DAFTAR HARGA SATUAN BAHAN DAN UPAH

BULAN JANUARI 2013


A. Harga Satuan Bahan
NO

NAMA BARANG

SATUA
N
3

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

FINISHING
Amplas
Cat besi
Cat dasar
Cat emco
Cat menie besi
Cat menie kayu
Cat tembok Decolith
Cat tembok Dulux
Cat tembok Emco
Cat tembok Paragon
Cat tembok Toyopaint
Cat tembok Vinilex
Cat tembok Vinippaint
Dempul
Kuas
Mild
Minyak cat
Plamir kayu
Plamir tembok
Politur ultra
Politur vernis
Thiner A Bonanza
Thiner B Spesial

lbr
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
ltr
bh
zak
ltr
kg
kg
ltr
ltr
ltr
ltr

24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54

PENUTUP ATAP
Alang-alang panjang 2,4 meter
Alluminium foil
Asbes Bubungan
Asbes Gelombang 1,80 m x 0,80 m x 5 mm
Asbes Gelombang 2,4 m x 1,05 m x 4 mm
Asbes Rata 2 m x 1 m x 4 mm
Atap metal Toratora 1 x 4 Extra
Atap metal Toratora 1 x 4 Premium
Atap metal Toratora 2 x 4 Extra
Atap metal Toratora 2 x 4 Premium
Atap metal Toratora 3 x 4 Extra
Atap metal Toratora 3 x 4 Premium
Atap metal Toratora 4 x 4 Extra
Atap metal Toratora 4 x 4 Premium
Bentala paras
Bentala tanah liat
Besi profil WF
Besi strip
Bubungan Biasa
Bubungan Karang Pilang (glazur) isi 3,5/m
Bubungan Karang Pilang isi 3,5/m
Bubungan Ngalayur isi 3,5/m
Bubungan Plentong
Bubungan Utama isi 3,5/m
Genteng Kanmuri (glazur) isi 14/m2
Genteng Kodok Karang Pilang (Bambe) isi 20/m2
Genteng Kodok Karang Pilang (Bisma) isi 20/m2
Genteng Kodok Karang Pilang (Good Year) isi 20/m2
Genteng Morando Abadi isi 18/m2
Genteng Morando Jatiwangi isi 18/m2
Genteng Morando Ngalayur isi 20/m2

lbr
m2
lbr
lbr
lbr
lbr
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
kg
kg
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj
bj

Harga Barang dan Upah

Hal. 1

NO

NAMA BARANG

55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70

Genteng Plentong
Genteng plentong dicat
Genteng Plentong Jatiwangi isi 24/m2
Ijuk
Ikut celedu paras
Ikut celedu tanah liat
Murda paras
Murda tanah liat
Seng BJLS 0,20 gelombang
Seng BJLS 0,25 gelombang
Seng BJLS 0,28 gelombang
Seng BJLS 0,32 gelombang
Seng Plat 3" x 6" BJLS 28
Sirap Jati
Tali Ijuk
Tali pengikat alang-alang

71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95

PENGGANTUNG
Engsel kupu-kupu
Engsel nylon
Espagnoleth
Grendel biasa
Grendel hararo
Kaca 3 mm bening
Kaca 5 mm bening
Kaca 6 mm bening
Kaca 8 mm bening
Kaca 10 mm bening
Kaca 12 mm bening
Kaca Es/Kapur 3 mm
Kaca Es/Kapur 5 mm
Kaca nako
Kaca nako teralis bening
Kaca ryben 3 mm
Kaca ryben 5 mm
Kait angin biasa
Kunci pintu TOP
Kunci pintu Union
Kunci pintu Vanesa
Kunci pintu Yale
Kunci pintu YURI
Kunci slot
Kunci tanam 2 slag

96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114

KAYU DAN PLAFOND


Bambu besar Ukuran 4 m
Bambu sedang Ukuran 4 m
Bambu kecil Ukuran 4 m
Celling teak (0,62 x 2,40) m2
Eternit
Formika
Gedeg kulit kelas I
Gypsum Old
Hard board MDF
Kalsiboard 4,5 mm
Kayu bekesting
Kayu bingkirai
Kayu bingkirai papan
Kayu dolken (pekerjaan sementara)
Kayu jati
Kayu jati papan
Kayu kamper balok
Kayu kamper usuk/reng
Kayu kamper papan

Harga Barang dan Upah

SATUA
N
3
bj
bj
bj
kg
bh
bh
bh
bh
lbr
lbr
lbr
lbr
lbr
bh
kg
ikat

ps
ps
set
bh
bh
m2
m2
m2
m2
m2
m2
m2
m2
daun
m2
m2
m2
bh
bh
bh
bh
bh
bh
bh
bh

btg
btg
btg
lbr
lbr
lbr
m2
lbr
lbr
lbr
m3
m3
m3
btg
m3
m3
m3
m3
m3
Hal. 2

NO

NAMA BARANG

SATUA
N
3

115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141

Kayu kruing balok


Kayu kruing usuk/reng
Kayu kruing papan
Kayu meranti balok
Kayu meranti usuk/reng
Kayu meranti papan
Kayu merbau
Kayu merbau papan
Kayu profil
Kayu seseh balok
Kayu seseh dolken
Lem Aibond
Lem Kayu
List Gypsum standar
Minyak bekisting
Multiplek 12 mm
Multiplek 18 mm
Multiplek 6 mm
Multiplek 9 mm
Plywood 12 mm
Plywood 3 mm
Plywood 4 mm
Plywood 6 mm
Plywood 9 mm
Plywood aluminium
Teak wood (0,9x2,20) m2
Teak wood (1,20x2,40) m2

m3
m3
m3
m3
m3
m3
m3
m3
m1
m3
m3
kg
ltr
m'
ltr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr

142
143
144
145
146
147
148
149
150
151

KERAMIK
IKAD
Ikad (Keramik) Kw. I 10 x 20 cm
Ikad (Keramik) Kw. I 20 x 20 cm
Ikad (Keramik) Kw. I 20 x 30 cm
Ikad (Keramik) Kw. I 30 x 30 cm
Ikad (Keramik) Kw. I 40 x 40 cm
Ikad (Keramik) Kw. II 10 x 20 cm
Ikad (Keramik) Kw. II 20 x 20 cm
Ikad (Keramik) Kw. II 20 x 30 cm
Ikad (Keramik) Kw. II 30 x 30 cm
Ikad (Keramik) Kw. II 40 x 40 cm

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

152
153
154
155
156
157
158
159
160
161
162

INESA
Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, P)
Keramik 30 x 30 Kelas I (Onyx Phyrus Ruby Jade, UP)
Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, P)
Keramik 30 x 30 Kelas I (Pearl Ghita Cat Eye, UP)
Keramik 30 x 30 Kelas I (Sand Wheat Spruce Clay Charcoal, R)
Keramik 40 x 40 Kelas I (Corypha Roystonea Raphia, P)
Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, P)
Keramik 40 x 40 Kelas I (Onyx Phyrus Ruby Jade, UP)
Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, P)
Keramik 40 x 40 Kelas I (Pearl Ghita Cat Eye, UP)
Keramik 60 x 60 Kelas I (Corypha Roystonea Raphia, P)

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

163
164
165
166
167

ESSENZA
Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, P)
m2
Keramik 30 x 30 Kelas I (Black Orchid, Coral Bell, UP)
m2
Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
Keramik 30 x 30 Kelas I (Pepper Grey Price Rubert Silver star, UP)m2
Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, P) m2

Harga Barang dan Upah

Hal. 3

NO

NAMA BARANG

SATUA
N
3

168
169
170
171
172
173

Keramik 40 x 40 Kelas I (Pepper Grey Price Rubert Silver star, UP)m2


Keramik 60 x 60 Kelas I (Pepper Grey Price Rubert Silver star, P) m2
Keramik Kelas I Domus
m2
Keramik Kelas I Granity Imperiali
m2
Keramik Kelas I Lavagna
m2
Keramik Kelas I Mountain Peak
m2

174
175
176
177
178
179
180
181
182
183
184

ROMAN
Keramik 20 x 20 tekstur kasar
Keramik 25 x 33 kelas I
Keramik 25 x 45 motif halus kelas I
Keramik 30 x 30 standard
Keramik 30 x 30 kelas I T. 1cm
Keramik 20 x 60 kelas I T. 1cm
Keramik 20 x 40 kelas I Motif standard
Keramik 30 x 60 kelas I Motif Dasar Muda
Keramik 40 x 40 kelas I krem
Keramik 40 x 40 kelas I white
Keramik 50 x 50 kelas I warna muda

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

185
186
187
188

PLATINUM
Keramik 25 x 33 kelas I
Keramik 25 x 40 kelas II
Keramik 30 x 60 kelas II bulgari
Keramik 40 x 40 kelas I brown

m2
m2
m2
m2

189
190
191
192
193

GRANIT
Granit star white L.60
Granit BGYD red L.60
Granit crystal pink L. 60
Granit mongol black L. 60
Granit gold black L. 60

m2
m2
m2
m2
m2

MARMER
194 Marmer cream BA 60 x 60
195 Marmer cream BA 40 x 40
196 Marmer cream BA 30 x 30

m2
m2
m2

MOZAIK
197 Mozaik keramik zehn crystal glass 30 x 30
198 Mozaik batu alam 30 x 30

biji
biji

ASIA
Keramik 20 x 30 kelas I warna muda
Keramik 30 x 30 kelas I warna muda
Keramik 30 x 30 kelas I warna tua
Keramik 40 x 40 kelas I warna muda
Keramik 10 x 20 kelas II
Keramik 20 x 20 kelas II
Keramik 20 x 30 kelas II
Keramik 30 x 30 kelas II
Keramik 40 x 40 kelas II

m2
m2
m2
m2
m2
m2
m2
m2
m2

199
200
201
202
203
204
205
206
207

MULIA
208 Keramik 10 x 20 cm kelas I
209 Keramik 20 x 20 cm kelas I

Harga Barang dan Upah

m2
m2

Hal. 4

NO

NAMA BARANG

SATUA
N
3

210
211
212
213
214
215
216
217

Keramik 20 x 30 cm kelas I
Keramik 30 x 30 cm kelas I
Keramik 40 x 40 cm kelas I
Keramik 10 x 20 cm kelas II
Keramik 20 x 20 cm kelas II
Keramik 20 x 30 cm kelas II
Keramik 30 x 30 cm kelas II
Keramik 40 x 40 cm kelas II

203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245

SANITAIR
Bak mandi fibre glass 70x70x66 cm
bh
Bak mandi keramik 50x50
bh
Floor Drain " TOTO TypeTx 1 Bv 1 " Square Flange "
bh
Floor drain plastik
bh
Floor drain stainless
bh
Kloset duduk INA Komplit
bh
Kloset duduk Amerika Standar
bh
Kloset duduk " TOTO Type AVANTE CW 821 PJ / SW 821JP COMPLIT
bh
Kloset duduk " TOTO Type AVANTE CW 821J"/ SW 821JP COMPLIT
bh
Kloset duduk " TOTO Type AVANTE CW 823 J
bh
Kloset duduk " TOTO Type CW 660J
bh
Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT
bh
Kloset duduk " TOTO Type CW 660J / SW 660J COMPLIT WARNAbh
Kloset duduk " TOTO Type CW 660J WARNA COMPLIT
bh
Kloset duduk " TOTO Type CW 661JT1 BODI COMPLIT
bh
Kloset duduk " TOTO Type CW 661JT1" / SW 661JP COMPLIT bh
Kloset duduk " TOTO Type CW 661JT1" / SW 784JP COMPLIT bh
Kloset jongkok " TOTO Type CE 6 COMPLIT
bh
Kloset jongkok " TOTO Type CE 7 COMPLIT
bh
Kloset porselin jongkok Kia (standar)
bh
Kloset porselin jongkok Ina (standar)
bh
Kran biasa
bh
Kran SunEi
bh
Kran TOTO T 205 LCSC
bh
Kran TOTO T 205 MC
bh
Kran TOTO T 23 B13
bh
Kran TOTO T 23 B13V7N
bh
Kran TOTO T 26 - 13
bh
Kran TOTO TX 109 LH
bh
Penyekat Urinoir " TOTO " Type A 100 "
bh
Shower Spray " TOTO Tx 403SPIV ( Pastel Ivory )
bh
Soap holder " TOTO " Type S 6 N "
bh
Seal tape
bh
Urinoir " TOTO U 57 M
bh
Urinoir " TOTO U 57 M BODI
bh
Urinoir " TOTO UW 447 JT 1 "
bh
Urinoir " TOTO UW 447 JT 1 BODI
bh
Urinoir " TOTO UW 447 JT 1,M "
bh
Urinoir " TOTO UW 447 JT 1,M "BODI
bh
Wastagel KIA Standard
bh
Wastagel KIA Warna
bh
Wastafel Komplit " TOTO Tx " Type L 521V1A "
bh
Wastafel Komplit top Counter" TOTO " Type CERABO LW 523 " bh

246
247
248
249
250
251

PAKU
Paku 10 cm
Paku kalsiboard
Paku list SQ
Paku pancing 60 x 230
Paku reng/usuk SQ
Paku seng

Harga Barang dan Upah

m2
m2
m2
m2
m2
m2
m2
m2

kg
kg
kg
kg
kg
kg
Hal. 5

NO

NAMA BARANG

SATUA
N
3

252
253
254
255
256

Paku seng import


Paku skrup 1/2"
Paku skrup 2"
Paku skrup 3.5"
Paku sumbat 1/2"

bj
kg
kg
kg
kg

257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310

PASIR, BATU, KERIKIL, BATA DAN PARAS


Bata gosok ex Tulikup
Bata Merah 5 x 11 x 22 cm
Batako kelas I
Batu kali /batu bulat 15/20 cm
Batu karang
Batu lahar Singaraja
Batu pecah 5-7 cm (manual)
Batu pipih Singaraja
Bata riyan ( abble )
Roster Keramik
Koral Beton
Limestone
Paras Batik
Paras Buahan
Paras Karang Bukit
Paras Kerobokan Tebal 5
Paras Malem
Paras Putih Bukit
Paras Silakarang tebal
Paras Silakarang tipis
Paras untuk pondasi
Batu alam RTM hijau 10 x 20 halus
Batu alam RTM hijau 20 x 20 halus
Batu alam RTS hijau 10 x 20 kasar
Batu pilah Jember 30 x 30
Batu pilah Jember 20 x 30
Batu pilah Jember 40 x 40
Batu pilah Singaraja 30 x 30
Batu pilah Singaraja 20 x 20
Batu hitam Jember 5 x 20 halus
Batu hitam Jember 20 x 40 halus
Batu hitam Jember 15 x 30 halus
Batu hitam Singaraja 15 x 30 halus
Batu hitam Singaraja 20 x 40 halus
Batu AND 60 x 60 abu
Batu AND 50 x 50 hitam
Batu AND 40 x 40 hitam bkr
Batu AND 30 x 60 hitam bkr
Batu AND 40 x 60 hitam kilap
Batu AND 30 x 40 abu SS
Batu marmer kuning 10 x 20
Batu marmer kuning PB1 10 x 20
Batu marmer kuning PB2 10 x 20
Batu marmer kuning 15 x 30
Batu kuning serat 30 x 30
Batu kuning serat 20 x 30
Batu palimanan cirebon 20 x 30
Batu palimanan cirebon 20 x 40
Batu paras Jogja 60 x 60
Batu candi hitam 60 x 60
Batu candi hitam 20 x 20
Batu candi hitam 30 x 30
Batu candi hitam 40 x 40 T.5cm
Batu candi hitam 20 x 30

bj
bj
bj
m3
m3
m3
m3
m3
bj
bh
m3
m3
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

Harga Barang dan Upah

Hal. 6

NO

NAMA BARANG

SATUA
N
3

311
312
314
315
316
317
318
319

Batu Bali green gelombang 20 x 40


Batu Bali green kombinasi 20 x 40
Batu serayu 20 x 60
Pasir beton
Pasir pasang
Pasir urug
Sirtu
Tanah urug

m2
m2
m2
m3
m3
m3
m3
m3

320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365

PIPA
Pipa Galvanis 1/2"
Pipa Galvanis 3/4"
Pipa Galvanis 1 1/4"
Pipa Galvanis 1 1/2"
Pipa Galvanis 1"
Pipa Galvanis 1,5 BSA
Pipa Galvanis 2"
Pipa Galvanis 3"
Pipa Maspion AW 1
Pipa Maspion AW 1/2
Pipa Maspion AW 10
Pipa Maspion AW 1-1/2
Pipa Maspion AW 1-1/4
Pipa Maspion AW 12
Pipa Maspion AW 14
Pipa Maspion AW 16
Pipa Maspion AW 2
Pipa Maspion AW 2-1/2
Pipa Maspion AW 3
Pipa Maspion AW 3/4
Pipa Maspion AW 4
Pipa Maspion AW 5
Pipa Maspion AW 6
Pipa Maspion AW 8
Pipa Maspion C 1
Pipa Maspion C 1-1/2
Pipa Maspion C 1-1/4
Pipa Maspion C 2
Pipa Maspion C 2-1/2
Pipa Maspion C 3
Pipa Maspion C 3/4
Pipa Maspion C 4
Pipa Maspion C 5/8
Pipa Maspion D 10
Pipa Maspion D 1-1/2
Pipa Maspion D 1-1/4
Pipa Maspion D 12
Pipa Maspion D 14
Pipa Maspion D 16
Pipa Maspion D 2
Pipa Maspion D 2-1/2
Pipa Maspion D 3
Pipa Maspion D 4
Pipa Maspion D 5
Pipa Maspion D 6
Pipa Maspion D 8

m1
m1
m1
m1
m1
m1
m1
m1
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr
ljr

SEMEN & AIR CAMPURAN BETON


366 Semen Bosowa 50 kg
367 Semen Gresik 40 kg
368 Semen Gresik 50 kg
Harga Barang dan Upah

zak
zak
zak
Hal. 7

NO

NAMA BARANG

SATUA
N
3

369
370
371
372

Semen Tiga Roga 50 kg


Semen Tonasa 50 kg
Semen warna/semen grouting
Air Campuran Beton

zak
zak
kg
ltr

373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395

BESI BETON DAN PAGAR


Besi beton
Kawat berduri
Kawat beton RRT
Pagar BRC asli T.120 diameter 6mm
Pagar BRC asli T.150 diameter 6mm
Pagar BRC asli T.175 diameter 7mm
Pagar BRC asli T.190 diameter 7mm
Pagar BRC asli T.90 diameter 6mm
Pagar HotDip Galvanized T.120 diameter 6mm
Pagar HotDip Galvanized T.150 diameter 7mm
Pagar HotDip Galvanized T.175 diameter 7mm
Pagar HotDip Galvanized T.190 diameter 7mm
Pagar HotDip Galvanized T.90 diameter 6mm
Tiang BRC asli T. 120 diameter 1 1/2"
Tiang BRC asli T. 150 diameter 2"
Tiang BRC asli T. 175 diameter 2"
Tiang BRC asli T. 190 diameter 2"
Tiang BRC asli T. 90 diameter 1 1/2"
Tiang HotDip Galvanized T. 120 diameter 1 1/2"
Tiang HotDip Galvanized T. 150 diameter 2"
Tiang HotDip Galvanized T. 175 diameter 2"
Tiang HotDip Galvanized T. 190 diameter 2"
Tiang HotDip Galvanized T. 90 diameter 1 1/2"

kg
roll
kg
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415

BAHAN LISTRIK
Saklar (Broco)
Stop Kontak
Fitting
Steker
Coaxial cable 5C - 75 ohm commscof
Kabel NYM 3 x 2.5 mm ex. Supreme
Kabel NYM 4 mm
Kabel telephone
Lampu pijar 10 Watt (Philip)
Lampu pijar 15 Watt (Philip)
Lampu pijar 25 Watt (Philip)
Lampu TL 10 Watt (10 Watt)
Lampu TL 20 Watt (10 Watt)
Lampu TL 25 Watt (10 Watt)
Pipa clipsal 20 mm
Pipa flexible clipsal 20 mm
Sock clipsal 20 mm
Tee dos clipsal 20 mm
Klem clipsal 20 mm
Inbow dos plastik clipsal E 157 P

bh
bh
bh
bh
m1
m1
m1
m1
bh
bh
bh
bh
bh
bh
bt
m1
bj
bh
bj
bj

416
417
418
419
420
421

BUIS BETON
Buis beton 10 x 75
Buis beton 15 x 75
Buis beton 20 x 75
Buis beton 25 x 75
Buis beton 30 x 75
Buis beton 50 x 75

bh
bh
bh
bh
bh
bh

Harga Barang dan Upah

Hal. 8

NO

NAMA BARANG

422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440

PAVING
Paving 10 x 20 cm tebal 6 cm K225
Paving 10 x 20 cm tebal 6 cm K350
Paving 10 x 20 cm tebal 8 cm K225
Paving 10 x 20 cm tebal 8 cm K350
Paving 10 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 6 cm K225
Paving 20 x 20 cm tebal 6 cm K350
Paving 20 x 20 cm tebal 8 cm K225
Paving 20 x 20 cm tebal 8 cm K350
Paving 20 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 10 cm K225
Paving 20 x 20 cm tebal 10 cm K350
Paving 20 x 20 cm tebal 10 cm K425
Paving Tiga Berlian tebal 6 cm K225
Kanstein Bulat (P:50,T:30,La:10,Lb:16 cm K225)
Kanstein Jumbo (P:50,L:15,T:30 cm K225)
Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)
Grass Block 36 X 54 cm tebal 9 cm K 225
Koral Sikat

441
442
443
444
445
446
447
448
449
450
451

LAIN-LAIN
Wall papper 29 x 29
Wall papper 70 x 100
Wall papper 50 x 70
Wall papper 30 x 60
Glass block
Dugul batu hitam 50 x 50 x 200
Dugul batu hitam 60 x 70 x 250
Dugul batu hitam 70 x 70 x 250
Padmasari batu hitam 50 x 50 x 200
Padmasari batu hitam 65 x 75 x 255
Padmasari batu hitam 70 x 70 x 250

SATUA
N
3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m1
m1
m1
m2
zak/10 kg

lembar
lembar
lembar
lembar
bj
unit
unit
unit
unit
unit
unit
Mangupura, Januari
Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk.I
NIP. 196110101994032001

Harga Barang dan Upah

Hal. 9

N BAHAN DAN UPAH


ARI 2013

HARGA SATUAN
4
4,100.00
70,500.00
43,600.00
55,000.00
22,000.00
22,000.00
33,000.00
38,800.00
38,000.00
10,000.00
18,500.00
20,600.00
17,000.00
29,000.00
16,800.00
12,000.00
26,000.00
42,000.00
30,000.00
47,000.00
59,000.00
22,000.00
12,000.00

12,500.00
29,000.00
24,000.00
29,000.00
36,000.00
50,000.00
84,000.00
125,000.00
74,000.00
108,500.00
72,000.00
105,000.00
70,000.00
105,000.00
68,000.00
52,000.00
15,000.00
8,000.00
2,700.00
7,200.00
10,000.00
7,000.00
6,000.00
4,200.00
6,500.00
3,000.00
2,800.00
3,500.00
2,800.00
2,900.00
2,800.00
Harga Barang dan Upah

Hal. 10

HARGA SATUAN
4
1,300.00
1,400.00
1,350.00
2,500.00
62,000.00
49,000.00
75,000.00
61,000.00
43,500.00
42,000.00
42,500.00
47,000.00
46,500.00
8,500.00
34,000.00
9,500.00

49,000.00
27,000.00
100,000.00
15,500.00
22,000.00
97,000.00
102,000.00
167,000.00
212,000.00
305,000.00
375,000.00
87,000.00
117,000.00
15,000.00
117,000.00
122,000.00
127,000.00
22,000.00
60,000.00
72,000.00
109,000.00
115,000.00
132,000.00
100,000.00
105,000.00

11,000.00
9,000.00
7,000.00
70,000.00
47,000.00
80,000.00
20,000.00
63,500.00
107,000.00
72,000.00
2,250,000.00
12,000,000.00
13,500,000.00
90,000.00
20,000,000.00
30,000,000.00
8,300,000.00
6,500,000.00
9,000,000.00
Harga Barang dan Upah

Hal. 11

HARGA SATUAN
4
5,000,000.00
6,000,000.00
6,000,000.00
2,500,000.00
3,000,000.00
6,000,000.00
13,000,000.00
13,200,000.00
12,250.00
2,264,750.00
2,750,000.00
33,000.00
12,500.00
17,000.00
15,000.00
135,000.00
200,000.00
62,000.00
98,700.00
127,000.00
36,000.00
47,000.00
67,000.00
105,500.00
75,000.00
56,000.00
62,000.00

51,500.00
42,000.00
52,000.00
40,000.00
48,000.00
38,000.00
40,000.00
47,000.00
42,500.00
52,000.00

191,000.00
154,000.00
180,000.00
143,000.00
165,000.00
209,000.00
209,000.00
160,000.00
197,000.00
149,000.00
248,500.00

210,000.00
189,500.00
150,700.00
107,800.00
222,900.00

Harga Barang dan Upah

Hal. 12

HARGA SATUAN
4
194,900.00
273,500.00
286,500.00
262,500.00
249,900.00
337,000.00

57,750.00
70,500.00
88,750.00
72,500.00
95,000.00
114,900.00
76,900.00
175,900.00
76,100.00
76,100.00
92,900.00

61,500.00
40,000.00
40,900.00
57,500.00

315,000.00
425,000.00
320,000.00
825,000.00
825,000.00

335,000.00
260,000.00
215,000.00

41,000.00
21,500.00

55,500.00
39,000.00
45,000.00
52,000.00
45,000.00
35,000.00
37,000.00
37,000.00
40,000.00

41,000.00
43,000.00

Harga Barang dan Upah

Hal. 13

HARGA SATUAN
4
56,000.00
40,000.00
48,000.00
38,500.00
40,000.00
53,500.00
36,500.00
46,000.00

230,000.00
170,000.00
225,000.00
15,000.00
45,000.00
1,300,000.00
955,000.00
1,500,000.00
5,610,000.00
5,600,000.00
610,000.00
1,365,000.00
1,491,000.00
670,000.00
2,800,000.00
2,200,000.00
1,800,000.00
355,000.00
165,000.00
145,000.00
135,000.00
18,000.00
110,500.00
220,500.00
165,000.00
140,000.00
142,000.00
187,000.00
410,000.00
835,000.00
235,000.00
48,000.00
2,600.00
1,052,000.00
849,000.00
185,000.00
235,000.00
1,135,000.00
735,000.00

14,000.00
24,000.00
17,000.00
20,000.00
13,000.00
21,000.00
Harga Barang dan Upah

Hal. 14

HARGA SATUAN
4
45,000.00
18,000.00
18,000.00
26,500.00
15,000.00

1,980.00
1,300.00
2,200.00
180,000.00
131,000.00
170,000.00
150,000.00
155,000.00
2,500.00
50,000.00
170,000.00
85,000.00
17,000.00
10,000.00
8,500.00
9,500.00
13,000.00
4,000.00
14,500.00
12,000.00
12,500.00
75,000.00
90,000.00
70,000.00
55,000.00
55,000.00
65,000.00
65,000.00
60,000.00
55,000.00
55,000.00
55,000.00
60,000.00
65,000.00
190,000.00
190,000.00
140,000.00
140,000.00
160,000.00
100,000.00
75,000.00
90,000.00
70,000.00
100,000.00
70,000.00
70,000.00
80,000.00
80,000.00
120,000.00
75,000.00
70,000.00
75,000.00
185,000.00
75,000.00
Harga Barang dan Upah

Hal. 15

HARGA SATUAN
4
105,000.00
100,000.00
90,000.00
141,000.00
158,000.00
130,000.00
125,000.00
80,000.00

27,125.00
35,000.00
70,625.00
81,125.00
38,000.00
58,000.00
77,500.00
175,000.00
32,000.00
22,000.00
112,000.00
59,480.00
45,000.00
1,550,000.00
1,900,000.00
2,400,000.00
89,000.00
103,000.00
140,000.00
25,000.00
225,000.00
373,000.00
494,000.00
768,000.00
14,700.00
19,500.00
16,500.00
35,000.00
45,000.00
50,000.00
10,000.00
63,000.00
5,500.00
784,000.00
32,000.00
28,000.00
1,270,000.00
1,650,000.00
1,877,568.00
42,000.00
62,000.00
86,000.00
120,000.00
209,000.00
254,000.00
449,000.00

60,000.00
51,000.00
61,000.00
Harga Barang dan Upah

Hal. 16

HARGA SATUAN
4
60,000.00
60,000.00
12,500.00
50.00

8,427.00
85,000.00
16,000.00
170,000.00
178,000.00
251,000.00
268,000.00
137,000.00
140,000.00
191,000.00
205,000.00
220,000.00
120,000.00
167,000.00
215,000.00
245,000.00
250,000.00
140,000.00
147,000.00
172,000.00
190,000.00
200,000.00
127,000.00

12,700.00
16,000.00
6,000.00
30,000.00
6,000.00
12,000.00
6,000.00
4,000.00
6,000.00
7,000.00
8,000.00
27,500.00
35,000.00
34,000.00
12,000.00
10,500.00
2,000.00
7,000.00
750.00
10,000.00

31,000.00
39,000.00
40,000.00
43,000.00
54,000.00
75,000.00

Harga Barang dan Upah

Hal. 17

HARGA SATUAN
4
55,000.00
63,000.00
63,000.00
68,000.00
75,500.00
55,000.00
63,000.00
63,000.00
68,000.00
75,500.00
66,500.00
76,000.00
85,000.00
53,000.00
58,000.00
66,000.00
69,000.00
55,000.00
35,000.00

22,000.00
80,000.00
99,000.00
35,000.00
25,000.00
3,800,000.00
4,100,000.00
4,300,000.00
3,800,000.00
4,100,000.00
4,300,000.00
Mangupura, Januari 2013
Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk.I
196110101994032001

Harga Barang dan Upah

Hal. 18

DAFTAR HARGA SATUAN UPAH


BULAN JANUARI TAHUN 2013
NO

NAMA BARANG

SPESIFIKASI

SATUAN

HARGA
(Rp.)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

Mandor
Kepala Tukang
Tukang Politur
Tukang Batu
Tukang kayu
Tukang Besi
Tukang cat
Tukang gali
Tukang Listrik
Tukang Pipa/ Tukang Ledeng
Tukang Aspal
Tukang masak Aspal
Pekerja
Tukang Ukir
Operator
Pembantu Operator
Mekanik
Pembantu Mekanik
Pasang Atap Alang-Alang
Pasang Bata Gosok Dua Muka
Pasang Bata Gosok Satu Muka
Pasang Batu Paras Diukir
Pasang Patu Paras Siap Diukir
Tukang Bongkar Begesting

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
M2
M2
M2
M2
Hari

68,000.00
60,000.00
42,000.00
45,000.00
55,000.00
50,000.00
40,000.00
40,000.00
45,000.00
50,000.00
43,000.00
44,000.00
40,000.00
75,000.00
50,000.00
40,000.00
50,000.00
45,000.00
45,000.00
270,000.00
145,000.00
288,500.00
250,000.00
40,000.00

Catatan :
1. Harga - harga belum termasuk PPn 10 %;
2. Harga - harga hanya sebagai pedoman / pendukung
dalam perhitungan konstruksi ( tidak mengikat ).
Mangupura, Januari 2013
Kepala Dinas Cipta Karya
Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
NIP. 196110101994032001

DAFTAR ANALISA PEKERJAAN


BULAN JANUARI TAHUN 2013
NO

URAIAN

PEKERJAAN PERSIAPAN

I
1

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2


METER
1.2500 btg Bambu Sedang
2.5000 kg Semen Portland
1.2000 lbr Seng gelombang 3" - 5"
0.0050 m3 Pasir Beton
0.0090 m3 Koral beton
0.0720 m3 Kayu Meranti Usuk 5/7
0.0600 kg Paku biasa 2" - 5"
0.4500 kg Meni Besi
0.2000 oh Tukang Kayu
0.4000 oh Pekerja
0.0200 oh Kepala Tukang
0.0200 oh Mandor

1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK


0.0120 m3 Kayu Usuk Meranti 5/7
0.0200 kg Paku Biasa 2" - 5"
0.0070 m3 Kayu Papan Meranti 3/20
0.1000 oh Tukang Kayu
0.1000 oh Pekerja
0.0100 oh Kepala Tukang
0.0050 oh Mandor
1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI
PLESTERAN
1.2500 btg Dolken Kayu 8 - 10/4m
0.1800 m3 Kayu Meranti
0.8500 kg Paku Biasa 2" - 5"
1.1000 kg Besi Strip
35.0000 kg Semen Portland
0.1500 m3 Pasir Pasang
0.1000 m3 Pasir Beton
0.1500 m3 Koral Beton
30.0000 bh Bata Merah
0.2500 lbr Seng Plat
2.0000 bh Jendela Nako
0.0800 m2 Kaca Polos
0.1500 bh Kunci Tanam
0.0600 lbr Plywood 4 mm
2.0000 oh Tukang Kayu
1.0000 oh Tukang Batu
2.0000 oh Pekerja
0.3000 oh Kepala Tukang
0.0500 oh Mandor

1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


1.7000 btg Bambu Sedang
0.2100 m3 Kayu Meranti
0.3000 kg Paku Biasa 2" - 5"
10.5000 kg Semen Portland
0.0300 m3 Pasir Beton
0.0500 m3 Koral Beton
1.5000 lbr Seng gelombang BJLS 28
2.0000 oh Tukang Kayu
1.0000 oh Pekerja
0.2000 oh Kepala Tukang
0.0500 oh Mandor
1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU
3.0000 btg Bambu Sedang
0.2760 m3 Kayu Meranti
0.7000 kg Paku biasa 2" - 5"
1.5000 lbr Seng gelombang BJLS 28
1.5000 oh Tukang Kayu
1.0000 oh Pekerja
0.1500 oh Kepala Tukang
0.0500 oh Mandor

9,000.00
1,220.00
43,500.00
141,000.00
170,000.00
3,000,000.00
13,000.00
22,000.00
55,000.00
40,000.00
60,000.00
68,000.00
Total :

3,000,000.00
13,000.00
6,000,000.00
55,000.00
40,000.00
60,000.00
68,000.00
Total :

90,000.00
2,500,000.00
13,000.00
8,000.00
1,220.00
158,000.00
141,000.00
170,000.00
1,300.00
46,500.00
15,000.00
102,000.00
105,000.00
47,000.00
55,000.00
45,000.00
40,000.00
60,000.00
68,000.00
Total :

9,000.00
2,500,000.00
13,000.00
1,220.00
141,000.00
170,000.00
42,500.00
55,000.00
40,000.00
60,000.00
68,000.00
Total :
9,000.00
2,500,000.00
13,000.00
42,500.00
55,000.00
40,000.00
60,000.00
68,000.00
Total :

11,250.00
3,050.00
52,200.00
705.00
1,530.00
216,000.00
780.00
9,900.00
11,000.00
16,000.00
1,200.00
1,360.00
29,560.00

295,415.00

36,000.00
260.00
42,000.00
5,500.00
4,000.00
600.00
340.00
10,440.00

78,260.00

112,500.00
450,000.00
11,050.00
8,800.00
42,700.00
23,700.00
14,100.00
25,500.00
39,000.00
11,625.00
30,000.00
8,160.00
15,750.00
2,820.00
110,000.00
45,000.00
80,000.00
18,000.00
3,400.00
256,400.00

795,705.00

15,300.00
525,000.00
3,900.00
12,810.00
4,230.00
8,500.00
63,750.00
110,000.00
40,000.00
12,000.00
3,400.00
165,400.00

633,490.00
27,000.00
690,000.00
9,100.00
63,750.00

82,500.00
40,000.00
9,000.00
3,400.00
134,900.00

789,850.00

NO

URAIAN

PEKERJAAN PERSIAPAN
6

1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


0.1000 oh Pekerja
0.0500 oh Mandor

1 M2 PEMBUATAN BEDENG BURUH


1.2500 btg Bambu Sedang
0.1860 m3 Kayu Meranti
0.3000 kg Paku Biasa 2" - 5"
18.0000 kg Semen Portland
0.0300 m3 Pasir Beton
0.0500 m3 Koral Beton
1.5000 lbr Seng gelombang BJLS 28
1.3500 lbr Plywood 4 mm
2.0000 oh Tukang Kayu
1.0000 oh Pekerja
0.2000 oh Kepala Tukang
0.0500 oh Mandor

1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM


0.0360 m3 Kayu Terentang
0.0800 kg Paku Biasa 2" - 5"
1.0000 btg Kaso 5/7
0.3000 oh Tukang kayu
0.0015 oh Mandor

1 M2 PEMBUATAN STEGGER DARI BAMBU


1.0000 btg Bambu
0.2500 kg Tali Ijuk
0.0170 oh Tukang Kayu
0.0020 oh Pekerja
0.2500 oh Kepala Tukang
0.0130 oh Mandor

11 1 M3 BONGKARAN BETON BERTULANG


6.6670 oh Pekerja
0.3330 oh Mandor

12 1 M3 BONGKARAN DINDING TEMBOK BATA MERAH


6.6670 oh Pekerja
0.0330 oh Mandor

PEKERJAAN TANAH
1

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

10 1 M2 PEMBUATAN JALAN SEMENTARA


0.1500 m3 Batu Kali / Batu Bulat 15/20
0.0900 m3 Batu Pecah 5 - 7
0.0100 m3 Pasir Pasang
1.0000 oh Pekerja
0.0500 oh Mandor

II

HARGA
SATUAN
(Rp)

40,000.00
68,000.00
Total :

9,000.00
2,500,000.00
13,000.00
1,220.00
141,000.00
170,000.00
42,500.00
47,000.00
55,000.00
40,000.00
60,000.00
68,000.00
Total :

2,500,000.00
13,000.00
84,000.00
55,000.00
68,000.00
Total :

7,000.00
34,000.00
55,000.00
40,000.00
60,000.00
68,000.00

4,000.00
3,400.00
7,400.00

11,250.00
465,000.00
3,900.00
21,960.00
4,230.00
8,500.00
63,750.00
63,450.00
110,000.00
40,000.00
12,000.00
3,400.00
165,400.00

90,000.00
1,040.00
84,000.00
16,500.00
102.00
16,602.00

1 M3 GALIAN TANAH BIASA DALAM 2 METER


0.9000 oh Pekerja
0.0450 oh Mandor

1 M3 GALIAN TANAH BIASA DALAM 3 METER


1.0500 oh Pekerja
0.0670 oh Mandor

1 M3 GALIAN TANAH KERAS DALAM 1METER


1.0000 oh Pekerja
0.0320 oh Mandor

1 M3 GALIAN TANAH CADAS DALAM 1 METER


1.5000 oh Pekerja
0.0600 oh Mandor

175,040.00

7,000.00
8,500.00
935.00
80.00
15,000.00
884.00
16,899.00

180,000.00
150,000.00
158,000.00
40,000.00
68,000.00
Total :

40,000.00
3,400.00
43,400.00

40,000.00
68,000.00
Total :

266,680.00
22,644.00
289,324.00

40,000.00
68,000.00
Total :

266,680.00
2,244.00
268,924.00

40,000.00
68,000.00
Total :

30,000.00
1,700.00
31,700.00

40,000.00
68,000.00
Total :

36,000.00
3,060.00
39,060.00

40,000.00
68,000.00
Total :

42,000.00
4,556.00
46,556.00

40,000.00
68,000.00
Total :

40,000.00
2,176.00
42,176.00

40,000.00
68,000.00
Total :

60,000.00
4,080.00
64,080.00

15,500.00

27,000.00
13,500.00
1,580.00

(SNI 2835 : 2008)

1 M3 GALIAN TANAH BIASA DALAM 1 METER


0.7500 oh Pekerja
0.0250 oh Mandor

642,040.00

42,080.00

NO

URAIAN

PEKERJAAN PERSIAPAN
6

1 M3 GALIAN TANAH LUMPUR DALAM 1 METER


1.2000 oh Pekerja
0.0450 oh Mandor

1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER


0.0500 oh Pekerja
0.0050 oh Mandor

1 M3 PEMBUANGAN TANAH SEJAUH 15 METER


0.3300 oh Pekerja
0.0100 oh Mandor

12 1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM


6.0000 m3 Ijuk
0.1500 oh Pekerja
0.0150 oh Mandor

13 1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan


1.2000 m3 Sirtu
0.2500 oh Pekerja
0.0250 oh Mandor

14 1 M3 URUGAN TANAH PILIHAN DIPADATKAN


1.2000 m3 Tanah Urug
0.5000 oh Pekerja
0.0500 oh Mandor
15 1 M3 URUGAN LIMESTONE PADAT
1.2000 m3 Limestone
0.2500 oh Pekerja
0.0250 oh Mandor

HARGA
BAHAN
(Rp)

40,000.00
68,000.00
Total :

48,000.00
3,060.00
51,060.00

40,000.00
68,000.00
Total :

2,000.00
340.00
2,340.00

40,000.00
68,000.00
Total :

13,200.00
680.00
13,880.00

1 M3 URUGAN KEMBALI
Mengurug Kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian

11 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug
0.3000 oh Pekerja
0.0100 oh Mandor

HARGA
UPAH
(Rp)

(SNI 03-2835-2002)

10 1 M3 PEMADATAN TANAH ( Per 20 Cm )


0.5000 oh Pekerja
0.0500 oh Mandor

III

HARGA
SATUAN
(Rp)

PEKERJAAN PONDASI

40,000.00
68,000.00
Total :

20,000.00
3,400.00
23,400.00

130,000.00
40,000.00
68,000.00
Total :

12,000.00
680.00
12,680.00

2,500.00
40,000.00
68,000.00
Total :

6,000.00
1,020.00
7,020.00

125,000.00
40,000.00
68,000.00
Total :

10,000.00
1,700.00
11,700.00

80,000.00
40,000.00
68,000.00
Total :

20,000.00
3,400.00
23,400.00

85,000.00
40,000.00
68,000.00
Total :

10,000.00
1,700.00
11,700.00

156,000.00

156,000.00

15,000.00

15,000.00

150,000.00

150,000.00

96,000.00

96,000.00
102,000.00

102,000.00

(SNI 2836 : 2008)

1 M3 BATU KALI CAMP. 1 PC : 3 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
202.0000 kg Semen Portland
0.4850 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

1 M3 BATU KALI CAMP. 1 PC : 4 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
163.0000 kg Semen Portland
0.5200 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

180,000.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

180,000.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

216,000.00
246,440.00
76,630.00
60,000.00
33,750.00
4,500.00
5,100.00
103,350.00

539,070.00

216,000.00
198,860.00
82,160.00
60,000.00
33,750.00
4,500.00
5,100.00
103,350.00

497,020.00

NO

URAIAN

PEKERJAAN PERSIAPAN
3

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

1 M3 BATU KALI CAMP. 1 PC : 5 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
136.0000 kg Semen Portland
0.5440 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

180,000.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1 M3 BATU KALI CAMP. 1 PC : 6 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
117.0000 kg Semen Portland
0.5610 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

180,000.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1 M3 BATU KALI CAMP. 1 PC : 8 PS


1.2000 m3 Batu Kali / Batu Bulat 15/20
91.0000 kg Semen Portland
0.5840 m3 Pasir Pasang
1.5000 oh Pekerja
0.7500 oh Tukang Batu
0.0750 oh Kepala Tukang
0.0750 oh Mandor

180,000.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI


0.4800 m3 Batu Kali / Batu Bulat 15/20
194.0000 kg Semen Portland
0.3120 m3 Pasir Beton
0.4680 m3 Koral Beton
126.0000 kg Besi Beton
1.8000 kg Kawat Beton
3.4000 oh Pekerja
0.8500 oh Tukang Batu
0.0850 oh Kepala Tukang
0.1700 oh Mandor

1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M


0.4500 m3 Batu Kali / Batu Bulat 15/20
194.0000 kg Semen Portland
0.3120 m3 Pasir Beton
0.4680 m3 Koral Beton
2.4000 oh Pekerja
0.8000 oh Tukang Batu
0.0800 oh Kepala Tukang
0.1190 oh Mandor

1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Kali / Batu Bulat 15/20 15/20
0.4320 m3 Pasir Urug
0.7800 oh Pekerja
0.3900 oh Tukang Batu
0.0390 oh Kepala Tukang
0.0390 oh Mandor

180,000.00
1,220.00
141,000.00
170,000.00
8,427.00
16,000.00
40,000.00
45,000.00
60,000.00
68,000.00

180,000.00
1,220.00
141,000.00
170,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

180,000.00
130,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

216,000.00
165,920.00
85,952.00
60,000.00
33,750.00
4,500.00
5,100.00
103,350.00

467,872.00

216,000.00
142,740.00
88,638.00
60,000.00
33,750.00
4,500.00
5,100.00
103,350.00

447,378.00

216,000.00
111,020.00
92,272.00
60,000.00
33,750.00
4,500.00
5,100.00
103,350.00

419,292.00

86,400.00
236,680.00
43,992.00
79,560.00
1,061,802.00
28,800.00
136,000.00
38,250.00
5,100.00
11,560.00
190,910.00

1,537,234.00

81,000.00
236,680.00
43,992.00
79,560.00
96,000.00
36,000.00
4,800.00
8,092.00
144,892.00

441,232.00

216,000.00
56,160.00
31,200.00
17,550.00
2,340.00
2,652.00
53,742.00

272,160.00

SNI 03-2836-2002
9

1 M1 Pembuatan Tiang Pancang 35 cm x 35 cm Beton Bertulang


0.0160 m3 Pasir Urug
0.0800 m3 Pasir Beton
0.1250 m3 Koral Beton
49.0000 kg Semen Portland
34.5000 kg Besi Beton
0.7000 kg Kawat beton
0.0270 m3 Kayu Bekesting
0.1200 kg Paku Reng SQ
0.2000 kg Plamir Tembok
0.0900
lt Minyak Bekisting
0.8000 oh Pekerja
0.5000 oh Tukang Batu
0.0500 oh Kepala Tukang
0.0400 oh Mandor

10 1 M1 Pembuatan Tiang Pancang 40 cm x 40 cm Beton Bertulang


0.0190 m3 Pasir Urug
0.0940 m3 Pasir Beton
0.1500 m3 Koral Beton
60.5000 kg Semen Portland

130,000.00
141,000.00
170,000.00
1,220.00
8,427.00
16,000.00
2,250,000.00
13,000.00
30,000.00
15,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :
130,000.00
141,000.00
170,000.00
1,220.00

2,080.00
11,280.00
21,250.00
59,780.00
290,731.50
11,200.00
60,750.00
1,560.00
6,000.00
1,350.00
32,000.00
22,500.00
3,000.00
2,720.00
60,220.00

465,981.50
2,470.00
13,254.00
25,500.00
73,810.00

NO

URAIAN

45.0000 kg
Besi Beton
PEKERJAAN
PERSIAPAN
0.9000
0.0320
0.1200
0.2400
0.0900
1.0000
0.6700
0.0670
0.0500

IV

kg
m3
kg
kg
lt
oh
oh
oh
oh

(SNI 03-2835-2002)

Kawat beton
Kayu Bekesting
Paku Reng SQ
Plamir Tembok
Minyak Bekisting
Pekerja
Tukang Batu
Kepala Tukang
Mandor

PEKERJAAN DINDING

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

8,427.00
16,000.00
2,250,000.00
13,000.00
30,000.00
15,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

HARGA
BAHAN
(Rp)
5

379,215.00
14,400.00
72,000.00
1,560.00
7,200.00
1,350.00
40,000.00
30,150.00
4,020.00
3,400.00
77,570.00

590,759.00

(SNI 6897 : 2008)

1
1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS
140.0000 bh Bata Merah 5 x 11 x 22 cm
43.5000 kg Semen Portland
0.0800 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

1,300.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00

182,000.00
53,070.00
12,640.00
24,000.00
9,000.00
1,200.00
2,040.00
36,240.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm
32.9500 kg Semen Portland
0.0910 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm
26.5500 kg Semen Portland
0.0930 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm
22.2000 kg Semen Portland
0.1020 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS


140.0000 bh Bata Merah 5 x 11 x 22 cm
18.5000 kg Semen Portland
0.1220 m3 Pasir Pasang
0.6000 oh Pekerja
0.2000 oh Tukang Batu
0.0200 oh Kepala Tukang
0.0300 oh Mandor

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
18.9500 kg Semen Portland
0.0380 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

1,300.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00

1,300.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00

1,300.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00

1,300.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00

1,300.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00

247,710.00

182,000.00
40,199.00
14,378.00
24,000.00
9,000.00
1,200.00
2,040.00
36,240.00

236,577.00

182,000.00
32,391.00
14,694.00
24,000.00
9,000.00
1,200.00
2,040.00
36,240.00

229,085.00

182,000.00
27,084.00
16,116.00
24,000.00
9,000.00
1,200.00
2,040.00
36,240.00

225,200.00

182,000.00
22,570.00
19,276.00
24,000.00
9,000.00
1,200.00
2,040.00
36,240.00

223,846.00

91,000.00
23,119.00
6,004.00
12,000.00
4,500.00
600.00
1,020.00
18,120.00

120,123.00

NO
1

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

1
M2 PASANGANPERSIAPAN
BATA MERAH TEBAL(SNI
1/2 BATA
CAMP. 1 PC : 3 PS
PEKERJAAN
03-2835-2002)
70.0000 bh Bata Merah 5 x 11 x 22 cm
14.3700 kg Semen Portland
0.0400 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
11.5000 kg Semen Portland
0.0430 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
9.6800 kg Semen Portland
0.0450 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

10 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
8.3200 kg Semen Portland
0.0490 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

11 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS


70.0000 bh Bata Merah 5 x 11 x 22 cm
6.5000 kg Semen Portland
0.0500 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

12 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)


12.5000 bh Batako
7.5000 kg Semen Portland
0.0270 m3 Pasir Pasang
1.9500 kg Besi Beton 8 mm
0.3200 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

13 1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI


12.5000 bh Batako
7.5000 kg Semen Portland
0.0270 m3 Pasir Pasang
0.3200 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

14 1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM


30.0000 bh Roster Keramik
11.0000 kg Semen Portland
0.0350 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

15 1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU


1.5000 m2 Bedeg/Bilik Bambu Kelas I
0.0140 m3 Kayu kamper usuk/reng
0.0120 kg Paku Biasa

1,300.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,300.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,300.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :
1,300.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,300.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

2,200.00
1,220.00
158,000.00
8,427.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

2,200.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

50,000.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

20,000.00
6,500,000.00
13,000.00

91,000.00
17,531.40
6,320.00
12,000.00
4,500.00
600.00
1,020.00
18,120.00

114,851.40

91,000.00
14,030.00
6,794.00
12,000.00
4,500.00
600.00
1,020.00
18,120.00

111,824.00

91,000.00
11,809.60
7,110.00
12,000.00
4,500.00
600.00
1,020.00
18,120.00

109,919.60
91,000.00
10,150.40
7,742.00

12,000.00
4,500.00
600.00
1,020.00
18,120.00

108,892.40

91,000.00
7,930.00
7,900.00
12,000.00
4,500.00
600.00
1,020.00
18,120.00

106,830.00

27,500.00
9,150.00
4,266.00
16,432.65
12,800.00
4,500.00
600.00
1,020.00
18,920.00

57,348.65

27,500.00
9,150.00
4,266.00
12,800.00
4,500.00
600.00
1,020.00
18,920.00

40,916.00

1,500,000.00
13,420.00
5,530.00
12,000.00
4,500.00
600.00
1,020.00
18,120.00

1,518,950.00

30,000.00
91,000.00
156.00

NO

URAIAN

0.0030 m3
List Kayu 2/4
PEKERJAAN
PERSIAPAN
0.1000
0.0500
0.0050
0.0020

oh
oh
oh
oh

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

PEKERJAAN PLESTERAN

V
1

(SNI 03-2835-2002)

CAMP. 1 PC : 1 PS TEBAL 15 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 PLESTERAN
10.2240 kg
0.0200 m3
0.3000 oh
0.1500 oh
0.0150 oh
0.0150 oh

CAMP. 1 PC : 2 PS TEBAL 15 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 PLESTERAN
6.2400 kg
0.0240 m3
0.3000 oh
0.1500 oh
0.0150 oh
0.0150 oh

1 M2 PLESTERAN
5.1840 kg
0.0260 m3
0.3000 oh
0.1500 oh
0.0150 oh
0.0150 oh

1 M2 PLESTERAN
4.4160 kg
0.0270 m3
0.3000 oh
0.1500 oh
0.0150 oh
0.0150 oh

1 M2 PLESTERAN
3.4560 kg
0.0290 m3
0.3000 oh
0.1500 oh
0.0150 oh
0.0150 oh

1 M2 PLESTERAN
13.6320 kg
0.0270 m3
0.4000 oh
0.2000 oh
0.0200 oh
0.0220 oh

1 M2 PLESTERAN
10.3680 kg
0.0310 m3
0.4000 oh

HARGA
UPAH
(Rp)

6,500,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

HARGA
BAHAN
(Rp)
5

19,500.00
4,000.00
2,750.00
300.00
136.00
7,186.00

140,656.00

(SNI 2837 : 2008)

1 M2 PLESTERAN
15.5040 kg
0.0160 m3
0.3000 oh
0.1500 oh
0.0150 oh
0.0150 oh

1 M2 PLESTERAN
7.7760 kg
0.0230 m3
0.3000 oh
0.1500 oh
0.0150 oh
0.0150 oh

HARGA
SATUAN
(Rp)

CAMP. 1 PC : 3 PS TEBAL 15 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

CAMP. 1 PC : 4 PS TEBAL 15 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

CAMP. 1 PC : 5 PS TEBAL 15 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

CAMP. 1 PC : 6 PS TEBAL 15 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

CAMP. 1 PC : 8 PS TEBAL 15 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

CAMP. 1 PC : 2 PS TEBAL 20 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

CAMP. 1 PC : 3 PS TEBAL 20 MM
Semen Portland
Pasir Pasang
Pekerja

1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,220.00
158,000.00
40,000.00

18,914.88
2,528.00
12,000.00
6,750.00
900.00
1,020.00
20,670.00

21,442.88
12,473.28
3,160.00

12,000.00
6,750.00
900.00
1,020.00
20,670.00

15,633.28

9,486.72
3,634.00
12,000.00
6,750.00
900.00
1,020.00
20,670.00

13,120.72

7,612.80
3,792.00
12,000.00
6,750.00
900.00
1,020.00
20,670.00

11,404.80

6,324.48
4,108.00
12,000.00
6,750.00
900.00
1,020.00
20,670.00

10,432.48

5,387.52
4,266.00
12,000.00
6,750.00
900.00
1,020.00
20,670.00

9,653.52

4,216.32
4,582.00
12,000.00
6,750.00
900.00
1,020.00
20,670.00

8,798.32

16,631.04
4,266.00
16,000.00
9,000.00
1,200.00
1,496.00
27,696.00

20,897.04

12,648.96
4,898.00
16,000.00

NO

HARGA
SATUAN
(Rp)

URAIAN

0.2000 oh
Tukang Batu
PEKERJAAN
PERSIAPAN
0.0200
0.0220

(SNI 03-2835-2002)

oh Kepala Tukang
oh Mandor

10 1 M2 PLESTERAN
8.3200 kg
0.0320 m3
0.4000 oh
0.2000 oh
0.0200 oh
0.0220 oh

CAMP. 1 PC : 4 PS TEBAL 20 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

11 1 M2 PLESTERAN
6.9120 kg
0.0350 m3
0.4000 oh
0.2000 oh
0.0200 oh
0.0220 oh

CAMP. 1 PC : 5 PS TEBAL 20 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

12 1 M2 PLESTERAN
5.8880 kg
0.0360 m3
0.4000 oh
0.2000 oh
0.0200 oh
0.0220 oh

CAMP. 1 PC : 6 PS TEBAL 20 MM
Semen Portland
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor

13 1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM


0.5000 kg Semen Portland
0.0130 m3 Pasir Pasang
0.0800 oh Pekerja
0.4000 oh Tukang Batu
0.0400 oh Kepala Tukang
0.0040 oh Mandor

14 1 M2 PLESTERAN CIPRAT 1 PC : 2 PS
4.3200 kg Semen Portland
0.0060 m3 Pasir Pasang
0.3000 oh Pekerja
0.1000 oh Tukang Batu
0.0100 oh Kepala Tukang
0.0150 oh Mandor

45,000.00
60,000.00
68,000.00
Total :

1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

9,000.00
1,200.00
1,496.00
27,696.00

17,546.96

10,150.40
5,056.00
16,000.00
9,000.00
1,200.00
1,496.00
27,696.00

15,206.40
8,432.64
5,530.00

16,000.00
9,000.00
1,200.00
1,496.00
27,696.00

13,962.64

7,183.36
5,688.00
16,000.00
9,000.00
1,200.00
1,496.00
27,696.00

12,871.36

610.00
2,054.00
3,200.00
18,000.00
2,400.00
272.00
23,872.00

1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

12,000.00
4,500.00
600.00
1,020.00
18,120.00

1,220.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

6,000.00
3,375.00
480.00
544.00
10,399.00

1,220.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

2,800.00
1,575.00
240.00
272.00
4,887.00

2,664.00

5,270.40
948.00

6,218.40

15
1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')
3.1080 kg Semen Portland
0.1500 oh Pekerja
0.0750 oh Tukang Batu
0.0080 oh Kepala Tukang
0.0080 oh Mandor

16 1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK


EKSPOSE (= 8 M')
1.6000 kg Semen Portland
0.0700 oh Pekerja
0.0350 oh Tukang Batu
0.0040 oh Kepala Tukang
0.0040 oh Mandor

3,791.76

3,791.76

1,952.00

1,952.00

17
1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS
6.3400 kg Semen Portland
0.0120 m3 Pasir Pasang
0.3000 oh Pekerja
0.1500 oh Tukang Batu
0.0150 oh Kepala Tukang
0.0150 oh Mandor

18 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg
0.2000 oh Pekerja
0.1000 oh Tukang Labur/Cat
0.0100 oh Kepala Tukang
0.0100 oh Mandor

1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

7,734.80
1,896.00
12,000.00
6,750.00
900.00
1,020.00
20,670.00

1,220.00
40,000.00
40,000.00
60,000.00
68,000.00
Total :

8,000.00
4,000.00
600.00
680.00
5,280.00

9,630.80

3,965.00

3,965.00

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

VI
1

PEKERJAAN PERSIAPAN
KAYU

(SNI3434
03-2835-2002)
(SNI
: 2008)

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS I
1.1000 m3 Balok Kayu Kamper
1.2500 Kg Paku 10 Cm
1.0000 Kg Lem Kayu
7.0000 oh Pekerja
21.0000 oh Tukang Kayu
2.1000 oh Kepala Tukang
0.3500 oh Mandor

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA


KAYU KELAS II/III
1.2000 m3 Balok Kayu kruing
1.2500 Kg Paku 10 Cm
1.0000 Kg Lem Kayu
6.0000 oh Pekerja
18.0000 oh Tukang Kayu
1.8000 oh Kepala Tukang
0.3000 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU


KELAS II
0.0400 m3 Papan Kayu Kamper
0.0500 Kg Paku 5-7 Cm
0.3500 oh Pekerja
1.0500 oh Tukang Kayu
0.1050 oh Kepala Tukang
0.0180 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA


KAYU KELAS III
0.0400 m3 Papan Kayu Kruing
0.0500 Kg Paku 5-7 Cm
0.3500 oh Pekerja
1.0500 oh Tukang Kayu
0.1050 oh Kepala Tukang
0.0180 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU


KELAS I/II
0.0400 m3 Papan Kayu Kamper
0.5000 Kg Lem Kayu
1.0000 oh Pekerja
3.0000 oh Tukang Kayu
0.3000 oh Kepala Tukang
0.0500 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA,


KAYU KELAS I/II
0.0240 m3 Papan Kayu Kamper
0.3000 Kg Lem Kayu
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI,


KAYU KELAS I/II
0.0640 m3 Papan Kayu Kamper
0.5000 Kg Lem Kayu
1.0000 oh Pekerja
3.0000 oh Tukang Kayu
0.3000 oh Kepala Tukang
0.0500 oh Mandor
MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA
TERTUTUP, KAYU KELAS II (Lebar Sampai 90 Cm)
0.0250 m3 Papan Kayu Kamper
0.0300 Kg Paku 1-2,5 Cm
0.5000 Kg Lem Kayu
1.0000 Lbr Plywood 4 mm
1.0000 oh Pekerja
3.0000 oh Tukang Kayu
0.3000 oh Kepala Tukang
0.0500 oh Mandor

8,300,000.00
14,000.00
12,500.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

5,000,000.00
14,000.00
12,500.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

9,000,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

6,000,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

9,000,000.00
12,500.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

9,000,000.00
12,500.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

9,000,000.00
12,500.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

9,000,000.00
14,000.00
12,500.00
47,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

9,130,000.00
17,500.00
12,500.00
280,000.00
1,155,000.00
126,000.00
23,800.00
1,584,800.00

9,160,000.00

6,000,000.00
17,500.00
12,500.00
240,000.00
990,000.00
108,000.00
20,400.00
1,358,400.00

6,030,000.00

360,000.00
700.00
14,000.00
57,750.00
6,300.00
1,224.00
79,274.00

360,700.00

240,000.00
700.00
14,000.00
57,750.00
6,300.00
1,224.00
79,274.00

240,700.00

360,000.00
6,250.00
40,000.00
165,000.00
18,000.00
3,400.00
226,400.00

366,250.00

216,000.00
3,750.00
32,000.00
132,000.00
14,400.00
2,720.00
181,120.00

219,750.00

576,000.00
6,250.00
40,000.00
165,000.00
18,000.00
3,400.00
226,400.00

582,250.00

225,000.00
420.00
6,250.00
47,000.00
40,000.00
165,000.00
18,000.00
3,400.00
226,400.00

278,670.00

NO

URAIAN

PEKERJAAN PERSIAPAN
9

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA


EXPOSE, KAYU KELAS I/II
0.0256 m3 Papan Kayu Kamper
0.0300 Kg Paku 1-2,5 Cm
0.5000 Kg Lem Kayu
1.0000 Lbr Plywood 4 mm
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

9,000,000.00
14,000.00
12,500.00
47,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

230,400.00
420.00
6,250.00
47,000.00
32,000.00
132,000.00
14,400.00
2,720.00
181,120.00

284,070.00

10 MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II


0.0600
0.1500
0.6700
2.0000
0.2000
0.3350

m3
Kg
oh
oh
oh
oh

Papan Kayu Kamper


Paku 1-2,5 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

11 MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU


KELAS I
0.0256 m3 Papan Kayu Kamper
0.0300 Kg Paku 1-2,5 Cm
0.5000 Kg Lem Kayu
1.0000 Lbr Teakwood 4 mm uk 90x220 cm
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

12 MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA


EXPOSE, KAYU KELAS II
0.0250 m3 Papan Kayu Kamper
0.0300 Kg Paku 1-2,5 Cm
0.8000 Kg Lem Kayu
1.0000 Lbr Teakwood 4 mm uk 90x220 cm
0.5000 Lbr Formika
0.8000 oh Pekerja
2.4000 oh Tukang Kayu
0.2400 oh Kepala Tukang
0.0400 oh Mandor

9,000,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

9,000,000.00
14,000.00
12,500.00
56,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

9,000,000.00
14,000.00
12,500.00
56,000.00
80,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

540,000.00
2,100.00
26,800.00
110,000.00
12,000.00
22,780.00
171,580.00

542,100.00

230,400.00
420.00
6,250.00
56,000.00
32,000.00
132,000.00
14,400.00
2,720.00
181,120.00

293,070.00

225,000.00
420.00
10,000.00
56,000.00
40,000.00
32,000.00
132,000.00
14,400.00
2,720.00
181,120.00

331,420.00

13 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL,


KAYU KELAS I,II,III Bentang 6 M'
1.1000
15.0000
5.6000
4.0000
12.0000
1.2000
0.2000

m3
Kg
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Besi Strip Tebal 5 cm
Paku 12 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

8,300,000.00
8,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

9,130,000.00
120,000.00
78,400.00
160,000.00
660,000.00
72,000.00
13,600.00
905,600.00

9,328,400.00

14 MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU


KELAS I
1.2000
15.0000
5.6000
6.7000
20.1000
2.0100
0.3350

m3
Kg
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Besi Strip Tebal 5 cm
Paku 12 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

8,300,000.00
8,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

9,960,000.00
120,000.00
78,400.00
268,000.00
1,105,500.00
120,600.00
22,780.00
1,516,880.00

10,158,400.00

15 MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II


1.1000
15.0000
3.0000
2.4000
7.2000
0.7200
0.1200

m3
Kg
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Besi Strip Tebal 5 cm
Paku 12 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

8,300,000.00
8,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

9,130,000.00
120,000.00
42,000.00
96,000.00
396,000.00
43,200.00
8,160.00
543,360.00

9,292,000.00

NO

URAIAN

PEKERJAAN PERSIAPAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

16 MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU


KELAS II
0.0140
0.0036
0.2500
0.1000
0.1000
0.0100
0.0050

m3
m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Reng ( 2 x 3 ) Cm
Paku 5 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

3,000,000.00
6,500,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

42,000.00
23,400.00
3,500.00
4,000.00
5,500.00
600.00
340.00
10,440.00

68,900.00

17 MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU


KELAS II
0.0140
0.0072
0.2500
0.1000
0.1000
0.0100
0.0050

m3
m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Reng ( 2 x 3 ) Cm
Paku 5 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

3,000,000.00
6,500,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

42,000.00
46,800.00
3,500.00
4,000.00
5,500.00
600.00
340.00
10,440.00

92,300.00

18 MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II


0.1650
0.2000
0.1200
0.1200
0.0120
0.0060

m3
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Paku 5 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

8,300,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

1,369,500.00
2,800.00
4,800.00
6,600.00
720.00
408.00
12,528.00

1,372,300.00

19 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU


KELAS II/III
0.0154
0.2000
0.1500
0.3000
0.0300
0.0750

m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Paku 7 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

3,000,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

46,200.00
2,800.00
6,000.00
16,500.00
1,800.00
5,100.00
29,400.00

49,000.00

20 MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU


KELAS II/III
0.0163
0.2500
0.2000
0.3000
0.0300
0.0100

m3
Kg
oh
oh
oh
oh

Kaso-Kaso ( 5 x 7 ) Cm
Paku 7 Cm dan 10 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

3,000,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

48,900.00
3,500.00
8,000.00
16,500.00
1,800.00
680.00
26,980.00

52,400.00

21 MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS


I/II
0.0108
0.1000
0.1000
0.2000
0.0200
0.0050

m3
Kg
oh
oh
oh
oh

Papan Kayu Kamper


Paku 5 Cm dan 7 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

9,000,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

97,200.00
1,400.00
4,000.00
11,000.00
1,200.00
340.00
16,540.00

98,600.00

22 MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS


I/II
0.0110
0.0500
0.1000
0.2000
0.0200
0.0050

m3
Kg
oh
oh
oh
oh

Papan Kayu Kamper


Paku 5 Cm dan 7 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

9,000,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

99,000.00
700.00
4,000.00
11,000.00
1,200.00
340.00
16,540.00

99,700.00

NO

URAIAN

PEKERJAAN PERSIAPAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

23 MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM,


KAYU KELAS II/III
0.0280
0.1500
0.1500
0.4500
0.0450
0.0080

m3
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Paku 5 Cm dan 7 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

8,300,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

232,400.00
2,100.00
6,000.00
24,750.00
2,700.00
544.00
33,994.00

234,500.00

24 MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280
0.1500
0.8600
0.5600
0.1500
0.4500
0.0450
0.0080

m3
Kg
Lbr
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Paku 5 Cm dan 7 Cm
Teakwood 4 mm uk 90x220 cm
Lem Kayu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

8,300,000.00
14,000.00
56,000.00
12,500.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

232,400.00
2,100.00
48,160.00
7,000.00
6,000.00
24,750.00
2,700.00
544.00
33,994.00

289,660.00

25 MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD


RANGKAP, RANGKA KAYU KELAS II
0.0280
0.1500
0.8600
0.5600
0.2000
0.6000
0.0600
0.0100

m3
Kg
Lbr
Kg
oh
oh
oh
oh

Balok Kayu Kamper


Paku 5 Cm dan 7 Cm
Plywood tebal 4 mm uk 120 x 240 cm
Lem Kayu
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

8,300,000.00
14,000.00
47,000.00
12,500.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

232,400.00
2,100.00
40,420.00
7,000.00
8,000.00
33,000.00
3,600.00
680.00
45,280.00

281,920.00

26 MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I


0.0070
0.1000
0.1500
0.6000
1.8000
0.1800
0.0300

m3
Kg
Kg
oh
oh
oh
oh

Papan Kayu Kamper


Paku 5 Cm dan 10 Cm
Paku Skrup 10 cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

9,000,000.00
14,000.00
18,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

63,000.00
1,400.00
2,700.00
24,000.00
99,000.00
10,800.00
2,040.00
135,840.00

67,100.00

27 MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120


X 240) CM
0.4000
0.0500
0.0250
0.0750
0.0080
0.0010

VII
1

Lbr
Kg
oh
oh
oh
oh

Plywood tebal 4 mm uk 120 x 240 cm


Paku 1 Cm dan 2.5 Cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

47,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

18,800.00
700.00
1,000.00
4,125.00
480.00
68.00
5,673.00

19,500.00

PEKERJAAN BETON ( SNI 7394:2008)


MEMBUAT 1 M BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 2)cm, w/c = 0,87
247.0000 kg Semen Portland
1,220.00
869.0000 kg Pasir Beton
100.71
999.0000 kg Koral Beton
92.59
215.0000
lt Air
25.00
1.6500 oh Pekerja
40,000.00
0.2750 oh Tukang Batu
45,000.00
0.0280 oh Kepala Tukang
60,000.00
0.0830 oh Mandor
68,000.00

MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78
276.0000 kg Semen Portland
1,220.00
828.0000 kg Pasir Beton
100.71
1,012.0000
kg Koral Beton
92.59
215.0000
lt Air
25.00
1.6500 oh Pekerja
40,000.00
0.2750 oh Tukang Batu
45,000.00
0.0280 oh Kepala Tukang
60,000.00
0.0830 oh Mandor
68,000.00
Total :

301,340.00
87,516.99
92,497.41
5,375.00
66,000.00
12,375.00
1,680.00
5,644.00
85,699.00

486,729.40

336,720.00
83,387.88
93,701.08
5,375.00
66,000.00
12,375.00
1,680.00
5,644.00
85,699.00

519,183.96

NO

URAIAN

PEKERJAAN PERSIAPAN
3

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

MEMBUAT 1 M BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 2)cm, w/c = 0,72
299.0000 kg Semen Portland
1,220.00
799.0000 kg Pasir Beton
100.71
1,017.0000
kg Koral Beton
92.59
215.0000
lt Air
25.00
1.6500 oh Pekerja
40,000.00
0.2750 oh Tukang Batu
45,000.00
0.0280 oh Kepala Tukang
60,000.00
0.0830 oh Mandor
68,000.00
Total :
MEMBUAT 1 M BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 2)cm, w/c = 0,66
326.0000 kg Semen Portland
1,220.00
760.0000 kg Pasir Beton
100.71
1,029.0000
kg Koral Beton
92.59
215.0000
lt Air
25.00
1.6500 oh Pekerja
40,000.00
0.2750 oh Tukang Batu
45,000.00
0.0280 oh Kepala Tukang
60,000.00
0.0830 oh Mandor
68,000.00
Total :

MEMBUAT 1 M BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 2)cm, w/c = 0,61
352.0000 kg Semen Portland
1,220.00
731.0000 kg Pasir Beton
100.71
1,031.0000
kg Koral Beton
92.59
215.0000
lt Air
25.00
1.6500 oh Pekerja
40,000.00
0.2750 oh Tukang Batu
45,000.00
0.0280 oh Kepala Tukang
60,000.00
0.0830 oh Mandor
68,000.00
Total :
6 MEMBUAT 1 M BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 2)cm, w/c = 0,58
371.0000 kg Semen Portland
1,220.00
698.0000 kg Pasir Beton
100.71
1,047.0000
kg Koral Beton
92.59
215.0000
lt Air
25.00
1.6500 oh Pekerja
40,000.00
0.2750 oh Tukang Batu
45,000.00
0.0280 oh Kepala Tukang
60,000.00
0.0830 oh Mandor
68,000.00
Total :
7 MEMBUAT 1 M BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 2)cm, w/c =0,56
384.0000 kg Semen Portland
1,220.00
692.0000 kg Pasir Beton
100.71
1,039.0000
kg Koral Beton
92.59
215.0000
lt Air
25.00
1.6500 oh Pekerja
40,000.00
0.2750 oh Tukang Batu
45,000.00
0.0280 oh Kepala Tukang
60,000.00
0.0830 oh Mandor
68,000.00
Total :
8 MEMBUAT 1 M BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 2)cm, w/c =0,53
406.0000 kg Semen Portland
1,220.00
684.0000 kg Pasir Beton
100.71
1,026.0000
kg Koral Beton
92.59
215.0000
lt Air
25.00
1.6500 oh Pekerja
40,000.00
0.2750 oh Tukang Batu
45,000.00
0.0280 oh Kepala Tukang
60,000.00
0.0830 oh Mandor
68,000.00
Total :
9 MEMBUAT 1 M BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 2)cm, w/c =0,52
413.0000 kg Semen Portland
1,220.00
681.0000 kg Pasir Beton
100.71
1,021.0000
kg Koral Beton
92.59
215.0000
lt Air
25.00
1.6500 oh Pekerja
40,000.00
0.2750 oh Tukang Batu
45,000.00
0.0280 oh Kepala Tukang
60,000.00
0.0830 oh Mandor
68,000.00
Total :
10 MEMBUAT 1 M BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 2)cm, w/c =0,49
439.0000 kg Semen Portland
1,220.00
670.0000 kg Pasir Beton
100.71
1,006.0000
kg Koral Beton
92.59
215.0000
lt Air
25.00
1.6500 oh Pekerja
40,000.00
0.2750 oh Tukang Batu
45,000.00
0.0280 oh Kepala Tukang
60,000.00
0.0830 oh Mandor
68,000.00
Total :

364,780.00
80,467.29
94,164.03
5,375.00
66,000.00
12,375.00
1,680.00
5,644.00
85,699.00

544,786.32

397,720.00
76,539.60
95,275.11
5,375.00
66,000.00
12,375.00
1,680.00
5,644.00
85,699.00

574,909.71

429,440.00
73,619.01
95,460.29
5,375.00
66,000.00
12,375.00
1,680.00
5,644.00
85,699.00

603,894.30
452,620.00
70,295.58
96,941.73
5,375.00

66,000.00
12,375.00
1,680.00
5,644.00
85,699.00

625,232.31
468,480.00
69,691.32
96,201.01
5,375.00

66,000.00
12,375.00
1,680.00
5,644.00
85,699.00

639,747.33
495,320.00
68,885.64
94,997.34
5,375.00

66,000.00
12,375.00
1,680.00
5,644.00
85,699.00

664,577.98
503,860.00
68,583.51
94,534.39
5,375.00

66,000.00
12,375.00
1,680.00
5,644.00
85,699.00

672,352.90
535,580.00
67,475.70
93,145.54
5,375.00

66,000.00
12,375.00
1,680.00
5,644.00
85,699.00

701,576.24

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

11 MEMBUAT
1 M BETON
MUTU f'C= 31,2 (SNI
Mpa (K350),
Slump (12 2)cm, w/c =0,48
PEKERJAAN
PERSIAPAN
03-2835-2002)
448.0000 kg Semen Portland
1,220.00
667.0000 kg Pasir Beton
100.71
1,000.0000
kg Koral Beton
92.59
215.0000
lt Air
25.00
1.6500 oh Pekerja
40,000.00
0.2750 oh Tukang Batu
45,000.00
0.0280 oh Kepala Tukang
60,000.00
0.0830 oh Mandor
68,000.00
Total :
12 PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR
10.5000 kg Besi Beton (Polos/ Ulir)
0.1500 kg Kawat Beton
0.0700 oh Pekerja
0.0700 oh Tukang Besi
0.0070 oh Kepala Tukang
0.0040 oh Mandor

13 1 M2 PASANG BEKISTING UNTUK PONDASI


0.0400 m3 Kayu Kelas III
0.3000 kg Paku Biasa 5' - 10'
0.1000
ltr Minyak Bekisting
0.5200 oh Pekerja
0.2600 oh Tukang Kayu
0.0260 oh Kepala Tukang
0.0260 oh Mandor

14 1 M2 PASANG BEKISTING UNTUK SLOOF


0.0400 m3 Kayu Kelas III
0.3000 kg Paku Biasa 5' - 10'
0.1000
ltr Minyak Bekisting
0.5200 oh Pekerja
0.2600 oh Tukang Kayu
0.0260 oh Kepala Tukang
0.0260 oh Mandor

15 1 M2 PASANG BEKISTING UNTUK KOLOM


0.0400 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.2000
ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4 m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

16 1 M2 PASANG BEKISTING UNTUK BALOK


0.0400 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.2000
ltr Minyak Bekisting
0.0180 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

17 1 M2 PASANG BEKISTING UNTUK LANTAI


0.0400 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.2000
ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
6.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

8,427.00
16,000.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

2,500,000.00
13,000.00
15,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

2,500,000.00
13,000.00
15,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

2,500,000.00
13,000.00
15,000.00
6,000,000.00
105,500.00
90,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

2,500,000.00
13,000.00
15,000.00
6,000,000.00
105,500.00
90,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

2,500,000.00
13,000.00
15,000.00
6,000,000.00
105,500.00
90,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

546,560.00
67,173.57
92,590.00
5,375.00
66,000.00
12,375.00
1,680.00
5,644.00
85,699.00

711,698.57

88,483.50
2,400.00
2,800.00
3,500.00
420.00
272.00
6,992.00

90,883.50

100,000.00
3,900.00
1,500.00
20,800.00
14,300.00
1,560.00
1,768.00
38,428.00

105,400.00

100,000.00
3,900.00
1,500.00
20,800.00
14,300.00
1,560.00
1,768.00
38,428.00

105,400.00

100,000.00
5,200.00
3,000.00
90,000.00
36,925.00
180,000.00
26,400.00
18,150.00
1,980.00
2,244.00
48,774.00

415,125.00

100,000.00
5,200.00
3,000.00
108,000.00
36,925.00
180,000.00
26,400.00
18,150.00
1,980.00
2,244.00
48,774.00

433,125.00

100,000.00
5,200.00
3,000.00
90,000.00
36,925.00
540,000.00
26,400.00
18,150.00
1,980.00
2,244.00
48,774.00

775,125.00

NO

URAIAN

PEKERJAAN PERSIAPAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

18 1 M2 PASANG BEKISTING UNTUK DINDING


3
0.0300 M Kayu Kelas III
0.4000 Kg Paku Biasa 5' - 12'
0.2000 Ltr Minyak Bekisting
3
0.0200 M Kayu Usuk 4/6
0.3500 Lbr Plywood 9 mm
3.0000 Btng Dolken Kayu 8" - 10"/4m
4.0000 Bh Formite/penjaga jarak bekisting/spacer
0.6600 Oh Pekerja
0.3300 Oh Tukang Kayu
0.0330 Oh Kepala Tukang
0.0330 Oh Mandor

19 1 M2 PASANG BEKISTING UNTUK TANGGA


0.0300 m3 Kayu Kelas III
0.4000 kg Paku Biasa 5' - 12'
0.1500
ltr Minyak Bekisting
0.0150 m3 Kayu Usuk 4/6
0.3500 lbr Plywood 9 mm
2.0000 btg Dolken Kayu 8" - 10"/4m
0.6600 oh Pekerja
0.3300 oh Tukang Kayu
0.0330 oh Kepala Tukang
0.0330 oh Mandor

20 1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON


0.0264 m3 Kayu Kelas III (Papan)
0.6000 kg Paku Biasa 5' - 12'
0.5000 btg Dolken Kayu 8" - 10"/4m
0.1500 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0080 oh Mandor

2,500,000.00
13,000.00
15,000.00
6,000,000.00
105,500.00
90,000.00
2,000.00
40,000.00
55,000.00
60,000.00
68,000.00

2,500,000.00
13,000.00
15,000.00
6,000,000.00
105,500.00
90,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

2,500,000.00
13,000.00
90,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

21 1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)


0.2000 m3 Kayu Kelas III
2,500,000.00
1.5000 kg Paku Biasa 5' - 12'
13,000.00
0.4000
ltr Minyak Bekisting
15,000.00
157.0000 kg Besi Beton
8,427.00
2.2500 kg Kawat Beton
16,000.00
336.0000 kg Semen Portland
1,220.00
0.5400 m3 Pasir Beton
141,000.00
0.8100 m3 Koral Beton
170,000.00
5.3000 oh Pekerja
40,000.00
0.2750 oh Tukang Batu
45,000.00
1.3000 oh Tukang Kayu
55,000.00
1.0500 oh Tukang Besi
50,000.00
0.2620 oh Kepala Tukang
60,000.00
0.2650 oh Mandor
68,000.00
Total :
22 1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)
0.2700 m3 Kayu Kelas III
2,500,000.00
2.0000 kg Paku Biasa 5' - 12'
13,000.00
0.6000
ltr Minyak Bekisting
15,000.00
210.0000 kg Besi Beton
8,427.00
3.0000 kg Kawat Beton
16,000.00
336.0000 kg Semen Portland
1,220.00
0.5400 m3 Pasir Beton
141,000.00
0.8100 m3 Koral Beton
170,000.00
5.6500 oh Pekerja
40,000.00
0.2750 oh Tukang Batu
45,000.00
1.5600 oh Tukang Kayu
55,000.00
1.4000 oh Tukang Besi
50,000.00
0.3230 oh Kepala Tukang
60,000.00
0.2830 oh Mandor
68,000.00
Total :

75,000.00
5,200.00
3,000.00
120,000.00
36,925.00
270,000.00
8,000.00
26,400.00
18,150.00
1,980.00
2,244.00
48,774.00

518,125.00

75,000.00
5,200.00
2,250.00
90,000.00
36,925.00
180,000.00
26,400.00
18,150.00
1,980.00
2,244.00
48,774.00

389,375.00

66,000.00
7,800.00
45,000.00
6,000.00
2,750.00
300.00
544.00
9,594.00

118,800.00

500,000.00
19,500.00
6,000.00
1,323,039.00
36,000.00
409,920.00
76,140.00
137,700.00
212,000.00
12,375.00
71,500.00
52,500.00
15,720.00
18,020.00
382,115.00

2,508,299.00

675,000.00
26,000.00
9,000.00
1,769,670.00
48,000.00
409,920.00
76,140.00
137,700.00
226,000.00
12,375.00
85,800.00
70,000.00
19,380.00
19,244.00
432,799.00

3,151,430.00

NO

URAIAN

PEKERJAAN PERSIAPAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

23 1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI +


BEKISTING)
0.4000 m3 Kayu Kelas III
4.0000 kg Paku Biasa 5' - 12'
2.0000
ltr Minyak Bekisting
315.0000 kg Besi Beton
4.5000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1500 m3 Kayu Kelas II balok
3.5000 lbr Plywood 9 mm
20.0000 btg Dolken Kayu 8" /4 m
7.0500 oh Pekerja
0.2750 oh Tukang Batu
1.6500 oh Tukang Kayu
2.1000 oh Tukang Besi
0.4030 oh Kepala Tukang
0.3530 oh Mandor

24 1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI +


BEKISTING)
0.3200 m3 Kayu Kelas III
3.2000 kg Paku Biasa 5' - 12'
1.6000
ltr Minyak Bekisting
210.0000 kg Besi Beton
3.0000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1400 m3 Kayu Kelas II balok
2.8000 lbr Plywood 9 mm
16.0000 btg Dolken Kayu 8" /4 m
6.3500 oh Pekerja
0.2750 oh Tukang Batu
1.6500 oh Tukang Kayu
1.4000 oh Tukang Besi
0.3330 oh Kepala Tukang
0.3180 oh Mandor
25 1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI +
BEKISTING
0.3200 m3 Kayu Kelas III
3.2000 kg Paku Biasa 5' - 12'
1.6000
ltr Minyak Bekisting
157.5000 kg Besi Beton
2.2500 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1200 m3 Kayu Kelas II balok
2.8000 lbr Plywood 9 mm
32.0000 btg Dolken Kayu 8" /4 m
5.3000 oh Pekerja
0.2750 oh Tukang Batu
1.3000 oh Tukang Kayu
1.0500 oh Tukang Besi
0.2650 oh Kepala Tukang
0.2650 oh Mandor
26 1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI +
BEKISTING)
0.2400 m3 Kayu Kelas III
3.2000 kg Paku Biasa 5' - 12'
1.6000
ltr Minyak Bekisting
157.0000 kg Besi Beton
2.2500 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1600 m3 Kayu Kelas II balok
2.8000 lbr Plywood 9 mm
24.0000 btg Dolken Kayu 8" /4 m
5.3000 oh Pekerja
0.2750 oh Tukang Batu
1.3000 oh Tukang Kayu
1.0500 oh Tukang Besi
0.2620 oh Kepala Tukang
0.2650 oh Mandor

2,500,000.00
13,000.00
15,000.00
8,427.00
16,000.00
1,220.00
141,000.00
170,000.00
5,000,000.00
105,500.00
90,000.00
40,000.00
45,000.00
55,000.00
50,000.00
60,000.00
68,000.00
Total :

2,500,000.00
13,000.00
15,000.00
8,427.00
16,000.00
1,220.00
141,000.00
170,000.00
5,000,000.00
105,500.00
90,000.00
40,000.00
45,000.00
55,000.00
50,000.00
60,000.00
68,000.00
Total :

2,500,000.00
13,000.00
15,000.00
8,427.00
16,000.00
1,220.00
141,000.00
170,000.00
5,000,000.00
105,500.00
90,000.00
40,000.00
45,000.00
55,000.00
50,000.00
60,000.00
68,000.00

2,500,000.00
13,000.00
15,000.00
8,427.00
16,000.00
1,220.00
141,000.00
170,000.00
5,000,000.00
105,500.00
90,000.00
40,000.00
45,000.00
55,000.00
50,000.00
60,000.00
68,000.00

1,000,000.00
52,000.00
30,000.00
2,654,505.00
72,000.00
409,920.00
76,140.00
137,700.00
750,000.00
369,250.00
1,800,000.00
282,000.00
12,375.00
90,750.00
105,000.00
24,180.00
24,004.00
538,309.00

7,351,515.00

800,000.00
41,600.00
24,000.00
1,769,670.00
48,000.00
409,920.00
76,140.00
137,700.00
700,000.00
295,400.00
1,440,000.00
254,000.00
12,375.00
90,750.00
70,000.00
19,980.00
21,624.00
468,729.00

5,742,430.00

800,000.00
41,600.00
24,000.00
1,327,252.50
36,000.00
409,920.00
76,140.00
137,700.00
600,000.00
295,400.00
2,880,000.00
212,000.00
12,375.00
71,500.00
52,500.00
15,900.00
18,020.00
382,295.00

6,628,012.50

600,000.00
41,600.00
24,000.00
1,323,039.00
36,000.00
409,920.00
76,140.00
137,700.00
800,000.00
295,400.00
2,160,000.00
212,000.00
12,375.00
71,500.00
52,500.00
15,720.00
18,020.00
382,115.00

5,903,799.00

NO

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

M3 MEMBUAT PERSIAPAN
DINDING BETON BERTULANG
(200 KG BESI +
27 1
PEKERJAAN
(SNI 03-2835-2002)
BEKISTING)
0.2500 m3 Kayu Kelas III
3.0000 kg Paku Biasa 5' - 12'
1.2000
ltr Minyak Bekisting
210.0000 kg Besi Beton
3.0000 kg Kawat Beton
336.0000 kg Semen Portland
0.5400 m3 Pasir Beton
0.8100 m3 Koral Beton
0.1050 m3 Kayu Kelas II balok
2.5000 lbr Plywood 9 mm
14.0000 btg Dolken Kayu 8" /4 m
5.6500 oh Pekerja
0.2750 oh Tukang Batu
1.5600 oh Tukang Kayu
1.4000 oh Tukang Besi
0.3230 oh Kepala Tukang
0.2830 oh Mandor

28 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11


CM)
0.0020 m3 Kayu Kelas III
0.0100 kg Paku Biasa 5' - 12'
3.0000 kg Besi Beton
0.0450 kg Kawat Beton
4.0000 kg Semen Portland
0.0060 m3 Pasir Beton
0.0090 m3 Koral Beton
0.1800 oh Pekerja
0.0200 oh Tukang Batu
0.0200 oh Tukang Kayu
0.0200 oh Tukang Besi
0.0060 oh Kepala Tukang
0.0090 oh Mandor
29 1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15
CM)
0.0030 m3 Kayu Kelas III
0.0200 kg Paku Biasa 5' - 12'
3.6000 kg Besi Beton
0.0500 kg Kawat Beton
5.5000 kg Semen Portland
0.0090 m3 Pasir Beton
0.0150 m3 Koral Beton
0.2970 oh Pekerja
0.0330 oh Tukang Batu
0.0330 oh Tukang Kayu
0.0330 oh Tukang Besi
0.0100 oh Kepala Tukang
0.0150 oh Mandor

2,500,000.00
13,000.00
15,000.00
8,427.00
16,000.00
1,220.00
141,000.00
170,000.00
5,000,000.00
105,500.00
90,000.00
40,000.00
45,000.00
55,000.00
50,000.00
60,000.00
68,000.00

2,500,000.00
13,000.00
8,427.00
16,000.00
1,220.00
141,000.00
170,000.00
40,000.00
45,000.00
55,000.00
50,000.00
60,000.00
68,000.00
Total :

625,000.00
39,000.00
18,000.00
1,769,670.00
48,000.00
409,920.00
76,140.00
137,700.00
525,000.00
263,750.00
1,260,000.00
226,000.00
12,375.00
85,800.00
70,000.00
19,380.00
19,244.00
432,799.00

5,172,180.00

5,000.00
130.00
25,281.00
720.00
4,880.00
846.00
1,530.00
7,200.00
900.00
1,100.00
1,000.00
360.00
612.00
11,172.00

2,500,000.00
13,000.00
8,427.00
16,000.00
1,220.00
141,000.00
170,000.00
40,000.00
45,000.00
55,000.00
50,000.00
60,000.00
68,000.00
Total :

11,880.00
1,485.00
1,815.00
1,650.00
600.00
1,020.00
18,450.00

1,300.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

6,000.00
3,300.00
360.00
544.00
10,204.00

1,400.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

6,000.00
3,300.00
360.00
544.00
10,204.00

38,387.00

7,500.00
260.00
30,337.20
800.00
6,710.00
1,269.00
2,550.00

49,426.20

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)


1

1 M2 PEKERJAAN ATAP GENTENG PLENTONG


25.0000 bh Genteng Plentong
0.1500 oh Pekerja
0.0600 oh Tukang Kayu
0.0060 oh Kepala Tukang
0.0080 oh Mandor

1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT


25.0000 bh Genteng Plentong Dicat
0.1500 oh Pekerja
0.0600 oh Tukang Kayu
0.0060 oh Kepala Tukang
0.0080 oh Mandor

1 M1 PASANG BUBUNGAN GENTENG PLENTONG


5.0000 bh Bubungan Plentong
8.0000 kg Semen Portland
0.0320 m3 Pasir Pasang
0.4000 oh Pekerja
0.2000 oh Tukang Kayu
0.0200 oh Kepala Tukang
0.0020 oh Mandor

6,000.00
1,220.00
158,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

32,500.00

32,500.00

35,000.00

35,000.00

30,000.00
9,760.00
5,056.00
16,000.00
11,000.00
1,200.00
136.00
28,336.00

44,816.00

NO
1

URAIAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

1
M2 PASANG ATAP
GENTENG ASBES(SNI
GELOMBANG
1.8 M X 0.92 M X 5 MM
PEKERJAAN
PERSIAPAN
03-2835-2002)
0.7500 lbr Asbes Gelombang 1.8 mx0.92mx5mm
29,000.00
0.1200 kg Paku Pancing 60 x 230
20,000.00
0.1400 oh Pekerja
40,000.00
0.0700 oh Tukang Kayu
55,000.00
0.0070 oh Kepala Tukang Kayu
60,000.00
0.0070 oh Mandor
68,000.00
Total :
1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M
2.4000 lbr Bubungan Stel Gelombang
6.0000 kg Paku Skrup 3,5"
0.0840 oh Pekerja
0.1250 oh Tukang Kayu
0.0130 oh Kepala Tukang
0.0040 oh Mandor
1 M2 PEKERJAAN ATAP SIRAP
60.0000 bh Genteng Sirap
0.2000 kg Paku Biasa 1/2" - 1"
0.1660 oh Pekerja
0.2500 oh Tukang Kayu
0.0250 oh Kepala Tukang
0.0080 oh Mandor

1 M2 PEKERJAAN ATAP NOK SIRAP


0.4000 lbr Seng plat 3" x 6" BJLS 28
0.0600 kg Paku biasa 1/2" - 1"
0.0500 kg Paku biasa 2" - 5"
0.0040 m3 Kayu papan 3 cm
0.1250 oh Pekerja
0.2500 oh Tukang kayu
0.0250 oh Kepala Tukang
0.0080 oh Mandor

1 M2 PASANG ATAP ALANG-ALANG 3 M1


6.5000 lbr Alang - alang
0.5000 glg Tali pengikat
0.2000 oh Pekerja
0.0100 oh Mandor

1 M2 PEKERJAAN ATAP SENG GELOMBANG


0.7000 lbr Seng Gelombang 3" x 6" BJLS 28
0.0200 kg Paku Biasa 1/2" - 1"
0.1200 oh Pekerja
0.0600 oh Tukang Kayu
0.0060 oh Kepala Tukang
0.0060 oh Mandor

10 1 M2 PASANGAN LAPISANG ALUMINIUM FOIL


1.0500 m2 Aluminium Foil
0.1500 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0080 oh Mandor

11 1 M1 PASANG NOK SENG GELOMBANG


0.3000 lbr Seng Plat 3" x 6" BJLS 28
0.0400 kg Paku biasa 1/2" - 1"
0.1500 oh Pekerja
0.0700 oh Tukang Kayu
0.0080 oh Kepala Tukang
0.0060 oh Mandor

IX
1

24,000.00
26,500.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :
8,500.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

46,500.00
14,000.00
13,000.00
9,000,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

12,500.00
9,500.00
40,000.00
68,000.00
Total :

21,750.00
2,400.00
5,600.00
3,850.00
420.00
476.00
10,346.00

57,600.00
159,000.00
3,360.00
6,875.00
780.00
272.00
11,287.00

216,600.00
510,000.00
2,800.00

6,640.00
13,750.00
1,500.00
544.00
22,434.00

512,800.00

18,600.00
840.00
650.00
36,000.00
5,000.00
13,750.00
1,500.00
544.00
20,794.00

56,090.00

81,250.00
4,750.00
8,000.00
680.00
8,680.00

42,500.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

4,800.00
3,300.00
360.00
408.00
8,868.00

29,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

6,000.00
2,750.00
300.00
544.00
9,594.00

46,500.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

24,150.00

86,000.00

29,750.00
280.00

30,030.00

30,450.00

30,450.00

13,950.00
560.00
6,000.00
3,850.00
480.00
408.00
10,738.00

14,510.00

PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)


MEMASANG 1 M2
5 MM DAN 6 MM
1.1000 lbr
0.0100 kg
0.0300 oh
0.0700 oh
0.0070 oh
0.0040 oh

LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM,


Asbes semen
Paku Biasa 1/2" - 1"
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

47,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

51,700.00
140.00
1,200.00
3,850.00
420.00
272.00
5,742.00

51,840.00

NO

URAIAN

PEKERJAAN PERSIAPAN
2

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM


0.3750 lbr TRIPLEKS
0.0300 kg Paku Biasa 1/2" - 1"
0.1000 oh Pekerja
0.1000 oh Tukang Kayu
0.0100 oh Kepala Tukang
0.0050 oh Mandor

1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING


0.0150 m3 Kayu Papan
0.0100 kg Paku Biasa 1/2" - 1"
0.8000 oh Pekerja
0.8000 oh Tukang Kayu
0.0800 oh Kepala Tukang
0.0400 oh Mandor

47,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

9,000,000.00
14,000.00
40,000.00
55,000.00
60,000.00
68,000.00

Total :
4

1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL


1.0500 m1 List Kayu Profil
0.1000 kg Paku list SQ
0.0500 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0030 oh Mandor

12,250.00
15,840.00
40,000.00
55,000.00
60,000.00
68,000.00

Total :
5

1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA


0.0120 m3 Kamper Usuk 4/6 cm
0.0600 kg Paku Biasa 2" - 5"
1.1000 lbr Asbes
0.1800 oh Pekerja
0.3200 oh Tukang Kayu
0.0320 oh Kepala Tukang
0.0090 oh Mandor

9,000,000.00
15,840.00
47,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM


0.1100 kg Paku Sekrup
18,000.00
0.3640 lbr Gypsum Board (120x240x9)
63,500.00
0.1000 oh Pekerja
40,000.00
0.0500 oh Tukang Kayu
55,000.00
0.0050 oh Kepala Tukang
60,000.00
0.0050 oh Mandor
68,000.00
Total :
1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM
0.1100 kg Paku Sekrup
0.3640 lbr Kalsiboard 4.5 mm
0.1000 oh Pekerja
0.0500 oh Tukang Kayu
0.0050 oh Kepala Tukang
0.0050 oh Mandor

18,000.00
72,000.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

17,625.00
420.00
4,000.00
5,500.00
600.00
340.00
10,440.00

18,045.00

135,000.00
140.00
32,000.00
44,000.00
4,800.00
2,720.00

83,520.00

135,140.00
12,862.50
1,584.00

2,000.00
2,750.00
300.00
204.00

5,254.00

14,446.50
108,000.00
950.40
51,700.00

7,200.00
17,600.00
1,920.00
612.00
27,332.00

160,650.40

1,980.00
23,114.00
4,000.00
2,750.00
300.00
340.00
7,390.00

25,094.00

1,980.00
26,208.00
4,000.00
2,750.00
300.00
340.00
7,390.00

28,188.00

PEKERJAAN SANITASI ( SNI 2002 )


1

MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK


1.0000 bh Kloset duduk/ monoblok
6% x harga kloset
Perlengkapan
3.3000 oh Pekerja
1.1000 oh Tukang batu
0.0010 oh Kepala Tukang
0.1600 oh Mandor

MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN


1.0000 bh Kloset jongkok porselen
6.0000 kg Semen Portland
0.0100 m3 Pasir Pasang
1.0000 oh Pekerja
1.5000 oh Tukang batu
1.5000 oh Kepala Tukang
0.1600 oh Mandor

1,365,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

135,000.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,365,000.00
81,900.00
132,000.00
49,500.00
60.00
10,880.00
192,440.00

1,446,900.00

135,000.00
7,320.00
1,580.00
40,000.00
67,500.00
90,000.00
10,880.00
208,380.00

143,900.00

NO

URAIAN

PEKERJAAN PERSIAPAN
3

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

MEMASANG 1 BUAH URINOIR


1.0000 bh Urinoir
6% x harga Urin
Perlengkapan
6.0000 kg Semen Portland
0.0100 m3 Pasir Pasang
1.0000 oh Pekerja
1.0000 oh Tukang batu
0.1000 oh Kepala Tukang
0.1000 oh Mandor

MEMASANG 1 BUAH WASHTAFEL KIA


1.0000 bh Washtafel
12% x harga wast
Perlengkapan
6.0000 kg Semen Portland
0.0100 m3 Pasir Pasang
1.2000 oh Pekerja
1.4500 oh Tukang batu
0.1500 oh Kepala Tukang
0.1000 oh Mandor

MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3


1.0000 bh Bak Fibreglass
18% x harga wast
Perlengkapan
1.8000 oh Pekerja
2.7000 oh Tukang batu
0.5400 oh Kepala Tukang
0.1100 oh Mandor
MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "
1.2000 m1 Pipa galvanis
35% x harga pipa
Perlengkapan
0.0540 oh Pekerja
0.0900 oh Tukang Pipa
0.0090 oh Kepala Tukang
0.0270 oh Mandor
MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"
1.2000 M' Pipa galvanis
35% x harga pipa
Perlengkapan
0.1080 Oh Pekerja
0.1800 Oh Tukang Pipa
0.0180 Oh Kepala Tukang
0.0054 Oh Mandor
MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"
1.2000 m1 Pipa PVC
35% x harga pipa
Perlengkapan
0.0360 oh Pekerja
0.0600 oh Tukang Pipa
0.0060 oh Kepala Tukang
0.0018 oh Mandor
MEMASANG 1 M1 PIPA PVC TYPE AW f 2"
1.2000 m1 Pipa PVC
35% x harga pipa
Perlengkapan
0.0540 oh Pekerja
0.0900 oh Tukang Pipa
0.0090 oh Kepala Tukang
0.0027 oh Mandor

10 MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"


1.2000 m1 Pipa PVC
35% x harga pipa
Perlengkapan
0.0810 oh Pekerja
0.1350 oh Tukang Pipa
0.0135 oh Kepala Tukang
0.0041 oh Mandor

1,052,000.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

1,052,000.00
63,120.00
7,320.00
1,580.00
40,000.00
45,000.00
6,000.00
6,800.00
97,800.00

185,000.00
1,220.00
158,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

185,000.00
22,200.00
7,320.00
1,580.00
48,000.00
65,250.00
9,000.00
6,800.00
129,050.00

230,000.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

72,000.00
121,500.00
32,400.00
7,480.00
233,380.00

2,160.00
4,500.00
540.00
1,836.00
9,036.00

4,320.00
9,000.00
1,080.00
367.20
14,767.20

1,440.00
3,000.00
360.00
122.40
4,922.40

23,048.50

26,700.00
7,787.50
2,160.00
4,500.00
540.00
183.60
7,383.60

56,250.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

271,250.00

17,844.00
5,204.50

22,250.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

58,900.00

210,000.00
61,250.00

14,870.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

271,400.00

45,600.00
13,300.00

175,000.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

216,100.00

230,000.00
41,400.00

38,000.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

1,124,020.00

34,487.50

67,500.00
19,687.50
3,240.00
6,750.00
810.00
278.80
11,078.80

87,187.50

NO

URAIAN

PEKERJAAN PERSIAPAN

XII
1

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

11 MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"


1.0000 bh Kran air
0.0250 bh Seal tape
0.0100 oh Pekerja
0.1000 oh Tukang Pipa
0.0100 oh Kepala Tukang
0.0050 oh Mandor

XI

HARGA
SATUAN
(Rp)

18,000.00
2,600.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

18,000.00
65.00
400.00
5,000.00
600.00
340.00
6,340.00

15,000.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

240.00
3,000.00
360.00
20.40
3,620.40

18,065.00

PEKERJAAN BESI DAN ALUMINIUM


(SNI 7393:2008)
1 KG PASANG RANGKA ATAP BAJA
1.1500 kg Besi Profil WF
0.0060 oh Pekerja
0.0600 oh Tukang besi
0.0060 oh Kepala Tukang
0.0003 oh Mandor

1 M2 PASANG JENDELA NAKO


1.1000 m2 Rangka + Kaca Nako
10.0000 bh Paku biasa 1 cm - 2,5 cm
7.0000 m' Besi strip
0.2000 oh Pekerja
0.2000 oh Tukang besi
0.0200 oh Kepala Tukang
0.0010 oh Mandor

1 M1 PASANG TALANG DATAR, SENG BJLS 28


1.0500 lbr Seng plat
0.0150 kg Paku biasa 0,5" - 1"
0.0190 m3 Kayu papan kelas II/III
0.1500 oh Pekerja
0.4000 oh Tukang besi
0.0250 oh Kepala Tukang
0.0013 oh Mandor

117,000.00
18,000.00
8,000.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

17,250.00

17,250.00

128,700.00
180,000.00
56,000.00
8,000.00
10,000.00
1,200.00
68.00
19,268.00

46,500.00
18,000.00
9,000,000.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

6,000.00
20,000.00
1,500.00
88.40
27,588.40

105,000.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

400.00
25,000.00
600.00
340.00
26,340.00

27,000.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

600.00
7,500.00
900.00
54.40
9,054.40

49,000.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

400.00
5,000.00
600.00
34.00
6,034.00

22,000.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

600.00
7,500.00
900.00
54.40
9,054.40

100,000.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

800.00
10,000.00
1,200.00
68.00
12,068.00

364,700.00

48,825.00
270.00
171,000.00

220,095.00

PEKERJAAN KUNCI DAN KACA (SNI 2002)


1 BH PASANG KUNCI TANAM BIASA
1.0000 bh Kunci tanam biasa
0.0100 oh Pekerja
0.5000 oh Tukang besi
0.0100 oh Kepala Tukang
0.0050 oh Mandor

1 PS PASANG ENGSEL PINTU


1.0000 ps Engsel pintu
0.0150 oh Pekerja
0.1500 oh Tukang besi
0.0150 oh Kepala Tukang
0.0008 oh Mandor

1 PS PASANG ENGSEL JENDELA KUPU-KUPU


1.0000 ps Engsel jendela
0.0100 oh Pekerja
0.1000 oh Tukang besi
0.0100 oh Kepala Tukang
0.0005 oh Mandor

1 BH PASANG KAIT ANGIN


1.0000 ps Kait angin
0.0150 oh Pekerja
0.1500 oh Tukang besi
0.0150 oh Kepala Tukang
0.0008 oh Mandor

1 BH PASANG KUNCI SLOT


1.0000 bh Kunci slot
0.0200 oh Pekerja
0.2000 oh Tukang besi
0.0200 oh Kepala Tukang
0.0010 oh Mandor

105,000.00

105,000.00

27,000.00

27,000.00

49,000.00

49,000.00

22,000.00

22,000.00

100,000.00

100,000.00

NO

URAIAN

PEKERJAAN PERSIAPAN
6

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

1 M2 PASANG KACA, TEBAL 3 - 5 MM


1.1000 bh Kaca
0.0150 oh Pekerja
0.1500 oh Tukang besi
0.0150 oh Kepala Tukang
0.0008 oh Mandor

102,000.00
40,000.00
50,000.00
60,000.00
68,000.00
Total :

112,200.00
600.00
7,500.00
900.00
54.40
9,054.40

112,200.00

XIII PEK. PENUTUP LANTAI DAN DINDING


(SNI 7395:2008)
1

1 M2 PASANG LANTAI KERAMIK 30 X 30 CM


11.8700 bh Keramik 30 x 30 cm
10.0000 kg Semen Portland
0.0450 m3 Pasir Pasang
1.5000 kg Semen warna/semen grouting
0.7000 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala Tukang
0.0350 oh Mandor

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM


26.5000 bh Keramik 20 x 20 cm
10.4000 kg Semen Portland
0.0450 m3 Pasir Pasang
1.6200 kg Semen warna/semen grouting
0.7000 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala Tukang
0.0350 oh Mandor

1 M1 PASANG PLIN KERAMIK 10 X 30 CM


3.3300 bh Keramik 30 x 30 cm
1.1400 kg Semen Portland
0.0030 m3 Pasir Pasang
0.1000 kg Semen warna/semen grouting
0.0900 oh Pekerja
0.0900 oh Tukang batu
0.0090 oh Kepala Tukang
0.0050 oh Mandor

1 M2 PASANG DINDING KERAMIK 20 X 20 CM


26.5000 bh Keramik 20 x 20 cm
9.3000 kg Semen Portland
0.0180 m3 Pasir Pasang
1.9400 kg Semen warna/semen grouting
0.9000 oh Pekerja
0.4500 oh Tukang batu
0.0450 oh Kepala Tukang
0.0450 oh Mandor

1 M2 PASANG BATU ALAM 30 X 30 CM


11.8700 bh Batu alam 30 x 30 cm
10.0000 kg Semen Portland
0.0450 m3 Pasir Pasang
1.5000 kg Semen warna/semen grouting
0.7000 oh Pekerja
0.3500 oh Tukang batu
0.0350 oh Kepala Tukang
0.0350 oh Mandor

1 M1 PASANG PLIN KAYU 2 X 10 CM


0.0030 m3 Papan Kayu Kelas II
0.0500 kg Paku sekrup 3,5'
0.1200 oh Pekerja
0.1200 oh Tukang kayu
0.0120 oh Kepala Tukang
0.0060 oh Mandor

4,090.91
1,220.00
158,000.00
12,500.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

8,600.00
1,220.00
158,000.00
12,500.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

4,090.91
1,220.00
158,000.00
12,500.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

8,600.00
1,220.00
158,000.00
12,500.00
40,000.00
45,000.00
60,000.00
68,000.00
Total :

6,318.44
160.00
68,000.00
34,000.00
1,220.00
45,000.00
12,500.00
68,000.00
Total :

9,000,000.00
26,500.00
40,000.00
55,000.00
60,000.00
68,000.00
Total :

48,559.09
12,200.00
7,110.00
18,750.00
28,000.00
15,750.00
2,100.00
2,380.00
48,230.00

86,619.09

227,900.00
12,688.00
7,110.00
20,250.00
28,000.00
15,750.00
2,100.00
2,380.00
48,230.00

267,948.00

13,622.73
1,390.80
474.00
1,250.00
3,600.00
4,050.00
540.00
340.00
8,530.00

16,737.53

227,900.00
11,346.00
2,844.00
24,250.00
36,000.00
20,250.00
2,700.00
3,060.00
62,010.00

266,340.00

74,999.88
1,600.00
3,060.00
51,000.00
854.00
15,750.00
437.50
2,380.00
19,421.50

130,659.88

27,000.00
1,325.00
4,800.00
6,600.00
720.00
408.00
12,528.00

28,325.00

XIV PEKERJAAN PENGECATAN (SNI 2002)


1

1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,


1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meni
0.1500 kg Dempul
0.1700 kg Cat dasar
0.2600 kg Cat Penutup 2x

22,000.00
29,000.00
43,600.00
55,000.00

4,400.00
4,350.00
7,412.00
14,300.00

NO
1

0.0700 oh
Pekerja
PEKERJAAN
PERSIAPAN
0.0090
0.0060
0.0025

HARGA
SATUAN
(Rp)

URAIAN

(SNI 03-2835-2002)

oh Tukang cat
oh Kepala Tukang
oh Mandor

1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS


0.1500 kg Vernis
0.0500 kg Dempul
0.1000 lbr Amplas
0.0100 bh Kuas
0.1600 oh Pekerja
0.1600 oh Tukang cat
0.0160 oh Kepala Tukang
0.0025 oh Mandor
1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,
1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
0.1000 kg Plamir
0.1000 kg Cat dasar
0.2600 kg Cat Penutup 2x
0.0200 oh Pekerja
0.0630 oh Tukang cat
0.0063 oh Kepala Tukang
0.0025 oh Mandor

40,000.00
40,000.00
60,000.00
68,000.00
Total :

59,000.00
29,000.00
4,100.00
16,800.00
40,000.00
40,000.00
60,000.00
68,000.00
Total :

30,000.00
43,600.00
20,600.00
40,000.00
40,000.00
60,000.00
68,000.00
Total :

1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)


0.1200 kg Cat dasar
43,600.00
0.1800 kg Cat Penutup 2x
20,600.00
0.0280 oh Pekerja
40,000.00
0.0420 oh Tukang cat
40,000.00
0.0042 oh Kepala Tukang
60,000.00
0.0025 oh Mandor
68,000.00
Total :
1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
0.1000 kg Meni besi
0.0100 lbr Kuas
0.0200 oh Pekerja
0.2000 oh Tukang cat
0.0200 oh Kepala Tukang
0.0100 oh Mandor

1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI


0.3000 kg Cat besi
0.0060 oh Pekerja
0.0600 oh Tukang cat
0.0120 oh Kepala Tukang
0.0060 oh Mandor

1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR


0.5220
ltr Politur
2.0000 lbr Amplas
0.0600 oh Pekerja
0.0600 oh Tukang cat
0.0160 oh Kepala Tukang
0.0025 oh Mandor

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

2,800.00
360.00
360.00
170.00
3,690.00

8,850.00
1,450.00
410.00
168.00
6,400.00
6,400.00
960.00
170.00
13,930.00

800.00
2,520.00
378.00
170.00
3,868.00

12,716.00

5,232.00
3,708.00
1,120.00
1,680.00
252.00
170.00
3,222.00

800.00
8,000.00
1,200.00
680.00
10,680.00

70,500.00
40,000.00
40,000.00
60,000.00
68,000.00
Total :

240.00
2,400.00
720.00
408.00
3,768.00

Total :

10,878.00

3,000.00
4,360.00
5,356.00

22,000.00
16,800.00
40,000.00
40,000.00
60,000.00
68,000.00
Total :

47,000.00
4,100.00
40,000.00
40,000.00
60,000.00
68,000.00

30,462.00

8,940.00

2,200.00
168.00

2,368.00

21,150.00

21,150.00

24,534.00
8,200.00
2,400.00
2,400.00
960.00
170.00
5,930.00

32,734.00

XV PEKERJAAN TETEMPELAN STYLE BALI


1

1 M2 PASANGAN BATA GOSOK 2 MUKA


110.0000 bh Bata Gosok
8.4000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA


13.7500 bh Paras Kerobokan
8.4000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN BATA GOSOK 1 MUKA


55.0000 bh Paras Kerobokan
4.2000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1,980.00
1,220.00
270,000.00
Total :

9,500.00
1,220.00
145,000.00
Total :

1,980.00
1,220.00
145,000.00
Total :

217,800.00
10,248.00
270,000.00
270,000.00

228,048.00

130,625.00
10,248.00
145,000.00
145,000.00

140,873.00

108,900.00
5,124.00
145,000.00
145,000.00

114,024.00

NO

URAIAN

PEKERJAAN PERSIAPAN
4

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

1 M2 PASANGAN PARAS 1 MUKA


18.3333 bh Batu paras
4.2000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA


55.0000 bh Bata gosok
4.4917 bh Batu paras
5.2500 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN BATA GOSOK DIUKIR


55.0000 bh Bata gosok
4.2000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS DIUKIR


18.3333 bh Batu paras
4.2000 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR


55.0000 bh Bata gosok
4.4917 bh Batu paras
5.2500 kg Semen 50 Kg
Upah Kerja ( Lumpsum)

12,000.00
1,220.00
145,000.00
Total :

1,980.00
12,000.00
1,220.00
145,000.00
Total :

1,980.00
1,220.00
288,500.00
Total :

12,000.00
1,220.00
288,500.00
Total :

220,000.00
5,124.00
145,000.00
145,000.00

225,124.00

108,900.00
53,900.00
6,405.00
145,000.00
145,000.00

169,205.00

108,900.00
5,124.00
288,500.00
288,500.00

114,024.00

220,000.00
5,124.00
288,500.00
288,500.00

1,980.00
12,000.00
1,220.00
280,000.00
Total :

280,000.00
280,000.00

55,000.00
45,000.00
60,000.00
40,000.00
68,000.00
Total :
63,000.00
63,000.00
68,000.00
75,500.00
55,000.00
63,000.00
63,000.00
68,000.00
75,500.00
66,500.00
76,000.00
85,000.00
53,000.00

11,250.00
1,500.00
20,000.00
1,700.00
34,450.00
34,450.00
34,450.00
34,450.00
34,450.00
34,450.00
34,450.00
34,450.00
34,450.00
34,450.00
34,450.00
34,450.00
34,450.00
34,450.00

225,124.00

108,900.00
53,900.00
6,405.00
169,205.00

XVI PEKERJAAN LANDSCAPE


1

2
4
5
5
7
8
10
11
12
14
15
16
18

1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225


1.0000 m2 Paving 10 x 20 cm tebal 8 cm K225
0.2500 oh Tukang Batu
0.0250 oh Kepala Tukang
0.5000 oh Pekerja
0.0250 oh Mandor
Paving 10 x 20 cm tebal 6 cm K350
Paving 10 x 20 cm tebal 8 cm K225
Paving 10 x 20 cm tebal 8 cm K350
Paving 10 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 6 cm K225
Paving 20 x 20 cm tebal 6 cm K350
Paving 20 x 20 cm tebal 8 cm K225
Paving 20 x 20 cm tebal 8 cm K350
Paving 20 x 20 cm tebal 8 cm K425
Paving 20 x 20 cm tebal 10 cm K225
Paving 20 x 20 cm tebal 10 cm K350
Paving 20 x 20 cm tebal 10 cm K425
Paving Tiga Berlian tebal 6 cm K225

19 1 M2 PASANGAN GRASS BLOCK


1.0000 m2 Grass Block
0.0690 m3 Pasir Urug
0.5000 oh Tukang Batu
0.0500 oh Kepala Tukang
1.0000 oh Pekerja
0.0500 oh Mandor

20 1 M2 PASANGAN KORAL SIKAT


1.2000 zak Koral Sikat
9.2800 zak Semen
0.2000 m3 Pasir pasang
0.2500 oh Tukang Batu
0.0100 oh Kepala Tukang
0.6250 oh Pekerja
0.0310 oh Mandor
21 1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225
1.0000 m1 Kanstein Bulat(P:50,T:30,La:10,Lb:16 cm K225
0.4500 zak Semen 50 Kg
0.0023 m3 Pasir Pasang
0.3500 oh Tukang Batu
0.0350 oh Kepala Tukang
0.9500 oh Pekerja
0.0950 oh Mandor
22 Kanstein Jumbo (P:50,L:15,T:30 cm K225)
23 Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)

55,000.00
130,000.00
45,000.00
60,000.00
40,000.00
68,000.00
Total :

35,000.00
1,220.00
158,000.00
45,000.00
60,000.00
40,000.00
68,000.00
Total :
69,000.00
1,220.00
158,000.00
45,000.00
60,000.00
40,000.00
68,000.00
Total :
55,000.00
69,000.00

55,000.00

55,000.00
63,000.00
63,000.00
68,000.00
75,500.00
55,000.00
63,000.00
63,000.00
68,000.00
75,500.00
66,500.00
76,000.00
85,000.00
53,000.00

55,000.00
8,970.00
22,500.00
3,000.00
40,000.00
3,400.00
68,900.00

63,970.00

42,000.00
11,321.60
31,600.00
11,250.00
600.00
25,000.00
2,108.00
38,958.00

84,921.60
69,000.00
549.00
363.40

15,750.00
2,100.00
38,000.00
6,460.00
62,310.00
62,310.00
62,310.00

69,912.40
97,921.60
111,921.60

NO

URAIAN

PEKERJAAN PERSIAPAN

HARGA
SATUAN
(Rp)

HARGA
UPAH
(Rp)

HARGA
BAHAN
(Rp)

(SNI 03-2835-2002)

24 1 M2 PENGECATAN KANSTEIN
0.2840 kg Cat
0.0710 kg Thiner
0.0300 oh Tukang Cat
0.0030 oh Kep. Tukang
0.1500 oh Pekerja
0.0150 oh Mandor

70,500.00
12,000.00
40,000.00
60,000.00
40,000.00
68,000.00
Total :

20,022.00
852.00
1,200.00
180.00
6,000.00
1,020.00
8,400.00

20,874.00

XVII PEKERJAAN ELEKTRIKAL


1

1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN
8.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme
12,000.00
3.0000
bt Pipa Clipsal 20 mm hitam
12,000.00
2.0000 bh Tee dos clipsal 20 mm hitam
7,000.00
15.0000
bj Klem clipsal 20 mm hitam
750.00
3.0000
bj Sock clipsal 20 mm hitam
2,000.00
1.0000
bj Inbow dos plastik clipsal E 157 P
10,000.00
1.0000 ttk Biaya pasang
25,000.00
Total :
1 TITIK INSTALASI AC
10.0000 m1 Kabel NYM 3 x 2.5 mm ex. Supreme
3.0000
bt Pipa Clipsal 20 mm hitam
1.0000 bh Tee dos clipsal 20 mm hitam
15.0000
bj Klem clipsal 20 mm hitam
4.0000
bj Sock clipsal 20 mm hitam
1.0000
bj Inbow dos plastik clipsal E 157 P
1.0000 m1 Pipa flexible clipsal 20 mm hitam
1.0000 ttk Biaya pasang

1 TITIK INSTALASI TELEPHONE


25.0000 m1 Kabel telephone
8.0000
bt Pipa Clipsal 20 mm putih
1.0000 bh Tee dos clipsal 20 mm putih
25.0000
bj Klem clipsal 20 mm putih
5.0000
bj Sock clipsal 20 mm putih
1.0000
bj Inbow dos plastik clipsal E 157 P
1.0000 ttk Biaya pasang

1 TITIK INSTALASI MATV


20.0000 m1 Coaxial cable 5C-75 ohm commscof
6.0000
bt Pipa Clipsal 20 mm putih
2.0000 bh Tee dos clipsal 20 mm putih
20.0000
bj Klem clipsal 20 mm putih
6.0000
bj Sock clipsal 20 mm putih
1.0000
bj Inbow dos plastik clipsal E 157 P
1.0000 ttk Biaya pasang

12,000.00
12,000.00
7,000.00
750.00
2,000.00
10,000.00
10,500.00
25,000.00
Total :

4,000.00
12,000.00
7,000.00
750.00
2,000.00
10,000.00
25,000.00
Total :

6,000.00
12,000.00
7,000.00
750.00
2,000.00
10,000.00
25,000.00
Total :

96,000.00
36,000.00
14,000.00
11,250.00
6,000.00
10,000.00
25,000.00
25,000.00

173,250.00

25,000.00
25,000.00

120,000.00
36,000.00
7,000.00
11,250.00
8,000.00
10,000.00
10,500.00
25,000.00
227,750.00

100,000.00
96,000.00
7,000.00
18,750.00
10,000.00
10,000.00
25,000.00
25,000.00

241,750.00

120,000.00
72,000.00
14,000.00
15,000.00
12,000.00
10,000.00
25,000.00
25,000.00

243,000.00

Kepala Dinas Cipta Karya


Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
NIP. 196110101994032001

HARGA
JUMLAH
(Rp)
6

324,975.00

88,700.00

1,052,105.00

798,890.00

924,750.00

HARGA
JUMLAH
(Rp)
6

7,400.00

807,440.00

191,642.00

32,399.00

85,480.00

289,324.00

268,924.00

31,700.00

39,060.00

46,556.00

42,176.00

64,080.00

HARGA
JUMLAH
(Rp)
6

51,060.00

2,340.00

13,880.00

23,400.00

168,680.00

22,020.00

161,700.00

119,400.00

113,700.00

642,420.00

600,370.00

HARGA
JUMLAH
(Rp)
6

571,222.00

550,728.00

522,642.00

1,728,144.00

586,124.00

325,902.00

526,201.50

HARGA
JUMLAH
(Rp)
6

668,329.00

283,950.00

272,817.00

265,325.00

261,440.00

260,086.00

138,243.00

HARGA
JUMLAH
(Rp)
6

132,971.40

129,944.00

128,039.60

127,012.40

124,950.00

76,268.65

59,836.00

1,537,070.00

HARGA
JUMLAH
(Rp)
6

147,842.00

42,112.88

36,303.28

33,790.72

32,074.80

31,102.48

30,323.52

29,468.32

48,593.04

HARGA
JUMLAH
(Rp)
6

45,242.96

42,902.40

41,658.64

40,567.36

26,536.00

24,338.40

14,190.76

6,839.00

30,300.80

9,245.00

HARGA
JUMLAH
(Rp)
6

10,744,800.00

7,388,400.00

439,974.00

319,974.00

592,650.00

400,870.00

808,650.00

505,070.00

HARGA
JUMLAH
(Rp)
6

465,190.00

713,680.00

474,190.00

512,540.00

10,234,000.00

11,675,280.00

9,835,360.00

HARGA
JUMLAH
(Rp)
6

79,340.00

102,740.00

1,384,828.00

78,400.00

79,380.00

115,140.00

116,240.00

HARGA
JUMLAH
(Rp)
6

268,494.00

323,654.00

327,200.00

202,940.00

25,173.00

572,428.40

604,882.96

HARGA
JUMLAH
(Rp)
6

630,485.32

660,608.71

689,593.30

710,931.31

725,446.33

750,276.98

758,051.90

787,275.24

HARGA
JUMLAH
(Rp)
6

797,397.57

97,875.50

143,828.00

143,828.00

463,899.00

481,899.00

823,899.00

HARGA
JUMLAH
(Rp)
6

566,899.00

438,149.00

128,394.00

2,890,414.00

3,584,229.00

HARGA
JUMLAH
(Rp)
6

7,889,824.00

6,211,159.00

7,010,307.50

6,285,914.00

HARGA
JUMLAH
(Rp)
6

5,604,979.00

49,559.00

67,876.20

42,704.00

45,204.00

73,152.00

HARGA
JUMLAH
(Rp)
6

34,496.00

227,887.00

535,234.00

76,884.00

94,680.00

38,898.00

40,044.00

25,248.00

57,582.00

HARGA
JUMLAH
(Rp)
6

28,485.00

218,660.00

19,700.50

187,982.40

32,484.00

35,578.00

1,639,340.00

352,280.00

HARGA
JUMLAH
(Rp)
6

1,221,820.00

345,150.00

504,780.00

67,936.00

286,017.20

27,970.90

41,871.10

98,266.30

HARGA
JUMLAH
(Rp)
6

24,405.00

20,870.40

383,968.00

247,683.40

131,340.00

36,054.40

55,034.00

31,054.40

112,068.00

HARGA
JUMLAH
(Rp)
6

121,254.40

134,849.09

316,178.00

25,267.53

328,350.00

150,081.38

40,853.00

HARGA
JUMLAH
(Rp)
6

34,152.00

24,808.00

16,584.00

12,162.00

13,048.00

24,918.00

38,664.00

498,048.00

285,873.00

259,024.00

HARGA
JUMLAH
(Rp)
6

370,124.00

314,205.00

402,524.00

513,624.00

449,205.00

89,450.00
97,450.00
97,450.00
102,450.00
109,950.00
89,450.00
97,450.00
97,450.00
102,450.00
109,950.00
100,950.00
110,450.00
119,450.00
87,450.00

132,870.00

123,879.60

132,222.40
160,231.60
174,231.60

HARGA
JUMLAH
(Rp)
6

29,274.00

198,250.00

252,750.00

266,750.00

268,000.00

nas Cipta Karya


aten Badung

ssy Dharmayanty, M.T


bina Tk. I
0101994032001

REKAPITULASI DAFTAR HARGA SATUAN PEKERJAAN


BULAN JANUARI TAHUN 2013
NO

URAIAN PEKERJAAN

HARGA

PEKERJAAN PERSIAPAN

(SNI 03-2835-2002)

1 M1 PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER

Rp.

324,975.00

1 M1 PENGUKURAN DAN PEMASANGAN BOWPLANK

Rp.

88,700.00

1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN

Rp.

1,052,105.00

1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT

Rp.

798,890.00

1 M2 PEMBUATAN RUMAH JAGA/KONSTRUKSI KAYU

Rp.

924,750.00

1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN

Rp.

7,400.00

1 M2 PEMBUATAN BEDENG BURUH

Rp.

807,440.00

1 M2 PEMBUATAN BAK ADUKAN UKURAN (40X50X20) CM

Rp.

191,642.00

1 M2 PEMBUATAN STEGGER DARI BAMBU

Rp.

32,399.00

10

1 M2 PEMBUATAN JALAN SEMENTARA

Rp.

85,480.00

11

1 M3 BONGKARAN BETON BERTULANG

Rp.

289,324.00

12

1 M3 BONGKARAN DINDING TEMBOK BATA MERAH

Rp.

268,924.00

II

PEKERJAAN TANAH

1 M3 GALIAN TANAH BIASA DALAM 1 METER

Rp.

31,700.00

1 M3 GALIAN TANAH BIASA DALAM 2 METER

Rp.

39,060.00

1 M3 GALIAN TANAH BIASA DALAM 3 METER

Rp.

46,556.00

1 M3 GALIAN TANAH KERAS DALAM 1METER

Rp.

42,176.00

1 M3 GALIAN TANAH CADAS DALAM 1 METER

Rp.

64,080.00

1 M3 GALIAN TANAH LUMPUR DALAM 1 METER

Rp.

51,060.00

1 M2 PEKERJAAN STRIPPING SETINGGI 1 METER

Rp.

2,340.00

1 M3 PEMBUANGAN TANAH SEJAUH 15 METER

Rp.

13,880.00

(SNI 2835 : 2008)

1 M3 URUGAN KEMBALI

Rp.

10

1 M3 PEMADATAN TANAH ( Per 20 Cm )

Rp.

23,400.00

11

1 M3 URUGAN PASIR

Rp.

168,680.00

12

1 M3 PEMASANGAN LAPISAN IJUK TEBAL 10 CM

Rp.

22,020.00

13

1 M3 URUGAN SIRTU PADAT Untuk Peninggian Lantai Bangunan

Rp.

161,700.00

14

1 M3 URUGAN TANAH PILIHAN DIPADATKAN

Rp.

119,400.00

15

1 M3 URUGAN LIMESTONE PADAT

Rp.

113,700.00

III

PEKERJAAN PONDASI

1 M3 BATU KALI CAMP. 1 PC : 3 PS

Rp.

642,420.00

1 M3 BATU KALI CAMP. 1 PC : 4 PS

Rp.

600,370.00

1 M3 BATU KALI CAMP. 1 PC : 5 PS

Rp.

571,222.00

1 M3 BATU KALI CAMP. 1 PC : 6 PS

Rp.

550,728.00

1 M3 BATU KALI CAMP. 1 PC : 8 PS

Rp.

522,642.00

6
7

1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI


1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M

Rp.
Rp.

1,728,144.00
586,124.00

1 M3 PASANGAN BATU KOSONG

Rp.

325,902.00

IV PEKERJAAN DINDING

(SNI 2836 : 2008)

(SNI 6897 : 2008)

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 2 PS

Rp.

283,950.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 3 PS

Rp.

272,817.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 4 PS

Rp.

265,325.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 5 PS

Rp.

261,440.00

1 M2 PASANGAN BATA MERAH TEBAL 1 BATA CAMP. 1 PC : 6 PS

Rp.

260,086.00

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 2 PS

Rp.

138,243.00

NO

URAIAN PEKERJAAN

HARGA

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 3 PS

Rp.

132,971.40

8
9

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 4 PS


1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 5 PS

Rp.
Rp.

129,944.00
128,039.60

10

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 6 PS

Rp.

127,012.40

11

1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA CAMP. 1 PC : 8 PS

Rp.

124,950.00

12

1 M2 PASANGAN
ANGANBATA
BATUMERAH
ALAM 30TEBAL
X 30 CAMP
1/2 BATA
1PC CAMP.
: 2PS 1 PC : 8 PS

Rp.

150,081.38

13

1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10)

Rp.

76,268.65

14

1 M2 PASANGAN DINDING HOLLOWBLOCK (HB. 10) TANPA BESI

Rp.

59,836.00

15

1 M2 PASANGAN DINDING Terawang/Roster (12 x 11 x 24) CM

Rp.

1,537,070.00

16

1 M2 PASANGAN DINDING BEDEG, RANGKA KAYU

Rp.

147,842.00

PEKERJAAN PLESTERAN

1 M2 PLESTERAN CAMP. 1 PC : 1 PS TEBAL 15 MM

Rp.

42,112.88

1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 15 MM

Rp.

36,303.28

1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 15 MM

Rp.

33,790.72

1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 15 MM

Rp.

32,074.80

1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 15 MM

Rp.

31,102.48

1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 15 MM

Rp.

30,323.52

1 M2 PLESTERAN CAMP. 1 PC : 8 PS TEBAL 15 MM

Rp.

29,468.32

1 M2 PLESTERAN CAMP. 1 PC : 2 PS TEBAL 20 MM

Rp.

48,593.04

1 M2 PLESTERAN CAMP. 1 PC : 3 PS TEBAL 20 MM

Rp.

45,242.96

10

1 M2 PLESTERAN CAMP. 1 PC : 4 PS TEBAL 20 MM

Rp.

42,902.40

11

1 M2 PLESTERAN CAMP. 1 PC : 5 PS TEBAL 20 MM

Rp.

41,658.64

12

1 M2 PLESTERAN CAMP. 1 PC : 6 PS TEBAL 20 MM

Rp.

40,567.36

13

1 M2 PLESTERAN SKONING 1 PC : 2 PS, TEBAL 10 MM

Rp.

26,536.00

14

1 M2 PLESTERAN CIPRAT 1 PC : 2 PS

Rp.

24,338.40

15

1 M2 FINISHING SIAR PASANGAN DINDING BATA MERAH (=20 M')

Rp.

14,190.76

16

1 M2 FINISHING SIAR PASANGAN DINDING CONBLOCK EKSPOSE (= 8 M')

Rp.

6,839.00

17

1 M2 FINISHING SIAR PASANGAN BATU KALI ADUKAN 1PC : 2 PS

Rp.

30,300.80

18

1 M2 PEKERJAAN ACIAN

Rp.

9,245.00

VI PEKERJAAN KAYU

(SNI 2837 : 2008)

(SNI 3434 : 2008)

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS I

Rp.

10,744,800.00

MEMBUAT DAN MEMASANG 1 M3 KUSEN PINTU DAN JENDELA KAYU KELAS II/III Rp.

7,388,400.00

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP STANDAR KAYU KELAS II

Rp.

439,974.00

MEMBUAT DAN MEMASANG 1 M2 PINTU KLAMP SEDERHANA KAYU KELAS III

Rp.

319,974.00

MEMBUAT DAN MEMASANG 1 M2 DAUN PINTU PANEL KAYU KELAS I/II

Rp.

592,650.00

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA KACA, KAYU KELAS I/II

Rp.

400,870.00

7
8

MEMBUAT DAN MEMASANG 1 M2 PINTU DAN JENDELA JALUSI, KAYU KELAS I/II
MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA TERTUTUP, KAYU
KELAS II (Lebar Sampai 90 Cm)
MEMBUAT 1 M2 DAUN PINTU PLYWOOD RANGKAP RANGKA EXPOSE, KAYU
KELAS I/II

Rp.

808,650.00

Rp.

505,070.00

Rp.

465,190.00

10

MEMASANG 1 M2 JALUSI KUSEN, KAYU KELAS I/II

Rp.

713,680.00

11

MEMBUAT 1 M2 TEAKWOOD RANGKAP RANGKA EXPOSE, KAYU KELAS I


MEMBUAT 1 M2 TEAKWOOD RANGKAP LAPIS FORMIKA RANGKA EXPOSE,
KAYU KELAS II
MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL, KAYU KELAS
I,II,III Bentang 6 M'

Rp.

474,190.00

Rp.

512,540.00

Rp.

10,234,000.00

14

MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA EXPOSE, KAYU KELAS I

Rp.

11,675,280.00

15

MEMASANG 1 M3 KONSTRUKSI GORDENG, KAYU KELAS II

Rp.

9,835,360.00

16

MEMASANG 1 M2 RANGKA ATAP GENTENG KERAMIK, KAYU KELAS II

Rp.

79,340.00

12
13

NO

URAIAN PEKERJAAN

HARGA

17

MEMASANG 1 M2 RANGKA ATAP GENTENG BETON, KAYU KELAS II

Rp.

102,740.00

18

MEMASANG 1 M2 RANGKA ATAP SIRAP, KAYU KELAS II

Rp.

1,384,828.00

19

MEMASANG 1 M2 RANGKA LANGIT-LANGIT (50 X 100), KAYU KELAS II/III

Rp.

78,400.00

20

MEMASANG 1 M2 RANGKA LANGIT-LANGIT (60 X 60) CM, KAYU KELAS II/III

Rp.

79,380.00

21

MEMASANG 1 M' LISPLANK UKURAN (3 X 20) CM, KAYU KELAS I/II

Rp.

115,140.00

22

MEMASANG 1 M' LISPLANK UKURAN (3 X 30) CM, KAYU KELAS I/II

Rp.

116,240.00

23

Rp.

268,494.00

Rp.

323,654.00

25

MEMASANG 1 M2 RANGKA DINDING PEMISAH (60 X 120) CM, KAYU KELAS II/III
MEMASANG 1 M2 RANGKA DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA
KAYU KELAS II
MEMASANG 1 M2 RANGKA DINDING PEMISAH PLYWOOD RANGKAP, RANGKA
KAYU KELAS II

Rp.

327,200.00

26

MEMASANG 1 M2 LAMBRIZIRING DARI PAPAN KAYU KELAS I

Rp.

202,940.00

27

MEMASANG 1 M2 LAMBRIZIRING DARI PLYWOOD UKURAN (120 X 240) CM

Rp.

25,173.00

24

VII PEKERJAAN BETON ( SNI 7394:2008)


1

MEMBUAT 1 M BETON MUTU f'C= 7,4 Mpa (K100), Slump (12 2)cm, w/c = 0,87

Rp.

572,428.40

MEMBUAT 1 M BETON MUTU f'C= 9,8 Mpa (K125), Slump (12 2)cm, w/c = 0,78

Rp.

604,882.96

MEMBUAT 1 M BETON MUTU f'C= 12,2 Mpa (K150), Slump (12 2)cm, w/c = 0,72

Rp.

630,485.32

MEMBUAT 1 M BETON MUTU f'C= 14,5 Mpa (K175), Slump (12 2)cm, w/c = 0,66

Rp.

660,608.71

MEMBUAT 1 M BETON MUTU f'C= 16,9 Mpa (K200), Slump (12 2)cm, w/c = 0,61

Rp.

689,593.30

MEMBUAT 1 M BETON MUTU f'C= 19,3 Mpa (K225), Slump (12 2)cm, w/c = 0,58

Rp.

710,931.31

MEMBUAT 1 M BETON MUTU f'C= 21,7 Mpa (K250), Slump (12 2)cm, w/c =0,56

Rp.

725,446.33

MEMBUAT 1 M BETON MUTU f'C= 24,0 Mpa (K275), Slump (12 2)cm, w/c =0,53

Rp.

750,276.98

MEMBUAT 1 M BETON MUTU f'C= 26,4 Mpa (K300), Slump (12 2)cm, w/c =0,52

Rp.

758,051.90

10

MEMBUAT 1 M BETON MUTU f'C= 28,8 Mpa (K325), Slump (12 2)cm, w/c =0,49

Rp.

787,275.24

11

MEMBUAT 1 M BETON MUTU f'C= 31,2 Mpa (K350), Slump (12 2)cm, w/c =0,48

Rp.

797,397.57

12

PEMBESIAN 10 KG DENGAN BESI POLOS ATAU BESI ULIR

Rp.

97,875.50

13

1 M2 PASANG BEKISTING UNTUK PONDASI

Rp.

143,828.00

14

1 M2 PASANG BEKISTING UNTUK SLOOF

Rp.

143,828.00

15

1 M2 PASANG BEKISTING UNTUK KOLOM

Rp.

463,899.00

16

1 M2 PASANG BEKISTING UNTUK BALOK

Rp.

481,899.00

17

1 M2 PASANG BEKISTING UNTUK LANTAI

Rp.

823,899.00

18

1 M2 PASANG BEKISTING UNTUK DINDING

Rp.

566,899.00

19

1 M2 PASANG BEKISTING UNTUK TANGGA

Rp.

438,149.00

20

1 M2 PASANG JEMBATAN UNTUK PENGECORAN BETON

Rp.

128,394.00

21

1 M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEKISTING)

Rp.

2,890,414.00

22

1 M3 MEMBUAT SLOOF BETON BERTULANG (200 KG + BEKISTING)

Rp.

3,584,229.00

23

1 M3 MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEKISTING)

Rp.

7,889,824.00

24

1 M3 MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEKISTING)

Rp.

6,211,159.00

25

1 M3 MEMBUAT PLAT BETON BERTULANG (150 KG BESI + BEKISTING

Rp.

7,010,307.50

26

1 M3 MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEKISTING)

Rp.

6,285,914.00

27

1 M3 MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEKISTING)

Rp.

5,604,979.00

28

1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (11 X 11 CM)

Rp.

49,559.00

29

1 M1 MEMBUAT KOLOM PENGUAT BETON BERTULANG (10 X 15 CM)

Rp.

67,876.20

30

1 M3 PASANGAN PONDASI SIKLOP, 40% BATU KALI

Rp.

1,728,144.00

31

1 M3 PASANGAN PONDASI SUMURAN DIAMETER 1 M

Rp.

586,124.00

32

1 M3 PASANGAN BATU KOSONG

Rp.

325,902.00

33

1 M1 Pembuatan Tiang Pancang 35 cm x 35 cm Beton Bertulang

Rp.

526,201.50

34

1 M1 Pembuatan Tiang Pancang 40 cm x 40 cm Beton Bertulang

Rp.

668,329.00

VIII PEKERJAAN PENUTUP ATAP (SNI 03-3436-2002)

NO

URAIAN PEKERJAAN

HARGA

1 M2 PEKERJAAN ATAP GENTENG PLENTONG

Rp.

42,704.00

1 M2 PEKERJAAN ATAP GENTENG PLENTONG DI CAT

Rp.

45,204.00

1 M1 PASANG BUBUNGAN GENTENG PLENTONG

Rp.

73,152.00

1 M2 PASANG ATAP GENTENG ASBES GELOMBANG 1.8 M X 0.92 M X 5 MM

Rp.

34,496.00

1 M1 PASANG BUBUNGAN STEL GELOMBANG 0.92 M

Rp.

227,887.00

1 M2 PEKERJAAN ATAP SIRAP

Rp.

535,234.00

1 M2 PEKERJAAN ATAP NOK SIRAP

Rp.

76,884.00

1 M2 PASANG ATAP ALANG-ALANG 3 M1

Rp.

94,680.00

1 M2 PEKERJAAN ATAP SENG GELOMBANG

Rp.

38,898.00

10

1 M2 PASANGAN LAPISANG ALUMINIUM FOIL

Rp.

40,044.00

11

1 M1 PASANG NOK SENG GELOMBANG

Rp.

25,248.00

MEMASANG 1 M2 LANGIT-LANGIT ASBES SEMEN, TEBAL 4 MM, 5 MM DAN 6 MM Rp.

57,582.00

1 M2 PASANG LANGIT-LANGIT TRIPLEKS 120X240 CM/6MM

Rp.

28,485.00

1 M2 PASANG LANGIT-LANGIT LAMBRIZIRING

Rp.

218,660.00

1 M1 PASANG LIST LANGIT-LANGIT KAYU PROFIL

Rp.

19,700.50

1 M2 PASANG LANGIT-LANGIT ASBES + RANGKA

Rp.

187,982.40

1 M2 PASANG LANGIT-LANGIT GYPSUM BOARD UKURAN (1200X2400X9) MM

Rp.

32,484.00

1 M2 PASANG LANGIT-LANGIT KALSIBOARD 4.5 MM

Rp.

35,578.00

PEKERJAAN SANITASI ( SNI 2002 )

MEMASANG 1 BUAH KLOSET DUDUK/MONOBLOK

Rp.

1,639,340.00

MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN

Rp.

352,280.00

MEMASANG 1 BUAH URINOIR

Rp.

1,221,820.00

MEMASANG 1 BUAH WASHTAFEL KIA

Rp.

345,150.00

MEMASANG 1 BUAH BAK MANDI FIBREGLASS, VOLUME 0,30 M3

Rp.

504,780.00

MEMASANG 1 M1 PIPA GALVANIS f 0,5" - 1 "

Rp.

67,936.00

MEMASANG 1 M1 PIPA GALVANIS f 1,5" - 3"

Rp.

286,017.20

MEMASANG 1 M1 PIPA PVC TYPE AW f 0,5" - 1,5"

Rp.

27,970.90

MEMASANG 1 M1 PIPA PVC TYPE AW f 2"

Rp.

41,871.10

10

MEMASANG 1 M1 PIPA PVC TYPE AW f 3" - 4"

Rp.

98,266.30

11

MEMASANG 1 BUAH KRAN f 0,75" ATAU 0,5"

Rp.

24,405.00

IX PEKERJAAN LANGIT - LANGIT (SNI 2839-2008)

XI PEKERJAAN BESI DAN ALUMINIUM

(SNI 7393:2008)

1 KG PASANG RANGKA ATAP BAJA

Rp.

20,870.40

1 M2 PASANG JENDELA NAKO

Rp.

383,968.00

1 M1 PASANG TALANG DATAR, SENG BJLS 28

Rp.

247,683.40

XII PEKERJAAN KUNCI DAN KACA (SNI 2002)


1

1 BH PASANG KUNCI TANAM BIASA

Rp.

131,340.00

1 PS PASANG ENGSEL PINTU

Rp.

36,054.40

1 PS PASANG ENGSEL JENDELA KUPU-KUPU

Rp.

55,034.00

1 BH PASANG KAIT ANGIN

Rp.

31,054.40

1 BH PASANG KUNCI SLOT

Rp.

112,068.00

1 M2 PASANG KACA, TEBAL 3 - 5 MM

Rp.

121,254.40

XIII PEK. PENUTUP LANTAI DAN DINDING

(SNI 7395:2008)

1 M2 PASANG LANTAI KERAMIK 30 X 30 CM

Rp.

134,849.09

1 M2 PASANG LANTAI KERAMIK 20 X 20 CM

Rp.

316,178.00

1 M1 PASANG PLIN KERAMIK 10 X 30 CM

Rp.

25,267.53

NO

URAIAN PEKERJAAN

HARGA

1 M2 PASANG DINDING KERAMIK 20 X 20 CM

Rp.

328,350.00

1 M1 PASANG PLIN KAYU 2 X 10 CM

Rp.

40,853.00

Rp.

34,152.00

XIV PEKERJAAN PENGECATAN (SNI 2002)


1

1 M2 PENGECATAN BIDANG KAYU BARU (1 LAPIS PLAMIR,


1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

1 M2 PENGECATAN BIDANG KAYU DENGAN VERNIS

Rp.

24,808.00

1 M2 PENGECATAN TEMBOK BARU (1 LAPIS PLAMIR,

Rp.

16,584.00

1 M2 PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) Rp.

12,162.00

1 M2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI

Rp.

13,048.00

1 M2 PENGECATAN PERMUKAAN BAJA, 1 LAPIS DENGAN CAT BESI

Rp.

24,918.00

1 M2 PELABURAN BIDANG KAYU DENGAN POLITUR

Rp.

38,664.00

1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)

NO

URAIAN PEKERJAAN

HARGA

XV PEKERJAAN TETEMPELAN STYLE BALI


1

1 M2 PASANGAN BATA GOSOK 2 MUKA

Rp.

498,048.00

1 M2 PASANGAN PARAS KEROBOKAN 1 MUKA

Rp.

285,873.00

1 M2 PASANGAN BATA GOSOK 1 MUKA

Rp.

259,024.00

1 M2 PASANGAN PARAS 1 MUKA

Rp.

370,124.00

1 M2 PASANGAN PARAS + BATA GOSOK 1 MUKA

Rp.

314,205.00

1 M2 PASANGAN BATA GOSOK DIUKIR

Rp.

402,524.00

1 M2 PASANGAN PARAS DIUKIR

Rp.

513,624.00

1 M2 PASANGAN PARAS + BATA GOSOK DIUKIR

Rp.

449,205.00

XVI PEKERJAAN LANDSCAPE


1

1 M2 PASANGAN PAVING BETON 10/20 CM TEBAL 6 CM K 225

Rp.

89,450.00

Paving 10 x 20 cm tebal 6 cm K350

Rp.

97,450.00

Paving 10 x 20 cm tebal 8 cm K225

Rp.

97,450.00

Paving 10 x 20 cm tebal 8 cm K350

Rp.

102,450.00

Paving 20 x 20 cm tebal 6 cm K225

Rp.

89,450.00

Paving 20 x 20 cm tebal 6 cm K350

Rp.

97,450.00

Paving 20 x 20 cm tebal 8 cm K225

Rp.

97,450.00

Paving 20 x 20 cm tebal 8 cm K350

Rp.

102,450.00

Paving 20 x 20 cm tebal 8 cm K425

Rp.

109,950.00

10

Paving 20 x 20 cm tebal 10 cm K225

Rp.

100,950.00

11

Paving 20 x 20 cm tebal 10 cm K350

Rp.

110,450.00

12

Paving 20 x 20 cm tebal 10 cm K425

Rp.

119,450.00

13

Paving Tiga Berlian tebal 6 cm K225

Rp.

87,450.00

14

1 M2 PASANGAN GRASS BLOCK

Rp.

132,870.00

15

1 M2 PASANGAN KORAL SIKAT

Rp.

123,879.60

16

1 M1 KANSTEIN BULAT (50 x 30 x 10 ) CM K225

Rp.

132,222.40

17

Kanstein Jumbo (P:50,L:15,T:30 cm K225)

Rp.

160,231.60

18

Kanstein Segi Lima Jumbo (P:50,L:15, T:40 cm K225)

Rp.

174,231.60

19

1 M2 PENGECATAN KANSTEIN

Rp.

29,274.00

XVII PEKERJAAN ELEKTRIKAL


1

1 TITIK INSTALASI STOP KONTAK, LAMPU, EXHAUST FAN DAN CEILING FAN

Rp.

198,250.00

1 TITIK INSTALASI AC

Rp.

252,750.00

1 TITIK INSTALASI TELEPHONE

Rp.

266,750.00

1 TITIK INSTALASI MATV

Rp.

268,000.00

Kepala Dinas Cipta Karya


Kabupaten Badung

Ir. Ni Luh Putu Dessy Dharmayanty, M.T


Pembina Tk. I
NIP. 196110101994032001

DAFTAR HARGA SATUAN BAHAN TAMBAHAN


BULAN Januari TAHUN 2013
A. Harga Satuan Bahan
NO

NAMA BARANG

SATUAN

HARGA SATUAN

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

78,000.00
78,000.00
78,000.00
80,000.00
80,000.00
105,000.00
115,000.00
135,000.00
135,000.00
165,000.00
185,000.00

BATU
Batu Candi
1 20x20x2
2 15x30x2
3 20x30x2
4 20x40x2
5 30x30x2
6 40x40x2
7 30x60x2
8 20x40x3
9 30x30x3
10 30x30x5
11 40x40x5

1
2
3
4
5

Palimanan putih
20x20x2
20x30x2
20x40x2
20x40x3
30x30x3

m2
m2
m2
m2
m2

65,000.00
67,000.00
68,000.00
110,000.00
110,000.00

1
2
3

Palimanan Serat Kuning


20x30
20x40
15x30

m2
m2
m2

75,000.00
75,000.00
75,000.00

1
2
3
4

Palimanan Cirebon
15x30x2
20x30x2
20x40x2
30x30x2

m2
m2
m2
m2

72,000.00
73,000.00
75,000.00
80,000.00

1
2

Alur Bali Green Lurus


20x30
20x40

m2
m2

105,000.00
105,000.00

1
2
3

Alur Bali Green Cukil


20x30
20x40
20x20

m2
m2
m2

105,000.00
105,000.00
105,000.00

1
2
3
4

Batu Bali Green


15x30
20x30
20x40
40x40

m2
m2
m2
m2

75,000.00
75,000.00
75,000.00
80,000.00

1
2

PARAS
Paras Kerobokan
20x40x3
20x40x5

Bj
Bj

6,000.00
8,000.00

1
2

Paras Kelating
20x40x3
20x40x5

Bj
Bj

6,000.00
8,000.00

1
2

Alur Andesit Lurus


20x40
30x60

m3
m3

135,000.00
140,000.00

1
2

Alur and cukil


20x40
15x30

m2
m2

135,000.00
135,000.00

Alur And Gelombang


Alur And Gelombang lurus

m2
m2

140,000.00
140,000.00

Harga Barang dan Upah

Hal. 76

NO

NAMA BARANG

SATUAN

HARGA SATUAN

Random Singaraja
Random Cirebon
Random Jember

Harga Barang dan Upah

m2
m2
m2

25,000.00
65,000.00
45,000.00

Hal. 77

Anda mungkin juga menyukai