EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-147 29 May 2013 28 May 2013 8.00-22.00


21.00 S 22.00 S 23.00

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 C 9.00 C 10.00 C Symbols Yesterday = 11.00 S 12.00 S 13.00 S Cloudy (C), 14.00 S 15.00 S 16.00 S 17.00 S 18.00 S

Working Date Working Time


19.00 S 20.00 S

24.00

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours

No.

Description

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 9 10 11 Grinding M/C 4" Grinding M/C 7" Activities (Yesterday) Install Stair Trim Cooler 03E006A Install Scaffolding For 03R003 Install Steel Structure For 03R003 Fit-up and welding Pipe 304H 28" Fit-up and welding Expension Joint 66" Chipping Fireproof Reactor 03R001 Re-Install Pump 04P001 Finishing Foundation For Chiller 05X007 Fit-up and welding Hopper Fit-up and welding Pipe 24" 304H Fit-up and welding Pipe 36" 800HT Area 03A 03B 03B 03B 03B 03B 04 05 Shop Shop Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Set Set Joint Set Set Set Set Set Joint Joint Q'ty 8 16 12 Q'ty 1 1 1 1 1 1 1 1 2 1 2 No. 4 5 6 No. 1 2 3 4 5 6 7 8 9 10 11 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Install Fire Proof Structure 02E003A Install Stair Trim Cooler 03E006A Install Insulation For Trim Cooler 03E006A Install Fire Proof Structure 03D020 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Fit-up and welding Pipe 304H 28" Fit-up and welding Expension Joint 66" Chipping Fireproof Reactor 03R001 Re-Install Pump 04P001 Fit-up and welding Hopper Fit-up and welding Pipe 36" 800HT Area 02 03A 03A 03B 03B 03B 03B 03B 03B 04 Shop Shop Unit Set Set Set Set Set Set Joint Set Set Set Set Joint Q'ty 1 1 1 1 1 1 1 1 1 1 2 2 No. 1 2 3 4 5 6 7 8 9 10 11 Activities (Tomorrow) Install Stair Trim Cooler 03E006A Install Fire Proof Structure 03D020 Install Scaffolding For 03R003 Install Steel Structure For 03R003 Fit-up and welding Pipe 304H 28" Chipping Fireproof Reactor 03R001 Install Steel Structure For 04E014 Fit-up and welding Hopper Fit-up and welding Pipe 36" 800HT Area 03A 03B 03B 03B 03B 03B 04 Shop Shop Unit Set Set Set Set Set Joint Set Set Set Set Joint Q'ty 1 1 1 1 1 1 1 1 1 2 2 3 3 6 13 2 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 10 11 45 22 13 2 12 5 80 88 360 176 104 16 96 40 24 24 48 104 16 3 2 6 3 2 10 11 40 20 8 2 10 5 30 33 120 76 24 6 30 17 9 6 18 9 6 10 11 45 22 13 2 12 5 3 3 6 13 2 169 110 121 480 252 128 22 126 57 33 30 66 113 22 1,787 Description 2 3 2 5 Indirect 1 1 4 2 1 1 8 8 32 16 8 8 16 24 16 40 2 2 1 4 1 4 2 1 3 12 6 3 6 6 3 12 1 1 4 2 1 1 2 3 2 5 8 11 44 22 11 8 22 30 19 52 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 4 4 1 No. 7 8 9 Crane 70T. Crane 25T. Trailer Description Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 10 14 42 22 13 2 12 5 6 2 3 7 14 2 80 112 336 176 104 16 96 40 48 16 24 56 112 16 10 14 42 22 13 2 12 5 6 2 3 7 14 2 176 Unit ea ea ea 80 112 336 176 104 16 96 40 48 16 24 56 112 16 1,408 Q'ty 1 2 3 2 5 Indirect 1 1 4 2 1 1 8 8 32 16 8 8 16 24 16 40 1 1 4 2 1 1 2 3 2 5 8 8 32 16 8 8 16 24 16 40

EQUIPMENT AND MACHINERY REPORT

Install Insulation For Trim Cooler 03E006A 03A

Fit-up and welding Expension Joint 66" 03B

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /