Anda di halaman 1dari 114

2011- 2010/ 70/ /

10 /

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE
KD

AMOUNT
KD

DIVISION 2 - SITE WORKS


Section 02315
Earth Work
Excavation and Backfilling
2.1

Excavation for foundation in any type of soil


even rock, up to required height including
backfilling, shoring (if required), dewatering
and removing of surplus excavated material from
site to a place approved by the Municipality.
Mechanical excavation shall be stopped 300mm
above the Foundation level and completed
manually.

M3

13308

2.250

29943.000

L.S

L.S

6000.000

6000.000

L.S

L.S

1500.000

1500.000

Compacted fill
2.2

Filling inside building (under slab on grade etc.)


as per proposed levels, with approved quality
imported filling material. Filling shall be
compacted in layers (each layer shall not be
more than 250mm thick) and compaction shall
not be less than 98% of dry density. Selected
excavated material may be used for filling but as
per approval of the Engineer.

Section 02360
Termite Control
2.3

Termilte Control/Soil treatment for the whole


building area all as described

Bill No-1: Class Room + Administration Bldg (A)

1/2-1

SITE WORKS

2011- 2010/ 70/ /



10 /

37443.000

Total Carried to Collection


ITEM

DESCRIPTION

AMOUNT
KD

DIVISION 2 - SITEWORKS
COLLECTION
Page No. 2-1

Bill No-1: Class Room + Administration Bldg (A)

37,443.000

1/2-2

SITE WORKS

2011- 2010/ 70/ /



10 /

37,443.000

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/2-3

SITE WORKS

2011- 2010/ 70/ /



10 /

ITEM

DESCRIPTION

UNIT QTY UNIT RATE


KD

AMOUNT
KD

DIVISION 3 - CONCRETE
Section 03300
Cast-in-place Concrete

3.1

3.1.1
3.1.2

3.2

Plain Concrete
Plain concrete grade using sulphate resisting
cement including all form work and laid as
described (smooth face)
100 mm thick under Foundation
50 mm thick under Ground beam & External
steps

M2

1,400

3.500

4900.000

M2

710

2.200

1562.000

Reinforced Concrete
Vibrated reinforced concrete using sulphate
resisting cement filled into formwork and
tamped around reinforcement including all
formwork, tie bolts and reinforcement etc.
complete as described (Fair finish for all
exposed faces)

3.2.1

Foundation: Col/Wall Footings etc.

M3

785

95.500

74967.500

3.2.2

Column/wall Neck

M3

190

100.000

19000.000

3.2.3

Ground Beam, External Steps/ramp etc.

M3

345

95.000

32775.000

3.2.4

150mm thick slab on grade with turn down


slab/edge thicnessing and including Isolation
joints (with celotex and mastic fill).
Construction joints shall be provided in case bay
area is more than 25 m2.

M2

3,930

7.250

28492.500

3.3

Vibrated reinforced concrete using ordinary


portland cement, filled into form work and
tamped around reinforcement including all
formwork, reinforcement etc. complete as
described. (Fair finish for all exposed faces)

3.3.1

Walls

M3

698

95.000

66310.000

3.3.4

Lintels, sills, bond beam etc.

M3

93

98.000

9114.000

Bill No-1: Class Room + Administration Bldg (A)

1/3-4

CONCRETE

2011- 2010/ 70/ /



10 /

237121.000

Total Carried to Collection


ITEM

3.4

3.5

DESCRIPTION

UNIT QTY UNIT RATE


KD

Section 03530
Concrete Topping
Minimum 50mm thick concrete topping with
mesh reinforcement (Y8/200mm both
direction)and laid over hollow core slab in
proper shape with required expansion,
construction and contraction joints. (K-300)

AMOUNT
KD

M2

11821

5.000

59,105.000

Section 03410
Plant Pre-cast Structural Concrete.
Vibrated precast prestressed reinforced concrete
with compressive strenght of 48Mpa (Cube
strenght) using Ordinary portland cement
finished fairface on all exposed surfaces
including all formwork, reinforcemet, tension
wires anchorage, lifting hooks, hoisting, placing
in position, bedding neoprene bearing pads,
perimeter gaskets, sealent, shims, dowels and
connections all as specified
Note : The dimensions mention below are as per
the drawings, and the dimensions shown in the
drawings are for guidance only, It is contractor's
responsibility to design all the precast concrete
element, and all connections and accessories as
specified.
The slab system shown in the drawing (Hollow
core system) is for guide line only, The
contractor to design complete slab system as
hollow core system or Double T (TT) System,
after consideration of all services passing fron
the ceiling and take the approval from Engineer
before commencing of the work.

3.5.1

Design, suplly and fixation of precast concrete


columns.

L.S.

L.S.

98,650.000

98,650.000

3.5.2

Design, suplly and fixation of rectangular


beams, edge beams, spine beams.

L.S.

L.S.

205,450.000

205,450.000

Bill No-1: Class Room + Administration Bldg (A)

1/3-5

CONCRETE

2011- 2010/ 70/ /



10 /

3.5.3

Design, suplly and fixation of hollow core or


Double TT, slab system.

L.S.

L.S.

201,450.000

564655.000

Total Carried to Collection


ITEM

201,450.000

DESCRIPTION

UNIT QTY UNIT RATE


KD

AMOUNT
KD

3.5.4

Design, suplly and fixation of all staircases.

L.S.

L.S.

20,000.000

20,000.000

3.5.5

Design, suplly and fixation of parapet.

M3

160

85.000

13,600.000

M2

112

24.000

2,688.000

M2

215

7.500

1,612.500

Section 03455
Glass Reinforced Concrete (GRC)
Precast GRC panel fixed over external wall
including galvanized steel support, anchors,
dowels etc. complete as described
3.6

Decorative GRC panels over Stair windows


Section 03550
Concrete Screed

3.7

Approx. 100mm thick smooth surface sand


cement and thin gravel screed with steel
wiremesh (6mm dia @ 200mm c/c) all as
described.

Bill No-1: Class Room + Administration Bldg (A)

1/3-6

CONCRETE

2011- 2010/ 70/ /



10 /

37900.500

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/3-7

CONCRETE

2011- 2010/ 70/ /



10 /

ITEM

DESCRIPTION

UNIT QTY UNIT RATE


KD

AMOUNT
KD

DIVISION 3 - CONCRETE
COLLECTION
Page No. 3-1

237121.000

Page No. 3-2

564655.000

Page No. 3-3

37900.500

839,676.500

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/3-8

CONCRETE

2011- 2010/ 70/ /



10 /

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE
KD

AMOUNT
KD

DIVISION 4 - MASONRY
Section 04200
Unit Masonry
4.1

Solid concrete block wall bedded in sand


cement motar with gavanized steel ties
including scaffolding up to any height etc.
complete as described.

4.1.1

400 mm thick wall

M2

72

12.250

882.000

4.1.2

300 mm thick wall

M2

10

8.750

87.500

4.1.3

250 mm thick wall

M2

75

7.300

547.500

4.1.4

200 mm thick wall

M2

3,152

7.000

22064.000

4.1.5

150 mm thick wall

M2

5,480

5.250

28770.000

4.1.6

100 mm thick wall

M2

487

4.250

2069.750

M2

1990

7.000

13930.000

M2

3,567

8.750

31,211.250

Sand Lime Bricks


4.2

Sand lime bricks size 290 x 90 x 45cm Standard 34.


Malaki from National Industries Company or equally
approved (Colour to be as per the approval of
Engineer In-Charge) bedded in sand cement mortar
with galvanized steel ties including scaffolding up to
any height etc. complete as described.

Section 04225
Light Weight Concrete Unit Masonry
4.3

4.3.1

Light weight concrete block wall bedded in sand


cement mortar with galvanized steel ties
including scaffolding up to any height etc.
complete as described.(External wall)
200 mm thick wall

Bill No-1: Class Room + Administration Bldg (A)

1/4-9

MASONRY

2011- 2010/ 70/ /



10 /

99562.000

Total Carried to Collection


ITEM

DESCRIPTION

UNIT QTY

UNIT RATE
KD

AMOUNT
KD

DIVISION 4 - MASONRY
COLLECTION
Page No. 4-1

Bill No-1: Class Room + Administration Bldg (A)

99562.000

1/4-10

MASONRY

/ 2011- 2010/ 70/



/ 10

99,562.000

MASONRY

TOTAL CARRIED TO SUMMARY

1/4-11

)Bill No-1: Class Room + Administration Bldg (A

2011- 2010/ 70/ /



10 /

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE
KD

AMOUNT
KD

DIVISION 5 - METALS
Section 05500
Metal Fabrication
5.1

Steel Railing

5.1.1

900mm high steel pipe railing fixed over


concrete with 25mm dia vertical steel post, 3
rows of 25mm dia horizontal steel pipe rail and
50mm dia steel pipe hand rail including
anchors, dowels, fixing accssories and approved
quality primer and alkyd paint etc. complete as
described over Stairs

MR

205

18.700

3833.500

5.1.2

1000mm high steel pipe railing around openings


fixed over concrete with 25mm dia vertical steel
post and 50mm dia steel pipe hand rail
including - ditto

MR

55

19.800

1089.000

5.1.3

200mm high steel pipe railing fixed over


concrete over balconies with 25mm dia vertical
steel post and 100mm dia steel pipe hand rail
including - ditto.

MR

42

12.100

508.200

Access/Cat ladder:
5.2

Steel access ladder comprising 32 mm


Dia.tubular section, stringer 25mm dia tubular
sections rungs at 300mm centres including wall
struts, welding, bolting, removable galvanized
steel chain barrier and fixing to structure, the
item include application of primer and akyd
paint to the required thickness, overall height as
shown in the drawings for different areas at roof
level.

5.2.1

Cat ladder 3750 mm high (approx.)

Nos

121.000

726.000

5.2.2

Cat ladder 4650 mm high (approx.)

Nos

154.000

308.000

Bill No-1: Class Room + Administration Bldg (A)

1/5-12

METAL

2011- 2010/ 70/ /



10 /

6464.700

Total Carried to Collection


ITEM

DESCRIPTION

UNIT QTY

UNIT RATE
KD

AMOUNT
KD

Steel shed over roof water tank


5.3

Design, fabricate and install steel shade over


roof water tank. Contractor shall provide
designed working/shop drawings for Engineer's
approval

L.S.

L.S.

1760.000

1760.000

L.S.

L.S.

20000.000

20000.000

Section 05810
Expansion Joints and Cover Assemblies

5.4

20mm wide expansion joint for footings,


columns, beams, slabs, walls etc. horizontally
and vrtically using bitumen impregnated joint
filler including 20x20mm approved quality
mastic/sealant over exposed joint face and
covered the exposed faces of joints with 30mm
thick aluminium cover plate including all
accessories complete as described

Bill No-1: Class Room + Administration Bldg (A)

1/5-13

METAL

2011- 2010/ 70/ /



10 /

21760.000

Total Carried to Collection


ITEM

DESCRIPTION

AMOUNT
KD

DIVISION 5 - METALS
COLLECTION
Page No. 5-1

6464.700

Page No. 5-2

21760.000

Bill No-1: Class Room + Administration Bldg (A)

1/5-14

METAL

/ 2011- 2010/ 70/



/ 10

28,224.700

METAL

TOTAL CARRIED TO SUMMARY

1/5-15

)Bill No-1: Class Room + Administration Bldg (A

2011- 2010/ 70/ /



10 /

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE
KD

AMOUNT
KD

DIVISION 6 - WOOD AND PLASTICS


Section 06200
Finish Carpentary
6.1

Preaperation and fixing of two wooden stripes


parallel to each other of white wood having the
size 25 x 100 mm each.( fixing on the walls
other than which is having marker board)

Bill No-1: Class Room + Administration Bldg (A)

1/6-16

MR

405

13.000

5265.000

WOOD AND PLASTIC

2011- 2010/ 70/ /



10 /

5265.000

Total Carried to Collection


ITEM

DESCRIPTION

AMOUNT
KD

DIVISION 6 - WOOD AND PLASTICS


COLLECTION
Page No. 6-1

Bill No-1: Class Room + Administration Bldg (A)

5265.000

1/6-17

WOOD AND PLASTIC

2011- 2010/ 70/ /



10 /

5,265.000

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/6-18

WOOD AND PLASTIC

2011- 2010/ 70/ /



10 /

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE
KD

AMOUNT
KD

DIVISION 7 - TH. & MOIST. PROTECTION


Section 07110
Sheet Membrane Waterproofing
7.1

Polythylene sheet 1000 gauge under slab on grade M2

3930

0.550

2161.500

7.2

4mm thick waterproofing membrane under, over


and around foundation concrete elements
contact in soil with 6mm thick protection board
over vertical surfaces including 50mm thick
horizontal protection screed below foundation
bed all as per MPW specificaions

L.S

L.S

6750.000

6750.000

M2

220

0.800

176.000

Section 07140
Fluid Applied Waterproofing
7.3

Rubberized waterproofing paint over external


wall along stone cladding
Section 07110 & 07140
Waterproofing System (Toilets & Kitchen)

7.4

Under tiling in wet areas (Toilets and Kitchen)


including dressing up walls, which shall be
including.

7.4.1

Two coats of fluid applied waterproofing paint


over concrete floor and wall

M2

345

0.800

276.000

7.4.2

130-150mm thick foam concrete fill

M2

345

1.950

672.750

7.4.3

20 mm thick sand cement screed

M2

345

0.950

327.750

7.4.4

4 mm thick waterproofing membrane

M2

345

2.000

690.000

7.4.5

2 cm sand cement screed

M2

345

0.950

327.750

Bill No-1: Class Room + Administration Bldg (A)

1/7-19

TH AND MOIST PROTECTION

2011- 2010/ 70/ /



10 /

Total Carried to Collection


ITEM

DESCRIPTION

UNIT QTY

UNIT RATE
KD

11381.750
AMOUNT
KD

Section 07500 (Composite Roofing System)


(Section 03520, 07110, 07140, 07200, 07320)
7.5

Roof Waterproofing System including testing


and guarantee of the roofing system for any
water leakage all as per specifications and
Engineer's approval.

7.5.1

2 coats of fluid applied w.p. paint over concrete roofM2

3140

0.950

2983.000

7.5.2

50-150mm thick lightweight concrete, 600


kg/m3 density with ordinary portland cement
laid to falls and cross falls.

M2

3140

2.000

6280.000

7.5.3

20mm thick cement sand screed (1:3) mortar


laid over light weight concrete bed.

M2

3140

1.250

3925.000

7.5.4

Two layer of 4mm thick membrane roofing


including 350-450 mm girth laid over roof with
primer

M2

3140

3.850

12089.000

7.5.5

20mm thick cement sand screed (1:3) mortar


laid over WP membrane

M2

3140

0.950

2983.000

7.5.6

75 mm thick extruded polysterene insulation

M2

3140

3.100

9734.000

7.5.7

Filter fabric

M2

3140

0.200

628.000

7.5.8

400x400x40mm
Cement
tile
and
400x150x40mm skirting bedded in cement and
sand mortar and laid over roof in 2.80x2.80m
bay with 10cm wide gravel/aggregate strip filled
with selected gravel at both direction all as per
Engineer's approval and as described

M2

3140

3.850

12089.000

Section 07840
Fire Stopping

Bill No-1: Class Room + Administration Bldg (A)

1/7-20

TH AND MOIST PROTECTION

2011- 2010/ 70/ /



10 /

7.6

Fire stopping over all openings around the


perimeter of Fire Zone as described.

L.S

50711.000

Total Carried to Collection


ITEM

L.S

DESCRIPTION

AMOUNT
KD

DIVISION 7 - THERMAL & MOIST.PROTECTION


COLLECTION
Page No. 7-1

11381.750

Page No. 7-2

50711.000

Bill No-1: Class Room + Administration Bldg (A)

1/7-21

TH AND MOIST PROTECTION

2011- 2010/ 70/ /



10 /

62,092.750

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/7-22

TH AND MOIST PROTECTION

2011- 2010/ 70/ /



10 /

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE
KD

AMOUNT
KD

DIVSION 8 - DOORS AND WINDOWS

8.1

Section 08110
Metal Door and frame
Hollow metal door and frame with all required
weather sealing, fixing accessories, sealant with
backup rod and fixing to concrete or block wall
including required fire rating, glazing and
Hardware etc. complete as described

8.1.1

Door Type FD1, size 1100x2200mm

Nos

190.000

1140.000

8.1.2

Door Type FD2, size 2000x2200mm

Nos

420.000

2940.000

8.1.3

Door Type FD3, size 1800x2200mm

Nos

10

410.000

4100.000

8.1.4

Door Type D02, size 2000x2200mm

Nos

430.000

2580.000

8.1.5

Door Type D03, size 1000x2200mm

Nos

13

190.000

2470.000

8.2

Section 08210, 06100,06200


Wood door and Frame, Rough Carpentry
Finish Carpentry
Solid core flush timber teak veneered doors
hanging to wood frames, fixed to concrete or
block, including sub-frames/timber packings
and fixings etc. complete as described. The item
includes frames, finishes, Glazing, Fire Rating,
Hardware etc., complete as described

8.2.1

Door Type D01, size 1100x2200mm

Nos

52

240.000

12480.000

8.2.2

Door Type D04, size 1000x2200mm

Nos

37

233.000

8621.000

8.2.3

Door Type D05, size 1000x2200mm

Nos

38

233.000

8854.000

8.2.4

Door Type D07, size 1100x2200mm

Nos

240.000

1440.000

8.2.5

Door Type D10, size 1800x2200mm

Nos

430.000

2150.000

8.2.6

Door Type D16, size 1100x2200mm

Nos

18

240.000

4320.000

8.2.7

Door Type D17, size 1000x2200mm

Nos

233.000

1398.000

8.2.8

Door Type D20, size 800x2200mm

Nos

13

226.000

2938.000

Bill No-1: Class Room + Administration Bldg (A)

1/8-23

DOORS AND WINDOWS

2011- 2010/ 70/ /



10 /

55431.000

Total Carried to Collection


ITEM

DESCRIPTION

UNIT QTY

UNIT RATE
KD

AMOUNT
KD

Section 08520
Aluminum Doors and Windows
Powder coated extruded section aluminium
Doors and Windows including glazing as
required, frames, fly screens, mullions,
loacation angles, shims and plates, heads, sills
and jambs, glazing and glazing beads, weather
stripping, caulking, pointing, sealing, sub
frames, all hard ware, etc. complete and fixing
to concrete or block work as described.
8.3

Aluminium Door:

8.3.1

Door Type D06, size 1800x2200mm

Nos

320.000

2560.000

8.3.2

Door Type D08, size 1100x2200mm

Nos

205.000

1230.000

8.3.3

Door Type D11, size 7100x2200mm

No

1313.000

1313.000

8.3.4

Door Type D12, size 11800x3000mm

Nos

2677.000

5354.000

8.3.5

Door Type D13, size 1100x2200mm

Nos

247.000

494.000

8.3.6

Door Type D14, size 3200x2200mm

Nos

588.000

2352.000

8.3.7

Door Type D15, size 3800x2200mm

Nos

704.000

4224.000

8.3.8

Door Type D18, size 1800x2200mm

Nos

325.000

650.000

8.3.9

Door Type D19, size 2000x2200mm

Nos

22

320.000

7040.000

8.3.10

Door Type D21, size 1600x2200mm

Nos

294.000

588.000

Nos

24

315.000

7560.000

Notes: Door D09 included in the toilet


partition, Div-10
8.4
8.4.1

Aluminium Windows
Window Type W01, size 1600x1600mm

Bill No-1: Class Room + Administration Bldg (A)

1/8-24

DOORS AND WINDOWS

2011- 2010/ 70/ /



10 /

8.4.2

Window Type W02, size 25700x1600mm

Nos

3360.000

43445.000

Total Carried to Collection


ITEM

10080.000

DESCRIPTION

UNIT QTY

8.4.3

Window Type W03, size 3200x1600mm

Nos

UNIT RATE
KD
677.000

AMOUNT
KD
5416.000

8.4.4

Window Type W04, size 3200x700mm

Nos

340.000

2040.000

8.4.5

Window Type W05, size 4800x1600mm

Nos

65

782.000

50830.000

8.4.6

Window Type W06, size 21500x1600mm

Nos

2835.000

2835.000

8.4.7

Window Type W07, size 1600x1600mm

Nos

12

195.000

2340.000

8.4.8

Window Type W08, size 800x1600mm

Nos

100.000

800.000

8.4.9

Window Type W09, size 2550x1600mm (internal) Nos

368.000

1472.000

8.4.10

Window Type W12, size 2000x1200mm (internal) No

184.000

184.000

8.4.11

Window Type W13, size 7100x2200mm (internal) No

1240.000

1240.000

Section 08600
Skylight
8.5

Aluminum framed double glazed skylight with


complete waterproof installation

8.5.1

Skylight size 4000x1000mm, Type W10

Nos

1890.000

3780.000

8.5.2

Skylight size 7300x1500mm, Type W11

No

7500.000

7500.000

No

2000.000

2000.000

Shutter
8.6

SH01 4800 x 3750mm

Bill No-1: Class Room + Administration Bldg (A)

1/8-25

DOORS AND WINDOWS

2011- 2010/ 70/ /



10 /

80437.000

Total Carried to Collection


ITEM

DESCRIPTION

AMOUNT
KD

DIVISION 8 - DOORS AND WINDOWS


COLLECTION
Page No. 8-1

55431.000

Page No. 8-2

43445.000

Page No. 8-3

80437.000

Bill No-1: Class Room + Administration Bldg (A)

1/8-26

DOORS AND WINDOWS

2011- 2010/ 70/ /



10 /

179,313.000

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/8-27

DOORS AND WINDOWS

2011- 2010/ 70/ /



10 /

ITEM

DESCRIPTION

UNIT QTY UNIT RATE


KD

AMOUNT
KD

DIVISION 9 - FINISHES

9.1

9.2

9.3

Section 09200
Lath and plaster
20mm thick cement and sand plaster (with mesh
fabric) applied to internal wall and ceiling,
stairs and shafts (concrete or block wall)
including under coat, metal lath, corner beads,
stop beads etc. complete as described.
Section 09260
Gypsum Board
100 mm thick and 2200mm high metal stud
partition comprising 12.5 mm thick waterproof
quality gypsum wall board on both sides with
sound attenuation blanket including metal
furring channels, head and sill runners,
caulking, leveling shims etc. all as described

M2

20,360

2.250

45810.000

M2

250

6.500

1625.000

Section 09310
Ceramic Tiles
Non slip ceramic floor tiles on and including
cement & sand setting bed, sand cushion and
joints grouted in waterproof grout over concrete
floor all as described.
(Prime cost for all the ceramic are 2.5 KD/M2,
similar to L& M artificial marble tiles ,Eagle
ceramic tiles or equally approved, sizes mention
here are only for reference , contrcator can use
standard sizes of ceramic)

9.3.1

Non-slip decorative ceramic tile for wet areas,


type CT1, size 600x600x10mm

M2

345

7.000

2415.000

9.3.2

Acid resistant ceramic tile, type CT2, size


600x600x10mm

M2

1,236

7.500

9270.000

9.3.3

Non-slip decorative ceramic tile with border,


type CT4 & CT7, size 600x600x10mm

M2

6,876

7.000

48132.000

Bill No-1: Class Room + Administration Bldg (A)

1/9-28

FINISHES

2011- 2010/ 70/ /



10 /

107252.000

Total Carried to Collection


ITEM

DESCRIPTION

9.3.4

Ditto-but with pattern and different color for


Corridoors

M2

240

7.250

1740.000

9.3.5

Non-slip ceramic tile, type CT5 for store and


service area, size 300x300x9mm

M2

553

6.500

3594.500

9.4

UNIT QTY UNIT RATE


KD

AMOUNT
KD

Ceramic Skirting - Ditto

9.4.1

Coved ceramic skirting, 600x100x10mm

MR

3,475

2.000

6950.000

9.4.2

Coved ceramic skirting, 300x100x9mm

MR

442

2.500

1105.000

9.5

Wall ceramic tiles fixed on concrete or block


work on and including cement and sand backing
and joints grouted in waterproof grout, all as
described.

9.5.1

300x300x6mm ceramic tile over corridor wall


1200mm high

M2

1,270

5.150

6540.500

9.5.2

300x300x6mm ceramic tile with border for wet


areas

M2

1,375

5.500

7562.500

9.5.3

Ditto but for laboratory areas (acid resistant)

M2

1,665

6.000

9990.000

9.5.4

300x300x 6mm ceramic tile for storage areas at


F.F

M2

154

5.150

793.100

M2

500

6.000

3000.000

9.6

Section 09420
Terrazzo
Precast Terrazzo floor tile, size 300x300x30mm
on and including cement and sand setting bed
and backing with joints grouted in white/colured
cement including grinding, polishing
etc.complete as described

Bill No-1: Class Room + Administration Bldg (A)

1/9-29

FINISHES

2011- 2010/ 70/ /



10 /

9.7

Precast Terrazzo Skirting, size 300x100x30mm


on and including cement and sand setting bed
and backing with joints grouted in white/colured
cement including grinding, polishing
etc.complete as described

MR

362

3.500

42542.600

Total Carried to Collection


ITEM

DESCRIPTION

9.8

Section 09510
Acoustic tile Ceiling
Acoustic tile ceiling, size 600x1200x15mm
including all frame work, suspension system,
access panels etc. complete as described

9.9

1267.000

UNIT QTY UNIT RATE


KD

Section 09513
Metal Suspended Ceiling
Metal tile / ribed crrugated sheet with anti bacterial
paint ceiling including all frame work, suspension
system, access panels etc. complete as described for
wet areas

AMOUNT
KD

M2

216

6.000

1296.000

M2

345

8.500

2932.500

M2

8,755

7.500

65662.500

M2

220

6.000

1320.000

Section 09260, 09535


Gypsum Board Ceiling / Acoustic tile Ceiling

9.10

Combination of 12.5mm thick Gypsum board


ceiling with emulsion paint finish and
600x600x15mm acoustic tile ceiling including
all frame work, suspension system, access
panels etc. complete as described
Section 09260
Glass Fiber Reinforced Gypsum (GRG) Ceiling

9.10
9.10.1

GRG Ceiling
20mm thick Decorative GRG ceiling with
emulsion paint finish including all frame work,
suspension system, access panels etc. complete
as described
Section 09260
Gypsum Board Ceiling

Bill No-1: Class Room + Administration Bldg (A)

1/9-30

FINISHES

2011- 2010/ 70/ /



10 /

9.10.2

12.5mm thick waterproof qualityGypsum board


ceiling with waterproof paint for wet areas all as
shown and described.

M2

695

6.500

123331.200

Total Carried to Collection


ITEM

4517.500

DESCRIPTION

UNIT QTY UNIT RATE


KD

AMOUNT
KD

Section 09600
Granite & Marble
9.11

Stone & Marble:

9.11.1

Natural Granite steps for external entrances,


30mm thick and 300mm wide Treadx 20mm
thick and 160mm high Riser all as described.

MR

51

15.000

765.000

9.11.2

3cm thick granite flooring tiles for Main &


Rear Entrances, type M-5,

M2

120

35.000

4200.000

9.11.3

400x400x30mm thick Italian carrara marble tile


for stair hall and landings

M2

395

20.000

7900.000

9.11.4

Italian carrara marble Steps, 30mm thick and


300mm wide Tread x 20mm thick and 160mm
high Riser
Italian carrara marble Skirting for Stair, 160mm
highx20mm thick

MR

960

13.000

12480.000

MR

547

5.000

2735.000

9.11.6

30mm thick Italian carrara marble threshold

MR

36

4.000

144.000

9.11.7

12mm thick synthetic marble (L.G. , Corrian or


equally approved) wash basin counter fixed
over galvanized steel supports including marble
fascia, back spalsh, cut out for wash basin, all
required accessories, sealant etc. complete as
described. 30mm thickx600mm wide and
7220mm long with 7 Bowls

Nos

750.000

4500.000

9.11.8

Ditto- but 1200mm with 1 Bowl

No

160.000

160.000

9.11.9

Ditto- but1900mm with 2 Bowl

No

250.000

250.000

9.11.5

Bill No-1: Class Room + Administration Bldg (A)

1/9-31

FINISHES

2011- 2010/ 70/ /



10 /

Section 09680
Carpet Tiles

9.12

Carpet tiles laid over screed floor with approved


quality additives. (screed measured separately )

M2

225

7.000

Total Carried to Collection


ITEM

1575.000

34709.000

DESCRIPTION

UNIT QTY UNIT RATE


KD

AMOUNT
KD

Section 09710 , 09842


Acoustical Wall Panel /
Stretched fabric acoustic panels.
9.13

Combination of acoustic wood panel and


Proprietary make "Streched Fabric" Acoustic
wall panel inside Seminar hall, Library/Office,
Vocal room and instrument music including all
fittings and accessories as decribed

M2

520

46.000

23920.000

M2

215

3.000

645.000

(lower 1mt. Height from flooring wooden


acoustic panel and fabric panels to be up to the
ceiling from top of the wood panels)
Section 09800
Epoxy
9.14

Epoxy finish over screed, Type CO-2 (Screed


measured separately in Div-3) min 300 micron
dry thick
Section 09900
Painting

9.15

Prepare and apply 3 coats paint of approved


colour over plastered surface (wall and ceiling)
including preparation of surfaces, undercoat,
sealcoat etc. complete as described

9.15.1

Emulsion paint

M2

13,140

1.200

15768.000

9.15.2

Oil paint

M2

4,065

1.300

5284.500

Bill No-1: Class Room + Administration Bldg (A)

1/9-32

FINISHES

2011- 2010/ 70/ /



10 /

9.15.3

Texture paint system as specified including two


coats of Polyurethane protection layers (NIC
texture paint system or equally approved)..

Total Carried to Collection


ITEM

M2

2,184

2.600

5678.400

27375.900

DESCRIPTION

AMOUNT
KD

DIVISION 9 - FINISHES
COLLECTION
Page No. 9-1

107252.000

Page No. 9-2

42542.600

Page No. 9-3

123331.200

Page No. 9-4

34709.000

Page No. 9-5

27375.900

Bill No-1: Class Room + Administration Bldg (A)

1/9-33

FINISHES

2011- 2010/ 70/ /



10 /

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

335,210.700

1/9-34

FINISHES

2011- 2010/ 70/ /



10 /

ITEM

UNIT QTY

DESCRIPTION

UNIT RATE
KD

AMOUNT
KD

DIVISION 10 - SPECIALTIES
Section 10100
Visual Display Board
10.1

Wall mounted marker board and tack board with


silver anodising frame with plastic rounded
corners, elegant alluminium tray ,fixing etc.
complete as described

10.1.1

Marker board having the size 2.5 mt x 1.25 mt


for general class room

Nos

50

50.000

2500.000

10.1.2

Ditto - but for computer lab,sientific


club,physics lab chemistry lab, biology lab,
geology lab, art club room, electronic workshop,
car mechanic work shop

Nos

22

50.000

1100.000

10.1.3

Marker board having the size 1.30 mt x 1.25 mt


for general class room.

Nos

100

30.000

3000.000

10.1.4

Ditto - but for computer lab,sientific


club,physics lab chemistry lab, biology lab,
geology lab, art club room, electronic workshop,
car mechanic work shop.

Nos

48

30.000

1440.000

Toilet partition/cubicle 13mm thick with five Nos


(5) doors, size 12750x2200mm (Door TypeD09)

12

1700.000

20400.000

2400.000

9600.000

10.2

10.2.1

10.3

Section 10170
Toilet Partition/Cubicle
Proprietary make Plastic toilet partition,
cubicles including doors, front panels, divisions,
end panels with all required hardware and
accessories as described.

Section 10651
Operable Panel Partition
Proprietary make "Manually Operated"
Operable Partition over Class room, size
8500x3500m including all fittings, accessories
and hardware all as described.

Bill No-1: Class Room + Administration Bldg (A)

1/10-35

Nos.

SPECIALITIES

2011- 2010/ 70/ /



10 /

38040.000

Total Carried to Collection


ITEM

UNIT QTY

DESCRIPTION

UNIT RATE
KD

AMOUNT
KD

Section 10800
Toilet Accessories
10.4

Supply and fix toilet accessories including all


component parts, assembling, plugging,
screwing or otherwise fixing and making good
all as described.

10.4.1

Waste Receptacle (WR)

Nos

76

40.000

3040.000

10.4.2

Toilet Paper Dispenser (TPD) recessed

Nos

70

15.000

1050.000

10.4.3

Paper Towel Dispenser (PTD)

Nos

22

12.000

264.000

10.4.4

Robe Hook (RH)

Nos

70

10.000

700.000

10.4.5

Soap Dispenser Vertical (SDV) wall mounted

Nos

39

10.000

390.000

10.4.6

St.steel framed mirror (FM), size 7600x900mm

Nos

300.000

1800.000

10.4.7

Ditto but size 1870x900mm

No

120.000

120.000

10.4.8

St.steel framed mirror (FM), size 700x1000mm

Nos

10

75.000

750.000

10.4.9

St.Steel Grab Bar (GB)

Nos

52

2.500

130.000

10.4.10 Folding Shower Seat (FSS)

No

200.000

200.000

10.4.11 Utility Shelf, Mop and Broom Holder (MH)

Nos

10.000

60.000

10.4.12 Hot Air Dryer (HD)

Nos

135.000

810.000

Notes: Flexible hose with spray nozzle


included with WC in Div-15, Mechanical

Bill No-1: Class Room + Administration Bldg (A)

1/10-36

SPECIALITIES

2011- 2010/ 70/ /



10 /

9314.000

Total Carried to Collection


ITEM

DESCRIPTION

AMOUNT
KD

DIVISION 10 - SPECILITIES
COLLECTION
Page No. 10-1

38040.000

Page No. 10-2

9314.000

Bill No-1: Class Room + Administration Bldg (A)

1/10-37

SPECIALITIES

2011- 2010/ 70/ /



10 /

47,354.000

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/10-38

SPECIALITIES

2011- 2010/ 70/ /



10 /

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE
KD

AMOUNT
KD

DIVISION 12 FURNISHINGS
Section 12357
Kitchen Casework/Cabinet
12.1

Kitchen area base and wall units complete with


double doors, adjustable shelves, sides, tops,
bottoms, backs, skirting and all required
accessories, hardware, fixings, components,
support legs, sealing, plugging, screwing,
making good, all as as per Engineer's approval.

12.1.1

Base unit size 600mm deep x 850mm high set in


range including sink units with dustbin, shaped
corner units and 3mm thick stainless steel top
with cutout for sinks and recesses for
appliances(Sink measured separately in Div-15,
Mechanical.)

MR

12

12.1.2

Wall Unit size 400x600mm high - ditto

MR

12

Section 12358
Laboratory Casework

12.2

Supply and fix Laboratory Casework for


Biology Lab 1 & 2, Geology Lab 1 & 2,
Chemistry Lab 1 & 2 and Physics Lab 1 & 2,
with all required fittings, weather sealing, fixing
accessories, sealant with backup rod and fixing
to concrete, block work or gypsum board
including all required hardware and accessories
as described.
BASE CABINETS:

12.2.1

Base cabinet type CK055PHX

Nos

240

12.2.2

Base cabinet type CD0455PHX

Nos

64

12.2.3

Base cabinet type CB050PHX

Nos

12.2.4

Base cabinet type CD050PHX

Nos

Bill No-1: Class Room + Administration Bldg (A)

1/12-39

FURNISHINGS

2011- 2010/ 70/ /



10 /

Total Carried to Collection


ITEM

DESCRIPTION

UNIT QTY

12.2.5

Base cabinet type CA060PHX

Nos

20

12.2.6

Base cabinet type CB060PHX

Nos

12.2.7

Base cabinet type CA045PHX

Nos

12.2.8

Base cabinet type CB045PHX

Nos

14

12.3

WALL CABINETS:
Wall cabinet type S2PND090-30

Nos

32

12.4

STORAGE CABINETS:
Storage cabinet type Q2PND120-40

Nos

14

12.5
12.5.1

WORKTOP COUNTERS:
Worktop counter type 16TRE60

MR

382

12.5.2

Worktop counter type 24MEL75

MR

12.6
12.6.1

SINK CABINETS:
Sink cabinet type CS060PHX

Nos

44

12.6.2

Sink cabinet type CS120PHX

Nos

12.7

UNIT RATE
KD

AMOUNT
KD

MISCELLANEOUS CABINETS/COUNTERS:

12.7.1

Type KB46

Nos

70

12.7.2

Type COD028

Nos

70

12.7.3

Type LE2WP

Nos

238

12.7.4

Type JCWSO

Nos

14

12.7.5

Type PPSINK

Nos

52

12.7.6

Type LMXSO

Nos

40

12.7.7

Type LGISO

Nos

32

12.8

FUME HOOD WITH BASIC CABINET:


Type FC120

Nos

12.9

SAFETY SHOWER
Type S&E Wash

Nos

Bill No-1: Class Room + Administration Bldg (A)

1/12-40

FURNISHINGS

2011- 2010/ 70/ /



10 /

Total Carried to Collection


ITEM

DESCRIPTION

AMOUNT
KD

DIVISION 12 FURNISHINGS

COLLECTION
Page No. 12-1
Page No. 12-2

Bill No-1: Class Room + Administration Bldg (A)

1/12-41

FURNISHINGS

2011- 2010/ 70/ /



10 /

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/12-42

FURNISHINGS

2011- 2010/ 70/ /



10 /

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE
KD

AMOUNT
KD

DIVISION 14- CONVEYING SYSTEM


14.1

Electrical Passenger Elevator.


Supply, Install & Commissioning Duplex
Electrical Passenger Elevator for 3 stops,
1600Kg. ( 21 Passengers) Loading capacity,
Complete with all necessary requirement as per
contract and Fire Brigade specification as shown
on the drawing. Including Fire Brigade
approval.

Nos

14.2

Allows for electrical works (power, control, fire


alarm, etc.) associated with Elevators
Equipments, and System, Including cabling,
wiring, switching, elevator control panels with
all accessories and all other related works as per
specification and Kuwait Fire Brigade..

LS

LS

14.3

Emergency Diesel Generator 45 KW for Fire


Brigade operation and in case of power failure
complete with all accessories

Nos.

14.4

Allow for interlocking the elevators control with


the building managements system.

LS

LS

14.5

Any other item (s) not mentioned either above


or in the specification but its necessary for the
optimum operation of the system in according
with the specification and Kuwait Fire Brigade
requirements.

LS

LS

14.6

Allow for builders works required for the


elevator.

LS

LS

14.7

Allow for submitting shop working drawing,


coordination drawing, builder works drawing, asbuilt drawing, operation & maintenance manual,
etc.

LS

LS

14.8

Allow for testing & commissioning of the


elevators in accordance with specification and
Kuwait Fire Brigade including handing over to
Kuwait Fire Brigade.

LS

LS

14.9

Allow for Lloyds approval certification

LS

LS

Bill No-1: Class Room + Administration Bldg (A)

1/14-43

CONVEYNG SYSTEM

2011- 2010/ 70/ /



10 /

Total Carried to Collection


ITEM

AMOUNT
KD

DESCRIPTION

DIVISION 14 CONVEYING SYSTEM

COLLECTION
Page No. 14-1

Bill No-1: Class Room + Administration Bldg (A)

1/14-44

CONVEYNG SYSTEM

2011- 2010/ 70/ /



10 /

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/14-45

CONVEYNG SYSTEM

2011- 2010/ 70/ /



10 /

ITEM

UNIT QTY

DESCRIPTION

UNIT RATE
KD

AMOUNT
KD

DIVISION - 15 MECHANICAL WORKS


DRAINAGE
The following BOQ is for guidance only.
Contractor shall verify the quantities as per
tender documents without increase in price.
Include in price all adjustment required by code
or as per coordination with other disciplines.
Contractor responsible to get approvals all
authorities having jurisdictions for shop drawings.
Contractor must attach a breakdown analysis for
lump sum items.
15.1

High density polyethylene tempered (HDPE) to


DIN 19535 / 19637 and DIN 8075 drainage
piping for underground and above ground
drainage system in all aspect as specified.
Dia 50mm
Dia 75mm
Dia 100mm
Dia 150mm

MR
MR
MR
MR

409
170
778
433

3.150
4.200
5.250
8.400

1288.350
714.000
4084.500
3637.200

Polished bronze rain water shoe


Dia 4"

Nos

28

36.750

1029.000

Adjustable floor cleanouts with galvanized cast


iron body, gas and water tight ABS tapered
thread plug, with nickel bronze top
Dia 4"

Nos

51

47.250

2409.750

Adjustable floordrain cleanouts with galvanized


cast iron body, gas and water tight ABS tapered
thread plug,with nickel bronze top
15.4..1 Dia 4"

Nos

85

47.250

4016.250

15.4.2 Dia 3"

Nos

47.250

141.750

15.5 Vent Hood Caps


15.5.1 Dia 4"

Nos

15.750

31.500

15.1.1
15.1.2
15.1.3
15.1.4
15.2

15.3

15.4

Bill No-1: Class Room + Administration Bldg (A)

1/15-46

Mechanical work

2011- 2010/ 70/ /



10 /

17352.300

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-47

Mechanical work

2011- 2010/ 70/ /



10 /

ITEM

15.6

15.7

UNIT QTY

DESCRIPTION

UNIT RATE
KD

AMOUNT
KD

Gco
Dia 6"

Nos

47.250

47.250

Dia 3" Planter drain

Nos

31.500

63.000

Nos
Nos

8
2

78.750
31.500

630.000
63.000

15.8 Roof Rain water outlets


15.8.1 Dia 6"
15.8.2 Dia 4"
15.9

Dia 3"Funnel floor drain

Nos

18

68.250

1228.500

15.10

Toilet & kitchen fixtures as shown on the on arch


drawings with chrome fittings of drainage
accessories, flexible hoses etc.
Ewc
Awc
Ablution hose
Wash basin (counter)
Wash basin (pedstal)
Pantry sinks-single bowl
LabSink-Single bowl
LabSink-double bowl
Shower Trays
Drinking Fountain (Type-A)

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

50
12
62
42
8
7
65
2
1
6

105.000
105.000
5.250
94.500
94.500
126.000
262.500
315.000
105.000
294.000

5250.000
1260.000
325.500
3969.000
756.000
882.000
17062.500
630.000
105.000
1764.000

15.10.1
15.10.2
15.10.3
15.10.4
15.10.5
15.10.6
15.10.7
15.10.8
15.10.9
15.10.10
15.11

Cleaning, flushing and painting of all the


drainage piping as per colour codes.

L.S.

L.S.

15.12

Builders work like including connecting pipes


and gullys through cement pipes to manhole and
covers for particular application and installation
of toilet

L.S.

L.S.

Bill No-1: Class Room + Administration Bldg (A)

1/15-48

Mechanical work

2011- 2010/ 70/ /



10 /

34035.750

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-49

Mechanical work

2011- 2010/ 70/ /



10 /

ITEM

UNIT QTY

DESCRIPTION

UNIT RATE
KD

AMOUNT
KD

WATER SUPPLY
Supply, installation, testing and commissioning
of the following items & piping networks for
buildings for hot and cold water supply system
with fittings, valves, equipments, support and
requiredpipe,fittings, valves, equipment, supports
with pipe, accessories in all aspect as specified.
NOTE :
All exposed water supply piping on roof and
inside roof shall be poly propylene, as per
specification.
15.13

15.13.1
15.13.2
15.13.3
15.13.4
15.13.5
15.13.6
15.13.7
15.14

Water supply piping network from water tank to


Including risers, with all accessories like gate
valve, check valve.
Dia 3"
Dia 2"
Dia 1 1/2"
Dia 1 1/4"
Dia 1"
Dia 3/4"
Dia 1/2"
Polythelene water tanks (Shaded) including all
accessories, fittings (float switches,inlet valve,
drain valves, over flow and drain pipe up to
required length etc) Cat and mouse water level
indicator including all galvanized steel
supports,frames and bases etc. complete 3000
gallon each.

15.14.1 Ditto - But Capacity 2000 gallon capacity for

MR
MR
MR
MR
MR
MR
MR

20
164
170
150
193
678
520

18.900
8.400
7.350
6.300
5.250
4.200
3.150

378.000
1377.600
1249.500
945.000
1013.250
2847.600
1638.000

Nos

840.000

4200.000

Nos

420.000

840.000

Nos
Nos
Nos

6
6
7

126.000
89.250
78.750

756.000
535.500
551.250

brackish water supply


15.15

Electric water heater pressure type with


concealed valve, pressure and temperature relief
valves, all fittings and accessories.
15.15.1 Unit Boiler 120 liter
15.15.2 Unit boiler of capacity 80 liters/each
15.15.3 Unit boiler of capacity 50 liters/each

Bill No-1: Class Room + Administration Bldg (A)

1/15-50

Mechanical work

2011- 2010/ 70/ /



10 /

16331.700

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-51

Mechanical work

2011- 2010/ 70/ /



10 /

ITEM

UNIT QTY

DESCRIPTION

15.16 Water filters


15.16.1 Central water filters of capacity 10 m3/hr
15.16.2 Unit filters for kitchen - Dia 1/2"
15.17

Booster pump set with pressure tank 200 ltr.


Minimum capacity including all acccessories
having capacity 40 Gpm @ 4 bar.

UNIT RATE
KD

AMOUNT
KD

Nos
Nos

1
10

997.500
21.000

997.500
210.000

Nos

1312.500

1312.500

Notes :
All the above rates to be including of the
following :
Submitting as-built drawings, providing all
operation, instruction and maintenance materials
etc..
Builders work related to all plumbing works
including trenches, patching, chipping works etc.
Electrical works related to all Plumbing services
Testing and commissioning of all plumbing
services

Bill No-1: Class Room + Administration Bldg (A)

1/15-52

Mechanical work

2011- 2010/ 70/ /



10 /

2520.000

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-53

Mechanical work

2011- 2010/ 70/ /



10 /

ITEM

UNIT QTY

DESCRIPTION

UNIT RATE
KD

AMOUNT
KD

FIRE FIGHTING
The tender drawing is for guidance only.
Contractor should arranage the layout
coordinated with all disciplines, submit
calculation, catalogues for material and
equipment for engineers approval and KFB.
The BOQ is for guidance only. Contractor should
quote for lump sum price including approval of
KFB.
15.18

Black steel piping network suitable for welding


type joints to schedule 40 seamless ( for sprinkler
system from tank to pumps, pump rooms, by
pass, risers etc. complete with all fittings, flanges
blank flanges,unions, fixation materials, supports
and hangers.
Dia 65mm

MR

30

15.750

472.500

MR
MR
MR

222
24
35

12.600
8.400
7.350

2797.200
201.600
257.250

L.S.

L.S.

525.000

525.000

Nos

18

288.750

5197.500

Nos

84.000

168.000

15.19

Galvanised steel piping suitable for threaded


type joints to schedule 40 seamless complete
with all fittings, flanges blank flanges,unions,
fixation materials, supports and hangers.
15.19.1 Dia 50mm
15.19.2 Dia 40mm
15.19.3 Dia 32mm
15.20

Painting of all fire fighting piping (2 coats of


primer and 2 coats of final finish painting) as per
colour codes, labelling, flow direction marking
and tags for valves.

15.21

FHC
80cm x 160cmx40 cm including 25mm fire hose
reel 30m long manual swing type fire
extinguisher as specified 6 kg Dry powder and 2
gallons water/gas

15.22

FC
Fire extinguisher cabinet with 6 kg Dry powder
and 2 gallons water/gas

Bill No-1: Class Room + Administration Bldg (A)

1/15-54

Mechanical work

2011- 2010/ 70/ /



10 /

9619.050

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-55

Mechanical work

2011- 2010/ 70/ /



10 /

ITEM
15.23

UNIT QTY

DESCRIPTION
Automatic air vents
Dia 25mm

UNIT RATE
KD

AMOUNT
KD

Nos

26.250

52.500

Electrical fire pumps of type vertical multistage


with all accessories and 2 years maintenance in
all aspect including pressure tanks (approval to
be done)
15.24.1 Capacity of 200 gpm@ 5.5 bar-20 K.W

Nos

2625.000

5250.000

15.24.2 Valves and fittings

L.S.

L.S.

15.24.3 Suction pipe from firewater tank to pumps

L.S.

L.S.

Fire Pumps and Accessories


15.24

including all fittings, connection to all valves,


mater, strainers, header
Notes :
All the above rates to be including of the
following :
Submitting as-built drawings, providing all
operation, instruction & maintenance materials
etc.
Electrcial works related to all firefighting services
Testing & commissioning of all firefighting services
Builders work related to all firefighting works

Bill No-1: Class Room + Administration Bldg (A)

1/15-56

Mechanical work

2011- 2010/ 70/ /



10 /

5302.500

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-57

Mechanical work

2011- 2010/ 70/ /



10 /

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE
KD

AMOUNT
KD

Kgs. 31000

1.694

52503.150

M2

4500

3.033

13650.525

L.S.

L.S.

1575.000

1575.000

L.S.

L.S.

12600.000

12600.000

HVAC - GENERAL NOTES


The following BOQ is for guidance only.
Contractor is responsible to get approval from all
local authorites.
The BOQ is for guidance only. Contractor should
quote for lump sum price including approval of
MEW . Include in quotation all catalogues for
equipments.

15.25

Duct Work
Glavanized sheet metal duct work complete with
required volume control dampers, joints, test
holes/back draft dampers, air turning devices,
duct access doors. As specified , shown and
required for functioning the system..

Duct Insulation
Perform iinsulation material secured around duct
work complete with finishing and aluminium
cladding etc. as specified.
15.27 Perform internal acoustic lining material secured
on internal surface of duct as specified.
15.26

Air Outlets and Inlets


15.28 Air Outlets and Inlets, include on diffusers,
Linear bar grilles, registers, exhaust air valves,
louvers, 4' thick filter grilles etc. complete as
specified.

Bill No-1: Class Room + Administration Bldg (A)

1/15-58

Mechanical work

2011- 2010/ 70/ /



10 /

80328.675

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-59

Mechanical work

2011- 2010/ 70/ /



10 /

ITEM

15.29

15.29.1
15.29.2
15.29.3
15.29.4
15.29.5
15.29.6
15.29.7
15.29.8
15.29.9
15.29.10
15.29.11
15.29.12
15.30

15.30.1
15.30.2
15.30.3
15.30.4
15.30.5
15.30.6
15.30.7
15.30.8
15.30.9
15.30.10
15.31

UNIT QTY

DESCRIPTION

UNIT RATE
KD

AMOUNT
KD

Exhaust Fans complete with bird screen, back


draft damper and other accessories as specified.
E.F -01 , 2700 cfm
E.F -02 , 200 cfm
E.F -03 , 2925cfm
E.F -04 , 300 cfm
E.F -05,06 , 400cfm
E.F -07, 400cfm
E.F -08 , 600 cfm
E.F -09 , 200 cfm
E.F -10 , 400 cfm
E.F -11 , 400 cfm
E.F -12,13,14,17,18,19 , 200 cfm
E.F -15-16 , 200 cfm

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

1
1
1
1
2
1
1
1
1
1
6
2

5985.000

5985.000

Nos

3780.000

7560.000

Nos

3780.000

15120.000

Nos
Nos
Nos
Nos
Nos
Nos
Nos
Nos

2
2
2
6
2
2
1
1

3780.000
3780.000
3780.000
3780.000
3780.000
3780.000
3780.000
3780.000

7560.000
7560.000
7560.000
22680.000
7560.000
7560.000
3780.000
3780.000

Nos

24

52.500

1260.000

Package Units

Package Unit complete with all accessories like


filters ,mixing box etc as specified @ 115F
PU-GF1&GF6 , 262800 BTU/Hr, 8750 cfm.
PU-GF2&GF3&PU-GF5&GF8, 280000
BTU/Hr, 10000cfm
PU-GF4&GF7, 200000 BTU/Hr, 7500cfm.
PU-FF1&FF9, 280000 BTU/Hr., 10000 cfm
PU-FF2&FF10, 262800 BTU/Hr. 8750cfm.
PU-FF3 to FF8 , 262800 BTU/Hr. , 8750 cfm
PU-SF1&SF6 , 315000 BTU/Hr.,12500 cfm
PU-SF2&SF5, 280000 BTU/Hr. , 10000 cfm
PU-SF3 ,271800 BTU/Hr., 9000 cfm
PU-SF4 , 262800 BTU/Hr., 8750 cfm
Automatic Control Sequence
Electrical type wall mounted thermostats

97965.000

Total Carried to Collection


Bill No-1: Class Room + Administration Bldg (A)

1/15-60

Mechanical work

2011- 2010/ 70/ /



10 /

ITEM

UNIT QTY

DESCRIPTION

UNIT RATE
KD

AMOUNT
KD

15.32 Refrigrant Piping / Condensate Drainnage


piping Complete With Insulation , Hangers and
cladding and insulation

L.S.

L.S.

1260.000

1260.000

15.33 Civil works related to A/C such as foundations,


steel walkways over the piping on roof, openings
and supporting structures, etc.

L.S.

L.S.

2625.000

2625.000

15.34 Allow for electrical works ( power, control and


fire alarm) associated with HVAC works
including cabling, wiring, switching, motor
control panels with accessories and all other
related works.

L.S.

L.S.

3675.000

3675.000

Bill No-1: Class Room + Administration Bldg (A)

1/15-61

Mechanical work

2011- 2010/ 70/ /



10 /

7560.000

Total Carried to Collection


ITEM

UNIT QTY

DESCRIPTION

UNIT RATE
KD

AMOUNT
KD

DIVISION - 15 MECHANICAL WORKS


MEDICAL GAS SYSTEM,
The following BOQ is for guidance only.
Contractor shall verify the quantities as per
tender documents without increase in price.
Include in price all adjustment required by code
or as per coordination with other disciplines.
Contractor responsible to get approvals all
authorities having jurisdictions.
Contractor must attach a breakdown analysis for
lumpsum items.
15.35

Supply and Installation of Medical Grade,


Degreased Copper Pipes as per specification
complete with all fixtures,insulation.
MR
MR
MR
MR
MR
MR

78
72
108
70
120
80

31.500
26.250
21.000
15.750
12.600
10.500

2457.000
1890.000
2268.000
1102.500
1512.000
840.000

15.36.1 Dia 2"


15.36.2 Central Gas regular 3
15.36.3 Regulating valve 2"

Nos
Nos
Nos

20
1
2

84.000
126.000
52.500

1680.000
126.000
105.000

Gas Cylinders
Supply and Installation of Medical Grade GS12
gas cylinders
15.37.1 Gas Cylinders (spare)

Nos

52.500

420.000

15.35.1
15.35.2
15.35.3
15.35.4
15.35.5
15.35.6

15.36

Dia 3"
Dia 2"
Dia 1 1/4"
Dia 1"
Dia 3/4"
Dia 1/2"
Control valves
Supply and Installation of Medical Grade,
Degreased Control valves as per specification
complete with all fixtures,insulation.

15.37

Bill No-1: Class Room + Administration Bldg (A)

1/15-62

Mechanical work

2011- 2010/ 70/ /



10 /

12400.500

Total Carried to Collection


ITEM DESCRIPTION

UNIT QTY

UNIT RATE
KD

AMOUNT
KD

15.38

Builders work related to Medical Gas euipment


and Piping

L.S.

L.S.

525.000

525.000

15.39

Testing and commissioning of all medical gas


services

L.S.

L.S.

315.000

315.000

L.S.

L.S.

26250.000

26250.000

Building Automation System (BAS) for


Complete Project
15.40 Full building automation system (BAS) complete
with controller (Lontalk) type and (Bac) net,
protocols and all control panels,wiring,
sensors,devices, transformers etc. as as per BAS
specifications and system points list schedules
for each equipment as per BAS drawings.

(This includes the connection of all services


(plumbing, fire fighting, HVAC) to BAS system
as per specification and drawings)

Bill No-1: Class Room + Administration Bldg (A)

1/15-63

Mechanical work

2011- 2010/ 70/ /



10 /

27090.000

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-64

Mechanical work

2011- 2010/ 70/ /



10 /

ITEM DESCRIPTION

AMOUNT
KD

DIVISION - 15 MECHANICAL WORKS


COLLECTION
Page No. 15-1
Page No. 15-2
Page No. 15-3
Page No. 15-4
Page No. 15-5
Page No. 15-6
Page No. 15-7
Page No. 15-8
Page No. 15-9
Page No. 15-10
Page No. 15-11

Bill No-1: Class Room + Administration Bldg (A)

17352.300
34035.750
16331.700
2520.000
9619.050
5302.500
80328.675
97965.000
7560.000
12400.500
27090.000

1/15-65

Mechanical work

2011- 2010/ 70/ /



10 /

310,505.475

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/15-66

Mechanical work

2011- 2010/ 70/ /



10 /

Description

Item
No.

Unit

Qty

Unit Price
KD. Fils

L.S.

L.S.

9900.000

DIVISION 16 - ELECTRICAL
General Consideration for all items:
16.1

The price for all the following items shall include the supply of all
materials and equipment unless other wise specified, delivery to
site installations , connections , testing, commissioning and
making ready for work complete with all necessary cables,
wiring, earthing, conduits, draw and outlet boxes , switches,
push-buttons, cable trays, trenches, supply steel frames, angles,
beams, rods fixation, etc. and all necessary accessories and
components for complete and perfect installation ready for work.

16.2

All works shall be carried out according to drawings,


particular and general specifications, contract conditions and to
the latest rules and regulations of MOE (E&W), MPW, MOC,
Kuwait Fire Brigade and any other concerned authorities, and as
approved by these authorities and approved by the Engineer.
All works shall be carried out to comply with the BAS
(Building Automation System) requirements.
16.3

The Contractor is reffered to the specifications and Drawings for all


details related to this section of the works and here is to include for
complying with all the requirements contained therein, wheather or
not they are specifically mentioned within the items.
16.4

BUILDER WORK:
All necessary Builder works required by the Engineer for Electrical
installation i.e. Manholes, handholds, earth pits, ducts, trenches,
cable tiles etc.
including supply and install 6" & 4" PVC ducts for MLTP,
MSB's DB's cables as per shown in drawing and as per MOE (E&W)
regulation. Including all ducts between ( LT, Panel and
Transformer ) and H.T. duct for MOE (E&W) intake cable.
And all civil work as per Drawings, Specification and the
Approval of the Engineer.

Bill No-1: Class Room + Administration Bldg (A)

1/16-67

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-68

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Description

Item
No.

Unit

Qty

Unit Price
KD. Fils

Section 16426
Distribution Equipment
Supply, install and connect the following electrical board or S/Fs or
DBs, including all cables, cable trays, access conduit, wiring,
boxes, W/T Enclosure, earthing, labels name plates , wire
and cables markers , foundation trenches , and All required
for the connection with the Central Control Management and
Monitoring System, etc., as MPW, MOE (E&W) requirements
and as shown in the drawings.
The Contractor Must Submit Detail For The Separate Phase Wire To
Feed The Backup Battery For Approval, and He is Obligee to
Achieve The Engineer Satisfaction.
16426 : Main Switch Board
16.5

Supply, install and connect the following main switch board (MSB),
Sub-Main switch Boards (SMSB) complete with Conduits,wiring,
earthing, cable glands, meters and all accessories as necessary,
testing and commissioning to be ready for good working and all
acording to drawings, specification and the Engineer approval.

16.5.01

MSB - A-G-1

No

3300.000

16.5.02

MSB - A-G-2

No

2640.000

16.5.03

MSB - PU-G

No

3168.000

16.5.04

MSB - A-F-1

No

2420.000

16.5.05

MSB - A-F-2

No

2420.000

16.5.06

MSB - PU-F

No

3300.000

16.5.07

MSB - A-S-1

No

2750.000

16.5.08

MSB - A-S-2

No

2970.000

16.5.09

MSB - A-PU-S

NO

2805.000

16.5.10

MSB - A-R

No

2475.000

16.5.11

MSB - FF

No

3300.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-69

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-70

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Description

Item
No.

Unit

Qty

Unit Price
KD. Fils

16426 : Isolators and Switch Fuses& PANEL BOARDS


16.6

Supply, install and connect est and make necessary commissioning,


complete with all necessary conduits feeding wirings and cables,
earthing , HRC fuses, magnetic contactors ...etc. and all necessary
accessories following electrical board and S/F , as per the drawing,
specification, MOE (E&W) regulation, and approval of Engineer.
All (S/F's, MCCB, ELCB, DB - AHU) protected by water tight
enclosure.
The following items fed from MSB - A-G-1-1
16.6.01

DB-A-G-02L

No

854.700

16.6.02

DB-A-G-02P

No

737.000

16.6.03

DB-A-G-03L

No

854.700

16.6.04

DB-A-G-03P

No

907.500

16.6.05

DB-A-G-05LP

No

693.000

16.6.06

DB-A-G-07L

No

836.000

16.6.07

DB-A-G-07P

No

902.000

16.6.08

30A TPN S/F in W.P.Enclosure for Water Cooler Type C

No

192.500

16.6.09

15A TPN S/F in W.P.Enclosure for GU

No

88.000

The following items fed from MSB - A-G-1-2


16.6.10

DB-A-G-01L

No

825.000

16.6.11

DB-A-G-01P

No

495.000

16.6.12

DB-A-G-04L

No

495.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-71

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-72

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

16.6.16

DB-A-G-04P

No

Unit Price
KD. Fils
385.000

16.6.17

DB-A-G-06L

No

660.000

16.6.18

DB-A-G-06P1

No

770.000

16.6.19

DB-A-G-06P2

No

412.500

16.6.20

DB-A-G-06P3

No

385.000

16.6.21

DB-A-G-08LP

No

825.000

16.6.22

30A TPN S/F in W.P.Enclosure for Water Cooler Type C

No

313.500

No

89.100

No

385.000

Description

Item
No.

Unit

Qty

The following items fed from DB-A-G-06P1


16.6.23

15A SPN S/F in W.P.Enclosure


The following items fed from MSB - A-G-2-2

16.6.24

30A TPN S/F in W.P.Enclosure for GU


The following items fed from MSB - A-F-1-1

16.6.25

DB-A - F -02L

No

660.000

16.6.26

DB-A - F -02P

No

660.000

16.6.27

DB-A - F -03L

No

632.500

16.6.28

DB-A - F -03P

No

660.000

16.6.29

DB-A - F -05LP

No

715.000

16.6.30

DB-A - F -07LP

No

715.000

16.6.31

30A TPN S/F in W.P.Enclosure for Water Cooler Type C

No

220.000

No

385.000

The following items fed from MSB - A-F-1-2


16.6.32

30A TPN S/F in W.P.Enclosure for Klin room

Bill No-1: Class Room + Administration Bldg (A)

1/16-73

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-74

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Description

Item
No.

Unit

Qty

Unit Price
KD. Fils

The following items fed from MSB - A-F-2-1


16.6.33

DB-A - F -01L

No

385.000

16.6.34

DB-A - F -01P

No

440.000

16.6.35

DB-A - F -04LP

No

275.000

16.6.36

DB-A - F -06LP

No

440.000

16.6.37

30A TPN S/F in W.P.Enclosure for Water Cooler Type C

No

165.000

The following items fed from MSB - A-F-2-2


16.6.38

DB-A - S -02L

No

825.000

16.6.39

DB-A - S -02P

No

660.000

16.6.40

DB-A - S -03L

No

385.000

16.6.41

DB-A - S -03P1

No

660.000

16.6.42

DB-A - S -03P2

No

742.500

16.6.43

DB-A - S -03P3

No

605.000

16.6.44

DB-A - S -05LP

No

660.000

16.6.45

30A TPN S/F in W.P.Enclosure for Water Cooler Type C

No

330.000

The following items fed from MSB - A-S-2


16.6.46

DB-A - S -01L

No

660.000

16.6.47

DB-A - S -01P1

No

605.000

16.6.48

DB-A - S -01P2

No

605.000

16.6.49

DB-A - S -01P3

No

825.000

16.6.50

DB-A - S -04LP

No

715.000

16.6.51

DB-A - S -06LP

No

770.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-75

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-76

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Description

Item
No.
16.6.52

30A TPN S/F in W.P.Enclosure for Water Cooler Type C

Unit

Qty

Unit Price
KD. Fils

No

330.000

The following items fed from MSB - A-R


16.6.53

DB-A - Roof LP

No

440.000

16.6.54

DB-A - EX FAN

No

302.500

16.6.55

15A TPN S/F in W.P.Enclosure (for FAF-1&2, W.Pump 1&2)

No

66.000

The following items fed from MSB - F-F


16.6.56

Main Fire Pump -01

No

192.500

16.6.57

Main Fire Pump -02

No

192.500

The following items fed from DB-A - EX FAN


16.6.58

15A TPN S/F in W.P.Enclosure

No

82.500

16.6.59

15A SPN S/F in W.P.Enclosure


16140 : Electrical Points

No

14

66.000

16.7

Supply, install and connect to their respective DB's, the


following points including conduit , wiring , draw boxes, outlet
boxes , trenching, earthing, switches, accessories, cable, silicon
wire, switches double pole switches and all requirements as
specified and as shown in drawing and as per the approval of
Engineer.
16.7.01

13 A switch / socket / outlet, 3 pin single socket

No

438

16.500

16.7.02

13 A switch / socket / outlet, 3 pin Twin socket

No

570

19.800

16.7.03

13 A W/T, 3 pin single socket, as specified and as per the drawing.

No

51

No

55.000

16.7.04

3 Compartment Under Floor Service Outlet Box complete with all


accessories including the flexible connection to the Power ,
Telephone , and Data.

16.7.05

Junction box with 20A DP switch for F.C. Unit

No

27.500

16.7.06

Junction box with 20A DP switch for E. W. Heater

No

16

27.500

Bill No-1: Class Room + Administration Bldg (A)

1/16-77

39.600

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

16.7.07

Junction box with 20A DP switch for Fire A. C. Panel with AVA.

No

27.500

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-78

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Description

Item
No.

Unit

Qty

Unit Price
KD. Fils

16.7.08

Junction box with 20A DP switch for W. Cooler

No

27.500

16.7.09

Junction box with 20A DP switch for Fume


16515 : Lighting

No

27.500

Lighting System
16.8

The price for the following items shall included the lighting points
C/W wiring conduit, earthing, switches, push-button, ceiling rose,
silicon wire and all accessories with supplying installation,
connecting, testing and making ready for work of all, lighting
fittings. The contractor should submit the fixation way of light
fittings for approval.

16.8.01

Light Points

No

407

101.200

16.8.02

Exit sing + EM Light

No

49

13.200

No

550.000

16.8.03

Lighting control panel with all Push Buttons, labeling in grave and
indication lambs (the indication Lampe shall indicate the on-off).

LIGHTING FITTINGS:

16.9

Supply light fitting complete with lamps, tubes , reflectors, diffusers


, louvers , transformers , control gears , etcand with all required
fixing accessories , brackets , concrete bases , etc all as shown on
the drawings , specified and as required for proper operation, and as
per the approval of the Engineer.

16.9.01

Type A

No

776

44.000

16.9.02

Type Ae

No

113

77.000

16.9.03

Type B

No

917

44.000

16.9.04

Type Be

No

99

77.000

16.9.05

Type E

No

205

60.500

16.9.06

Type E-EM

No

47

93.500

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-79

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Description

Item
No.

Unit

Qty

Unit Price
KD. Fils

16.9.07

Type F

No

157

49.500

16.9.08

Type F-EM

No

18

77.000

16.9.09

Type G-70

No

86

93.500

16.9.10

Type H

No

109

55.000

16.9.11

Type H-EM

No

37

82.500

16.9.12

Type-EX

No

44

55.000

16.9.13

Type-EM

No

33.000

16.9.14

Type I

No

15

38.500

16.9.15

Type O

No

91

55.000

16.9.16

Type FL

No

12

82.500

16.9.17

Type M

No

229

60.500

16.9.18

Type M-EM

No

16

88.000

16.9.19

Type L

No

45

44.000

16.9.20

Type L-EM

No

45

71.500

16.9.21

Type Z

No

18

38.500

16.9.22

Type Z-EM

No

66.000

16.9.23

Type J

No

60

82.500

16.9.24

Type J-EM

No

110.000

16.9.25

Type N (1 x 3)

No

16

275.000

16.9.26

Type ST

No

27.500

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-80

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Description

Item
No.

Unit

Qty

Unit Price
KD. Fils

L.S.

L.S.

8250.000

16452 : Earthing
16.10

Supply, install and connect complete earthing system as per


drawings, specification and MOE (E&W) regulation. Any additional
earth electrodes needed shall be included without extra cost.

16.11

Prepare complete set of electrical and telephone as built drawings


and get the approval from MOE (E&W) and MOC.

L.S.

L.S.

16.12

Testing and inspection of the electrical and telephone


installation on completion and before being energized and get
the approved by MOE (E&W) and MOC inspectors in
accordance to the MOE (E&W) and MOC regulations and to the
approved drawing.

L.S.

L.S.

16.13

Allow for submitting as built drawings, providing


operation, instruction and maintenance manuals etc

L.S.

L.S.

Bill No-1: Class Room + Administration Bldg (A)

1/16-81

all

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Carried to Collection


Description

Unit

No.

Qty

Unit Price
KD. Fils

DIVISION 16 - ELECTRICAL (LOW VOLTAGE)


General Consideration for all items:
16.14

The price for all the following items shall include the supply of all
materials and equipment unless other wise specified, delivery to
site installations , connections , testing, commissioning and
making ready for work complete with all necessary cables
wiring, earthing, conduits, draw and outlet boxes , switches,
push-buttons, cable trays, trenches, supply steel frames, angles,
beams, rods fixation, etc. and all necessary accessories and
components for complete and perfect installation ready for work.
BUILDER WORK:
All necessary Builder works required by the Engineer for Electrical
installation i.e. Manholes, handholes, earth pits, ducts, trenches cable
tiles etc.
16.15

All works shall be carried out according to drawings,


particular and general specifications, contract conditions and to
the latest rules and regulations of MOP (E&W), MPW, MOC,
Kuwait Fire Brigade and any other concerned authorities, and as
approved by these authorities and approved by the Engineer.
All works shall be carried out to comply with the BAS
(Building Automation System) requirements.
16.16

The Contractor is referred to the specifications and Drawings for all


details related to this section of the works and here is to include for
complying with all the requirements contained therein, whether or
not they are specifically mentioned within the items.

Bill No-1: Class Room + Administration Bldg (A)

1/16-82

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-83

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Unit

Qty

Unit Price
KD. Fils

Description

Item
No.

Section:16721
Fire Detection & Alarm System
16.17

Supply, install, connect, test and commission the fire


detection and alarm system complete as per the drawings,
specification and to the rules and regulation of Kuwait fire brigade
and as per approval of Engineer. Work shall include all conduits
, wiring, accessories and components.

16.17.01

Fire Alarm Control Panel complete with all accessories.

No

2585.000

16.17.02

Fire Alarm Active mimic display panel

No

1750.000

16.17.03

Main operating , display graphics and programming terminal with


processor.

No

4400.000

16.17.04

Logging and event system printer.

No

275.000

16.17.05

Optical smoke detector ( addressable type).

Nos

235

38.500

16.17.06

Heat Detector (addressable type).

Nos

11

38.500

16.17.07

Duct Detector (addressable type).

Nos

20

137.500

16.17.08

Fire alarm manual call point (addressable type).

Nos

10

38.500

16.17.09

Local alarm horn.

Nos

35

55.000

16.17.10

Connection up to Motorized Dampers, Doors Opener, HVAC


control panels, elevator control panels, sprinkler flow switches, Air
pressure fans, Smoke and Fresh air Fansetc.

L.S.

L.S.

825.000

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-84

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Item
No.

Description

Unit

Qty

Unit Price
KD. Fils

Section:16740
Telephone System - Cabling
16.18

Supply, install, connect, test and make ready for works the
following Telephone System including conduits, wire, terminal
boxes, draw boxes, socket outlet, all as per schematic, drawings

16.18.01

telephone socket outlets

Nos

151

38.500

16.18.02

MDF

Nos

715.000

16.18.03

TTB-A-F(80X90X15 CM)

Nos

550.000

16.18.04

TTB-A-S(70X80X15 CM)

Nos

440.000

16.18.05

TTB-A-F (80x90x15cm)

Nos

550.000

16.18.06

TTB-A-S (70x80x15cm)

Nos

440.000

16.18.7

Any other missing items required for full functioning of the job (if
any)

L.S.

L.S.

Bill No-1: Class Room + Administration Bldg (A)

1/16-85

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Carried to Collection


Item

Description

Unit

Qty

Unit Price
KD. Fils

No
No
No
No
No
No
No
No
No
No
Nos
No
Nos
No
Nos

2200.000
385.000
1375.000
220.000
132.000
82.500
1430.000
330.000
1265.000
132.000
495.000
715.000

No.

Section 16750
Audio Visual System
16.23

16.23.4

Supply, install, connect test and make ready for works, Sound system
including all, conduit, boxes, draw boxes, terminal boxes wires,
connection of Gl conduit, The price for the sound system shall
include the supply of all materials and equipment delivery to
site,installations, connections, testing, commissioning and making
ready for work complete with all necessary cables wiring,
earthing, conduits, draw and outlet boxes, switches , push-buttons ,
cable trays, and all work required to make the work done. All should
be as per the contract drawing and the approval of Engineer.

Seminar Hall

16.23.4.01 Data And Video Projector 4000 ANSI Lumens


16.23.4.02 Rear Projection Lens
16.23.4.03 Rear projection screen
16.23.4.04 Rear Projection screen frame
16.23.4.05 DVD
16.23.4.06 VCR
16.23.4.07 Visualizer
16.23.4.08 PC interface
16.23.4.09 Hide away unit
16.23.4.10 AV switcher
16.23.4.11 Power amplifier
16.23.4.12 Mixer and preamplifier
16.23.4.13 Sub waffer speaker
16.23.4.14 Monitoring panel
16.23.4.15 Stage speaker

Bill No-1: Class Room + Administration Bldg (A)

1/16-86

1
1
1
1
1
1
1
1
1
3
1
2
1
6

385.000
275.000

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-87

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

DESCRIPTION

PAGE
NO

DIVISION 16 - ELECTRICAL

COLLECTION

Page No. 16-1


Page No. 16-2
Page No. 16-3
Page No. 16-4
Page No. 16-5
Page No. 16-6
Page No. 16-7
Page No. 16-8
Page No. 16-9
Page No. 16-10
Page No. 16-11
Page No. 16-12
Page No. 16-13
Page No. 16-14

Bill No-1: Class Room + Administration Bldg (A)

1/16-88

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Carried to Summary

Bill No-1: Class Room + Administration Bldg (A)

1/16-89

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Price
KD. Fils

9900.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-90

ELECTRICAL WORKS

/ 2011- 2010/ 70/



/ 10

9900.000

ELECTRICAL WORKS

1/16-91

)Bill No-1: Class Room + Administration Bldg (A

2011- 2010/ 70/ /



10 /

Total Price
KD. Fils

3300.000
2640.000
3168.000
2420.000
2420.000
3300.000
2750.000
2970.000

2475.000
3300.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-92

ELECTRICAL WORKS

/ 2011- 2010/ 70/



/ 10

28743.000

ELECTRICAL WORKS

1/16-93

)Bill No-1: Class Room + Administration Bldg (A

2011- 2010/ 70/ /



10 /

Total Price
KD. Fils

854.700
737.000
854.700
907.500
693.000
836.000
902.000
192.500
88.000

825.000
495.000
495.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-94

ELECTRICAL WORKS

/ 2011- 2010/ 70/



/ 10

7880.400

ELECTRICAL WORKS

1/16-95

)Bill No-1: Class Room + Administration Bldg (A

2011- 2010/ 70/ /



10 /

Total Price
KD. Fils
385.000
660.000
770.000
412.500
385.000
825.000
313.500

89.100

770.000

660.000
660.000
632.500
660.000
715.000
715.000
220.000

385.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-96

ELECTRICAL WORKS

/ 2011- 2010/ 70/



/ 10

9257.600

ELECTRICAL WORKS

1/16-97

)Bill No-1: Class Room + Administration Bldg (A

2011- 2010/ 70/ /



10 /

Total Price
KD. Fils

385.000
440.000
275.000
440.000
165.000

825.000
660.000
385.000
660.000
742.500
605.000
660.000
330.000

660.000
605.000
605.000
825.000
715.000
770.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-98

ELECTRICAL WORKS

/ 2011- 2010/ 70/



/ 10

20395.100

ELECTRICAL WORKS

1/16-99

)Bill No-1: Class Room + Administration Bldg (A

2011- 2010/ 70/ /



10 /

Total Price
KD. Fils
330.000

440.000
302.500
264.000

192.500
192.500

330.000
924.000

7227.000
11286.000
2019.600

275.000

192.500
440.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-100

ELECTRICAL WORKS

/ 2011- 2010/ 70/



/ 10

27.500
2975.500

ELECTRICAL WORKS

1/16-101

)Bill No-1: Class Room + Administration Bldg (A

2011- 2010/ 70/ /



10 /

Total Price
KD. Fils
165.000
55.000

41188.400
646.800
550.000

34144.000
8701.000
40348.000
7623.000
12402.500
4394.500
42605.200

Bill No-1: Class Room + Administration Bldg (A)

1/16-102

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Price
KD. Fils
7771.500
1386.000
8041.000
5995.000
3052.500
2420.000
165.000
577.500
5005.000
990.000
13854.500
1408.000
1980.000
3217.500
693.000
396.000
4950.000
550.000
4400.000
165.000
50666.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-103

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Price
KD. Fils

8250.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-104

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

8250.000
Total Price
KD. Fils

Bill No-1: Class Room + Administration Bldg (A)

1/16-105

ELECTRICAL WORKS

/ 2011- 2010/ 70/



/ 10

ELECTRICAL WORKS

1/16-106

)Bill No-1: Class Room + Administration Bldg (A

2011- 2010/ 70/ /



10 /

Total Price
KD. Fils

2585.000
1750.000
4400.000

275.000
9047.500
423.500
2750.000
385.000
1925.000
825.000

24366.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-107

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

Total Price
KD. Fils

5813.500
715.000
550.000
440.000
550.000
440.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-108

ELECTRICAL WORKS

2011- 2010/ 70/ /



10 /

8508.500
Total Price
KD. Fils

2200.000
385.000
1375.000
220.000
132.000
82.500
1430.000
330.000
1265.000
132.000
1485.000
715.000
385.000
1650.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-109

ELECTRICAL WORKS

/ 2011- 2010/ 70/



/ 10

2035.000

ELECTRICAL WORKS

1/16-110

)Bill No-1: Class Room + Administration Bldg (A

2011- 2010/ 70/ /



10 /

Total Price
KD. Fils

9900.000
28743.000
7880.400
9257.600
20395.100
2975.500
42605.200

Bill No-1: Class Room + Administration Bldg (A)

1/16-111

ELECTRICAL WORKS

/ 2011- 2010/ 70/



/ 10

121756.800

ELECTRICAL WORKS

1/16-112

)Bill No-1: Class Room + Administration Bldg (A

PART SUMMARY - 1

PAGE NO.

DIVISION
NO.

2-2

SITE WORKS

37443.000

3-4

CONCRETE

839676.500

4-2

MASONRY

99562.000

5-3

METAL WORKS

28224.700

6-2

WOOD AND PLASTIC

5265.000

7-3

THERMAL AND MOISTURE PROTECTION

62092.750

8-4

DOORS AND WINDOWS

179313.000

9-6

FINISHES

335210.700

10-3

10

SPECIALTIES

47354.000

12-3

12

FURNISHINGS

14-2

14

CONVEYING SYSTEM

15-12

15

MECHANICAL WORKS

16-14

16

ELECTRICAL WORKS

Bill No-1: Class Room + Administration Bldg (A)

TITLE

2011- 70/2010/ /

10 /

1/SUM-1

AMOUNT
KD

310505.475

PART SUMMARY-1

2011- 70/2010/ /

10 /

PART SUMMARY - 1

TOTAL CARRIED TO MAIN SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/SUM-1

KD

1944647.125

PART SUMMARY-1

Anda mungkin juga menyukai