Anda di halaman 1dari 1

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAUDI ARAMCO INSPECTION CHECKLIST


Inspection of Culvert Crossing
PROJECT TITLE

SAIC NUMBER

DATE APPROVED

QR NUMBER

SAIC-L-2118
WBS / BI / JO NUMBER

25-May-05

MECH.

CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) LAYOUT DRAWING NUMBER SCHEDULED INSPECTION DATE & TIME SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO INSPECTION LEVEL

EQUIPMENT DESCRIPTION REV. NO. PURCHASE ORDER NUMBER

EQPT CODE

SYSTEM ID.

PLANT NO.

EC / PMCC / MCC NO. QUANTITY INSP. MH's SPENT TRAVEL TIME

ACTUAL INSPECTION DATE & TIME SAUDI ARAMCO ACTIVITY NUMBER CONTRACTOR INSPECTION LEVEL

SAUDI ARAMCO USE ONLY


WORK PERMIT REQUIRED?

ITEM No. A. A1 General:

ACCEPTANCE CRITERIA

REFERENCE

PASS

FAIL

N/A

RE-INSP DATE

The culvert length or bridge width does exceed 20 times the clearance between the top of the highest pipeline in a culvert and the ceiling of the culvert, or from the top of a pipeline to the bottom of the bridge beams. Box culverts are not used in areas where moving sand can bury the pipeline unless the pipeline is coated in accordance with SAES-H-002. The minimum spacing between any two pipes when pipelines cross under roads or railroads through box culverts shall be twice the diameter of the larger pipe. The minimum spacing between any pipe and the overhead or side portion of the culvert structure shall be 1.5 pipe diameters, but in no case less than 1 meter. Transition from pipeline spacing within corridors and that stipulated at box culverts shall be made within the road or railroad right-of-way.

SAES-L-460 Para. 6.3 SAES-L-460 Para. 6.4 SAES-B-064 Para. 10.12 SAES-B-064 Para. 10.12 SAES-B-064 Para. 10.13

A2

A3

A4

A5

REMARKS:

REFERENCE DOCUMENTS: 1. SAES-L-460, Pipeline Crossings Under Roads and Railroads, (30 September, 2003) 2. SAES-B-064, Onshore and Nearshore Pipeline Safety, (30 January, 2002)

Contractor / Third-Party
Construction Representative*
Work is Complete and Ready for Inspection: Name, Initials and Date: Name, Initials and Date:

Saudi Aramco
PMT Representative
T&I Witnessed QC Record Reviewed Work Verified

QC Inspector
Performed Inspection Name, Initials and Date: Work / Rework May Proceed

PID Representative
T&I Witnessed Name, Initials and Date: QC Record Reviewed Work Verified

QC Supervisor
Quality Record Approved: Name, Sign and Date: *Person Responsible for Completion of Quality Work / Test

Proponent and Others


Name, Organization, Initials and Date: T&I Witnessed QC Record Reviewed Work Verified

Y = YES

N = NO F = FAILED

Page 1 of 1

Anda mungkin juga menyukai