of India Name of Work: Construction of 4-Lane Guwahati University by-pass to NH-37 from km 140.000 to 146.300 (Total=6.30 km) in the state of Assam. (Job No 037-AS-2008-09-079)
Package No.PWD-NH(R)/GHY/09-10/04 Name of Contractor : Sri Bhagya Kalita HOT MIX PLANT Mixing Lorry Lorry 0 No. Departure Temp C Temp 0C
Date
Remarks
Laying Temp 0C
1400 (min)
Rolling Temp 0C
900 (min)
PUBLIC WORKS DEPARTMENT NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work:: 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) Packeg No. : Package No.PWD-NH( R)/GHY/08-09/03 Name of Contractor : Bhagya Kalita PRIME COAT / TACK COAT SPRAY TEST RFI No. :_________________________ Date :____________________ Location :___________________________ Type of Work :________________________ Test No. 2 Test No. 3 Test No. 4
PARTICULARS Chainage 1. Container Ref. : / Mass (Gms) 2. Container+Bitumen, (Mass) (gms) 3. Bitumen (2-1) only (Gms) 4. Tray Size (Mtr)2 2 5. Rate of Spray = (3/4) Kg/m Average
Test No. 1
Remarks : _________________________________________________________________________________________
FOR THE ENGINEER FOR THE CONTRACTOR Lab Technician Material Engineer
PUBLIC WORKS DEPARTMENT NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work:: 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) Packeg No. : Package No.PWD-NH( R)/GHY/08-09/03 Name of Contractor : Bhagya Kalita HOT BIN GRADATION Date : ____________________ INDIVIDUAL GRADATION SIEVE SIZE 13.200 4.750
26.500
2.360
0.300
0.750
% BLEND AS PER PROPOSAL 1A BIN-1 ________% FILLER________% BIN-2 _______% BIN-3_______% BIN-4 ________%
SIEVE SIZE % PASSING 37.500 26.500 13.200 4.750 2.360 0.300 0.075
JMF LIMIT
Date : ____________________
PUBLIC WORKS DEPARTMENT NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work:: 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-200809-061) Packeg No. : Package No.PWD-NH( R)/GHY/08-09/03 Name of Contractor : Bhagya Kalita DENSE BITUMINOUS MACADAM Date :____________________ Sample No. :_________________________ Lab No :___________________________ Spec % of Aggregate No Bitumen percentage by wt. by total of mix weight % % a b c 100-b Weight In Water Bulk Bulk Specific Sat Volume Density Gravity of Total Mix Surface mix dry in air (max. Theo) cc gm/cc % f g h i j f-e d/g 100 100(b/Gb)+(100- 100h/i b)/Gac Voids (%) Stability In mineral Filled Observed Correlat aggregate Bitumen Ratio % % k l 100[(k-j)k] ((cxh)/Gab x100 kg m Flow Corrct.
In Air
Gram d
Gram e
kg o mxn
mm p
1 2 3 Avg. Specific Gravity of Bitumen (Gb): Bulk Specific Gravity of Aggregate (Gab): Apparent Specific Gravity of Aggregate: Effective Specific Gravity of Aggregate (Gac): Bitumen Grade: FOR THE CONTRACTOR
1.040
PUBLIC WORKS DEPARTMENT NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work:: 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) Packeg No. : Package No.PWD-NH( R)/GHY/08-09/03 Name of Contractor : Bhagya Kalita MOISTURE CONTENT OF MATERIAL :_________________________ Description 1 Time 2 Sample No. 3 Initial weight of material (with moisture) 4 Weight of material after drying 5 Weight of water 6 Moisture Content % Remarks : _________________________________________________________________________________________ FOR THE ENGINEER FOR THE CONTRACTOR Lab Technician Material Engineer
Type of Material
Date :____________________
Name of Work: : 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS-2008-09-061) Packeg No. Name of Contractor : Package No.PWD-NH( R)/GHY/08-09/03 : Bhagya Kalita
DENSITY TEST RESULTS ON BITUMINOUS MATERIAL Source. : _______________________ Weight In Air Sl. No 1 2 3 4 5 6 Average (gms.) a Weight In Water (gms.) b Date :____________________ S.S.D weight (gms.) c Density a / (c-d)
Remarks :
FOR THE ENGINEER FOR THE CONTRACTOR Lab Technician Material Engineer
PUBLIC WORKS DEPARTMENT NH Works, Assam AP Works Under MOSRT&H, Govt. of India Name of Work:: 4-lanning of existing NH-37 from km 134.00 to 140.00 (Total=6km) including construction of flyover at LGBI Airport junction. (Job No 037-AS2008-09-061) Packeg No. : Package No.PWD-NH( R)/GHY/08-09/03 Name of Contractor : Bhagya Kalita BITUMINOUS MATERIAL COMPACTION DATA RFI No. :_________________________ Date :____________________ Location :_________________________ Layer :____________________ Compaction required :_________________________ Stage of Work :____________________ Tested by :____________________ 1 2 3 4 1 2 3 4 TEST NUMBER CHAINAGE % COMPACTION AVG. % COMPACTION TEST NUMBER CHAINAGE % COMPACTION AVG. % COMPACTION 1 2 3 4 5 6 7 8 9 10 11 12
Remarks : _____________________________________________________________________________________________________________________
FOR THE ENGINEER FOR THE CONTRACTOR Lab Technician Material Engineer
RATE OF SPREAD OF AGGREGATE IN SURFACE DRESSING Job No: 037-AS-2008-09-079 Location :______________Km Tested By: Date of Test:
Test Nos. Area considered for the test, m2 Wt. of aggregate, Kg. Rate of spread, Kg./m
2
Acceptable limits: The variation in the rate of spread of aggregate should be within 20% of the mean Remarks:
APWD REPRESENTATIVE
CONTRACTOR'S REPRESENTATIVE
CHECKING RATE OF SPREAD OF BINDER (SD/prime coat/tack coat) Job No: 037-AS-2008-09-079 Location :______________Km Material : TRAY SIZE=20 x 20 x 3 cm Tray No. 1. Wt. of Tray, gms. 2. Wt. of (Tray + Bitumen), gms. 3. Wt. of Bitumen on Tray, gms. (2-1) 4. Area of tray cm
2
400
400
400
400
5. Rate of spread, gm/cm2 (3/4) 6. Rate of spread, Kg/m2 (5/0.1) 7. Avg. rate of spread, Kg/m2 Acceptable limits: Maximum long. distribution error shall be within 10% of the specification Remarks:
APWD REPRESENTATIVE
CONTRACTOR'S REPRESENTATIVE
TEMPARATURE OF BINDER, AGGREGATE & HOT MIX JOB No: 037-AS-2009-10-079 Location : Material type:
Date Bitumen Temp 0C Aggregate Temp 0C Mixing Temp 0C Lorry No. Lorry Lorry Departure Departure Time Temp 0C Remarks/ sign.
Acceptable limit:
Bitumen Temp 0C
Aggregate Temp 0C
Laying Temp 0C
TEMPARATURE OF HOT MIX AT SITE JOB No: 037-AS-2009-10-079 Location : Chainage from___________to____________ Material type:
Date Lorry No. Lorry Arrival Time Mix Temp 0C Laying Temp 0C Rolling Temp 0C Remarks/ sign.
Acceptable limit:
Laying Temp 0C