Anda di halaman 1dari 39

TRAININGMANUAL

Vol.III:BALANCEofPLANT

NEWBONGESCAPE 400VACSwitchgear(3.6) Oct.2012

NewBongEscape BalanceofPlant
400VACSwitchgear

Contents
1.GeneralIntroduction 2.MajorTechnicalData 3.Design 4.OutlineDrawingandInstallation 5.Operation 6.InspectionandMaintenance

NewBongEscape BalanceofPlant
400VACSwitchgear

Notes: Whileoperatingelectricaldevicestherearesomepartsundercurrent.Onlystaffwho hasreceivedrelevanttrainingandwhichisfamiliarwiththesafelydefinitionof electricaldevicescanexecutesuchworkasinstallation,trying,maintainsand modification


.

NewBongEscape BalanceofPlant
400VACSwitchgear

1. General Introduction

NewBongEscape BalanceofPlant
400VACSwitchgear

GeneralIntroduction
The400VACstationsupplysystemshallbeprovidedwith400VACdistributionboardssuppliedfrom4 (four)setsof11kVgeneratorswitchgearthrough2(two)setsof 11000/400Vdrytypeauxiliary transformerseachof1600kVAaspertheloadcalculationoftheplant.Thesystemshallalsobesupplied fromonesetofdieselgeneratorofsufficientcapacityincaseofblackoutandblackstart. Thesystemshallbemadeofnonessentialbusandessentialbusconnectedbyabustiebreaker.The nonessentialbuswithmainbus1shallsupplytononessentialloadsandunitauxiliaryloads,whilethe essentialbuswithmainbus2shallsupplytoessentialloadsandunitauxiliaryloadsasbackuptomain bus1. Themain400VACdistributionboardsshallbeinstalledindoorin theauxiliaryelectricalroomat elevation245mondownstreamsideofthepowerhouse.

NewBongEscape BalanceofPlant
400VACSwitchgear

Structure
TheframeisconsistsofsquaresteelstubeswithYsectionconnectedbyrivets.

NewBongEscape BalanceofPlant
400VACSwitchgear

Structure
Theframebaseoflowvoltagecabinetisconsistsoffoursquaresteeltubes.Itcaninstallonthetrough directly.Thecabinetisassembledwithparts,suchasdoors,rearplates,sideplates,partitions,supports, busbars,functionalunit.Thedimensionsofpartsandpartitions aremodular.

NewBongEscape BalanceofPlant
400VACSwitchgear

Structure
Therespartitionbetweeneverypanelormainbusbarandunits.Passagewaysofcablesaresealed.The equipmentscanensurethatforfaultsineverycircuit,changethebreakersandcomponents,inspectand repairthecableswithoutswitchingoffmainbusbar.

NewBongEscape BalanceofPlant
400VACSwitchgear

Structure
Forthecabinet,thecablescancomeinfromtoporbottom.Insidethecabinet,thereshorizontalcable ductandverticalcableduct.Theyarecompletelyseparatedwith horizontalbusbar.Theverticalcable ductisfromhorizontalcableductontoptothehorizontalcableductonbottom.

NewBongEscape BalanceofPlant
400VACSwitchgear

Structure
ThematerialofmainplugincontactsisBe Cualloy.Theyaremadeofmultiplesprungsilverlamination andconnectwithCdropperbars.Be Cualloyhastheabilitiesofresistpressureandflexibility.Multiple sprungsilverlaminationhasconductivity.Andtheyaugmenttheinterfacebetweencontactsand dropperbar.Theproblemforthelifeofcontact:themainplugincontacts,whicharemadeofBe Cu alloyandmultiplesprungsilverlamination,arealwayspressed. Insomecompressingdistance,thelifeof maincontactscanbeincreased.

NewBongEscape BalanceofPlant
400VACSwitchgear

Structure
Inthelowvoltagecabinet,themainbusbaranddropperbarareCcopper.

NewBongEscape BalanceofPlant
400VACSwitchgear

400VACSwitchgearPictures

PhysicalPicture

NewBongEscape BalanceofPlant
400VACSwitchgear

2. Major Technical Data

NewBongEscape BalanceofPlant
400VACSwitchgear

SystemParameter:

Detail information refer to the specification NBE-207-02-001_R1

NewBongEscape BalanceofPlant
400VACSwitchgear

3. Design

NewBongEscape BalanceofPlant
400VACSwitchgear

Design
The400Vlowvoltagedistributionboardsshallbedesigned,manufacturedandtestedinaccordancewithIEC 60439andIEC60529. Thedevicesprovidedwiththeswitchgearassembliesshallincludelowvoltagepoweraircircuitbreakers, molded casecircuitbreakers,busbar,currenttransformers,voltagetransformers,meters,indicationlamps, relays,controlelementsandassociatedwiringandtestblocks. Lowvoltagepoweraircircuitbreakersshallbe3poleelectricallyandmechanicallytripfreedrawouttype andshallbecompletedwithinterpolebarriersforeliminatingallfaultcommunication,arcquenchers, manualandelectricalstoredenergyoperatingmechanism,mechanicalpositionindicator,andshallbe mountedonadrawoutmechanisminthebreakercompartment. Allmolded casecircuitbreakersshallbelocalmanualoperatedfixedtype andshallhavethermaland magnetictrippingdevices. Theremoteelectricallyoperatedcircuitbreakersshallbeequippedwithpushbuttonsforlocalcontrol,anda Local Remote selectorswitch.Allelectricallyoperatedcircuitbreakersshallbeprovidedwithsufficient numberofauxiliarycontactsforoperation,control,interlockingandlocal/remoteindication.

NewBongEscape BalanceofPlant
400VACSwitchgear

Design

NewBongEscape BalanceofPlant
400VACSwitchgear

4. Outline Drawing and Installation

NewBongEscape BalanceofPlant
400VACSwitchgear

OutlineDrawing

Detail information refer to drawing NBE-207-03-023_R2

NewBongEscape BalanceofPlant
400VACSwitchgear

GeneralInstallationRequirement:
Regulatethefirstcabinets/transportationunit. Installthenextcabinetaccordingtothearrangeorder,andconnecttheframeofcabinettillthe arrangementisended. Cleantheconnectionareaofmaincircuitandconnectthemaincircuitandaux.circuit. Installcablestofeedcabinets(payattentiontotorque). Connectearthingpointofcabinetstooverallearthingsystem. Duringtheaboveprocessbesurethatconnectionspointsofmain circuits/transportationisolatedpoints mustreachthetightentorque. Eachblockof400VACcabinetshallbeearthedatleastwith2points Afterinstallationfinished,cleanthelocationandthematerialswhichareinsidethecabinets.Alsocleanthe partswhichareirrelevantfortherunningofthecabinetssuchastools,packingmaterial,conductions. Lockthedoor

NewBongEscape BalanceofPlant
400VACSwitchgear

GeneralInstallationMethodontheGround(recommend)
Whentheincomingunitisfrombottom,thecableslotisrequiredontheground. Cabinetsshouldbeinstalledonthepedestalwhichisembeddedintheconcreteground.Thehorizontalerrorof thepedestalis1mm/permeter. Cabinetsshouldbeconnectedwiththepedestal(withweldingorscrews).Thegroundingisreliable. Thelengthofweldinglineinfrontandbackofeverycabinetis 20mm.Allweldinglineshouldbecoatedwith antisepsis. Whenfixingcabinetsonthepedestal(withweldingorscrews),Thehorizontalerrorofthepedestalis 1mm/permeter.Thegroundingisreliable.Allweldinglinesarecoatedwithantisepsis.Toensurethe bendingradiusofcablesandenoughspace,suggesttheminheightofcablechannelis500mm.

NewBongEscape BalanceofPlant
400VACSwitchgear

TheSketchMapforInstallingBLTS

NewBongEscape BalanceofPlant
400VACSwitchgear

TheSketchMapforConnectionBetweenCabinets

NewBongEscape BalanceofPlant
400VACSwitchgear

TheSketchMapforConnectingBusbarBetweenCabinets

NewBongEscape BalanceofPlant
400VACSwitchgear

CableConnection

The sketch map of connection for control busbar between cabinets

NewBongEscape BalanceofPlant
400VACSwitchgear

CableConnection

The sketch map of direct connection for breakers and loading components

The sketch map for connection without holes between cables and C-copper

NewBongEscape BalanceofPlant
400VACSwitchgear

5. Operation

NewBongEscape BalanceofPlant
400VACSwitchgear

AdditionalInspectionBeforeFirstEnergizing
CleanUptheCabinets Cleanupinsideequipments(includingtopplate,bottomplateandeachpartitionunit) Cleanupcomponents InspectCircuitBreaker whetherallbreakersareswitchedOFF,includingloadingbreakersinmaincircuit,controlpowerswitchesin controlcircuit,andincomingbreakersareindisconnectionposition. ProtectionValueSetupofLoadingSwitches Accordingtodesigninstitute.Setuptheprotectionvalueofallloadingswitches,includingoverloadtripping, shortcircuittripping,groundingprotection,delayandsoon. InsulationInspection Thissystemshouldhavenecessaryisolation:systemvoltage is500V,use500megohmmeter;system voltageis500V,use1000meohmmeter.Calibratetheinstrumentswithzerobeforeoperation.

NewBongEscape BalanceofPlant
400VACSwitchgear

InspectinIncomingUnit
Inspect the type of breakers. Copper connection of breaker. Inspect whether degree of protection (distance between phases, creepage,distance, arc distance) meets requirements. Inspect the action property of breaker (switch on and off 5 times). Inspect whether mechanical interlock system is reliable. Inspect whether control circuit.

InspectinFeederUnit
Inspect whether components meet requirements. Internal interlock of mechanical and electrical parts whether is reliable. Inspect whether panel can be operated normally (including contacting property of insert parts). Inspect whether electrical and mechanical interlock are reliable. Inspect action property in control circuit and main components (switch on and off 5 times).

NewBongEscape BalanceofPlant
400VACSwitchgear

FirstEnergizing
Afterenergizinghighvoltage,iftheresconnectioncabinet,thebreakerinconnectioncabinetshouldbein disconnectposition.Theninspectwhetherthethreephasesvoltageoflowvoltageoftransformerisok.If itsok,andtherescontrolpower Breaker,opendoorofcabinetandswitchoncontrolpowerbreaker.Here,observewhethertheindicator lightersareok.Afterconfirmingtheyareok,operateincomingcircuitbreaker.Firstoperatetheincoming breakertotestposition,switchonandoffonetime.Ifitsok,directlyoperatethebreakertoconnect position(seepicture6.2.2.1).Switchonincomingcircuitbreaker. Makerecordsforallinstrumentsindifferenttimeaccordingtoloading. Thebreakerinconnectioncabinetshouldkeepthesamephasesequence.

Sketch map for handing in and out breaker

NewBongEscape BalanceofPlant
400VACSwitchgear

Eliminatethegeneralfaults
When having faults, you must take the emergency step at the first time on site. Record the phenomenon. Thegeneralfaultscanbeeliminatedasfollowingsteps:
No. Fault Possible reason There is no control voltage. 1 Solution Switch on control power breaker. Adjust or replace the voltage inspector Check the wiring or replace the coil. Reset the overload/short setting value Eliminate loading faults. Increase the switchs capacity Stop the power supply and tighten the connection points. Use again when having more loading.

Main circuit breaker can not switch on

Voltage inspector does not work. Under voltage release has not been energized/ damaged. The setting value of overload/short is too low.

Feeder circuit breaker is tripping.

Load or its wiring has mistake. The breakers capacity is too small.

3 4 5

Theres fog/ taste. Capacitor unit cabinet does not work. Faults of other components

Connection area of conductor didnt tighten. No load and the current is too small. See manuals of components for other faults. See manuals of components

NewBongEscape BalanceofPlant
400VACSwitchgear

EnergizingLoadBreakers
ACB in Fixed Unit Cabinets

Infixedunitcabinet,energizingmethodofACBisthesamewith incomingunitcabinet.Butbefore energizing,inspecttheisolationforloadingcables.Iftheisolationofcablesisnoproblem,operatethe breakeraccordingtoabovementionedsteps.

NewBongEscape BalanceofPlant
400VACSwitchgear
Adjust the Protective Value of Breaker NZM2

PKZ2

NZM2

NewBongEscape BalanceofPlant
400VACSwitchgear
Give Operating Power Control operating power is the main factor to start up circuits. Therefore, before energizing, give working power in time for all loads in loading circuit. State of Normal Running When normal running, it should be light for the white indicator lights of control bar. When normal running, all doors of cabinets should be closed and each panel are in connection position. Operating handle of panel is in I.

NewBongEscape BalanceofPlant
400VACSwitchgear
Monitoring Item of Normal Running

Voltageofthreephaseswhetherisnormalbyobservingvoltagemeter.Ifthererecurrentmetersinthe circuit,pleaseinspectthecurrentduringrunning.Ifitsnecessary,pleaseinstallthetongtestammeterto inspectthebalanceofthreephases.Ifitsdigitalfunctionalmeter,onlyoperatefunctionalkeystolook the current,voltage,powerandsoon


Monitoring Item of Equipments for Stopping Running

Whenstoppingrunning,theindicatorlightOFF ison.The handleofbreakerisino position.Switchoff thebreaker.

NewBongEscape BalanceofPlant
400VACSwitchgear

6.Maintenance
MaintenanceinRunning
Iftheequipmentshaveproblemsduringrunning,ortermmaintenanceandinspection,cutpowerfor runningequipment.Afterfinishingmaintenance,givepoweragain.
The following points should be attended.

Inspectthoroughlyforthismaintenance.Theinspectionwhetherperfectreally. Inspectthesiteofmaintenance,mainincomingcircuitbreakermustinconnectionposition.Powerstorageof breakerisok. Beforestartinguprunningagain,itmustbeensuredthatallbreakerloadhasntfaults.Theisolationofcables is10M.Energizingbreakeriscorrespondingwithcableload. Resumetostartupreferringtotherequirementsinfirsttime.

MaintenancePeriod
Suggest:newrunningequipmentsaremaintainedoneyear.Later,maintainonceevery2to5years.(Depend onenvironmentoraskmanufacture.)

NewBongEscape BalanceofPlant
400VACSwitchgear StepsforMaintenance
1.Maintenancepersonshouldbetheprofessionalelectricianwhoistrained.Faultsshouldberecorded. 2.Checkindicatorlightswithpower. 3.Switchoffmainpower(includinghighvoltagepart),auxiliarypowerandcontrolpower,checkitandsure thereisnopowerandconnectmaincircuittoground 4.Openallcabinetdoorsandcheckmaincircuitconnection points torque,meanwhilecheckwhetherthere isbreakdowncausedbyoverload 5.Carbonizationhasappearedcheckandmaintenancetherelevantpartsandchangethedamagedparts. Ifthecolorhaschangedbutitstillhasglosstightenthetorque. 6.Checkwhetherthereisuncommonphenomenon,ifthereispleasechecktherelevantconductorofmain plugandchangedamagedpartsAttention:mainplugofwithdrawablecomponentsandcannotattach object,plugscanbeusedagainaftertheywerecleanedandpaintedVaseline) 7.Cleantheinsideofcabinetwithbrushandcloth(ifthereiscontrolwiringdropped,tightenitagain) Cleantheoutsideofcabinets(solventisnotpermitted)

NewBongEscape BalanceofPlant
400VACSwitchgear Itemsbefore/aftermaintenance
Before Maintenance

MaintenanceworkcannotdowithpowerON. MainandauxiliarypowerrelevantwiringsmustbeswitchOFF. WithdrawablepartsandcomponentsmustbesettoOFF position. Verifythereisnopower. Shortandgroundconnectionprotectionmustbedone.


After Maintenance

Toolscannotleaveincabinets. Disconnectprotectiveactions Checkisolationandmakearecord. Takeawaylockingdevices Placewithdrawablepartstoconnectionposition Supplythepower

NewBongEscape BalanceofPlant
400VACSwitchgear

THANKYOUFORATTENTION!