Anda di halaman 1dari 1

A-A

250 thick shiver layer supply press the eart h

15 thick earth and solid polishing 350 thick C30 ferroconcrete layer

Technical Requriement
6000

450+5 0

700

2000

nature floor

C-C

1000

1000
800

2 cable pipe(pvc) put into operating room,a piece of thin iron thread t hrough pip to proof water and dusts int o pipe.

140

t ot al are round girder

3100 2200 10

2800

150
6@200 dual directions

1% 1%
700

A
F F

1% 1%

12@200
dual directions

A A

A
900

t ot al are round girder

15

591010

591010

591010

350

18040

corner s teel 50*50*5 protecting corner for 4 sides or pit provided by user

embedded plate 350*250*16 total 8 pc sprovided by user.

D-D
earth s tick 12*1000 c onnect to reinforcing steel bar net stbly 20mm up. weld screw M6X30 ,1 pcs beside every basic plate.

1. The allo wed be aring capacity o f the 2groundsil l f 1 00kpa(i.e 10t/m). Th e g roundsill str engthening re quirement: the be aring capacity of each pr eburied found ati on p late sh ould be 25t, the endlon g long should be ar 5t. When th e found ati on plate i s beared wi th weight, the re sho uld be no phenomen on of sinking or loosing. 2. In the dra win g a ll the sizes are in mm, " " is deg ree reinforcing steel bar, " " is re inforci ng steel bar. 3. The bottom of the gird er o f the foun dation and the bottom of the ra mp should ha ve a 100 thick C10 con cre te layer. After the earth is compacted, there shoul d h ave a layer of d etritus as in the drawing. In th e o ther pa rt of the ramp, ther e shou ld be a layer of 250 thick detritus un der the concrete plate. The concrete u sed in the foundation and ra mp are all C3 0. 4.The ri ght ang le at end of the founda tion shoul d be buried with 50*5 0* 5mm anl ge steel welde d with 8 bracing for protection. It is sug gested that o n top of the ramp, the re should be a gap in each 2m and fil led wi th asphal tum and woodwool board, and on top fill with asp haltum. 5. C30 concrete pourin g i s prefered to be poured on ce, and the error th e l oad cel l center( the fo undation plate center) and the catercorner, th e size of the fo ur side s of the foundation and the catercorner,, th e size of the load cell bea ring ce nte r a nd the four sizes of the foundation and the catercorner should not be more than +5mm. 6. the preburi ed fou ndation plate sh ould use 1:1 concrete to p our sen con d. When it is 70 % 80% dry, di sassemble th e mould plate and th en put the fo undation plate and pour second, during the second po uring, the follwing req uirment shou ld be met: the surfa ce of the fo undation plate should be on the same level, th e error between them sho uld not b e over 3mm. the levelness of the surface should not be ove r 5/100 0. The fo undation should be buri ed solid an d should be no ro om with the concrete. The cente r l ine of the foundation plate should be kept cle ar for check before insta llation. 7 . 2" wi re p ipe is for co nnecti ng the signal wire to the loading room, th e l ength shou ld be fixed acco rding to the place of the loading room, th e p ipe sho uld not b e more than 6m normally, the turning should be smooth, or i t will be hard to go through th e wire. 8The fou r side of the roo m should ha ve enough place for the cranes to li ft a nd place the truck sca les an d for installation. If th e custome r ne eds to build a fence o n the two sides of the truck scale, you should do that after the instal lation and make su re of the drainag e or con struct a awnin g. 9. Never i nstall the tr uck until the foundation is 100 % d ry. 10. the load ing room is better to be away from the fou ndation, the lo ading room should have th ree pin AC p owe r connecting to the earth. Th e p owe r used by the truck sca le sho uld be connected to the earth.

450+5 0

700

embedded stop plate 150*150*16 total 8 pcs steel plate

Foundation 3 modules

LILA SCALE

Match with-HM9B30t loadcell

170

T3018 LION.W

Anda mungkin juga menyukai