PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS

(CL02) ITEM Soil investigation The contractor shall implemented of exploratory drilling and mechanical test in all types of soil with on site testing and the issuance of the final report which contain the test results and recommendations of the foundation work. 01 Research and treatment for cavities Implementation through a perforating exploratory(cavity probing) In all types of rock to determined the horizontal and vertical elongation of cavities, the contractor will be responsible for treatment all cavities By injection and treatment for all cavities and voids of rock with all necessary work accordance with the technical specifications and instructions of the Supervising engineer SITE DEVELOPMENT The bidder is advised to visit the site before quoting the rates in order to get himself familiarized with the present site conditions Site clearance and demolitions 02 Demolish and clear away existing structures, pavings, electrical lighting, pavements or upstands, cut and plug or reroute existing service lines or utilities inside property line, clear site of rubbish or any impediments, loose top soil and as deemed necessary, for the total site cluster number 2 (CL02) area, approximately (23360m2), subject to engineer approval and as coordinated with public pension agency as shown on drawing CL02- XC-01 Note DESCRIPTION QTY UNIT RATE AMOUNT SR

M3

Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

1 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM SITE GRADING Bulk excavate over site on unclassified ground including all hard and rock layers to reduced levels generally in cutting profiles the work shall include clear away to approved disposals. All additional excavation required for temporary works and spaces, shoring, dewatering, removal of surplus excavated materials, support, temporary spoil heaps and general compaction EXCAVATION AND EARTHWORK Necessary moving or transportation about the site excavation material including handling to temporary stockpile or ultimate disposal off site is to be included in the unit rate of excavation SITE PREPARATION AND GRADING 01 Excavation oversite on unclassified ground including all hard and rock layers (if any) to reduced levels generally in cutting profiles and forming depressions, falls and the like and clear away to approved disposal tip. Fill oversite with approved imported fill material according to site soil report recommendation including compaction in making up levels to required formations, embankments, contouring and the like as per drawings and spec. Note DESCRIPTION QTY UNIT RATE AMOUNT SR

Note

50

M3

02

2390

M3

Note
Work on proposed structural built-up areas from part of the Work pertaining to respective building or structure as measured elsewhere.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

2 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION PAVING AND SURFACING 01 Supply and install precast concrete shotblasted pavers (beige color) size 400x400x60mm thk. with photocatalytic titanium doxide coating including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, moisture barrier on compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no A1 on drawing CL02-XL301 to suit required locations as shown on drawing CL02-XL101 Supply and install precast concrete shotblasted pavers (beige, & brown color) size 400x400x60mm thk with photocatalytic titanium doxide coating including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. A5 on drawing CL02-XL301 to suit required locations as shown on drawing CL02-XL101 Supply and install precast concrete shotblasted pavers (beige, brown & grey color) size 400x400x60mm thk with photocatalytic titanium doxide coating including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. A6 on drawing CL02-XL301 to suit required locations as shown on drawing CL02-XL101 Supply and install precast concrete shotblasted pavers (beige & light beige color) size 400x400x60mm thk with photocatalytic titanium doxide coating ,w./grey color granite band size 200x200x30mm thk including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. B3 on drawing CL02-XL301 to suit required locations as shown on drawing CL02-XL101 Supply and install polished granite paving dark &light colors,size 400x400x30mm thk w.\ granite band dark color, size 200x200x30mm including 100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement, 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. C2 on drawing CL02-XL301 to suit required locations as shown on drawing CL02-XL101 To Collection QTY UNIT RATE AMOUNT SR

2900

M2

02

132

M2

03

36

M2

04

755

M2

05

512

M2

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

3 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION PAVING AND SURFACING 01 Supply and install concrete screed with epoxy coat finish including 100mm/50mm thick cast-in-place concrete slab with A193-WWF reinforcement mesh, polyethylene moisture barrier, compacted sub grade, 3mm water proofing membrane on R.C. slab as per detail no. D on drawing CL02-XL301 to suit required locations as shown on drawing CL02-XL101 Supply and install 50mm thk rubber pavement green, blue , brown & red color including adhesive mixture,100mm thick cast-in-place concrete slab with A193-WWF mesh reinforcement smooth finish, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. E4 on drawing CL02-XL301 to suit required locations as shown on drawing CL02-XL101 Supply and install asphalt paving comprising 80mm bituminous wearing course, bituminous prime coat, including granular base course, 3mm water proofing membrane on R.C. slab as per detail no. F on drawing CL02-XL301 to suit required locations as shown on drawing CL02-XL101 Supply and install cast in place concrete paving with A193-WWF mesh reinforcement, smooth finish light grey color, 100mm thick w.\ brick edge band size 200x200x60mm thick including 20mm thick cement mortar setting bed, polyethylene moisture barrier, compacted subgrade, 3mm water proofing membrane on R.C. slab as per detail no. G7 on drawing CL02-XL301 to suit required locations as shown on drawing CL02-XL101 EARTH MOUNT 05 Supply and formation of 500-1500 mm height earth mount including compacted sub base layer, 100 mmm thick layer of sand and gravel mix, and all required to complete and finish te work as shown on drawing CL02- XL101, and as per detail no. 5 on drawing CL02- XL302 and sections details on drawing CL02- XL303 (Softscape and planting soil mix are measured elsewhere)(area measured on plan) QTY UNIT RATE AMOUNT SR

5230

M2

02

259

M2

03

2130

M2

04

354

M2

775

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

4 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM CURBS AND EDGING 01 Supply and install precast concrete road curb, size 300X500X150 mm with exposed aggregate finish including bedding, haunching, cast in place concrete base and concrete grout behind curb, 20mm thick cement mortar setting bed, on R.C. slab as per detail no.1 on drawing CL02-XL302 to suit required locations as shown on drawing CL02-XL101 Supply and install precast concrete mowing edge, size 200X100X65 mm including concrete base, 20mm thick cement mortar setting bed, cast in place concrete base on R.C. slab, as per detail no. 2 on drawing CL02-XL302 to suit required locations as shown on drawing CL02-XL101 SUNDRIES TENSILE STRUCTURE 03 Supply and install tensile staructure comprising columns, tent fabric, foundation, earthwork, and all required to compleet and fix the work as shown on drawing CL02- XL101 and as per detail no. 6 on drawing CL02- XL302, and sections details on drawing CL02XL303 and as per manufacturer's recommendations and subject to engineer's approoval to cover an area of 125 m2 . Contractor shall submitt shop drawings for approval before supply DESCRIPTION QTY UNIT RATE AMOUNT SR

885

02

152

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

5 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM SITE SIGNAGE Manufacturer's standard outdoor sings, letters and plaques including fixings, finishes, accessories complete as per details on drawing CL02-XC-04, CL02-XC-05 and as per specifications REGULATORY SIGNS 01 Ref. type R5-1 ( ENTRY PROHIBTED ) INFORMATIVE SIGNS 02 03 04 Ref. type I-1 (PARKING) Ref. type I-2 (ENTRY ) Ref. type I-3 (EXIT ) Manufacturer's standard outdoor signs, letters and plaques, including fixings, accessories complete as per details on drawing CL02-XL-602 to suit required locations as shown on drawing CL02-XL-601 and as per specifications 05 06 07 08 Residential sign, as per detail (1) Directional sign, as per detail (2) Sports club building, as per detail (3) Sports club parking as per detail (4) DESCRIPTION QTY UNIT RATE AMOUNT SR

No.

7 7 6

No. No. No.

10 3 2 1

No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

6 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION ROAD SIGNAGE & PAVEMENTMARKING Thermoplastic paint for traffic marking on drive way at basement/ground floor and ramps floor as per Manufacturer's standard as shown on details on drawing CL02-XC-05, to suit required locations as shown on drawing CL02-XC-04, as per specification and as per engineer's instructions pavement marking 01 02 03 04 White edge line, ref. detail 2 Lane marking, as per detail (3) Dotted line marking (give way line), ref. detail 7 Through traffic arrow, ref. detail 9-1 QTY UNIT RATE AMOUNT SR

230 210 550 46

M M M No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

7 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION RAISED CONCRETE PLANTER Supply and install concrete raised planter with granite cladding, including (Softscape and planting soil mix are measured elsewhere), drainage layer, filter , membrane, sealant and all required to compleet and finish the work as per detail no. 3 on drawing CL02-XL302 01 Raised planter to suit required locations as shown on drawing CL02- XL101 RAISED CONCRETE PLANTER & WOODEN BENCH 02 Supply and install concrete raised planter with granite cladding, and wooden bench, 50x75 mm interior wooden rails,comprising concrete walls, reinforced concrete slab with A 193 W.W.F reinforcement mesh smooth finished, (Softscape and planting soil mix are measured elsewhere), drainage layer, filter membrane, water proofing membrane, protection board, sealant and all required to compleet and finish the work as per detail no.4 on drawing CL02- XL302, and sections details on drawing CL02XL303 to suit required locations as shown on drawing CL02- XL101 QTY UNIT RATE AMOUNT SR

205

M2

202

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

8 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM LANDSCAPING Palms including pit excavation, stakes and ties, soil planting mix, mulching, filter membrane and drainage layer all as details and planting schedule as per detail P1, on drawing CL02-XL-401 01 P/Wf Trees including pit excavation, stakes and ties, soil planting mix, mulching, filter membrane and drainage layer all as details and planting schedule as per detail P2 on drawing CL02-XL-401 02 03 04 05 T/Aa T/Af T/Po T/Tp Shrubs including planting, site excavation as required, soil planting mix, mulching, filter membrane, screed sloped to drain and drainage layer all as per details and planting schedule as per detail P3,P5, on drawing CL02-XL-401 06 07 08 09 10 11 12 S/Hs S/Iha S/lo S/Ld S/Ob S/Pav S/Mc DESCRIPTION QTY UNIT RATE AMOUNT SR

No.

2 12 4 8

No. No. No. No.

230 35 26 18 10 43 203

No. No. No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

9 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM LANDSCAPING Ground cover including planting, site excavation as required, soil planting mix, mulching, filter membrane, screed sloped to drain and drainage layer all as per details and planting schedule as per detail P3, on drawing CL02-XL-401 01 02 03 04 G/As G/Lm G/Ggp G/Gr (Y) Lawn planting, including soil planting mix, filter membrane and drainage layer, screed sloped to drain all as per details and planting schedule as per detail P4,P6 on drawing CL02-XL-401 05 L/Cd DESCRIPTION QTY UNIT RATE AMOUNT SR

574 723 1162 942

No. No. No. No.

2117

M2

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

10 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION PLUMBING INSTALLATION WASTE AND DRAINAGE INSTALLATION Supply, install and testing pipework, UPVC schedule 40, the work shall include but not limited to fittings, supports, cast iron pipes on roof for vent with caps, installation, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 02 03 75 mm dia. 100 mm dia. 150 mm dia. Accesssories 04 Ground cleanout 75 mm dia, ref. FCO Construction work for briks inspection chamber, the work shall include bit not limited to earth work, plain concrete for foundation BED, concrete channel at chamber DED with standard cast iron manhole frame and double cover and all materials and equipments required to complete and finish the work according to specifications, drawings and code of practice 05 Inspection chamber, ref. (WIC) 600x600mm WASTE AND DRAINAGE INSTALLATION Supply, installation and test drainage pipe work UPVC schedule 80 the work shall include but not limited to fittings, supports hangers, excavation, backfilling, cast iron pipes on roof for vent with caps and all materials and equipment required to complete and finish the work according to specifiactions, drawings and code of practice 06 100 mm dia 80 M 1 No 1 No 30 110 67 M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

11 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION Drainage installation to the external drainage network Construction work for briks inspection chamber, the work shall include bit not limited to earth work, plain concrete for foundation BED, concrete channel at chamber DED with standard cast iron manhole frame and double cover, UPVC pipework schedule 40 to nearest main sewer manhole and all materials and equipments required to complete and finish the work according to specifications, drawings and code of practice 01 02 Inspection chamber, ref. (IC) 600x600mm Slow down chamber 2 9 No No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

12 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION POTABLE WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for potable water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 02 75 mm dia. 100 mm dia. Supply, installation and test Packaged type constant pressure booster potable water pumps, set of one duty and one stand by pump, including piping and valving network within pump chamber, complete with all controllers, accessories for automatic operateion and all associate works as per code standard and as described on drawings and specification 03 04 Ref. PWP CAP 3.14 KW Ref. CP CAP 0.5 HP Reinforced concrete under ground water tank and pump room with proprietary cast iron manhole covers and frames the work shall include but not limited to earthworks, concrete works, sump pit, and submersible pump internal lining and water proofing, access ladders, pipework and valving, test main fold vent pipes, truck fill pipework with back flow preventer, ventilating fan and duct work within tank and pump room structure, and UPVC schedule 80 drainge pipe from submersible pump to the nearest sewer manhole and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 05 06 07 Potable water tank CAP 83 M3 Gray water tank CAP 25 M
3

QTY

UNIT

RATE

AMOUNT SR

55 10

M M

1 1

Set Set

1 1 1

No. No. No.

Potable water tank CAP 173 M3

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

13 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION POTABLE WATER SUPPLY SYSTEM Packaged type variable speed discharge pressure system Gray water lift pumps (one duty & one stand-by), including piping and valves network within pump chamber, complete with all controllers, accessories for automatic operation as scheduled on drawing as per spec. section 15453 01 Gray water lift pumps CAP. 5.23 KW Allow for the design, supply and installation of packaged type waste water treatment plant complete including filter, chemical feeders, air blowers controls, wirings, piping and all as associated works as per specifications section 02736 and scheduled on drawing 02 Packaged water treatment unit NON-POTABLE WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for non-potable water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 03 75 mm dia. Accessories 04 05 06 Isolating & check valve assembly 75 mm dia. Water metre assembly 50mm dia., ref. (WMA) Back flow preventer assembly, ref. BFPA Supply, install and testing pipework, UPVC Schedule 80 for fire water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 07 100 mm dia. 15 M 2 3 3 No No No 22 M 1 Item 1 Set QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

14 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION FIRE WATER UTILITIES Supply, installation and test Electrically driven horizontal split case centrifugal fire pump, including piping network and valving within pump chamber,complete with all controllers, accessories for automatic operateion and all associate workks as per code standard and as scheduled on drawings and specification 01 02 Ref. FP1 CAP 75 KW electrically driven Ref. FP2 CAP 75 KW fuel diesel driven Supply, installation and test Electrically driven peripheral turbine Jockey pump, including piping network and valving within pump chamber, complete with all controllers, accessories for automatic operateion and all associate workks as per code standard and as scheduled on drawings and specification 03 Ref. JP CAP 5 KW IRRIGATION WATER INSTALLATION Supply, install and testing pipework, UPVC Schedule 80 for Irrigataion water the work shall include but not limited to fittings, supports, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 04 05 06 07 08 20 mm dia. 25 mm dia. 32 mm dia. 40 mm dia. 50 mm dia. 115 140 170 160 370 M M M M M 1 No 1 1 No No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

15 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION IRRIGATION WATER INSTALLATION Accessories 01 Supply and installation irrigation controller as detailed on drwings and as per specifications Supply and installation bubbler for trees Supply and install bubbler for shrubs, ground cover and succulents Supply and installation spray lawn sprinkler Gate valve W/valve box 20 mm dia., Gate valve W/valve box 25 mm dia., Gate valve W/valve box 32 mm dia., Gate valve W/valve box 40 mm dia., Gate valve W/valve box 50 mm dia., Supply and installation remote control valve assembly including piping complete with valve box, Y-strainer, accessories and all associated works as detail on drawing and as per specifications section 02810 10 11 12 13 14 Ref. RCV 20mm dia. Ref. RCV 25mm dia. Ref. RCV 32mm dia. Ref. RCV 40mm dia. Ref. RCV 50mm dia. 1 1 2 3 9 No. No. No. No. No. 1 No. QTY UNIT RATE AMOUNT SR

02 03

10 869

No. No.

04 05 06 07 08 09

60 1 1 1 2 6

No. No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

16 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIESEL FUEL STORAGE TANK INSTALLATION Allow for underground fiberglass diesel fuel storage tank with required capacity including concrete anti-flotation pad, heavy duty traffic type manhole ring and cover, pipework, valves duplex diesel fuel transfer pumps, steel ladder, pea gravel bed, earthworks, fixings and accessories all as detailed on drawings 01 Proprietary tank units CAP. 5675 Lit. 1 No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

17 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM SITE DEVELOPMENT Collection Sheet -1 Sheet -2 Sheet -3 Sheet -4 Sheet -5 Sheet -6 Sheet -7 Sheet -8 Sheet -9 Sheet -10 Sheet -11 Sheet -12 Sheet -13 Sheet -14 Sheet -15 Sheet -16 Sheet -17 DESCRIPTION QTY UNIT RATE AMOUNT SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

18 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 2 - SITE WORK SITE GRADING All additional excavation required for temporary works and spaces, shoring, dewatering, removal of surplus excavated materials, support, temporary spoil heaps and general compaction EXCAVATION AND EARTHWORK Necessary moving or transportation about the site excavation material including handling to temporary stockpile or ultimate disposal off site is to be included in the unit rate of excavation Excavation in natural land consisting of solid rock formation, cracked rocks, bolders and natural contoured soil, temporary earthwork supports, dewatering ( if any ) as per specifications sections 02200 01 Excavation for foundations commencing from existing grade level Backfilling 02 Approved selected imported fill material including compaction in making up levels around and over foundations, beds and the like as per spec. sections 02200 Approved fill material selected from excavated material including compaction as per specification section 02200 Drainage layer 04 100 mm thick compacted coarse gravel to underside of slabs on grade as per specification section 02200 Soil treatment application for termite control 05 To subgrades of slabs and along periphery of building The work shall include all materials and equipments required to complete and finish the work according to specifications and code of practice Note QTY UNIT RATE AMOUNT SR

Note

82460

1100

03

price only

18

21170

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

19 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 2 - SITE WORK TRAFFIC MARKING DIMENSION Thermoplastic paint for traffic marking on parking pavement as detail 11 shown on drawing CL-GA-901 and specification 01 02 03 04 05 06 07 08 09 Straight arrows Straight & curved arrows Parking lane marking Parking lane marking at site Handicapped marking on floor ENTRY (text) NO ENTRY (text) EXIT (text) Lane numbers 93 No. QTY UNIT RATE AMOUNT SR

1 3817 175 16 5 8 3
493

No. M M No. No. No. No.


No

To Collection To Collection Sheet 19 sheet 20

SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

20 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 3 - CONCRETE CONCRETE WORK CONCRETE TYPES Include in Unit Rates for concrete of the following types and locations: 20 Mpa a) Blinding concrete b) Catch basins and side walks 40 Mpa a) Footings b) Columns and R.C. walls c) Floor and roof slabs, beams, girders, stairs d) Concrete topping or structural screed e) Slab on grade f) water tanks Water stops including junction accessories are not measured separately The cost of water stop items are to be included in the unit rates of the related concrete items QTY UNIT RATE AMOUNT SR

Note

To Collection

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

21 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 3 - CONCRETE Plain insitu concrete, 20 Mpa, cement type V as per drawings and specifications section 03300 01 02 Screed, 50mm thick Blinding beds, 100mm thick Supply and placing Insitu reinforced concrete, 40 Mpa cement type V including formwork and steel reinforcements conforming to ASTMA615and A185 and all requiments to finish the work according to drawings as per specifications sections 03100, 03200 & 03300 , and code of practice in: 03 Raft foundation various thickening including depression areas, sump pits and elevators pits and electrical cables trench Retaining walls Reinforced concrete for tanks Slab on grade 125 mm thick with A193WWF mesh reinforcement including thickening QTY UNIT RATE AMOUNT SR

1085 2170

M M

13605

04 05 06

775 351
3

M M3
M

To Collection

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

22 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 3 - CONCRETE CONCRETE WORK Supply and placing of Insitu reinforced concrete, 40 Mpa type I cement including formwork and steel reinforcements conforming to ASTM A615 and A185 and all requirements to finish the work according to the drawings,as per specifications sections 03100, 03200 & 03300,and code of practice 01 02 03 04 05 06 07 08 Columns Shear wall Beams Suspended flat slabs, 300mm thickening including drop panel Suspended flat slabs, 320mm thickening including drop panel Suspended flat slabs, 380mm thickening including drop panel Ramps Stairs including landings PRECAST CONCRETE Precast concrete wheel stopper including dowels, grouting and accessories for complete installation as per detail 21 on drawing CL-GA-901 and specification 09 10 Precast concrete wheel stopper including fixings Ditto,but at site 436 270 35 2790 1539 1002 120 66 M M M M M M M M QTY UNIT RATE AMOUNT SR

493 60

No. No.

To Collection

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

23 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 3 - CONCRETE CONCRETE WORK Sundries 01 Allow for reinforced concrete equipment pads including upstand surrounds and anti-vibration accessories as required Allow for expansion joint, fillers, back rods and sealants at expansion joints of concrete as required. 150mm thick raised slabs, Handicapped`s ramps and curbs to suit required areas as per detail 10,14, 20 on drawing CL-GA-901 8 M QTY UNIT RATE AMOUNT SR

02

955

03

4569

To Collection

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

24 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 3 - CONCRETE Collection Sheet - 21 Sheet - 22 Sheet - 23 Sheet - 24 QTY UNIT RATE AMOUNT SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

25 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 4 - MASONRY UNIT MASONRY Supply and fix concrete masonry blocks in courses with cement lime mortar including concrete lintels over openings , horizontal and vertical reinforcement, fixings, fillers, sealants and grout to complete the work according to specifications and drawings 01 02 03 200 mm thick wall 200 mm thick wall one hour fire rated Ditto, but two hour fire rated QTY UNIT RATE AMOUNT SR

655 181 428

M M M

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

26 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DIVISION 5 - METALS EXPANSION JOINT Supply and install expansion joint including extruded aluminum assemblies, fillets, accessories, fixing and sealants as per detail1 on drawing CL-GA-902. Price includes all required to thoroughly completet the work according to code of practice and as per specification 01 Per linear meter, expansion joint for floor and ceiling as per detail 1CL-GA-902 Steel cover as per details on drawings 02 03 To suit electrical cable trench Per number, supply and install steel bollard comprising 150 mm dia. painted finish steel pipe filled with concrete, including fixings, finishing, and all associated and required to thoroughly complete the work as per detail no.19 on drawing CL- GA-901 and as per specifications and supervisor engineer's instructions Per number, Bollards, exposed height 750 mm high Supply and install 30mm depth panted galvanized cast iron gratings including 40x40mm steel angle, medium gauge galvanized gutter slope to drain and all required for fixing and finisheng as per detail no.13 on drawing CL-GA-901 and specificatons DESCRIPTION QTY UNIT RATE AMOUNT SR

955

60

M2

04

24

No

05

20

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

27 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 7 - THERMAL AND MOISTURE PROTECTION Water proofing and moisture protection as per specification section 07100 01 Membrane waterproofing to suit "wet room" areas including upturn to abutting walls or upstands concrete screed and all required material and equipments to complete the work as per details shown on drawing, according to specifications and code of practice Membrane waterproofing to suit concrete wall and foundation Protection board to suit concrete walls Vapour barrier 04 Vapour barrier to underside of slabs, beds, and the like, specifications section 07100 QTY UNIT RATE AMOUNT SR

43

02 03

24855 3500

M2

18

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

28 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 8 - DOORS AND WINDOWS DOOR SETS Supply and install all doors to suit masonry openings and approved samples including fixings, decorations, frames, architrave, hardwares and saddles and all required materials and equipments to complete and finish the work as detailed on drawing VL-GA-02 and according to specifications and code of practice TYPE A : 44mm thick painted wood door door including frames and decortion as per drawings and specification 01 TypeA1, single leaf door, size 800x2150mm TYPE B : 44mm thick painted hollow metal insulated door including door grill (where required) 02 Type B1, single leaf door, size 900x2150mm and 45 minute fire rated Type B3, single leaf door, size 800x2150mm and 45 minute fire rated Type B5, single leaf door, size700x2150mm Type B6, double leaves door, leaf size 950x2400mm and 45 minute fire rated TYPE C : 44mm thick fully louvered paneled hollow metal. door motorized adjustable louvers panel working upon signal from fire alarm system for generator including frames including frames and decoration as per drawings and specifications 06 Type C1, double leaves door, leaf size 950x2400mm and 45 minute fire rated Type C2, double leaves door, leaf size1050x2400mm and 45 minute fire rated QTY UNIT RATE AMOUNT SR

Note

11

No.

No.

03

No.

04 05

5 1

No. No.

No.

07

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

29 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 8 - DOORS AND WINDOWS DOOR SETS TYPE D : 44mm thick paneled hollow metal door with 6 mm thick wired glass fixed vision panel including frames and decoration as per drawings and specifications 01 Type D2, single leaf door, size900x2150mm QTY UNIT RATE AMOUNT SR

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

30 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 8 - DOORS AND WINDOWS Collection Sheet - 29 Sheet - 30 QTY UNIT RATE AMOUNT SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

31 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DIVISION 9 - FINISHES INTERNAL FINISHES Flooring including respective types of bounding materials, concrete screed sub-floor of required thickness, (if any) accessories for complete installations as per ID drawing and specification 01 02 03 Epoxy paint on cement screed , ref.EC Anti carbonation Porcelain epoxy coating for pavement , ref.AEC Multi component epoxy coating on concrete screed for drive way & turns , ref.MEC Ceramic floor tiles size 600x600mm , ref.CR1 Ceramic floor tiles size 300x300mm , ref.CR2 Finishings : bases including sand-cement backing mortar and grout 06 100 mm high Ceramic tiles base , ref. B03 DESCRIPTION QTY UNIT RATE AMOUNT SR

325
4569

M M M

12988

04 05

198 18

M M

215

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

32 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DIVISION 9 - FINISHES INTERNAL FINISHES Finishings : walls including metal angle beads and lathing at junctions of differing backgrounds 01 02 03 04 Cement plaster to suit walls Paint on cement plaster ,ref. W01 Non toxic epoxy paint on structure ,ref. W07 Ceramic wall tiles ,ref. W03 Finishings : ceilings 05 06 07 Cement plaster to suit ceiling Paint on cement plaster, ref.C01 Metal tiles 600x600mm Ref. C05 DESCRIPTION QTY UNIT RATE AMOUNT SR

8420 8420 2139 105

M M M M

18058 18058 40

M M M

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

33 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DIVISION 9 - FINISHES Collection Sheet - 32 Sheet - 33 DESCRIPTION QTY UNIT RATE AMOUNT SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

34 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 10 -SPECIALTIES CORNER & COLUMN GUARD Corner guards install at 600 high from finish floor heavy duty rubber guard bumper, including all associated works, as per detail 18 shown on drawing CL-GA-901 and as specification 01 To suit column location as required ALUMINUM SAND TRAP LOUVERS Supply and installation fixed anodized aluminum sand trap louvers panels on anodized aluminum frames including fixings and including frames and decoration as per drawing CL - GA- 802 and specifications 02 03 04 05 06 07 08 Ref.L02, size1800x3200mm . Ref.L03, size2500x3200mm . Ref.L04, size2500x3400mm . Ref.L05, size2500x1500mm . Ref.L06, size2500x2300mm . Ref.L07, size700x450mm . Ref.L08, size400x700mm . 442 No QTY UNIT RATE AMOUNT SR

1 2 3 6 2 2 6

No. No. No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

35 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 10 -SPECIALTIES SIGNAGE Manufacturer's standard indoor signs, letters and plaques including fixings, finishes, accessories complete as per interior design drawings CL02-i901 to CL02-i910 and all required materials and equipments to complete and finish the works according to specifications, drawings and code of practice 01 02 03 04 05 06 07 Ref. type S01 Ref. type S02 Ref. type S09 Ref. type S10 Ref. type S11 Ref. type S12 Ref. type S13 TOILET AND BATH ACCESSORIES Supply and installation of following toilet and bath accessories as per schedule including fixings and trims as shown on drawings and specification Ref. FM2, Clear glass mirror with stainless steel frame, size 400 x 600 mm Ref. RH, Single robe hook Ref. SDH, Wall mounted soap dish and holder . Ref.SH1 wall mounted shower head . 23 9 3 102 14 22 1 No No No No No No No QTY UNIT RATE AMOUNT SR

08

No

09 10 11

10 5 5

No No No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

36 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 10 -SPECIALTIES Collection Sheet - 35 Sheet - 36 QTY UNIT RATE AMOUNT SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

37 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 14 - CONVEYING SYSTEMS AUTOMATED WASTE COLLECTION SYSTEM Supply and provide all required to construct, test and operate automated waste collection system, consisting of the following items:QTY UNIT RATE AMOUNT SR

01

Discharge valve room with basement floor including all required works as detailed on drawing no. STM - ITCCP2 - TD - 008. Contractor shall perform all required coordination with other trade to ensure proper installation and operation of the complete system to transport waste from tower chute to pipe networks as shown on drawings STM ITCCP2 - TD - 001 to 007 and 015, 016 and according to manufacturer's standards and specifications Full Vacuum Load station including required earthworks, concrete works, masonry and electromechanical works for the vacuum room and PAI service box located at the end of pipe work including all required works as detailed on drawing no. STM - ITCCP2 - TD - 010 and 011. Contractor shall perform all required coordination with other trade to ensure proper installation and operation of the complete system to transport waste kitchen areas to pipenetworks as shown on drawings STM - ITCCP2 - TD - 001 to 007 and according to manufacturer's standards and specifications PIPE WORK Supply and installation of Automated waste collection system piping. Item shall include the earth works, insulation, ,concentric reducer, puddle flanges ,inspection covers and all required materials and equipments to complete the transport pipe line from DV rooms , outdoor load stations and full vacuum load stations to waste plant

10

No.

02

No.

03

508mm under/above ground transport pipe RC MANHOLE Supply and install cast insitu or precast reinforced concrete manhole ,the item shall include excavation, backfill insulation ,inspection cover and all required to complete the work.

975

04

RC manhole to suit required location in sitesas shown on drawings STM - ITCCP2 - TD 001 to 016

20

No.

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

38 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS SANITARY FIXTURES Supply and install sanitary fixtures, water mixers and accessories, as selection schedule, the work shall include but not limited to necessary fittings, trims, valves, traps, spouts and all materials and equipment required to complete and finish the work according to specifiactions, drawings and code of practice 01 02 03 Floor mounted water closet with flush tank, ref. (WC) Lavatory without pedistal, ref. LAV Counter top one bowel sink, ref. 03 5 5 3 No No No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

39 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS WASTE AND DRAINAGE INSTALLATION Supply, installation and test drainage pipe work UPVC schedule 40 the work shall include but not limited to fittings, supports hangers, excavation, backfilling, cast iron pipes on roof for vent with caps and all materials and equipment required to complete and finish the work according to specifiactions, drawings and code of practice 01 02 03 04 05 06 32 mm dia 40 mm dia 50 mm dia 75 mm dia 100 mm dia 150 mm dia Supply, installation and test drainage pipe work UPVC schedule 80 the work shall include but not limited to fittings, supports hangers, excavation, backfilling, cast iron pipes on roof for vent with caps and all materials and equipment required to complete and finish the work according to specifiactions, drawings and code of practice 07 100 mm dia Accessories 08 09 10 11 12 13 Floor drain, 50 mm dia., ref. (FD) Parking drain, 150mm dia., ref. PD Cleanout, 50 mm dia., ref. (CO) Cleanout, 75 mm dia., ref. (CO) Cleanout, 100 mm dia., ref. (CO) Cleanout, 150 mm dia., ref. (CO) 32 50 3 61 126 14 No. No. No. No. No. No. 175 M 310 85 380 820 1700 1415 M M M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

40 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS WASTE AND DRAINAGE INSTALLATION Accessories 01 02 03 04 05 06 Floor cleanout 50mm dia., ref. (FCO) Floor cleanout 100mm dia., ref. (FCO) Floor cleanout 150mm dia., ref. (FCO) Gully trap, ref. GT Trench drain outlet, 100mm dia., ref. TDO Running trap 32mm dai., Reinforced concrete sump pit including internal lining, proprietary galvanized steel manhole cover and frame, guide bar, lifting chain and all associated works, valves pipework within sump pit chamber as detailed on drawings (concrete work & earthwork, waterproofing measured elsewhere) 07 Sump pit Submersible pumps (one duty and one stand-by) including associated valves, pipework, valves controllers and accessories within sump pit chamber as described on drawings (sump pit measured separately) 08 Ref. SP1 capacity 1.5 HP 8 Set 8 No. 18 1 1 2 4 10 No. No. No. No. No. No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

41 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS POTABLE WATER INSTALLATION Supply, installation and test pipework, plypropylene for potable water the work shall include but not limited to installation, fittings, insulation for hot pipework, valves, supports and all materials and equipment required to complete and finish the work according to specifications, drawings and code of practice 01 02 03 04 05 06 07 15 mm dia. 20 mm dia. 25 mm dia. 50 mm dia. 63 mm dia. 75 mm dia. 100 mm dia. NON-POTABLE WATER INSTALLATION Supply, installation and test pipework, plypropylene for non-potable water the work shall include but not limited to installation, fittings, insulation for hot pipework, valves, supports and all materials and equipment required to complete and finish the work according to specifications, drawings and code of practice 08 09 10 11 12 20 mm dia. 50 mm dia. 63 mm dia. 75 mm dia. 100 mm dia. 25 1550 215 500 330 M M M M M 58 758 195 740 220 60 245 M M M M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

42 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS HOT WATER INSTALLATION Supply, installation and test pipework, plypropylene for hot water the work shall include but not limited to installation, fittings, insulation for pipework, valves, supports and all materials and equipment required to complete and finish the work according to specifications, drawings and code of practice 01 02 15 mm dia. 20 mm dia. Accessories 03 04 05 06 07 08 09 10 11 12 13 Water meter assembly 63mm dia., Isolating valve 20 mm dia., ref. (IV) Isolating valve, 25 mm dia, ref. (IV) Isolating valve, 50 mm dia, ref. (IV) Isolating valve, 75 mm dia, ref. (IV) Isolating valve, 100 mm dia, ref. (IV) IV & CV assembly 50 mm dia., IV & CV assembly 100 mm dia., Hand spray with flexible hose and wall hook, ref. (HS) Wall mounted shower head with mixer, ref SH Hose bib, 20mm dia., ref. )HB) 10 7 9 24 20 1 2 5 5 4 48 No. No. No. No. No. No. No. No. No. No. No. 55 10 M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

43 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS Supply, install, testing and commissioning electrical water heaters the work shall include but not limited to short length pipework, valves, supports, controls, fixings, accessories and all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 Ref. EWH- 1 Drainage installation Reinforced concrete gray water tank with proprietary medium duty cast iron manhole cover and frame, including sump pit, submersible pumps, internal lining, access ladder vent pipework within tank as detailed on drawing (Concrete work, earthwork & water proofing measured elsewhere) 02 03 04 Gray water tank CAP. 41 m3 Gray water tank CAP. 44 m4 Gray water tank CAP. 70 m5 Packaged type variable speed discharge pressure system Gray water lift pumps, including piping and valves network within pump chamber, complete with all controllers, accessories for automatic operation as scheduled on drawing as per spec. section 15453 05 06 Gray water lift pumps CAP. 5 KW Gray water lift pumps CAP. 6 KW Allow for the design, supply and installation of packaged type waste water treatment plant complete including filter, chemical feeders, air blowers controls, wirings, piping and all as associated works as per specifications section 02736 and scheduled on drawing 07 08 09 Packaged water treatment unit. Cap. 41 m3/day Packaged water treatment unit. Cap. 44 m3/day Packaged water treatment unit. Cap. 70 m3/day 1 1 1 No. No. No. 2 1 Set Set 1 1 1 No No No 3 No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

44 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATIONS Packaged type duplex unit discharge pressure system potable water lift pumps, (one duty & one stand by) including piping and valves network within pump chamber, complete with all controllers, accessories for automatic operation as scheduled on drawing and specification section 15453 01 02 Circulating potable water pump CAP. 7.17 KW Circulating potable water pump CAP. 0.5 HP Reinforced concrete under ground water tank and pump room with proprietary cast iron manhole covers and frames, including internal lining access ladders, pipework submersible pump, ventilating fans with exhaust and fresh air pipework, valves, vent pipes and truck fill pipework as detailed on drawings (concrete work & earthwork, water proofing measured elsewhere) 02 03 Potable Water tank CAP. 263 M3 Potable Water tank CAP. 265 M3 1 1 No. No. 2 2 Set Set QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

45 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15 - MECHANICAL FIRE WATER UTILITIES Supply, installation and test Pipework, UPVC class 5 including fittings, trenching, back fill supports system and all associate works as per code standard 01 02 03 04 05 06 25 mm dia. 32 mm dia. 40 mm dia. 50 mm dia. 100 mm dia. 150 mm dia. Accessories 07 08 09 10 11 12 Pendent sprinkler head Upright sprinkler head Side wall sprinkler head 100mm Fire departement valve , ref. FDV Floor control valve assembly 150mm dia., ref. FCVA Fire department connection, 2 way fire department inlet connection type with gate and check valve 100mm dia. Back folw preventer assembly, 150mm dia., ref. BFPA Supervisory switch 150mm dia., 70 1260 15 26 4 No No No No No 2705 675 875 265 1505 430 M M M M M M QTY UNIT RATE AMOUNT SR

4 1 1

No No No

13 14

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

46 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15 - MECHANICAL FIRE WATER UTILITIES Supply, install, testing and commissioning proprietary integrated fire hose reel and fire extinguisher cabinet the work shall include but not limited to fire extinguisher, hose reel nozzle, fixings, isolating valve 40 mm dia., trims and all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 01 Ref. FHC Supply, install, testing and commissioning portable multipurpose fire extinguisher the work shall include but not limited to fixing to wall, all associate works and all materials and equipments required to complete and finish the work according to drawings, specification and code of practices 02 03 Ref. PFE Ref. CO2 CO2 system Supply, install and test CO2 cylinders including pipe work, black steel seamless for CO2 fittings, supports valves, regulators, sleeves, as shown on drawings and as per specification 04 05 06 07 08 09 10 CO2 cylinders CAP 45 KG Control panel Remote manual release Abort switch Alarm bell 4-port nozzle Ioization detector To Collection 52 22 22 22 22 22 22 3 10 No No 12 No QTY UNIT RATE AMOUNT SR

No. No. No. No. No. No. No.


SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

47 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15 - MECHANICAL PLUMBING INSTALLATION DIESEL FUEL STORAGE TANK INSTALLATION Allow for underground fiberglass diesel fuel storage tank with required capacity including concrete anti-flotation pad, heavy duty traffic type manhole ring and cover, pipework, valves duplex diesel fuel transfer pumps, steel ladder, pea gravel bed, earthworks, fixings and accessories all as detailed on drawings 01 02 Proprietary tank units CAP. 1890 Lit. Proprietary tank units CAP. 2800 Lit. 1 2 No. No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Collection Sheet -39 Sheet -40 Sheet -41 Sheet -42 Sheet -43 Sheet -44 Sheet -45 Sheet -46 Sheet -46 Sheet -47 Sheet -48

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

48 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS CHILLED WATER SYSTEM Supply, install and test black steel pipework including fittings thermal insulation, valves, gagues, strainers, flexible connections and accessories as per required drawings and spec. sections15050 to 15140 ,15510 01 02 03 04 05 06 07 08 09 15 mm dia. 20 mm dia. 25 mm dia. 32 mm dia. 40 mm dia. 100 mm dia. 150 mm dia. 200 mm dia. 300 mm dia. QTY UNIT RATE AMOUNT SR

175 40 70 65 30 280 185 450 260

M M M M M M M M M

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

49 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Isolating valves 01 02 03 04 300 mm dia. 200 mm dia. 40 mm dia. 32 mm dia. Check valve 05 06 40 mm dia. 32 mm dia. BTU meter 07 08 40 mm dia. 32 mm dia. Supply, install, test and commission, Fan coil units ducted type including control valves, pressure & temperature, gauge, Y-strainer mounting and fixing as per drawings and specifications section 15781 09 10 11 12 13 14 Ref. FCU-02, 4 KW cooling capacity Ref. FCU-03, 2.4 KW cooling capacity Ref. FCU-04, 5.1 KW cooling capacity Ref. FCU-05, 4.4 KW cooling capacity Ref. FCU-06, 1.5 KW cooling capacity Ref. FCU-07, 2.7 KW cooling capacity QTY UNIT RATE AMOUNT SR

2 4 10 10

No. No. No. No.

5 5

No. No.

5 5

No. No.

5 5 5 5 3 6

No. No. No. No. No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

50 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply and install of A/C unit room air conditioning type with wooden frame as detailed on drawing and specifications 01 Ref. RAC-01, 3.5 KW nominal coolling capacity Supply, install, test and commission DX- ducted split unit including control, pipes and fixing as per drawings and specifications 02 Ref. FCU-01/ACC-01, 4KW capacity Supply, install, test and commission, Ventilating fans as details on drawings and specifications, section 15860 03 Ref. PEF- 01, 13500/22500 LPS capacity with exh. Duct and CAP. On roof Ref. EF- 02, 50 LPS capacity Ref. EF- 03, 1335 LPS capacity Ref. EF- 04, 135 LPS capacity Ref. EF- 05, 105 LPS capacity Ref. EF- 06, 80 LPS capacity Ref. EF- 07, 160 LPS capacity Ref. EF- 08, 55 LPS capacity Ref. EF- 09, 30 LPS capacity Ref. EF- 10, 40 LPS capacity Ref. EF- 11, 30 LPS capacity Ref. EF- 12, 40 LPS capacity Ref. BIF- 12, 3480 LPS capacity To Collection QTY UNIT RATE AMOUNT SR

21

No.

No.

No.

04 05 06 07 08 09 10 11 12 13 14 15

3 3 3 3 11 4 10 1 1 4 2 23

No. No. No. No. No. No. No. No. No. No. No. No.
SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

51 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install, test and commission, Supply air round ceiling diffusers with opposed blade volume damper including frame trims & insulated plenum box as detailed on drawing and specification, section 15860 01 02 Ref. SD1 Ref. SD2 Supply, install, test and commission, Supply air tegister as detaild on drawings and specification 03 Ref. SR1/RR1 Supply, install, test and commission, door grille as detailed on drawings and specification 04 05 06 Ref. DG1 Ref. DG2 Ref. DG3 Supply and install exhaust register as detailed on drawing and specification, section 15891 07 Ref. ER1 Supply and install Galvanized steel sheet rectangular ductwork, including supports and volume damper , and bill mouth opening as per drawings and specification, section 15891 08 Various gauges Supply and install Duct insulation 09 Thermal semi-rigid insulation to rectangular ductwork QTY UNIT RATE AMOUNT SR

5 20

No. No.

No.

2 10 18

No. No. No.

12

No.

950

Kg

245

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

52 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Supply, install and operations supply motorized damber door louver as detailed on drawing and specifications 01 Size 2200 x 950 mm Supply, install, test and commission, Supply air square ceiling diffusers as detailed on drawing and specification, section 15860 02 Ref. SD 1/A,B,C Supply, install, test and commission, return air round ceiling diffusers as detailed on drawing and specification, section 15860 03 04 Ref. RD 1 Ref. RD 2 Supply, install, test and commission, return air square ceiling diffusers as detailed on drawing and specification, section 15860 05 Ref. RD 1/A,B,C Supply, install and test generator exhaust ductwork with canvass connection 06 To suit generator room QTY UNIT RATE AMOUNT SR

No.

15

No.

5 20

No. No.

15

No.

No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

53 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 15B - MECHANICAL HVAC INSTALLATIONS Collection Sheet - 49 Sheet - 50 Sheet - 51 Sheet - 52 Sheet - 53 QTY UNIT RATE AMOUNT SR

To Bill Summary

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

54 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MEDIUM VOLTAGE INSTALLATION MVSWGR (medium voltage switchgear) Supply , install , testing and commissioning 13.8 KV, 3 phase, 60 Hz,SF6 MVSWGR with 2 cells including all associated works to complete installation as per drawings and specifications. The contractor shall prepare sketches and details for approval from SEC and shall make arrangement and required coordination with supervising engineer to complete the work 01 Ref (MVSWGR/CL-2) RING MAIN UNIT Only installation, testing and commissioning for 13.8 KV, 3 phase, 60 Hz SF6 ring main unit including all associated works for complete installation as per drawings and specifications and required coordination (supply will be by client) 02 Ring Main Units , ref (RMU1-CL2 ,RMU2-CL2& RMU3-CL2) Supply , install, testing and commissioning of the following equipment including grounding, all accessories and necessary works required for installation as per SEC regulation and as shown on the drawings and as described in specifications and required coordination 03 Dry type transformer 1600 KVA, 13.8KV -400/230V, 3PH, 60HZ , ref (TR1-CL2 , TR2-CL2 &TR3-CL2) 3 No 3 No 1 No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

55 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MEDIUM VOLTAGE INSTALLATION Supply , install and test medium voltage copper Cables 15KV/ XLPE/STA/PVC, between medium voltage equipments as shown on drawings and coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 Medium voltage cable comprising 3 core 70 mm CU / XLPE /STA/ PVC, cables route from RMU up to transformers Medium voltage cable comprising 3 core 300 mm CU / XLPE /STA/ PVC, cables Smart Metering System Supply, installation , testing and commissioning of Smart Metering System comprising of M-bus master controller ,M-bus IP router, complete with soft ware, including electronic KWH meter, interface with water meter& digital BTU meter, M-bus & 1 pair twisted cable # 22 AWG for each meter, and the necessary connection to TCP/IP net work and all associated works required as shown on drawing and as described in specifications To suit Building Smart Metering System as required to form a complete and fully operative system to link all project buildings with the existing data center at phase (1) 03 04 05 Electronic KWH meters M-bus master controller complete with software M-bus IP router 12 12 12 Note 15 M QTY UNIT RATE AMOUNT SR

02

510

No No No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

56 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply , install , testing and commissioning 600/1000V XLPE multicore copper cable in conduit or cable tray (measured elsewhere ) , including earth cable, junction boxes, connection for feeders and various power loads as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 4C-10mm2-CU/XLPE/PVC+10mm2G/ cable trench 4C-10mm2-CU/XLPE/PVC+10mm2G/ cable trench 4C-50mm2-CU/XLPE/PVC+25mm2G/ cable tray 4C-95mm2-CU/XLPE/PVC+50 mm2G / cable tray 4C-95 mm2-CU/XLPE/PVC+ 50 mm2G / cable trench 4C-95mm2-CU/XLPE/PVC+50mm2G/ 1 x110mm UPVC conduit 2(4C-120mm2-CU/XLPE/PVC)+120mm2G / cable tray 2(4C-150mm2-CU/XLPE/PVC)+150mm2G / cable tray 2(4C-150mm2-CU/XLPE/PVC)+150mm2G / cable trench 4C-185mm2-CU/XLPE/PVC+95mm2G / cable trench 2(4C-185mm2-CU/XLPE/PVC) / cable tray 4C-185mm2-CU/XLPE/PVC / 1 x110mm UPVC conduit 2(4C-185mm2-CU/XLPE/PVC) / 2 x110mm UPVC conduit 2(4C-185mm2-CU/XLPE/PVC)+185mm2G / cable tray 2(4C-185mm2-CU/XLPE/PVC)+185mm2G / cable trench 236 5 682 10 5 21 121 198 10 10 12 18 15 364 5 M M M M M M M M M M M M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

57 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Sub-Main Circuit: supply , install , testing and commissioning 600/1000V XLPE multicore copper cable in conduit or cable tray (measured elsewhere ) , including earth cable, junction boxes, connection for feeders and various power loads as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 4C-240mm2-CU/XLPE/PVC+120mm2G / cable tray 4C-240mm2-CU/XLPE/PVC+120mm2G / cable trench 2(4C-240mm2-CU/XLPE/PVC)+240mm2G / cable tray 2(4C-240mm2-CU/XLPE/PVC)+240mm2G / cable trench 4C-300mm2-CU/XLPE/PVC+150mm2G / cable tray 3(4X1C-630mm2)-CU/XLPE/PVC / cable trench The following items listed below shown in drawing AP05 - E701 , AP07 - E701 &SF03 - E701(inside each apartment building AP05, AP07 &SF03.) 07 08 09 10 4C-10mm2-CU/XLPE/PVC+10 mm2G/ cable tray 4C-10mm2-CU/XLPE/PVC+10mm2G/ 50mm UPVC conduit 4C-50mm+1C-25mmG-CU/XLPE/PVC/ cable tray 4C-70mm+1C-35mmG-CU/XLPE/PVC / cable tray 100 100 50 50 M M M M 121 5 125 29 198 30 M M M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

58 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply and install an Emergency Power Generating Sets including associated Generator Control Panel . In addition to circuit breakers, pads, supports, controls, daily and diesel fuel with necessary connections to earth as per the manufacture including all necessary equipment, accessories and associated works, as shown on drawings and as described in specifications. sections 01 02 03 (GEN.SET-3), 250 KVA, 400/230V, 3Ph, 4W, 60Hz,1800 RPM. (GEN.SET-2), 500 KVA, 400/230V, 3Ph, 4W, 60Hz,1800 RPM. (GEN.SET-1), 450 KVA, 400/230V, 3Ph, 4W, 60Hz,1800 RPM. MAN / HAND HOLE Supply, install, testing and commissioning reinforced concrete manholes and hand holes connected via UPVC conduit, complete with hand hole bolted type metal cover, drain pipe outlet, including trenching and backfilling for UPVC conduits for power and communication cables in UPVC conduit, tapes, , grounding, all as required to suit locations as shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 04 05 Power manhole (1800x1800x1800mm) ( Ref.PMH). Power hand hole (900x900x900mm) ( Ref.PHH). 14 3 No No 1 1 1 No No No QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

59 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers units and all associated works as required and shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 Ref. MDP-P1 Ref. DP51 Ref. DP52 Ref. DPS5 Ref. PPSD Ref. DPSB1 Ref. PPSB1 Ref. SLP2B ( listed in bill of site lighting package ) Ref. EDPSB1 with ATS (built-in ) Ref. EPSB1 Ref. EPMSB1 Ref. EPMSB1A Ref. EMDP1 Ref. EDPS5 with ATS (built-in ) Ref. EPSD 1 5 5 5 5 1 1 1 1 1 1 1 1 5 5 No No No No No No No No No No No No No No No NIC QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

60 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers units and all associated works as required and shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 Ref. MDP-P2 Ref. DP71 Ref. DPS7 Ref. EPSF Ref. DP72 Ref. DPSB2 Ref. PPSB2 Ref. SLP2A ( listed in bill of site lighting package ) Ref. PPT Ref. EDPSB2 with ATS (built-in ) Ref. EPSB2 Ref. EPMSB2 Ref. EPMSB2A Ref. EMDP2 Ref. EDPS7 with ATS (built-in ) 1 5 5 5 5 1 1 1 3 1 1 1 1 1 5 No No No No No No No No No No No No No No No NIC QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

61 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Supply , install , testing and commissioning of panel boards including grounding, circuit breakers, grounding, fixings, markers units and all associated works as required and shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 Ref. EPSF Ref. MDP-P3 Ref. EMDP3 Ref. MCC ( supplied and installed by others ) Ref. EPP1 Ref. EPP2 Supply , install , testing and commissioning of circuit breaker including cables, conduits, fittings, supports, fixings, tapes, connections enclosures and all necessary works required to suit the locations shown on drawings and coordination & integration with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 07 200AT /250AF Rating. 1 No 5 1 1 1 1 1 No No No No No No NIC QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

62 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN AND SUB-MAIN POWER Sub-Main circuit :Supply , install, Power & Communication distribution galvanized steel cable trays, including fittings, supports and all accessories as described on drawing Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 200 mm wide 300 mm wide 400 mm wide 400 mm wide double layer 600 mm wide 800 mm wide 800 mm wide double layer 900 mm wide 1000 mm wide 600 1600 150 200 25 50 140 30 25 M M M M M M M M M QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

63 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL POWER INSTALLATION The contractor is to insure that all power outlets mounted in wet areas and all service outlets for kitchens, bathrooms, laundry and water heaters are to be protected by central ground fault circuit interrupter (GFCI) Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 Disconnect switch, non-fused with pilot light, weatherproof, 16 A, 1P, 230V for waste collection equ. Above false ceiling disconnect switch, non-fused with pilot light, 20A, 1P, 230V for FCU-02,03,04,05 Above false ceiling disconnect switch, non-fused with pilot light, weatherproof, 20A, 1P, 230V for EWH-01 Above false ceiling disconnect switch, non-fused with pilot light , weatherproof, 20A, 3P, 400V for BIF'S-01 Disconnect switch, non-fused with pilot light, 20A, 1P, 230V for active switcher for PRI. network active switched for SCE. network for gray pumps ,FACP& FDB2 Disconnect switch, non-fused with pilot light, weatherproof, 20A, 1P, 230V for submersible pump,2 submersible pumps & fuel pump Disconnect switch, non-fused with pilot light, weatherproof, 20A,3P, 400V for potable pump , gray pumps Disconnect switch, non-fused with pilot light, 50A,3P, 400V for PEF-01 10 No Note QTY UNIT RATE AMOUNT SR

02

20

No

03

No

04

23

No

05

35

No

06

15

No

07

No

08

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

64 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL POWER INSTALLATION Supply , install, testing and commissioning of power and sockets accessories including all necessary boxes, faces(according to the engineer approval ) comprising cables, conduits, fittings, connections, from the outlets to Panel boards feeder associated works as required to suit the locations shown on drawings Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 Disconnect switch, non-fused with pilot light, weatherproof,50A,3P, 400V for PEF-01 Disconnect switch, non-fused t, weatherproof, 200A, 3P, 400V for fire pump & jockey pumps Disconnect switch, fused ,with pilot light, 20A, 1P, 230V for RAC-01,FCU-01,06,07 &FDB1 Disconnect switch, fused, with pilot light, weatherproof, 20A, 1P, 230V for RAC-01 Disconnect switch, fused, with pilot light, 40A, 1P, 230V for RAC-01 Ceiling mounted junction box Wall mounted junction box Single socket outlet, 10A, 230V, grounding type Single socket outlet, weatherproof , 10A, 230V, grounding type Single socket outlet, weatherproof , 16 A, 230V, with ground fault circuit interrupter Duplex socket outlet,16A,230V, grounding type Single phase power socket outlet, weatherproof , 20A\230V, grounding type 3 No QTY UNIT RATE AMOUNT SR

02

No

03

27

No

04

No

05 06 07 08 09 10

1 64 38 164 167 11

No No No No. No. No.

11 12

27 6

No. No.

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

65 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply, install , testing and commissioning of switches lighting accessories including all necessary boxes, switches, faces, conduits, wires (according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 Single pole one-way switch (13A) Single pole one-way switch weatherproof (13A) Single pole , two gang, switch (13A) Push button switch Motor switch with built-in overload protection (tumbler switch) Supply, install , testing and commissioning of lighting fixture outlets and including conduits, wires and all boxes belong to Lighting Panel boards and associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 06 07 Lighting fixture outlets Lighting fixture outlets type FT1 (cove light ) 1,196 20 No No 85 4 18 35 34 No. No. No. No. No. QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

66 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL LIGHTING INSTALLATION Supply ,install, testing and commissioning of lighting fixture (furnished with lamp and electronic blast, accessories and internal wires) mounting accessories.(according to the engineer approval ) associated works as required to suit the locations shown on drawings .Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 Ref. EX (Exit light wall mounted, single sided) Ref. EX (Exit light ceiling mounted, single sided) Ref. F1 Ref. F1E Ref. F2 Ref. F2E Ref. F3 Ref. F3E Ref. F4 Ref. F4E Ref. F5 Ref. F7E Ref. NE Ref. WL3 Ref. WL4 Ref. WL4E Ref. FT1 30 49 484 141 190 76 4 7 25 6 5 75 32 40 18 14 593 No No No No No No No No No No No No No No No No M. QTY UNIT RATE AMOUNT SR

To Collection

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

67 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL COMMUNICATION SYSTEMS DATA AND VOICE SYSTEM INSTALLATION Supply, install , testing and commissioning of integrated data and voice system with inter-link with CCTV camera, comprising equipment rack consisting of building data distribution, outlets, patch panels, patch cords including cabling (including fiber optic cable all UTP CAT 6A cable, switches) , in conduits, connection/ extension and interfacing all as shown on drawings .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications To suit system network equipped with: 01 02 Wall mounted telecommunication outlet, 1 ports ( one data ) ref. (T0 ) Ceiling mounted telecommunication outlet, 1 ports ( one data ) ref. (T0 ) Wall mounted telecommunication outlet for intercom system Ref. (T0 )I Wall mounted telecommunication outlet, 1 ports ( one tel ), Ref. (T01) Wall mounted telecommunication outlet, 1 ports ( one tel ),at 1500 mm A.F.F.L Ref. (T01)W Wall mounted telecommunication outlet, 1 ports ( oneTV. ) Ref.( T03 ) Wall mounted telecommunication outlet, 3 ports ( two data,one telephone. ) Ref.( T04 ) Floor Distributor includes : 19",standard rack , fiber optic patch panel (F. O. P. P) , data switch CAT6 a 1X36 RJ45 ports ,UTP patch panel CAT6 a 1x36 RJ45 ports, with fans ,UPS,power supply and all accessories to complete the work as per drawings and specifications according to latest technology Ref (FDB1 &FDB2 ) 23 70 No No QTY UNIT RATE AMOUNT SR

03

15

No

04

No

05

51

No

06

No

07

10

No

08

No

To Collection

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

68 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL COMMUNICATION SYSTEMS DATA AND VOICE SYSTEM INSTALLATION Supply ,install, testing and commissioning of integrated data and voice system with inter-link with CCTV camera, comprising equipment rack consisting of building data distribution, outlets, patch panel, patch cords including cabling (including fiber optic cable all UTP CAT 6A cable, switches) , in conduits, connection/ extension and interfacing all as shown on drawings .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications The following items listed below shown in drawing AP05 - E801 , AP07 - E801 (inside each apartment building AP05, AP07.) 01 Building distributor (BD5,&BD7) ( Includes main F. O. P. P. and all necessary works required for installation as shown on drawings, on single line diagram in AP -05-E801&AP -07-E801) to form a complete and fully operative system Floor Distributor includes : 19",standard rack , fiber optic patch panel (F. O. P. P. (2 x 4 port)) , data switch cable 1x24 RJ45portss ,UTP patch panel (24 ports) with fans ,UPS,power supply and all accessories to complete the work as per drawings and specifications according to latest technology Ref (FD5G &FD7G) Data and voice system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 10 No QTY UNIT RATE AMOUNT SR

02

10

No

03

Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

69 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL FIRE ALARM SYSTEM
Supply, install , testing and commissioning of fire detection /alarm system comprising of analogue addressable fire alarm panel , detectors, alarm bell, break glass, modules including associated cable wires, ear thing for equipment and conducting, interfacing with other systems as shown on drawings and .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications

QTY

UNIT

RATE

AMOUNT SR

To suit fire alarm system network equipped with: 01 02 03 04 05 06 07 08 09 10 11 Ceiling mounted optical smoke detector, Ceiling mounted heat detector Multi sensor detector (smoke , heat) Ceiling mounted multi sensor ( CO ,heat , smoke ) Sounder with strobe light Fire alarm bell Fire alarm manual call station Fire alarm interface module Fire fighting telephone panel ref (FFT) Fire man's telephone jack Master analogue fire alarm control panel-FACP comprising of TCP-IP interface and power supply unit with complete PC work station , interfacing to auto - dialer to local fire department, Analogue terminal adapter (interfacing with auto - dialer ) 102 3 46 129 8 20 45 35 10 20 1 No No No No No No No No No No No

12

No

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

70 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL FIRE ALARM SYSTEM
Supply, install , testing and commissioning of fire detection /alarm system comprising of analogue addressable fire alarm panel , detectors, alarm bell, break glass, modules including associated cable wires, ear thing for equipment and conducting, interfacing with other systems as shown on drawings and .Coordination, integration with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications

QTY

UNIT

RATE

AMOUNT SR

The following items listed below shown in drawing AP05 - E801 , &AP07 - E801(inside each apartment building AP05 &AP07.) 01 Analogue addressable fire alarm control panel-FACP comprising of TCP-IP interface and power supply unit, automatic dialer ,analogue terminal adapter interfacing to auto - dialer to local fire department, Fire alarm system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system IP TV SYSTEM Supply, install, test and commissioning of television system connected to TCP/IP (LAN) comprising for RJ 45 outlet (measured elsewhere ) set top box , power supply , and all associated works as shown on drawings and .Coordination, integration with other systems disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 10 No

02

Item

To suit IPTV system network equipped with:


03 04

Set top box

No Item

1 IP TV system network including coaxial cabling/wire and all required accessories to form a complete and fully operative system

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

71 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL VOICE EVACUATION SYSTEM Supply , installation, testing and commissioning of voice evacuation system complete with all accessories required for installation including distribution panel for voice evacuation system , pull boxes, loudspeaker , microphone, cable/ wire and conducting supports, fittings, interfacing units , and all required to suit the locations shown on drawings. Coordination and integration with other systems shall be conducted during work execution, as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications To suit evacuation system network equipped with: 01 Master voice evacuation distribution panel ref. MVP complete with fire phone, power supply unit with battery backup (3-hours continuance operation), including master mic with zone selection, master mic control, 96 switch control, dual channel , integrated fire phone & interface to fire alarm control panel (FACP). Voice evacuation distribution panel (ref.VDP) with3x100W amplifier, and power supply unit Voice evacuation distribution panel (ref.VDP) with 2x100W amplifier, and power supply unit 2 Watts, voice evacuation speaker, ceiling mounted 2 Watts, voice evacuation speaker, wall mounted Voice evacuation system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 1 No. QTY UNIT RATE AMOUNT SR

02

No.

03

10

No.

04 05 06

30 53 1

No. No. Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

72 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL AUDIO / VIDEO IP INTERCOM SYSTEM Supply , installation testing and commissioning of audio / video IP intercom system comprising of outdoor station unit with built-in color camera, indoor station units with built -in monitors, electrical door lock , AC power supply, cables and conduits and associated works as required to suit the locations shown on drawings and coordination & integration & communication kit with other systems shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications To suit audio /video phone IP intercom system network equipped with: The following items listed below shown in drawing AP05- E801 , &AP07- E801(inside each apartment building AP05,&AP07.) 01 Waterproof outdoor station unit (48 lines) including but not limited to color camera, mic, speaker, push buttons, power supply, , etc. in drawing AP05- E801 Waterproof outdoor station unit (72 lines) including but not limited to color camera, mic, speaker, push buttons, power supply, etc.in drawing AP07- E801 , Electric door lock Network controller with power supply Exit push button Electric door strike Audio / video IP intercom system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 10 No QTY UNIT RATE AMOUNT SR

02

10

No

03 04 05 06 07

20 10 20 15 1

No No No No Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

73 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL INTEGRATED SECURITY SYSTEM Supply , installation testing and commissioning of integrated security system comprising of CCTV IP cameras, network video recorder with built in motion detection, CCTV monitors, video display unit, keypad, system controllers, readers, readers interface modules, push buttons, electro magnetic locks, encoders, security server, workstations, wire, power supplies, conduits, interfaces and all accessories required for the system as per drawings, riser diagrams and specifications To suit system consisting of ,but not limited to: 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Intelligent security controller (ref. ISC) Reader interface module (ref. RIM) Double reader interface module (ref. DRIM) Card reader ref. (CR) Exit push button (ref. PB) Electromagnetic lock Magnetic door contact(ref. DC) Electromagnetic lock for double side door with electric lock (D) Ceiling mounted indoor IP CCD day / night camera Outdoor ceiling mounted IP CCD day / night camera Outdoor wall mounted IP CCD day / night camera Ceiling mounted IP fixed dome camera Outdoor type motion sensor Security system network including conduits, wiring, pull boxes, connections, and all required accessories to form a complete and fully operative system 12 18 41 No No No QTY UNIT RATE AMOUNT SR

100
60

No.
No

42
42 18 10 40 15 20 35 1

No.
No No No No No No No Item

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

74 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN TELECOMMUNICATION SYSTEM NETWORK Supply, installation, testing and commissioning distribution network for data and telephone system to connect all buildings/floor distributers BD/FD to the primary/secondary active switch as shown on drawings. Item includes cables\ wires in conduits or cable tray( measured elsewhere )and all associated works as required for the whole network in the site. Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings by making arrangement with supervising engineer according to manufacturer's recommendations to achieve the complete work to the best possible 01 To suit all network system MAIN FIRE ALARM SYSTEM NETWORK Supply, installation, testing and commissioning distribution network for fire alarm system to connect all FACPs in all buildings with each other as shown on drawings. Item includes cables\ wires in conduits or cable tray( measured elsewhere )and all associated works as required for the whole network in the site. Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings by making arrangement with supervising engineer according to manufacturer's recommendations to achieve the complete work to the best possible To suit all network system 02 Supply and install a fire alarm system to suit external feeder network 1 Item 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

75 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL MAIN VOICE EVACUATION SYSTEM NETWORK Supply, installation, testing and commissioning distribution network for voice evacuation system to connect all voice evacuation distribution panels. in all buildings with master voice evacuation panel. as shown on drawings. Item includes cables\ wires in conduits or cable tray( measured elsewhere )and all associated works as required for the whole network in the site. Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings by making arrangement with supervising engineer according to manufacturer's recommendations to achieve the complete work to the best possible 01 To suit all network system BUILDING MANAGEMENT SYSTEM (BMS) Supply, install, testing, commissioning and integrating the building / cluster BMS system or sub system items (equipment controllers, routers, cables inside the building between system items, conduits, boxes, fiber optic cables,..etc) with phase 1 main BMS system (located in the data center)via LAN network as shown on the building drawings, indicated in plumbing, HVAC and electrical input/ output schedules (all BMS schedules) and as described in the specifications, consisting of but not limited to: 02 To suit building BMS system network and the system should be applicable to linked with existing operating system in phase one after getting approval from service and operation team in phase one to complete the work to the best possible 1 Item 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

76 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL GROUNDING SYSTEM Supply, install, test and commissioning a grounding system for cluster comprising bare copper conductors for grounding all electrical and mechanical equipments in the cluster and all required works for connecting in one grounding system In addition to all earthwork, connections, clips, copper clad steel rods in ground test wells with cast iron covers situated around the building as required and all associated works as necessary to provide a complete grounding system, all as shown on drawing . Coordination with other disciplines shall be conducted during work execution as per technical specifications, drawings and by making arrangement with supervising engineer to achieve the work to the best possible and specifications 01 To suit grounding system for network of cluster 1 Item QTY UNIT RATE AMOUNT SR

To Collection

SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

77 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION DIVISION 16 - ELECTRICAL Collection Sheet - 55 Sheet - 56 Sheet - 57 Sheet - 58 Sheet - 59 Sheet - 60 Sheet - 61 Sheet - 62 Sheet - 63 Sheet - 64 Sheet - 65 Sheet - 66 Sheet - 67 Sheet - 68 Sheet - 69 Sheet - 70 Sheet - 71 Sheet - 72 Sheet - 73 Sheet - 74 Sheet - 75 Sheet - 76 Sheet - 77 To Collection SR QTY UNIT RATE AMOUNT SR

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

78 / 79 REVISED PAGE

Date: MAY 2012

PROJECT: Infrastructure buildings of the residential complex (phase 2) of ITCC complex - RIYADH REVISED BOQ FOR PARKING CLUSTERS (CL02) ITEM DESCRIPTION AMOUNT S.R.

BILL SUMMARY Sheet - 18 Sheet - 20 Sheet - 25 Sheet - 26 Sheet - 27 Sheet - 28 Sheet - 31 Sheet - 34 Sheet - 37 Sheet - 38 Sheet - 48 Sheet - 54 Sheet - 78 SITE DEVELOPMENT SITE WORK CONCRETE MASONRY METALS THERMAL AND MOISTURE PROTECTION DOORS AND WINDOWS FINISHES SPECIALTIES CONVEYING SYSTEMS PLUMBING HVAC ELECTRICAL 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

To Tender Summary

SR

0.0

Project No. J10-13300 ZUHAIR FAYEZ PARTNERSHIP

79 / 79 REVISED PAGE

Date: MAY 2012