Anda di halaman 1dari 6

#13-29, 2694 Street, Gimhaedae-ro, Gimhae-city, Gyeongnam, Korea Tel : +82-70-7817-1775 Fax: +82-303-3130-1775 E-mail : mti@mti21.com http://www.mti21.

com

Global Vision 2012

SALES REFERENCE LIST for Shipbuilding Equipment


-. Hull Shop Equipment -. Shiplift & Transfer system -. Shipyard Consulting

MTi Co., Ltd.


1/6

#13-29, 2694 Street, Gimhaedae-ro, Gimhae-city, Gyeongnam, Korea Tel : +82-70-7817-1775 Fax: +82-303-3130-1775 E-mail : mti@mti21.com http://www.mti21.com

No.

Buyer

Name of Project Ship transfer system

Hanjin Shipyard

Supplied equipment Name of equipment Ship Transfer system: 20,000ton -. Hyd transfer car / 200ton -. 18 x500ton-idle car -. 22 x 500ton-self moving car Skid conveyor / 1500ton

QTY

Supplied year 2002/2

Remark

1 lot

Samsung Heavy Industries Daewoo Shipbuilding (3D shop)

Panel Fabrication Line

6 set

2002/7

Panel Fabrication Line

Hyd Transport car / 800ton Longi welding M/C / 24 pole Hyd Transport car / 400ton Chain conveyor / 1200ton Idle roller Self drive Winch / 10ton Longi fit-up M/C Swivel roller Up-down roller Hyd Transport car / 400ton/200ton Plate fit-up M/C Chain conveyor Longi fit-up M/C Longi welding M/C/24pole Idle roller Swivel roller Self drive Working beam Winch / 10ton
2/6

2 set 1 set 2 sets 4 sets 1 lot 1 lot 6 set 1 set 1 lot 1 lot 3 sets 1 set 3 sets 1 set 1 set 1 lot 1 lot 1 lot 1 lot 6 sets

2003/5

Samsung Heavy Industries (new factory)

Panel Fabrication Line

2004/4

Hyundai Samho Heavy Industries (Mokpo, Hanla Gr.)

Panel Fabrication Line

200411

#13-29, 2694 Street, Gimhaedae-ro, Gimhae-city, Gyeongnam, Korea Tel : +82-70-7817-1775 Fax: +82-303-3130-1775 E-mail : mti@mti21.com http://www.mti21.com

No.

Buyer

Supplied equipment Name of Project Name of equipment Up down idle roller Working table Chain conveyor Plate fit-up M/C Self drive Idle roller Longi welding M/C /16pole Block lifter / 400ton Winch / 5ton Pin jig Chain conveyor Idle roller Self drive Swivel roller Up-down roller Chain conveyor Idle roller Self drive Swivel roller T-bar Fabrication line Turn over M/C T-bar Fabrication line

QTY 2 lot 2 lot 4 sets 2 sets 2 lot 2 lot 2 sets 2 sets 4 sets 1 lot 6 sets 1 lot 1 lot 11 lot 1 lot 2 sets 1 lot 1 lot 1 lot 1 lot 1 set 1 set

Supplied year

Remark

STX Shipbuilding

Panel Fabrication Line

2005/3

Hyundai Shipbuilding (new factory)

Panel Fabrication Line

2006/2

Hyundai Mipo Dockyard

Panel Fabrication Line

2007/4

Daewoo Shipbuilding

Panel Fabrication Line

2007/5

3/6

#13-29, 2694 Street, Gimhaedae-ro, Gimhae-city, Gyeongnam, Korea Tel : +82-70-7817-1775 Fax: +82-303-3130-1775 E-mail : mti@mti21.com http://www.mti21.com

No.

Buyer

Supplied equipment Name of Project Name of equipment Consulting of new shipyard engineering & planning - Annual 2,500K DWT - Ship size: 170K~318K DWT - Dry dock Supply of Hull shop equipment -. Panel & Block Fabrication Line- 4 bays -. Curved Block Fabrication Equipment- 2 bays -. T-bar Fabrication Line- 2 bays -. Sub assembly welding gantry, etc Ship transfer and launching system - Ship size: 45K dwt - Ship transfer system: 36 x 500ton - Floating dock: 22,000 ton Panel & Block Fabrication Line: 30W x 482L m - 4 Bay T-bar fabrication line 2 bay Sub assembly line and welding gantry full set Shipyard reconstruction (7K DWG) - Shipyard layout - Ship Transfer system - Slipway Launching system

QTY

Supplied year

Remark

10

Dung Quat Shipyard Vietnam

New shipyard Consulting & Supply of Hull shop equipment

1 Lot

2007/12

11

Mokpo Shipyard

Supplying of Ship transfer & Launching system

1 Lot

2008/1

12

STX (Dalian) Heavy Industry Co., Ltd.

Panel & Block Fabrication Lines

4 Lines

2008/3

13

Pella Shipyard Russia

Shipyard revamping

1 Lot

2008/5

4/6

#13-29, 2694 Street, Gimhaedae-ro, Gimhae-city, Gyeongnam, Korea Tel : +82-70-7817-1775 Fax: +82-303-3130-1775 E-mail : mti@mti21.com http://www.mti21.com

No.

Buyer

Supplied equipment Name of Project Name of equipment Consulting of new shipyard engineering & planning - Production capacity: 5 ships/year - Ship size: 45K B/C - Dry dock: 120W x 360L m - Annual steel throughput: 50,050 ton/year - Steel stock area: 30 x 160 3bay - Hull shop: 40 x 380 4bay - Piping/Machine shop/Ware house: 30 x 160 3bay - Shot blast/Paint shop: 50 x 190 - Outfitting area: 100 x 250 - PE area: 120 x 170 + 50 x 360 - Offshore module area: 130 x 300 - Quay: 400 + 870 Supply of Hull shop equipment full line

QTY

Supplied year

Remark

14

Estaleiro Manu Shipyard Brazil

Shipyard consulting

1 Lot

2008/6

15

HHIC, Subic Shipyard, Philippines

Panel & Block Fabrication Lines

28W x 400L, m 4bay

1 Lot

2008/12

16

STX (Dalian) Marine Engineering Co., Ltd.

Panel & Block Fabrication Lines

Curved Block Fabrication line: 30W x 482L, m - 2 Bay Panel Joining Line, 280 m 1 Line

3 Lines

2009/3

5/6

#13-29, 2694 Street, Gimhaedae-ro, Gimhae-city, Gyeongnam, Korea Tel : +82-70-7817-1775 Fax: +82-303-3130-1775 E-mail : mti@mti21.com http://www.mti21.com

No.

Buyer C& Heavy Industrial Co., Ltd.

Supplied equipment Name of Project Panel & Block Fabrication Lines Name of equipment Full line assembly x 1 Bay

QTY

Supplied year 2009/9

Remark

17

1 Line

18

SPP Shipbuilding Co.

Floating dock & Ship transfer system

Ship transfer system: 60 x 500ton Floating dock: 35,000 ton Mooring devices, Trestles, etc Shiplift Assy: - Lifting capacity: 9800 ton (350 ton x 28) - Size: 30W x 100L x 11 Draft, m - 6 x ground birth Transfer car: 9600 ton (400ton x 24) Traverse car: 55Kw x 2 with gear box Consulting of new shipyard engineering & planning - Annual steel throughput: 24K ton - Ship size: 10K B/C Shiplift: 120L x 25W x 8,000ton Ship transfer system: 18 x 500ton Consulting of new shipyard engineering & planning - Annual steel throughput: 20K ton - Ship size: 20K B/C - New ship and repair ship Supplying of Shiplift and transfer system: - Shiplift: 120L x 25W x 8,000ton - Ship transfer system: 18 x 500ton

1 Set each

2009/10

19

Oceana Shipyard, Brazil

Shiplift and Transfer system

1 Lot

2012/07

20

Turkmenbashi Shipyard Turkmenistan

Shipyard consulting & supplying of shiplift and transfer system

1 Lot

2012/03~

Under progress

21

Umm Qasr Shipyard, Iraq

New shipyard consulting & supplying of shiplift and transfer system

1 Lot

2012/10~

Under progress

6/6

Anda mungkin juga menyukai