EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-119 1 May 2013 30 April 2013 08.00-22.00


21.00 S 22.00 S 23.00

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 S 9.00 S 10.00 S Symbols Yesterday = 11.00 S 12.00 S 13.00 S Cloudy (C), 14.00 S 15.00 S 16.00 S 17.00 S 18.00 S

Working Date Working Time


19.00 S 20.00 S

24.00

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours

No.

Description

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 9 Griding M/C 4" Griding M/C 7" Activities (Yesterday) Installation Structure For 03E015 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Install Platform For 03D020 & 03D030 Install Structure & Equipment For 04E014 Install New Foundation Support Pipe Welding Pipe 304H 36" & 40" Shop Fabrication Steel Structure Area 03A 03B 03B 03B 04 05 Shop Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Set Set Set Set Set Set Joint Kg. Q'ty 5 12 9 Q'ty 1 1 1 1 1 1 3 2 7608 No Activities No. 4 5 6 No. Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Area Unit Q'ty No. 1 2 3 4 5 6 7 8 9 10 11 12 Activities (Tomorrow) Modify Grating For 02E003A Remove Scaffolding For Trim Cooler Installation Structure For 03E015 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Install Platform For 03D020 & 03D030 Fit-up and welding Pipe 66" Install Steel Structure For 04E014 Install New Foundation Support Pipe Welding Pipe 304H 36" & 40" Area 02 03A 03A 03B 03B 03B 03B 04 05 Shop Unit Set Set Set Set Set Set Set Set Joint Set Set Joint Q'ty 1 1 1 1 1 1 1 3 1 1 3 2 Centering & Leveling Equipment For 02E003A 02 Fit-up and Welding Pipe Fire Sub MCC. OSBL 3 3 8 3 1 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 7 7 22 16 10 2 9 4 56 56 176 128 80 16 72 32 24 24 64 24 8 3 2 8 3 1 4 7 5 17 15 10 2 25 19 51 45 30 8 12 11 6 24 9 5 7 7 22 16 10 2 9 4 3 3 8 3 1 114 81 75 227 173 110 24 72 44 35 30 88 33 13 1,201 Description 2 2 2 4 Indirect 1 1 4 1 1 1 8 8 32 8 8 8 16 16 16 32 3 2 1 1 3 1 1 3 9 3 3 8 5 13 1 1 4 1 1 1 2 2 2 4 8 11 41 11 11 8 24 21 16 45 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 4 3 1 No. 7 8 9 Crane 50T. Crane 500T. Trailer Description Unit ea ea ea Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct Q'ty 1 Indirect -

EQUIPMENT AND MACHINERY REPORT

Grouting Pump Step 2 For 03P020A/B/C 03B

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /