SECTION 11880 COMPRESSOR AFTERCOOLER

NTS: This specification section requires careful review by the specifier. Thespecifier is required to modify the section according to the requirements ofthe project. Brackets indicate items to be checked, completed, edited, selected, or filled in. NTS notations and brackets should be removed in thefinal printing. (Formerly Master Spec. Sec. 11375_ww)

PART 1 -- GENERAL 1.1 A. THE REQUIREMENT The CONTRACTOR shall furnish and install [ ] aftercooler [and oil separator unit[s]] complete and workable, with all connections, supports, controls, valves, drains, gages, and other accessories and appurtenances for cooling [and oil separation] of air compressor discharge prior to its entry into the air receiver, as specified herein in accordance with the requirements of the Contract Documents. RELATED WORK SPECIFIED ELSEWHERE Section [11855] Blowers, Compressors, and Vacuum Pumps, General. Section [15610] Piping, General REFERENCE SPECIFICATIONS, CODES AND STANDARDS Comply with the applicable reference specifications as specified in the GENERAL REQUIREMENTS. CONTRACTOR SUBMITTALS Submittals shall be made in accordance with GENERAL REQUIREMENTS. QUALITY ASSURANCE Comply with applicable subsection of Section [11000] "Equipment General Provisions."

1.2 A. B. 1.3 A.

1.4 A. 1.5 A.

PART 2 -- PRODUCTS 2.1 A. COMPRESSOR AFTER COOLER Construction: The aftercooler shall be of the shell and tube type, with corrosion-resistant tubes and tube sheets, and steel or cast-iron shell and air headers. [The outlet of the aftercooler shall be flanged to an oil and water separator of the centrifugal type, with drain trap.] Air inlet and outlet flanges shall be [ ]-inch ANSI 150-lb. The cooler shall be mounted on fabricated steel brackets. Water inlet and outlet connections shall be [ ]-inch N.P.T. with solenoid valve controlled inlet, and temperature gage with throttling valve in outlet. Solenoid valve shall be interlocked with air compressor start/stop controls. Capacity: The aftercooler shall have a capacity of not less than [ ] scfm at [ ] psig, and a water inlet temperature of approximately [ ] degrees F, at [ ] degrees F approach. Manufacturers: 1. [Manufacturer 1]; COMPRESSOR AFTERCOOLER DIVISION 11 11880-1

B.

C.

[PROJECT NUMBER] [PROJECT TITLE] [12/10/07]

2. 3. 4.

[Manufacturer 2]; [Manufacturer 3]. Or Equal.

PART 3 -- EXECUTION 3.1 A. INSTALLATION All equipment shall be installed in accordance with approved procedures submitted with the shop drawings and as shown, unless otherwise approved. General installation requirements shall be as specified in Section [11000], "Equipment General Provisions."

B.

END OF SECTION

[PROJECT NUMBER] [PROJECT TITLE] [12/10/07]

COMPRESSOR AFTERCOOLER DIVISION 11 11880-2