By U.Nagarajan, HLL Lifecare Ltd Purpose: To explain the Procedural steps for deleting the Control Recipes/PI sheets which are created against the process orders. Sequential steps to be followed: Completing the PI sheet entries using CO60XT Sending &Deleing the PI Sheet using CO54
Steps in details: Step 1 Completing the PI sheet entries using CO60XT Go to CO60XT, Save& complete the PI sheet without entering any details and the make the status as completed
Step 2 Sending &Deleing the PI Sheet using CO54 Go to CO54 ,enter the plant, delete the creation date (from),enter the order ,select the To be sent &sent then enter
Now select the line item, go to Edit and then click Delete options
STEPS IN DETAILS STEP 1 Notification type for the Shift note-Creation IMG Menu path Step 2 Assigning Shift Notification type to the required resources Logistics General Make Settings for Shift Notes Make Settings for Shift Note Type
CRC1/CRC2
STEP 3 Shift Note Creation using SHN1 & sending to different recipients Go To SHN1 ,enter the Resource / Work center
Click
Click
Segregation of Valuable Components (ROHs/VERPs/SFGs) for reuse after Process order confirmation & after GR
By U.Nagarajan, HLL Lifecare Ltd Purpose: Segregation of valuable components (ROHs/VERPs/SFGs) for reuse (with the same batch number) after Process order Confirmation & after GR against the process order Procedural steps to be followed: (1) Entry of the rejection quantity in the Scrap column and the GI and GR to be done as per the procedure during the confirmation in transaction COR6N (2) GR for the scrap materials to be done in transaction MB1C. Steps in details: Step 1:Let us consider the following BOM in which the valuable component (I101011007) is in level 3, so that it will recover after the Level 1 GR:
Entry of the rejection quantity in the Scrap column after GI and GR done for the process order
261 details:
101 details:
Entry of the rejected quantities mentioned as 10 NO(mentioned in Orange color box ) ,the GI done for 100 NOs(Mentioned in green color Box)&GR 90 Nos done for the order Step 2: GR for the rejected material For recovering the component I101011007 10 Nos , the following steps to be carried out After confirmation, the stock of the component is shown as below:
Features of PI sheet PI sheet can display Control information such as instructions for the Process operator in the Shop-floor on how to carryout the production step in effective manner Critical Machine parameters like Operating temperature, Die & Mould settings which are not captured in any form in SAP can be recorded with the help of PI Sheet
Sequential steps: Creation of PI sheet/Control recipe destination Creation of Process Message category Creation of Process Instruction Category Assigning Process message & Process Instruction Category to the Phase of the Master recipe C202 Generating Control Recipe-COR2 Sent Control Recipe-CO53XT PI sheet details entry-CO60XT
Step 4 Assigning Process message & Process Instruction Category to the Phase of the Master recipe
Go to C202-Change Master recipe Enter the Material code/Recipe group to which the assignment needed
Enter the Process Instructions, Process Instructions category as follows and click any one Process instructions category
Save the recipe group Step 5 Generating control recipe-COR2: Go to T. code COR2-Change Process Order Enter the Process order number
Process Order Confirmation with Auto Goods Movement (Both GI & GR)
By U.Nagarajan, HLL Lifecare Ltd Purpose: To perform the Auto GI by using Back flush technique and Auto GR by using Control key during the Process order confirmation in COR6N Steps involved: Backflush indicator is to be made active for all the GI materials(ROHs/VERPs/SFGs) Creation of Control keys Assigning the Control keys to the Phase in Master recipe for which the Auto GR is required Material assignment to the corresponding phases in Master recipe Auto GI & GR during Process order Confirmation through the T.Code COR6N
Definitions: Back flushing -A technique through which automatic accounting of GI materials with 261 movement can be performed, at the time of process order confirmation Control Key- specifies the business functions to carry out with an operation. In the control key one can specify whether an operation has to be scheduled, whether capacity calculations should happen, whether the operation needs to be costed and whether auto goods receipt with 101 movements has to be carried out.
Steps in details:
I.
Menu Path
Logistics -> Materials Management -> Material Create(general) -> MM01 > Procurement OR
-> 2 -
Logistics -> Materials Management -> Material Master -> Material > Change -> MM02 Immediately -> MRP 2 -> Procurement T. Code MM01/MM02
II.
Production Planning for Process Industries -> Master Data -> data -> Define Control Key OP00
Master recipe
III.
IV.
V.
Auto GI & GR :-
o In COR6N , enter the Process order number, select the Phase & Confirmation type and click on Goods Movements button
101-Goods Receipt for the order 261-Goods Issue to the order Save the Confirmation
Note: If the material is not activated by Backflush indicator and not assigned by the control key, then the GI & GR to be done separately through MB1A-261 movement& MB31-101 movement respectively.
Automatic batch determination for raw materials/packaging materials/semi finished goods during Process Order Confirmation
By U.Nagarajan, HLL Lifecare Ltd Purpose: To determine the Batches automatically based on FIFO while doing the 261 movement through Auto goods movement in COR6N by using Batch Search Strategy Technique. Sequential steps: Batch search Strategy creation through COB1 transaction Pre-requisites: Strategy type: a. Order Type/Plant/Material b. Order Type/Plant Search strategies ( will be created by MM) Selection criteria ( will be created by MM) Sorting rules ( will be created by MM) Creating the Classification view for SFGs in MM02 transaction Assigning the batches automatically during Process order creation (COR1) or in COR6N through auto goods movement Steps in detail I. Batch search Strategy creation through COB1 transaction Strategy Type & Strategies SAP Menu Path:
Logistics Production Shop Floor Control Goods Movements Batch Search Strategy Create
COB1
After entering the strategy type, enter the Order Type , Plant &Material codes:
Note: Before the Creation of the Batch strategy, the Selection &Sort sequences columns are in deactivate condition (mentioned in Green colour box) Selection Criteria
After entering the material codes, select all the materials by clicking criteria button ,
And click on button, then the following screen will display with the default selection with the tick mark for the particular material.
Similarly the selection criteria procedure has to be repeated for all the remaining materials
Sorting Rules
MDBT SAP menu Logistics Production MRP Planning Total Planning MDBT--Background MRP
After filling information please click on Attributes. Here you need to do configuration for Scope of Planning (TCode: OM0E) or you can select single plant also. In Scope of planning you take multiple plants.
Here you select different option as per your requirement like protect variant. After Saving Variant you will get Variant SCM VB Saved.
S. No 1
Master
Transaction
T-code
Description
MM01
Create Material
Used for creating Recipe and further tracking Machine / set of Machines used for making the product Here we are calling resource and materials required to make the finished product List of specifications to be checked for that concerned finished goods Creating Quality Plan Initiating Production creating Process Order Process by
CRC1
Create Resource
C201
Create Recipe
QS21
Create MIC
5 6
QP01 COR1
Production Process
Output
confirmation
QA32
Step by Step Execution Process: Scenario Explanation: REQUIREMENTS: For a leading Process Manufacturing Company ABC, they are selling the product FG 1, the raw materials and resource requirements are listed below Raw Materials required for making 50kg of Finished Product, FG 1 are S.No Material Code / Material Type RM l 1 / ROH RM 2 /ROH BP 1 / FERT Material Description Quantity required Unit of Measurement
1 2 3
80 20 60
Kg Kg L
Resources required for making 50kg of Finished Product FG1 S.No 1 2 Resource Code CRC-001 CRC-002 Resource Description Reactor Vessel Capacity 2KL 4KL
List of MASTERS required for addressing the above scenario 1. Create Materials using MM01 transactions in the following way:
In this screen select select views button and extend the following fields
We have selected basic information entries field. Fill the information and finally select the General plant / storage data and give plant as 1100 and storage as 0001 in case of Raw material. The same procedure has to be repeated for finished goods and Co-Products, in plant storage data we have to give Plant 1100 and storage 0004. 2. Create Resource master using CRC 1 Transactio
When you run MRP using md02, a planned order will be created for the requirement (Eg: say 100 no's given using transaction code MD61). Use transaction code MD04 to view the stock/requirement list.
Here double click the planned order, you can see tabs such as convert into purchase requisition, into production order, into process order. Click convert into Purchase Requisition & enter 50 Nos. Then a Purchase Requisition will be created which can be further converted into Purchase Order. Again come to md04 screen.
You can see a planned order & Purchase Requisition for 50 no's. This planned order can be converted into production order & 50 no's can be produced internally.
Types of Subcontracting
By Chandra There are two types of subcontracting relevant for PP module: 1. Operation subcontracting 2. Assembly subcontracting. Operation subcontracting: Within in-house production if some capacity bottlenecks exists in any operations then you can this job to some vendors to carryout this job at his premises and supply us the semi-finished part. This can be done via control key example PP02 (external processing). Assembly subcontracting: Total product can be given for subcontracting. We have to give the raw materials to vendors and they would supply the assembly. This can be done with special procurement type 30 with procurement type F.
Process Order Confirmation with Auto Goods Movement (Both GI & GR)
By U.Nagarajan, HLL Lifecare Ltd Purpose: To perform the Auto GI by using Back flush technique and Auto GR by using Control key during the Process order confirmation in COR6N Steps involved: Backflush indicator is to be made active for all the GI materials(ROHs/VERPs/SFGs) Creation of Control keys Assigning the Control keys to the Phase in Master recipe for which the Auto GR is required Material assignment to the corresponding phases in Master recipe Auto GI & GR during Process order Confirmation through the T.Code COR6N
Definitions: Back flushing -A technique through which automatic accounting of GI materials with 261 movement can be performed, at the time of process order confirmation Control Key- specifies the business functions to carry out with an operation. In the control key one can specify whether an operation has to be scheduled, whether capacity calculations should happen, whether the operation needs to be costed and whether auto goods receipt with 101 movements has to be carried out.
Steps in details:
I.
Menu Path
Logistics -> Materials Management -> Material Create(general) -> MM01 > Procurement OR
-> 2 -
Logistics -> Materials Management -> Material Master -> Material > Change -> MM02 Immediately -> MRP 2 -> Procurement T. Code MM01/MM02
II.
Production Planning for Process Industries -> Master Data -> data -> Define Control Key OP00
Master recipe
III.
IV.
V.
Auto GI & GR :-
o In COR6N , enter the Process order number, select the Phase & Confirmation type and click on Goods Movements button
101-Goods Receipt for the order 261-Goods Issue to the order Save the Confirmation
Note: If the material is not activated by Backflush indicator and not assigned by the control key, then the GI & GR to be done separately through MB1A-261 movement& MB31-101 movement respectively.