April, 2011
Agenda
1. 2. 3. 4.
Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration
Overview
1. Preparation Phase
1.1 1.2 1.3 Reasons to move to PI 7.3 Overview of new features Technical prerequisites
2. Upgrade Options
Ensure your Future: Improved SOA Infrastructure: Enhanced Integrated Configuration: Advanced Adapter Engine Extended (AEX)
Overview
1. Preparation Phase
1.1 1.2 1.3 Reasons to move to PI 7.3 Overview of new features Technical prerequisites
2. Upgrade Options
Elevator Pitch SAP NetWeaver PI 7.3 Centralized Monitoring, Single Stack ESB, Reduced TCO
Centralized monitoring via SAP Solution Manager 7.1 - Good morning page - Monitor multiple PI domains - Reduced time for root cause analysis
Single stack ESB capabilities through Advanced Adapter Engine - Up to 60% less energy consumption - Lower footprint, easy maintenance: 1h installation*, HW requirements* comp. to double stack, 90 sec restart*
Major Improvements for Reduced cost of operations via increased fault tolerance Design governance Standards based interoperability and connectivity
*Hardware dependent
Overview
1. Preparation Phase
1.1 1.2 1.3 Reasons to move to PI 7.3 Overview of new features Technical prerequisites
2. Upgrade Options
Check Product Availability Matrix for SAP NetWeaver Process Integration 7.3 http://service.sap.com/pam Requires a 64-bit Operating System Compatible with certain database releases SAP Software Catalog http://www.sap.com/ecosystem/customers/directories/SearchSolution.epx Not all 3rd-party Adapters are certified on SAP NW PI 7.3
Check
Check
for SAP Business Content availability Check for 3rd-party PI Content availability from your 3rd-party solution providers http://service.sap.com/swdc
Minimum SP requirements:
PI 7.1 requires minimum SP01 (RTC) PI 7.11 requires minimum SP01 (RTC)
Overview
1. Preparation Phase
1.1 1.2 1.3 Reasons to move to PI 7.3 Overview of new features Technical prerequisites
2. Upgrade Options
1: Technical Upgrade
Upgrade of existing XI/PI system 32 Bit Operating System is not supported SAP JVM is installed during upgrade process
Option
New SAP PI 7.3 Installation Use SAP PI 7.3 for new integration scenarios Phased migration of application systems
Agenda
1. 2. 3. 4.
Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration
Overview
SAP Applications
PI
Central SLD (7.0)
Running Stand-Alone AS Java 7.0 in HA
External Accounting and Email based Applications Are registered in the Central SLD And communicate with PI and SolMan
SLD
SLD
Upgrade to PI 7.3
Use Central SLD
SLD
SLD
PI
SLD SLD
Upgrade to PI 7.3
Use Local PI 7.3 SLD
PI
PI
SLD
SLD SLD
SLD
PI
Upgrade to PI 7.3 with local (7.3) SLD:
Improved performance of SLD 7.3 2 parallel SLD versions Full automatic synchronization
SLD
SLD
PI
SLD
SLD
Overview
PI
DEV 7.X
PI
DEV 7.3
PI
DEV 7.3
PI
DEV 7.3
PI
DEV 7.3
PI
QA 7.X
PI
QA 7.X
PI
QA 7.X
PI
QA 7.X
PI
Load Test
Patch
PI
Prod 7.X
PI
Prod 7.X
PI
Prod 7.X
PI
Prod 7.X
PI
Prod 7.3
1-2 days
14 18 days
1-2 days
Upgrade Steps
Upgrade
Get rid of erroneous messages Reducing latency period Clear open change lists
Upgrade
to PI 7.3
PI
DEV 7.X
PI
DEV 7.X
PI
DEV 7.X
PI
DEV 7.3
PI
DEV 7.X
PI
DEV 7.3
PI
QA 7.X
PI
QA 7.X
PI
QA 7.X
PI
QA 7.3
PI
QA 7.3
PI
Prod 7.X
PI
Prod 7.X
PI
Prod 7.X
PI
Prod 7.3
2 days
14 days
14 days
2 days
Overview
Deploy J2EE5 compliant JDBC/JMS drivers Check that message packaging is switched on globally XSLT and Java Mappings might have to be adjusted due to changes in the JVM and built-in XSLT processor
Agenda
1. 2. 3. 4.
Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration
PI 7.3 Track
PI
DEV 7.X
DEV ECC DEV FIN
PI
DEV 7.3
PI
QA 7.X QA ECC QA FIN
PI
QA 7.3
PI
Prod 7.X Prod ECC Prod FIN
PI
Prod 7.3
PI
DEV 7.X
DEV ECC
PI
DEV 7.3
DEV FIN
PI
QA 7.X QA ECC
PI
QA 7.3 QA FIN
PI
Prod 7.X Prod ECC
PI
Prod 7.3 Prod FIN
Migration to PI 7.3
Move
Transport selected Integration Repository content Transport selected Integration Directory Configure Communication Channels
Perform
Post-Upgrade steps
PI 7.3 Track
PI
DEV 7.X
PI
DEV 7.3
DEV ECC DEV FIN
PI
QA 7.X
PI
QA 7.3 QA ECC QA FIN
PI
Prod 7.X
PI
Prod 7.3 Prod ECC
Prod FIN
Phase-out Steps
Agenda
1. 2. 3. 4.
Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration
Upgrade
Pros
No adjustment of the Sending/Receiving systems Existing basis customization can be reused after upgrade
Cons
High risk (no fallback XI/PI solution available, only restore possible)
Higher downtime compared to new installation and phase-out Existing limitations for upgrade
SAP Note 1407530: Release restrictions for SAP NetWeaver 7.3 - Process Integration SAP Note 1403832: Central Note: Upgrade Systems on SAP NetWeaver 7.3
Low risk
Cons
More effort because XI/PI scenarios have to be transported to the SAP PI 7.3 system and communication channels have to be changed manually Existing basis has to be incorporated in the new SAP PI 7.3 system Additional hardware is required
Decision Factors
Upgrade
Options
Yes
No
Is your current OS version and/or DB version supported? (Check PAM for PI 7.3)
Yes
No
What is the maximum allowed downtime of your productive PI system (in hours)?
> 12h
< 12h
As soon as you answer one of the major questions with No or with less than 12 hours downtime, you should go with a new installation of SAP NetWeaver PI 7.3
ASCS/SCS
SCS/CI
Yes
No
Many
Few
Is your productive system wellcustomized and optimized with regard to Monitoring Setup, Alerting Setup, and Operations Setup?
Yes
No
Yes
No
1
SAP 2008 Page 35
Decision Factors
Upgrade
Options
Do you want to use only limited new PI 7.3 features and functions? Do you have many business systems connected to your XI/PI system?
Limited
Intensive
Many BS
Few BS
Many
Few
Normal EO/EOIO
ccBPM/ AAE
1
SAP 2008 Page 36
Decision Example
SAP 2008 / SAP TechEd 08 / SOA213 Page
ASCS/SCS
4.8 No
SCS/CI
Yes
6.0 5.5
Many
Few
Is your productive system wellcustomized and optimized with regard to Monitoring Setup, Alerting Setup, and Operations Setup?
Yes 2.0
No
Yes
5.0
No
1
SAP 2008 Page 38
Upgrade
Options
Do you want to use only limited new PI 7.3 features and functions? Do you have many business systems connected to your XI/PI system?
Limited
Intensive 5.0
Many BS
2.5
Few BS
6.2
1.5 Many
Few
Normal EO/EOIO
3.5 4
ccBPM/ AAE
1
SAP 2008 Page 39
Factor HA Setup Auditing Required Long-Running ccBPM Processes Well-Configured Productive System Third-Party Adapters / Content Usage of New PI 7.3 Functionality Many Connected Business Systems Many SAP Systems Connected By Proxies Many Live Interfaces Types of High-Volume Scenarios Customer-own KPIs For Example Skills, Operations Costs, and so on Summary Rating
SAP 2008 Page 40
Rating 4.8 6.0 5.5 2.0 5.0 5.0 2.5 6.2 1.5 3.5 tbd 4,2
Rating is done by customer Customer own factors have to be taken into account Final decision has to be taken by the customer
Thank you!