Arabtec Engineering Services (AES) specialize in major infrastructure works especially utility installations such as Sewerage, Storm Water and Irrigation Networks and Pump Stations for both government entities as well as various private clients. AES pride themselves on their reputation for the quality of the product that they produce, the punctual delivery of their contracts along with a safe environment they provide for their workers. AES are able to undertake design and build contracts, offer innovative solutions or undertake more traditional construction methods dependent upon the individual clients requirements. AES have gained great experience in working in a variety of ground conditions and depth bands utilizing open cut, trench sheeting and non destructive methods of construction, AES are experts at both dewatering and over pumping. AES have a modern and extensive plant and equipment fleet that is being constantly maintained, expanded and improved to meet the demands of the current challenging construction market.
Arabtec Engineering Services LLC (AES) Tel: +9714 347 1968 Post Box 27566, Dubai, UAE. Email: info@aesuae.com Web: www.aesuae.com
the Dubai International Airport Terminal 2 Expansion in UAE. Because of our commitment to providing high quality work, on-time and within budget, our client base continues to grow and most of our large clients like Emaar, Dubai Properties, Nakheel, etc. repeatedly award work to Arabtec. Arabtec Plant Departments fleet is amongst the largest in the area, with the latest construction equipment backed up by highly qualified and professional teams who continuously monitor service and maintain this equipment. Arabtec follows stringent Health and Safety regimes in addition to the Quality and Environment procedures. Arabtec is ISO 9001:2008; Quality Management System (QMS) certified, ISO 14001:2004; Environmental Management System (EMS), and OHSAS 18001:2007; Occupational Health & Safety Management System certified by the Lloyds Accreditation Agency. We believe that Arabtec is one of the very few construction companies in the region which is fully certified in all three areas. Arabtec Holding PJSC, which became publicly listed in 2004, and is traded under the symbol ARTC on the Dubai Financial Market, is the parent company of Arabtec Construction LLC. It is worth noting that Arabtec is the first privately held company to go public, as well as the first construction company to be publically traded in the UAE.
ProjectProfile Arabtec Construction, L.L.C. P.O. Box: 3399 Dubai, UAE Tel: (+971) 4 340 0700 Fax: (+971) 4 340 4004 E-mail: info@arabtecuae.com URL: www.arabtecuae.com
ProjectProfile Project Name: World Trade Centre Client: Qatar General Insurance & Reinsurance Company Project Manager: Projacs International; Main Contractor: Arabtec Construction Co. W.L.L; Contract Value: Approx QR 520 million (USD 142.7 million)
ProjectProfile Project Name: Dubai International Airport Terminal 2 - Expansion Duration: 25 Months Client: Dubai Aviation Engineering Company Projects Corporation Value: Approx. AED 600 M (USD 163M) 10 Million passengers per year
ProjectProfile Project Name: Saraya R01/R02, Residential Development by Aabar Properties Abu Dhabi, UAE Completion Period: Q2 2013 Client: Aabar Investment PJSC Floors: 46 (Tower 1), 41 (Tower 2)
Five-storey academic, faculty and administrative office buildings Auditorium with 250 seating capacity Multi-purpose hall Learning centre Large common dining hall The project design has received several prestigious awards.
ProjectProfile Project Name: College of Arts Duration: 42 months Client: Kuwait University Total Project Value: Approx. KWD 140 M (USD 500M) Total Project built-up Area: 230,000 square meter
DAMAC HEIGHTS
Dubai Marina, UAE
Damac Heights is a skyscraper under construction in Dubai Marina. It is Arabtecs second project for Damac Properties in the UAE, following the completion of the award winning Ocean Heights, also located in Dubai Marina. The tower is a residential development, 420 meters high and, with 85 floors, will consist of 600 luxury apartments of one, two and three bedroom units, in addition to duplexes and penthouses. When completed in 2014, Damac Heights will become one of the tallest buildings in Dubai and amongst the top three tallest residential buildings in the world. Damac Heights will be one of Damacs most iconic projects, occupying a prime position overlooking the Palm Jumeirah.
ProjectProfile Project Name: Damac Heights Tower Duration: 36 Months Client: DAMAC Properties Value: Approx. AED 551 M (USD 150 M) Floors: 85
INFINITY TOWER
Dubai, UAE
The Infinity Tower will come to be viewed as the epitome of 21st century architecture. The Infinitys twisting shape challenges conventional architecture and redefines standards of luxury. Infinity Tower has large floor plates, which actually requires the structure to be twisted as it rises from level to level in combination with a vertical and central core structure. Each of the 80 floors of this residential apartment development is rotated to achieve a 90 degrees spiral, creating the shape of a helix and revealing a structure that helps shield its interior from the sun. The actual rotation is 1.2 degrees per floor and is based on the total height above ground floor, to achieve the total rotation of 89.51 degrees. Amazingly, there is not a single vertical structural pillar anywhere in the building. These pillars form the main part of the twisted structure, while it is combined and supported with a central and vertical service core structural element. Achieving the rotation of the floor plan and the twisting of heavily reinforced columns was one of the major challenges faced during the construction of the Infinity Tower. Precise surveying methodologies at each and every stage of execution were required to achieve the design parameters while still achieving a concreting cycle of fourdays per floor. The Infinity tower has won six world-class awards so far, including Best Architecture in the World at the 2006 International Property Awards in London and Best New Global Design at the 2008 International Architecture Awards from the Chicago Athenaeum Museum of Architecture and Design. The Infinity Tower is developed by Cayan and was designed by Skidmore Owings & Merrill LLP (SOM) known for their iconic landmarks such as the Sears Tower in Chicago and Burj Khalifa in Dubai, in which Arabtec was also a main contractor.
ProjectProfile Project Name: Infinity Tower Completion Date: 3Q 2012 Client: Cayan Investment & Development Value: Approx. AED 750 M (USD 200 M) Floors: 80
ProjectProfile Project Name: 5,000 villas - Housing Project - KSA Duration: 48 Months Client: Saudi Binladen Group Designer: Dar Al Handasah Consultant: Dar Al Riyadh Value: Approx. SAR 5.5 B (USD 1.5 B)
ProjectProfile Project Name: Princess Nora Bint Abdul Rahman University (Married Junior Staff Housing - 50 Buildings) Duration: 18 Months Client: Saudi Binladen Group Owner: Ministry of Finance Designer: Dar Al Handasah Consultant: Dar Al Riyadh Value: Approx. SAR 1.5 B (USD 400 M)
NATION TOWERS
Abu Dhabi, UAE
The Nation Towers, winner of an international design competition, is a mixed use development project, with a footprint of 53,209ft2, and comprises two towers one 64 storey (residential tower), and the other 50 storey (luxury hotel and office tower and a retail podium) connected by a (World Record) sky bridge at the 48th level and a three-storey podium for retail outlets/ two basement parking structure. A Beach Club will be constructed on the (approximately) 15,000m2 site north of the Corniche, which will be connected to the towers site by a tunnel. The total built up area will be over 300,000m2. The site is comprises a South block (approximately 40,000m2 inclusive of landscaped area) and a North block (approximately 15,000m2 inclusive of landscaped area) separated by the Corniche Road. A sky bridge (the highest link bridge in the world, at a height of 202.5 meters) at the 48th level connects the two towers and surpasses the world record, previously held by the sky bridge of the PETRONAS Tower in Malaysia, by 32 meters. 5+ Star Contemporary Hotel the hotel complex is situated in the upper part of the 50 storey tower (17 floors with 17 rooms per floor to provide a total of 280 keys). Loft Apartments the loft apartments are located in the 64 storey tower (58 floors with a total of 360 residential units). Office Area the commercial office areas are located in the lower part of the 50 storey tower (27 floors of commercial space totaling over 40,000m2). Retail Area the retail shopping complex is comprised of approximately 35,000m2 distributed over two levels, around a large central multi-storey galleria space. The shopping complex will consist of water fountains and landscaped multi-storey spaces with connections to the office area and hotel components of the project, as well as a tunnel connecting to the beach club. The Tunnel links the shopping complex and the other project components to the Beach Club. The tunnel is designed to accommodate both pedestrian and service vehicles under Corniche road. Recreational Amenities recreation facilities will be situated in three main zones. This is a JV project with NPC (National Projects & Construction)
ProjectProfile Project Name: Nation Towers Location: Abu Dhabi, UAE Duration: 30 Months Client: International Capital Trading, L.L.C. Consultant: Hill International Value: Approx. AED 1.6 billion (approx. USD 500 million)
ABG TOWER
Manama, Bahrain
Arabtec has been awarded the contract to construct the new head office for the Al Baraka Banking Group (ABG). Strategically located in Bahrain Bay, a waterfront district of residential, commercial and retail space, the ABG Tower is comprised of two office towers. It will have nine levels above ground plus a mezzanine level, in addition to four basement levels for parking for 365 cars and facilities. The gross area for the 14 floors is approximately 40,000m2. The two towers are joined by a podium and a ground plaza level, while the upper floors are linked by a bridge. On top of the podium the building complex is divided into two office towers; Tower A, designed for lease, and Tower B, the headquarters of the ABG Bank. The work will include the fit-out works and construction of the two ABG towers and the link bridge structure which connects both buildings at levels three, four, five, six and seven. The main contract works consist of the shell and core construction of the above and below ground and associated areas, along with the external works.
ProjectProfile Project Name: ABG Tower, Bahrain Duration: 20 months Client: Al Baraka Banking Group (ABG) Value: Approx. BHD 23 M (USD 63 M) Floors: 14