v. Funds availability is a major issue plaguing the power sector. Lack of funds delays the projects and puts modernisation plans on hold.
vi. Need for improvement in design of procurement process and policies of central and state utilities: a) There is a need for improvement in procurement design and policies and qualifying criteria (which operate on outdated tendering procedures) and system for awarding contracts, based on L1 criterion.
b) Utilities are not awarding projects regularly and are bunching them, leading to sub-optimal capacity utilization.
c) Delays by utilities in taking decisions on projects, reviews, etc., is leading to delays in execution.
d) Sub optimal quality products are getting approved in the absence of standard procurement policies and product specifications not defined in time.
e) There is a lack of standardization of product specifications, design parameters and ratings for transmission and distribution (T&D) equipment across different utilities.
f) There is need for enforcing and monitoring of regulations on power plants (e.g., related to emissions, heat rate) to ensure that good quality equipment gets installed that meets specifications. Currently, power plants look at the capital cost of procurement and do not consider other costs including societal and environmental costs.
g) Absence of price variation clauses in certain transmission contracts or projects is leading to imbalance in pricing, which affects the margins of companies in the event of an increase in the price of raw materials and lead to delay in supply.