Anda di halaman 1dari 1

CALCULO DEL ESAL PARA PAVIMENTO RIGIDO (METODO AASHTO)

ESTACION:

C-1

PROYECTO:

"PAVIMENTACION DE LA AV. UNIVERSITARIA (UNIVERSIDAD NACIONAL DE HUANCAVELICA E.A.P. INGENIERIA CIVIL-HVCA.)"

UBICACIN:

PUENTE VILLA AGRARIA

DATOS:

T=

20

aos

FORMULA DEL ESAL PARA

esp =

200

mm

PAVIMENTO RIGIDO

Pt =

seviciabilidad final

METODO DEL AASHTO

D=

0.5

factor de direccion ida y vuelta

L=

un carril en cada sentido

=>

W18 =

100%

ESAL = ni = (no)i (G) (D) (L) (365) (Y)

Tipo de
Vehiculo

CARGA
Lx (kips)
no
r%
Gt
L2
B18
Bx
log(Wtx/Wt)
G = Wt/Wtx
GY
ESAL
PARCIAL
TOTAL

VEHICULOS LIGEROS
Autos

Pick up

delant.

post.

delant.

1
2.2059
2756
0.045
-0.079
1
1
1
3.5704
0.0003
31.371
4243.5

0.8
1.7647
2756
0.045
-0.079
1
1
1
3.8674
0.0001
31.371
2141.2

1.2
2.6471
95
0.04
-0.079
1
1
1
3.3117
0.0005
29.778
251.9

post.

BUS

C. Rural
delant.

1.5
1.5
3.3089 3.3089
95
22
0.04
0.03
-0.079 -0.079
1
1
1
1
1
1
2.9771 2.9771
0.0011 0.0011
29.778 26.870
544.24 113.73
7880.689404

Micros

2E

post.

delant.

post.

delant.

2
4.4118
22
0.03
-0.079
1
1
1
2.5198
0.003
26.870
325.95

2
4.4118
3
0.03
-0.079
1
1
1
2.5198
0.003
26.870
44.448

3
6.6177
3
0.03
-0.079
1
1
1
1.8338
0.0147
26.870
215.7

7
15.441
7
0.03
-0.079
1
1
1
0.2902
0.5126
26.870
17596

CAMIONES UNITARIOS
3E

post.

delant.

11
7
24.265 15.441
7
2
0.03
0.03
-0.079 -0.079
1
1
1
1
1
1
-0.572 0.2902
3.7307 0.5126
26.870 26.870
128063 5027.5
173455.6028

2E

SEMITRAILER

3E

post.

delant.

post.

16
35.294
2
0.03
-0.079
2
1
1
-0.366
2.3215
26.870
22769

7
15.441
15
0.03
-0.079
1
1
1
0.2902
0.5126
26.870
37706

11
24.265
15
0.03
-0.079
1
1
1
-0.572
3.7307
26.870
274421

delant.

4E
post.

7
18
15.441 39.706
4
4
0.045 0.045
-0.079 -0.079
1
2
1
1
1
1
0.2902 -0.59
0.5126 3.8914
31.371 31.371
11739 89118
433807.27
744310.5858

2S1/2S2

2S3

delant.

post.

delant.

centr.

post.

delant.

centr.

7
15.441
1
0.04
-0.079
1
1
1
0.2902
0.5126
29.778
2785.8

23
50.736
1
0.04
-0.079
3
1
1
-0.521
3.3191
29.778
18037

7
15.441
1
0.03
-0.079
1
1
1
0.2902
0.5126
26.870
2513.7

11
24.265
1
0.03
-0.079
1
1
1
-0.572
3.7307
26.870
18295

18
39.706
1
0.03
-0.079
2
1
1
-0.59
3.8914
26.870
19083

7
15.441
1
0.03
-0.079
1
1
1
0.2902
0.5126
26.870
2513.7

11
24.265
1
0.03
-0.079
1
1
1
-0.572
3.7307
26.870
18295

3S1/3S2
post.

delant.

25
7
55.148 15.441
1
0
0.03
0.03
-0.079 -0.079
3
1
1
1
1
1
-0.679 0.2902
4.779 0.5126
26.870 26.870
23435
0
129167.0236

>=3S3

centr.

post.

delant.

centr.

post.

18
39.706
0
0.03
-0.079
2
1
1
-0.59
3.8914
26.870
0

18
39.706
0
0.03
-0.079
2
1
1
-0.59
3.8914
26.870
0

7
15.441
1
0.03
-0.079
1
1
1
0.2902
0.5126
26.870
2513.7

18
39.706
1
0.03
-0.079
2
1
1
-0.59
3.8914
26.870
19083

25
55.148
1
0.03
-0.079
3
1
1
-0.679
4.779
26.870
23435

Anda mungkin juga menyukai