Decision making factors when moving to SAP NetWeaver Process Integration 7.

Patrick Kelleher, Regional Implementation Group

April, 2011

Agenda

1. 2. 3. 4.

Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration

SAP 2007 / Page 2

Overview

1. Preparation Phase
1.1 1.2 1.3 Reasons to move to PI 7.3 Overview of new features Technical prerequisites

2. Upgrade Options

SAP 2008 / Page 3

Evaluate your reasons for moving to SAP NetWeaver PI 7.3

Ensure your Future: Improved SOA Infrastructure: Enhanced Integrated Configuration: Advanced Adapter Engine Extended (AEX)

The SAP NW PI 7.3 release will be the release of choice.


Central Monitoring, Better Federation Support Option of choice for new content development. Is a more feature complete single stack option for SAP NW PI 7.3.

Overview

1. Preparation Phase
1.1 1.2 1.3 Reasons to move to PI 7.3 Overview of new features Technical prerequisites

2. Upgrade Options

SAP 2008 / Page 5

Elevator Pitch SAP NetWeaver PI 7.3 Centralized Monitoring, Single Stack ESB, Reduced TCO
Centralized monitoring via SAP Solution Manager 7.1 - Good morning page - Monitor multiple PI domains - Reduced time for root cause analysis

Single stack ESB capabilities through Advanced Adapter Engine - Up to 60% less energy consumption - Lower footprint, easy maintenance: 1h installation*, HW requirements* comp. to double stack, 90 sec restart*

Major Improvements for Reduced cost of operations via increased fault tolerance Design governance Standards based interoperability and connectivity
*Hardware dependent

Overview

1. Preparation Phase
1.1 1.2 1.3 Reasons to move to PI 7.3 Overview of new features Technical prerequisites

2. Upgrade Options

SAP 2008 / Page 7

Technical prerequisites that need to be evaluated before an Upgrade

Check Product Availability Matrix for SAP NetWeaver Process Integration 7.3 http://service.sap.com/pam Requires a 64-bit Operating System Compatible with certain database releases SAP Software Catalog http://www.sap.com/ecosystem/customers/directories/SearchSolution.epx Not all 3rd-party Adapters are certified on SAP NW PI 7.3

Check

Check

for SAP Business Content availability Check for 3rd-party PI Content availability from your 3rd-party solution providers http://service.sap.com/swdc

SAP 2008 Page 8

PI constraints that need to be evaluated before an Upgrade

Minimum SP requirements:

XI 3.0 requires minimum SP15 PI 7.0 requires minimum SP09 (SR1)

PI 7.1 requires minimum SP01 (RTC) PI 7.11 requires minimum SP01 (RTC)

Single usage type? Additional components?


Non-Central Adapter Engine

J2SE Adapter Engine PCK (Migration to AEX)

SAP 2008 Page 9

Overview

1. Preparation Phase
1.1 1.2 1.3 Reasons to move to PI 7.3 Overview of new features Technical prerequisites

2. Upgrade Options

SAP 2008 / Page 10

Upgrade Paths to SAP NetWeaver Process Integration 7.3


Upgrade paths will be offered for SAP NetWeaver 2004 (XI 3.0) SAP NetWeaver 7.0 (2004s) (PI 7.0) Update paths will be offered for SAP NetWeaver PI 7.1
Upgrade
Update

SAP NetWeaver PI 7.3

EHP1 for SAP NetWeaver PI 7.1 (PI 7.11)

PI 7.1 and 7.11

XI 3.0 and PI 7.0

SAP 2008 Page 11

Options How to Get to SAP PI 7.1

Two options exist to go from XI/PI to SAP PI 7.3:


Option

1: Technical Upgrade

Upgrade of existing XI/PI system 32 Bit Operating System is not supported SAP JVM is installed during upgrade process

Option

2: New Installation and Phase-out

New SAP PI 7.3 Installation Use SAP PI 7.3 for new integration scenarios Phased migration of application systems

SAP 2008 Page 12

Agenda

1. 2. 3. 4.

Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration

SAP 2007 / Page 13

Overview

1. Performing a PI 7.3 Upgrade


SLD Considerations Upgrade Project Steps Adjust Scenarios to SAP PI 7.3 capabilities

SAP 2008 / Page 14

SLD Considerations Example migration from a SAP NW PI 7.0


PI 7.0
Registered in Central SLD
PI

SAP Applications

PI
Central SLD (7.0)
Running Stand-Alone AS Java 7.0 in HA

External Accounting and Email based Applications Are registered in the Central SLD And communicate with PI and SolMan

SLD

SLD

Upgrade to PI 7.3
Use Central SLD

SLD

SLD

PI

Solution Manager 7.0


With Local SLD 7.0
SLD

SLD SLD

Upgrade to PI 7.3
Use Local PI 7.3 SLD

SLD Considerations Example migration from a SAP NW PI 7.0


Upgrade to PI 7.3 and use the Central SLD: PI 7.0
Registered in Central SLD
PI 7.3 can run as client of a 7.0 SLD (SAP Note 954820)

PI

PI

Central SLD (7.0)

SLD

SLD SLD

Solution Manager 7.0


With Local SLD 7.0

SLD

SLD Considerations Example migration from a SAP NW PI 7.0


PI 7.0
Registered in Central SLD

PI
Upgrade to PI 7.3 with local (7.3) SLD:

Central SLD (7.0)

Improved performance of SLD 7.3 2 parallel SLD versions Full automatic synchronization

SLD

SLD

PI

Solution Manager 7.0


With Local SLD 7.0
SLD

SLD
SLD

Overview

1. Performing a PI 7.3 Upgrade


SLD Considerations Upgrade Project Steps Adjust Scenarios to SAP PI 7.3 capabilities

SAP 2008 Page 18

Option 1: Upgrade Three-Tier Landscape


1

PI
DEV 7.X

PI
DEV 7.3

PI
DEV 7.3

PI
DEV 7.3

PI
DEV 7.3

Disconnect Upgrade Test


QA 7.3

PI
QA 7.X

PI
QA 7.X

PI
QA 7.X

PI
QA 7.X

PI

Load Test
Patch

PI
Prod 7.X

PI
Prod 7.X

PI
Prod 7.X

PI
Prod 7.X

PI
Prod 7.3

1-2 days

14 18 days

1-2 days

SAP 2007 Page 19

Upgrade Steps

Upgrade

Operating System to 64Bit and Database (see PAM) Clean-up XI/PI

Get rid of erroneous messages Reducing latency period Clear open change lists

Upgrade

to PI 7.3

Configure new features of PI 7.3 Test your business scenarios


Repeat

for Test and Production system

SAP 2008 Page 20

Option 2: Upgrade with a Development Sandbox


1 2 3 4&5

PI
DEV 7.X

PI
DEV 7.X

PI
DEV 7.X

PI
DEV 7.3

PI
DEV 7.X

PI
DEV 7.3

PI
QA 7.X

PI
QA 7.X

PI
QA 7.X

PI
QA 7.3

PI
QA 7.3

PI
Prod 7.X

PI
Prod 7.X

PI
Prod 7.X

PI
Prod 7.3

2 days

14 days

14 days

2 days

SAP 2007 Page 21

Overview

1. Performing a PI 7.3 Upgrade


SLD Considerations Upgrade Project Steps Adjust Scenarios to SAP PI 7.3 capabilities

SAP 2008 Page 22

Post Upgrade Steps

Adjust and redeploy adapter modules and Java Proxies

Custom adapter modules 3rd-party adapters and modules

3rd-party dependant content

Deploy J2EE5 compliant JDBC/JMS drivers Check that message packaging is switched on globally XSLT and Java Mappings might have to be adjusted due to changes in the JVM and built-in XSLT processor

SAP 2008 Page 23

Agenda

1. 2. 3. 4.

Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration

SAP 2007 Page 24

New Installation of SAP PI 7.3

Existing XI/PI Track

PI 7.3 Track

PI
DEV 7.X
DEV ECC DEV FIN

PI
DEV 7.3

PI
QA 7.X QA ECC QA FIN

PI
QA 7.3

PI
Prod 7.X Prod ECC Prod FIN

PI
Prod 7.3

SAP 2007 Page 25

Migration: Pre-flight Checklist

Check PI 7.3 PAM and Sizing Guide


Evaluate HA setup

Install PI 7.3 development system


Create/Transfer communication users Optional: Setup new SLD 7.3 Optional: Transport selected SLD content Transport selected basic and operations relevant configuration (Alerts, archiving, ABAP transports, etc)

SAP 2008 Page 26

Transition from existing PI to new PI 7.3 installation


Existing XI/PI Track PI 7.3 Track

PI
DEV 7.X
DEV ECC

PI
DEV 7.3
DEV FIN

PI
QA 7.X QA ECC

PI
QA 7.3 QA FIN

PI
Prod 7.X Prod ECC

PI
Prod 7.3 Prod FIN

SAP 2007 Page 27

Migration to PI 7.3

Move

Selected Scenarios to PI 7.3

Transport selected Integration Repository content Transport selected Integration Directory Configure Communication Channels

Transport Custom ABAP Development

Perform

Post-Upgrade steps

Update Adapter, Modules, and Proxies Deploy JMS/JDBC Drivers

Switch on message packaging Update XSLT and Java Mappings


Test

Migration Migrate QA and Production

SAP 2008 Page 28

Gradual phase-out of existing PI.

Existing XI/PI Track

PI 7.3 Track

PI
DEV 7.X

PI
DEV 7.3
DEV ECC DEV FIN

PI
QA 7.X

PI
QA 7.3 QA ECC QA FIN

PI
Prod 7.X

PI
Prod 7.3 Prod ECC

Prod FIN

SAP 2007 Page 29

Phase-out Steps

Execute Final Testing of all migrated interfaces on Dev and QA

Disconnect Remaining Systems/Components from existing PI


Optional: Create a final Backup of the existing production PI

Transport remaining scenarios from QA to Production

SAP 2008 Page 30

Agenda

1. 2. 3. 4.

Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration

SAP 2007 Page 31

Upgrade: Pros and Cons

Upgrade
Pros

Less effort because no redirection of the business scenarios are required

No adjustment of the Sending/Receiving systems Existing basis customization can be reused after upgrade

Cons

High risk (no fallback XI/PI solution available, only restore possible)

Higher downtime compared to new installation and phase-out Existing limitations for upgrade

SAP Note 1407530: Release restrictions for SAP NetWeaver 7.3 - Process Integration SAP Note 1403832: Central Note: Upgrade Systems on SAP NetWeaver 7.3

SAP 2008 Page 32

New Install: Pros and Cons

New Installation and Phase-out


Pros

Low risk

Phased approach for interface implementation Lower downtime compared to upgrade

Cons

More effort because XI/PI scenarios have to be transported to the SAP PI 7.3 system and communication channels have to be changed manually Existing basis has to be incorporated in the new SAP PI 7.3 system Additional hardware is required

SAP 2008 Page 33

Major Decision Factors

Decision Factors

Upgrade

Options

New Installation & Phaseout

Is XI/PI the only usage type installed?

Yes

No

Is your current OS version and/or DB version supported? (Check PAM for PI 7.3)

Yes

No

What is the maximum allowed downtime of your productive PI system (in hours)?

> 12h

< 12h

As soon as you answer one of the major questions with No or with less than 12 hours downtime, you should go with a new installation of SAP NetWeaver PI 7.3

SAP 2008 Page 34

Technology/Operation Related Decision Factors


Decision Factors Upgrade Options New Installation & Phaseout

Are you already using the HA setup with ASCS/SCS?

ASCS/SCS

SCS/CI

Do you require XI/PI runtime information for auditing?

Yes

No

Do you have many longrunning ccBPM processes?

Many

Few

Is your productive system wellcustomized and optimized with regard to Monitoring Setup, Alerting Setup, and Operations Setup?

Yes

No

Have your third-party adapters/contents already been released for PI 7.3.?

Yes

No

1
SAP 2008 Page 35

Interface Related Decision Factors

Decision Factors

Upgrade

Options

New Installation & Phaseout

Do you want to use only limited new PI 7.3 features and functions? Do you have many business systems connected to your XI/PI system?

Limited

Intensive

Many BS

Few BS

Do you have many SAP systems connected by proxy?

Many SAP Proxies

Few SAP Proxies

Do you have many live interfaces?

Many

Few

Which types of high-volume scenarios do you run?

Normal EO/EOIO

ccBPM/ AAE

1
SAP 2008 Page 36

Decision Example
SAP 2008 / SAP TechEd 08 / SOA213 Page

Technology/Operation Related Decision Factors Customer Example for Decisions


Decision Factors Upgrade Options New Installation & Phaseout

Are you already using the HA setup with ASCS/SCS?

ASCS/SCS

4.8 No

SCS/CI

Do you require XI/PI runtime information for auditing?

Yes

6.0 5.5

Do you have many longrunning ccBPM processes?

Many

Few

Is your productive system wellcustomized and optimized with regard to Monitoring Setup, Alerting Setup, and Operations Setup?

Yes 2.0

No

Have your third-party adapters/contents already been released for PI 7.3.?

Yes

5.0

No

1
SAP 2008 Page 38

Interface Related Decision Factors Customer Example for Decisions


Decision Factors

Upgrade

Options

New Installation & Phaseout

Do you want to use only limited new PI 7.3 features and functions? Do you have many business systems connected to your XI/PI system?

Limited

Intensive 5.0

Many BS

2.5

Few BS

Do you have many SAP systems connected by proxy?

Many SAP Proxies

Few SAP Proxies

6.2

Do you have many live interfaces?

1.5 Many

Few

Which types of high-volume scenarios do you run?

Normal EO/EOIO

3.5 4

ccBPM/ AAE

1
SAP 2008 Page 39

Example Rating for Decision

Factor HA Setup Auditing Required Long-Running ccBPM Processes Well-Configured Productive System Third-Party Adapters / Content Usage of New PI 7.3 Functionality Many Connected Business Systems Many SAP Systems Connected By Proxies Many Live Interfaces Types of High-Volume Scenarios Customer-own KPIs For Example Skills, Operations Costs, and so on Summary Rating
SAP 2008 Page 40

Rating 4.8 6.0 5.5 2.0 5.0 5.0 2.5 6.2 1.5 3.5 tbd 4,2

Rating is done by customer Customer own factors have to be taken into account Final decision has to be taken by the customer

Thank you!