 22
38
39