Anda di halaman 1dari 11

INTERNATIONAL JOURNAL OF NUMERICAL MODELLING: ELECTRONIC NETWORKS, DEVICES AND FIELDS

Int. J. Numer. Model. 2013; 26:140150 Published online 18 June 2012 in Wiley Online Library (wileyonlinelibrary.com). DOI: 10.1002/jnm.1847

Corrective economic dispatch in a microgrid


Yu-Chi Wu1,*,, Meng-Jen Chen2, Jin-Yuan Lin1, Wen-Shiush Chen1 and Wen-Liang Huang2
2 1 Department of Electrical Engineering, National United University, Miao-Li, Taiwan Department of Electrical Engineering, National Kaohsiung University of Applied Science, Kaohsiung, Taiwan

ABSTRACT In this paper, a corrective economic dispatch problem formulation for distributed generators in a microgrid is presented, which considers the transition from grid-connected operation to islanded operation. Various constraints related to the operation of a microgrid are modeled, such as spinning reserve requirement for the variation of load demand and the output of intermittent sources, the ow limits between the control areas, and ramping limits of distributed generators. The resulting problem is then solved by an interior point method. Numerical tests based on a three-area ten-unit microgrid system show the effects of these constraints on the generation cost. Copyright 2012 John Wiley & Sons, Ltd. Received 9 May 2011; Revised 15 February 2012; Accepted 26 April 2012
KEY WORDS:

economic dispatch; microgrid; distributed generator; interior point method

1. INTRODUCTION A microgrid is a low-voltage distribution system with various distributed generators (DGs) and controllable loads together with storage devices (ywheels, energy capacitors, and batteries). It can be operated either in a non-autonomous way (grid-connected) or in an autonomous way (islanded mode). Signicant research projects have been conducted about the design, control, and operation of microgrids [14]. A generally accepted concept about a microgrid is that it has enough local power generation to supply a local load demand (or at least a signicant portion of it) and has the ability to work in grid-connected or islanded mode [5]. To obtain the maximum benet from the operation of a microgrid, many researchers propose the central controller or energy management system (EMS) for the microgrid [3,58]. The purpose of the EMS in a microgrid is to make decisions for the best use of the generators to produce electric power and heat, on the basis of various information such as the local electrical and heat demands, weather, price of electric power, fuel cost, power quality requirements, demand side management requests, and congestion levels [7,9]. In this paper, a post-islanding corrective economic dispatch (ED) problem formulation for the EMS in a microgrid is presented to provide the optimal power reference of DGs in a microgrid. The advantage of this proposed problem formulation is that it takes into account the microgrid corrective capabilities after islanding has occurred. The corrective capability considered in this paper is the generation rescheduling [10], which is then represented in the presented corrective ED formulation by ramping limits for the pre-islanding and post-islanding DG generations. The DG generations obtained from the corrective ED are economical for grid-connected operation with the ramping limits as well as capable to be rescheduled to make the system stay in a secure mode when islanding occurs. Besides ramping limits, other constraints are also modeled in the presented corrected ED, such as the ow limits between the control areas for both grid-connected and islanded modes, spinning reserve
*Correspondence to: Yu-Chi Wu, Department of Electrical Engineering, National United University, Miao-Li, Taiwan. E-mail: ycwu@nuu.edu.tw

Copyright 2012 John Wiley & Sons, Ltd.

CORRECTIVE ECONOMIC DISPATCH IN A MICROGRID

141

requirement for the variation of load demand and the output of intermittent sources. When a gridconnected microgrid switches to the islanded mode, the DGs then increase or decrease power in order to compensate the power loss of the grid. The feasible increased/decreased power is warranted by ramping constraints. However, if the power ow in the inter-area line is near its maximum value under the grid-connected mode, then the power ow might not be able to be transmitted under islanded mode, and this may cause the system to become unstable [9]. To avoid this situation, ow limits between the control areas are imposed for both grid-connected and islanded modes. The difference between the ED of a conventional power system and the ED of a microgrid relies on the renewable energy sources, such as photovoltaic (PV) and wind generators. In a conventional power system, most utility generator units are dispatchable. However, in a microgrid, there exist PVs and wind generators that are intermittent energy sources, and therefore they are not dispatchable. In a microgrid, the total power production of a PV plant or a wind farm in a specied future period cannot be determined because of the variations of weather conditions, control strategies, and so on. For this reason, any grid-connected PV plant and wind farm have to be considered as an uncontrollable and non-dispatchable power generator in the utility network. However, output power forecasting for PV and wind generator has been studied extensively [1121]. References [1114] adopted time series method incorporated with articial intelligence method to forecast the average wind speed; the forecasted output wind power is calculated from the wind speed according to the power characteristic of the wind generator. References [1518] took advantage of articial intelligence method to directly forecast the output wind power from the meteorological data such as the average wind speed and the wind direction. References [1921] address the forecasting methods for PV output power. The presented corrective ED problem in this paper is solved by an interior point method. Numerical tests based on a three-area ten-unit microgrid system are conducted to show the effects of these constraints on the microgrid generation cost.

2. CORRECTIVE ECONOMIC DISPATCH PROBLEM IN A MICROGRID 2.1. Conguration of the example microgrid For illustration purpose, the test system used in [9] is adopted in this paper but with no limitation for the use of the presented formulation. The presented ED problem formulation is suitable for any microgrid topology. Figure 1 shows the conguration of this system. It consists of three control areas. The weather-driven output of an intermittent energy source such as PV cell and wind turbine cannot be dealt as a dispatchable source; therefore, it is dealt as a negative load and assumed to be predicable within some range of uncertainty [2,9]. The variation of loads and the output of non-dispatchable DGs in each area are compensated by the dispatchable DGs in the same area [9]. In Figure 1, FLpcc is the power from the main grid. FL12 and FL23 are the line ows of inter-areas. 2.2. Corrective ED problem formulation The objective of the corrective ED problem in a microgrid is to minimize the total energy cost for the whole microgrid, subject to a set of physical and security constraints. The total cost includes the fuel cost of DGs, and the cost of the energy purchased from the main grid or the prot by selling energy to the main grid. For the grid-connected mode, DGs should produce more power to minimize the total cost when the market prices are high. In the opposite condition, when the market price is low, DGs would reduce the power output. The presented corrective ED problem can be expressed as follows:

Figure 1. Conguration of test system.


Copyright 2012 John Wiley & Sons, Ltd. Int. J. Numer. Model. 2013; 26:140150 DOI: 10.1002/jnm

142

Y.-C. WU ET AL.
G X min F fpcc FLpcc fi Pgi i1

(1)

s.t. FLpcc
G X

Pgi FL12 L1

i1 i 2 Area1 FL12
G X

PNDj j1 j 2 Area1
J X

J X

(2)

Pgi FL23 L2

PNDj

(3)

i1 i 2 Area2 FL23
G X

j1 j 2 Area2

J X Pgi L3 PNDj i1 j1 i 2 Area3 j 2 Area3 J X

(4)

G X

max Pgi

G X

Pgi r Lk

PNDj ; 8k 1; 2; 3

(5)

i1 i 2 Areak
G X

i1 i 2 Areak
G X min Pgi r L k

j1 j 2 Areak
J X

Pgi

PNDj ; 8k 1; 2; 3

(6)

i1 i1 i 2 Areak i 2 Areak
G X

j1 j 2 Areak
J X

i1 i 2 Area1

isl Pisl gi FL12 L1

PNDj j1 j 2 Area1
J X

(7)

FLisl 12

G X

i1 i 2 Area2
G X

isl Pisl gi FL23 L2

PNDj

(8)

j1 j 2 Area2

FLisl 23

Pisl gi L3

J X

PNDj

(9)

i1 i 2 Area3

j1 j 2 Area3 (10)

rampi Pisl gi Pgi rampi ;8i


min max min max Pgi Pgi ; Pgi Pisl Pgi gi Pgi ;8i

(11) (12)

max max FLpcc FLpcc FLpcc

Copyright 2012 John Wiley & Sons, Ltd.

Int. J. Numer. Model. 2013; 26:140150 DOI: 10.1002/jnm

CORRECTIVE ECONOMIC DISPATCH IN A MICROGRID

143

max FLmax k 1k FLk 1k FLk 1k 8k 2; 3 isl max FLmax k 1k FLk 1k FLk 1k 8k 2; 3

(13) (14)

where Pgi and Pisl gi are generations of dispatchable DGs for grid-connected mode and islanded mode, respectively; Lk is the total load of area k; FLisl k 1k is the inter-area line ow between area (k 1) and area k under islanded mode; PNDj is the output power of non-dispatchable DG j; G and J are the min max total numbers of dispatchable DGs and non-dispatchable DGs, respectively; Pgi and Pgi are the genmax eration lower and upper bounds of DG i, respectively; FLk1k is the inter-area (area k 1 to area k) line ow limit; rampi is the ramping limit of DG i; and fpcc and fi are cost functions of FLpcc and Pgi, respectively. Equations (2)(4) are load balance equations under grid-connected mode for area 1, 2, and 3, respectively. Equations (7)(9) are load balance equations under islanded mode for area 1, 2, and 3, respectively. Equations (5) and (6) are spinning reserve requirements for area k, where r accounts for the uncertainty of load forecasting and the variation of intermittent DGs. Equation (10) is the ramping constraints for DG i. Equations (11)(14) are physical limits for Pgi, Pisl gi , FLpcc, FL(k 1) k, isl and FLk1k. The spinning reserve requirements (5) and (6) are modied from [9,22] where (15) and (16) are used instead with parameters v and u to account for the uncertainty of the load forecasting and variation of intermittent DGs, respectively. As both v and u are user-dened parameters according to the system characteristics, they are combined as one parameter r in this paper.
G X max Pgi G X

Pgi v Lk u

J X

PNDj ; 8k 1; 2; 3

(15)

i1 i 2 Areak
G X

i1 i 2 Areak
G X min Pgi v

j1 j 2 Areak Lk u PNDj ; 8k 1; 2; 3 j1 j 2 Areak


J X

Pgi i1 i1 i 2 Areak i 2 Areak

(16)

Equations (1)(14) can be rewritten as follows: x min cT  s:t: Aeq x beq (17) Aineq x bineq l xu h i T isl isl isl FLisl , PG = [Pg1 Pg2 . . . PgG],Pisl G Pg1 Pg2 PgG , FL = [FLpcc FL1 2 FL2 3],

where  x PG FL Pisl G isl isl isl x beq represents equalities of (2)(4) and (7)(9). Aineq xbineq represents FL FL12 FL23 . Aeq inequalities of (5), (6), and (10). 0 x u represents variable bound constraints corresponding to (11) (14). By introducing slack and surplus variables, one can further reformulate inequalities (5), (6), and (10) as equalities. T isl sr spr . Linear programming (LP) problem (17) can be Let x PG FL spu spl Pisl G FL rewritten as follows: min cT x s:t: Ax b lxu

(18)

where spu = [spu1 spu2 spu3] are the surplus variables for inequality (5); spl = [spl1 spl2 spl3] are the surplus variables for inequalities (6); sr = [sr1 sr2 srG] are the slack variables for ramping constraints (10); spr = [spr1 spr2 sprG] are the surplus variables for ramping constraints (10). N is the dimension of x, and M is the number of equalities.
Copyright 2012 John Wiley & Sons, Ltd. Int. J. Numer. Model. 2013; 26:140150 DOI: 10.1002/jnm

144

Y.-C. WU ET AL.

3. INTERIOR POINT METHOD In this paper, predictorcorrector primal-dual interior point method (PCPDIPM) [23,24] is used to solve the corrective ED problem. The theoretical foundation of PCPDIPM consists of three crucial methods: Newtons method for solving nonlinear equations and hence for the unconstrained optimization, Lagranges method for optimization with equality constraints, and Fiacco and McCormicks barrier method for optimization with inequality constraints. Consider the LP problem (18), and the resulting Lagrangian functions with barrier terms (19a) and (19b) for the corresponding primal and dual LP problems, respectively: Lp cT x yT b Ax vT u x swT x p l m
N X i

lnxi

N X i

lnsi

(19a)

N N X X lnwi lnvi Ld bT y lT w uT v xT AT y v w c m i i

(19b)

where s and p are slack and surplus variables for l x u respectively; v, w, and y are dual variables or Lagrangian multipliers (also known as shadow prices) for constraints u x s = 0, x l p = 0, and Ax = b, respectively. The KarushKuhnTucker rst-order necessary conditions for Lp and Ld are as follows: Ax b primal constraints (20a) xsu xpl AT y v w c WPe me VSe me primal constraints primal constraints dual constraints approximated complementary slackness approximated complementary slackness (20b) (20c) (20d) (20e) (20f)

where e is a column vector with all elements being 1; W, S, P, and V are diagonal matrices with elements wi, si, pi, and vi, respectively. In the spirit of the barrier method, m starts at some positive value and approaches zero (by Fiacco and McCormicks theorem [25]: x(m) approaches x*, the constrained minimizer, as it decreases towards zero). Conditions (20a)(20f) are then solved by some iterative method. In this paper, the predictorcorrector method is implemented: Ax x b Ax b Ax x x s s u x s u x s x x p p l x p l x p AT y y v v w w c AT y v w c AT y v w W W P Pe me W p Pw me WPe W Pe ~ Pe ~ W p Pw me WPe W V V S Se me V s Sv me VSe V Se ~ ~ V s Sv me VSe V Se (21a) (21b) (21c) (21d) (21e)

(21f)

where P, W, S, V are diagonal matrices with unknown elements pi, wi, si, vi, and ~ ; W ~ ; ~ ~ are the approximated matrices for P, W, S, V. As P, W, S, V P S; V are unknown, approximations for them in (21e) and (21f) are calculated by solving Equations (22a)(22f).
Copyright 2012 John Wiley & Sons, Ltd. Int. J. Numer. Model. 2013; 26:140150 DOI: 10.1002/jnm

CORRECTIVE ECONOMIC DISPATCH IN A MICROGRID

145

A~ x b Ax ~ x ~ suxs ~ x ~ plxp ~ c AT y v w y ~ v w AT ~ ~ WPe W ~ p Pw V ~ s S~ v VSe The procedures of PCPDIPM are stated as follows: Beginning of iteration loop Step 1: Check convergence If criteria (23) are satised, an optimal solution is found; otherwise, continue. gap e1 1 jdobjj kthe largest mismatch of KKT k < e2 ; where dobj cT x yT b Ax vT u x wT x l Step 2: Calculate the primal-dual afne direction Solve equation (25) for the primal-dual afne direction. 2 P1 W 6 0 6 6 I 6 6 0 6 4 0 0 0 I 0 0 0 I 0 0 0 I 0 0 I 0 I I 0 0 A 3 32 3 2 ~ p w 0 7 6 s7 6 v 0 7 7 76 ~ 7 6 6 7 7 6 7 ~7 6 xpl 0 76 w 7 6 7 7 6 7 v7 6 uxs 0 76 ~ 7 T T 54 ~ 4 5 x c A y v w 5 A b Ax ~ y 0

(22a) (22b) (22c) (22d) (22e) (22f)

(23)

(24)

S1 V 0 I 0 0

(25)

Step 3: Calculate the barrier parameter,  m   ^ p 2 g^ ga ap gap 2n

(26) (27) (28)

gap vT s wT p ~ T p ^ g^ a p v ^ a ~ vT s^ a ~ sw^ a w a ~ p where ^ a is the step size based on the predictor direction. Step 4: Compute the nal search direction Solve Equation (29) for the primal-dual direction: 2 P1 W 6 0 6 6 I 6 6 0 6 4 0 0 0 I 0 0 0 I 0 0 0 I 0 0 I 0 I I 0 0 A 3 32 3 2 1 ~ Pe ~ p 0 mP e w P1 W 1 1 ~ ~ 7 6 7 6 0 7 76 s 7 6 mS e v S S Ve 7 7 6 w 7 6 0 7 x p l 7 76 7 6 7 6 v 7 6 0 7 u x s 7 76 7 6 5 AT 54 x 5 4 c AT y v w y 0 b Ax

S1 V 0 I 0 0

(29)

Copyright 2012 John Wiley & Sons, Ltd.

Int. J. Numer. Model. 2013; 26:140150 DOI: 10.1002/jnm

146 Step 5: Update the solution

Y.-C. WU ET AL.

x x ax; s s as; p p ap; y y ad y; w w aw; v v av where a is the step size to keep primal and dual variables positive. End of iteration loop As the big matrix in (29) is symmetrical and the same as (25), the Chelosky factorization on it is only used once per iteration. The computational effort can be saved, and convergence performance can be enhanced.

4. NUMERICAL RESULTS The three-area ten-unit test system in [9] is adopted in this paper. Table I lists the cost function of 10 DGs in the system, which are adopted from [9,26]. The last column in Table I indicates the area that DG is located in, and the cost function is expressed as (30). As it is very difcult to obtain the cost data of the new energy sources, the cost functions of the conventional power units are used in this study. Although the ratings of the conventional units are higher than those of typical DGs, the algorithm can be veried without limiting its generality. Table II lists the area load data for the total load 1800 MW. The user-dened parameter r is set as 0.1 in this study, but without loss of generality, it can be adjusted by the user according to the characteristics of the system that he or she is dealing with. (30) fi Pgi ai bi Pgi ci P2 gi Tables III and V show the ED solutions for three different prices of main grid power. For the one with highest price (Table III), DGs in the microgrid produce more power than those with lower prices (Tables IV and V). In Table III, the microgrid sells the surplus power as much as possible to the grid through the line ow FLpcc (=50 MW) till the ow hits its limit (50 MW). The total DG generation cost is 3887.3, and the net cost is 3667.3 (3887.3 220 = 3667.3). In this case, two DGs (units 5 isl and 9) reach the ramping limits, Pg1 and Pisl g1 hit the generation lower limits, and FL12 hits its upper limit (50 MW). The Lagrangian multipliers (shadow prices) of ramping limits for units 5 and 9 are 0.04234 and 0.04239, respectively. That is, the incremental cost of DG unit 5 is 0.04234 if it violates its limit by 1 MW. The shadow prices of Pg1 and Pisl g1 for their lower limits are 0.00346 and 0.04236, respectively. The shadow prices of FLpcc for its lower limit (50 MW) and FLisl 12 for its upper limit are 2.6891 and 0.04236, respectively. On the other hand, for the case with the lowest price (Table IV), the microgrid buys power (+50 MW) as much as possible from the grid. The net cost for this case is 3746.9 (3666.9 + 80 = 3746.9). FL112 is at its upper bound (50 MW). DG unit 1 is still at its lower bound. The shadow prices of FLpcc for its upper limit (50 MW) and FL1 2 for its upper limit are 1.1213 and 0.1717, respectively. The shadow price of Pg1 for its lower limit is 0.1840. For the case
Table I. Cost funcation data of 10 DGs. Cost data DG 1 2 3 4 5 6 7 8 9 10 a 15 25 40 32 29 72 49 82 105 100 b 2.2034 1.9161 1.8518 1.6966 1.8015 1.5354 1.2643 1.2163 1.1954 1.1285 c 0.00510 0.00396 0.00393 0.00382 0.00212 0.00261 0.00289 0.00148 0.00127 0.00135 Pmax 60 80 100 120 150 280 320 445 520 550 Output limits Pmin 10 20 30 25 50 75 120 125 250 250 Area 1 2 3 3 1 3 2 3 1 2

Copyright 2012 John Wiley & Sons, Ltd.

Int. J. Numer. Model. 2013; 26:140150 DOI: 10.1002/jnm

CORRECTIVE ECONOMIC DISPATCH IN A MICROGRID

147

Table II. Area load data. Area load (MW) Total load (MW) 1800 1 450 2 720 3 630

Table III. Economic dispatch solution for the case with total load = 1800 MW, FPCC(FLPCC) = 5 FLPCC + 30. i 1 2 3 4 5 6 7 8 9 10 Gen FLpcc FL12 FL23 Pgi 10.000 48.717 57.276 79.244 108.049 146.855 179.523 366.786 418.951 434.599 1850.000 50.000 37.000 20.161 Pisl gi 10.000 48.865 56.479 82.365 98.049 157.565 187.198 338.011 391.951 429.517 1800.000 0.000 50.000 4.420 Pgi Pisl gi 0.000 0.148 0.797 3.122 10.000 10.709 7.674 28.775 27.000 5.082 50.000 50.000 13.000 15.741 min 10.0 20.0 30.0 25.0 50.0 75.0 120.0 125.0 250.0 250.0 955.0 50.0 50.0 50.0 max 60.0 80.0 100.0 120.0 150.0 280.0 320.0 445.0 520.0 550.0 2625.0 50.0 50.0 50.0 cost 37.5 127.7 159.0 190.4 248.4 353.8 369.1 727.2 828.7 845.4 3887.3 220.0 rampi 5.0 6.0 7.0 9.5 10.0 20.5 20.0 32.0 27.0 30.0

Table IV. Economic dispatch solution for the case with total load = 1800 MW, FPCC(FLPCC) = 1 FLPCC + 30. i 1 2 3 4 5 6 7 8 9 10 Gen FLpcc FL12 FL23 Pgi 10.000 47.593 56.137 78.068 75.443 145.142 177.983 363.764 364.557 431.311 1750.000 50.000 50.000 13.112 Pisl gi 14.067 49.171 58.195 83.202 84.460 158.155 193.933 338.184 384.733 435.901 1800.000 0.000 32.260 7.736 Pgi Pisl gi 4.067 1.577 2.058 5.133 9.017 13.013 15.950 25.581 20.176 4.590 50.000 50.000 16.740 5.377 min 10.0 20.0 30.0 25.0 50.0 75.0 120.0 125.0 250.0 250.0 955.0 50.0 50.0 50.0 max 60.0 80.0 100.0 120.0 150.0 280.0 320.0 445.0 520.0 550.0 2625.0 50.0 50.0 50.0 Cost 37.5 125.2 156.3 187.7 177.0 349.8 365.6 720.3 709.6 837.9 3666.9 80.0 rampi 5.0 6.0 7.0 9.5 10.0 20.5 20.0 32.0 27.0 30.0

with fpcc(FLpcc) = 2.15 FLpcc + 30, the microgrid buys some power from the grid and the line ow FLpcc = 31.979 < 50 is within its limit, and the net cost is 3804.1 (3705.4 + 98.6 = 3804.1). No unit hits its ramping limit in this case. These three tables show that the price of grid power affects the net cost of the microgrid. For the case that the inter-area line ow limits are relaxed, the ED solution for fpcc(FLpcc) = 5 FLpcc + 30 is listed in Table VI, where the net cost is 3353.0 (4158 805 = 3353) and FLpcc = 167 (microgrid sells power to the grid). As the price is high, the microgrid sells power as much as possible to the main grid through line ow FLpcc. In this case, all units reach their ramping limits in this case, and the net cost of the microgrid is cheaper than that in Table III. Tables VI and III show the impact of line ow limits to the microgrid cost. When the price of the grid power is reduced to fpcc(FLpcc) = 1 FLpcc + 30 and no inter-area line ow limits are imposed in the ED, the net cost is 3598.5 and FLpcc = +167 (microgrid buys power from the grid), and all units hit their ramping limits but in the opposite way as the case with fpcc(FLpcc) = 5 FLpcc + 30.
Copyright 2012 John Wiley & Sons, Ltd. Int. J. Numer. Model. 2013; 26:140150 DOI: 10.1002/jnm

148

Y.-C. WU ET AL.

Table V. Economic dispatch solution for the case with total load = 1800 MW, FPCC(FLPCC) = 2.15 FLPCC + 30. i 1 2 3 4 5 6 7 8 9 10 Gen FLpcc FL12 FL23 Pgi 10.000 47.595 56.137 78.069 82.195 145.142 177.982 363.764 375.826 431.312 1768.021 31.979 50.000 13.111 Pisl gi 14.960 51.721 55.527 82.810 91.679 157.472 183.407 342.524 382.754 437.146 1800.000 0.000 39.393 8.333 Pgi Pisl gi 4.960 4.126 0.611 4.741 9.485 12.331 5.424 21.240 6.927 5.835 31.979 31.979 10.607 4.778 min 10.0 20.0 30.0 25.0 50.0 75.0 120.0 125.0 250.0 250.0 955.0 50.0 50.0 50.0 max 60.0 80.0 100.0 120.0 150.0 280.0 320.0 445.0 520.0 550.0 2625.0 50.0 50.0 50.0 Cost 37.5 125.2 156.3 187.7 191.4 349.8 365.6 720.3 733.6 837.9 3705.4 98.6 rampi 5.0 6.0 7.0 9.5 10.0 20.5 20.0 32.0 27.0 30.0

Table VI. Economic dispatch solution for the case with total load = 1800 MW, FPCC(FLPCC) = 5 FLPCC + 30. i 1 2 3 4 5 6 7 8 9 10 Gen FLpcc FL12 FL23 Pgi 15.000 53.878 62.478 84.604 127.733 154.627 186.646 380.648 451.679 449.707 1967.000 167.000 22.588 52.357 Pisl gi 10.000 47.878 55.478 75.104 117.733 134.127 166.646 348.648 424.679 419.707 1800.000 0.000 102.412 16.643 Pgi Pisl gi 5.000 6.000 7.000 9.500 10.000 20.500 20.000 32.000 27.000 30.000 167.000 167.000 125.000 69.000 min 10.0 20.0 30.0 25.0 50.0 75.0 120.0 125.0 250.0 250.0 955.0 N/A N/A N/A max 60.0 80.0 100.0 120.0 150.0 280.0 320.0 445.0 520.0 550.0 2625.0 N/A N/A N/A Cost 49.2 139.7 171.1 202.9 293.7 371.8 385.7 759.4 904.0 880.5 4158.0 805.0 rampi 5.0 6.0 7.0 9.5 10.0 20.5 20.0 32.0 27.0 30.0

Table VII. Economic dispatch solution for the case with total load = 1800 MW, FPCC(FLPCC) = 2.15 FLPCC + 30. i 1 2 3 4 5 6 7 8 9 10 Gen FLpcc FL12 FL23 Pgi 10.000 38.928 47.407 69.084 82.186 131.993 166.112 340.579 375.828 405.897 1668.014 131.986 150.000 40.937 Pisl gi 14.938 38.114 50.089 69.758 91.949 152.454 186.110 370.202 399.001 427.385 1800.000 0.000 55.888 12.503 Pgi Pisl gi 4.938 0.815 2.682 0.674 9.763 20.461 19.998 29.624 23.173 21.488 131.986 131.986 94.112 53.441 min 10.0 20.0 30.0 25.0 50.0 75.0 120.0 125.0 250.0 250.0 955.0 150.0 150.0 150.0 max 60.0 80.0 100.0 120.0 150.0 280.0 320.0 445.0 520.0 550.0 2625.0 150.0 150.0 150.0 Cost 37.5 105.6 136.6 167.4 191.4 320.1 338.8 667.9 733.6 780.5 3479.5 313.8 rampi 5.0 6.0 7.0 9.5 10.0 20.5 20.0 32.0 27.0 30.0

Table VII shows the ED solution for the case where the inter-area line ow limit is changed to 150 MW and fpcc(FLpcc) = 2.15 FLpcc + 30. As the price 2.15 is cheaper than some DGs in the microgrid, the microgrid buys power from the main grid till the line ow FL112 hits its limit, 150. In this case, no unit hits its ramping limit. The net cost is 3793.3 (3479.5 + 313.8 = 3793.3), which is lower than the one in Table V.
Copyright 2012 John Wiley & Sons, Ltd. Int. J. Numer. Model. 2013; 26:140150 DOI: 10.1002/jnm

CORRECTIVE ECONOMIC DISPATCH IN A MICROGRID

149

On the basis of the aforementioned numerical tests, it is found that the price of grid power and interarea line ow limits affect the economic solution of the microgrid. With the presented corrective ED problem formulation, one can manipulate different parameter settings (r, rampi, and fpcc(FLpcc)) to observe the economic impact to the microgrid.

5. CONCLUSIONS In this paper, a corrective ED problem formulation for the EMS in a microgrid and an interior point method for solving it has been presented. Various constraints related to the microgrid operation were modeled, such as spinning reserve requirement for the variation of load demand and the output of intermittent sources, the ow limits between the control areas, and generation ramping limits for the transition from grid-connected operation to islanded operation. Several numerical tests based on a three-area 10-unit microgrid system were conducted to show the effects of these constraints on the microgrid generation cost. With the help of the presented formulation, one can manipulate different parameter settings to observe the economic impact to the microgrid.
ACKNOWLEDGEMENT

The nancial support (project no. NSC98-3114-E-007-004) from the National Science Council in Taiwan is gratefully acknowledged.
REFERENCES 1. Paolo P, Lasseter RH. Micriogrid: a conceptual solution. Power Electron Specialists Conf 2004; 6:42854290. 2. Lasseter RH. Control and design of microgrid components. PSERC Final project reports, 2006. Availble from: http://www.pserc.org/cgi-pserc/ getbig/publication/reports/2006report/ lasseter_microgridcontrol_ nal_ project_report.pdf [access 2010/10/1]. 3. European Research Project MciroGrids. Available from: http://micro grids.power.ece.ntua.gr/ [access 2010/10/1]. 4. Toshihisa F, Ryuichi Y. Microgrid eld test experiences in Japan. Proc. Power Eng. Soc. General Meeting, 2006. 5. Henandez-Aramburo CA, Green TC, Mugniot N. Fuel consumption minization of a microgrid. IEEE Trans Ind Appl 2005; 41:673681. 6. Celli G, Pisano G, Soma GG. Optimal paticipation of a microgrid to energy market with an intelligent EMS. Int Power Eng Conf 2005; 2:663668. 7. Kueck JD, Staunton RH, Labinov SD, Kirby BJ. Microgrid energy management system. CERTS, 2003. 8. Basu AK. Key energy management issues of setting market clearing price (MCP) in micro-grid scenario. Proc UPEC, 2007; 854860. 9. Ahn S-J, Moon S-I. Economic scheduling of distributed generators in a microgrid considering various constraints. IEEE PES General Meeting, 2009. 10. Monticelli A, Pereira MVF, Granville S. Security-constrained optimal power ow with post-contingenecy corrective rescheduling. IEEE Trans Power Syst 1987; 2:175180. 11. Moreno VC, Duarte AH, Garcia UJ. Propagation of icker in electric power networks due to wind energy conversions systems. IEEE Trans Energy Conv 2002; 17:267272. 12. Potter C, Negnevitsky M. Very shortterm wind forecasting for Tasmanian power generation. IEEE Trans Power Syst 2006; 21:965972. 13. Turbelin G, Ngae P, Grignon M. Wavelet cross correlation analysis of wind speed series generated by ANN based models. Renew Energ 2009; 34:10241032. 14. Andrew K, Zheng H, Song Z. Shortterm prediction of wind farm power: a data mining approach. IEEE Trans Energy Conv 2009; 24:125136. 15. Sideratos G, Hatziargyriou ND. An advanced statistical method for wind power forecasting. IEEE Trans Power Syst 2007; 22:258265. 16. Methaprayoon K, Yingvivatanapong C, Lee WJ. An integration of ANN wind power estimation into unit commitment considering the forecasting uncertainty. IEEE Trans Ind Appl 2007; 43:14411448. 17. Bludszuweit H, Dominguez-Navarro JA, Llombart A. Statistical analysis of wind power forecast error. IEEE Trans Power Syst 2008; 23:983991. 18. El-Fouly THM, El-Sssdany EF, Salama MMA. Grey predictor for wind energy conversion systems output power prediction. IEEE Trans Power Syst 2006; 21:14501452. 19. Cai T, Duan S, Chen C. Forecasting power output for grid-connected photovoltaic power system without using solar radiation measurement. Proc. of the 2nd IEEE International Symposium on Power Electronics for Distributed Generation Systems (PEDG), 2010. 20. Huang Y et al. Comparative study of power forecasting methods for PV stations. Proc. of International conference on power system technology (POWERCON), 2010. 21. Tian J, Zhu Y, Tang J. Photovoltaic array power forecasting model based on energy storage. Proceedings of 2010 International conference on critical infrastructure, 2010. 22. Chen CL, Lee TY, Jan RM. Optimal wind-thermal coordination dispatch in isolated power systems with large integration wind capacity. Energy Conv Manage 2006; 47:34563472. 23. Wu YC, Debs AS, Marsten RE. A direct nonlinear predictor-corrector primal-dual interior point algorithm for optimal power ows. IEEE Trans Power Syst 1994; 9:876883. 24. Wu YC. Efcient two-level interior point method for optimal pumped hydro-storage scheduling: exploiting the non-sparse matrix structure. IEE Proc Gen Trans Distrib 2001; 148:4148. 25. Fiacco AV, McCormick GP. Nonlinear Programming: Sequential Unconstrained Minimization Techniques. SIAM, Baker & Taylor Books 1990. 26. Chen CL et al. Optimal integration of wind farms to isolated wind diesel energy system. Energy Conv Manage 2008; 49:15061516.

Copyright 2012 John Wiley & Sons, Ltd.

Int. J. Numer. Model. 2013; 26:140150 DOI: 10.1002/jnm

150

Y.-C. WU ET AL. AUTHORS BIOGRAPHIES

Yu-Chi Wu received his electrical engineering diploma in 1984 from the National Kaohsiung Institute of Technology, Taiwan, and his MS and PhD degrees both in 1993 from the Georgia Institute of Technology (Georgia Tech), USA. He has been involved in activities in both academic and industrial areas since 1986. His industrial work experience with Pacic Gas and Electric Company, EDS/Energy Management Associates, and EDS/ China Management Systems includes development and study of EMS applications and power system planning. At present, he is a professor at the Department of Electrical Engineering, National United University, Taiwan. Dr Wu is a senior member of IEEE.

Meng-Jen Chen was born in Taiwan, ROC. He received his diploma in electrical engineering from the National Kaohsiung Institute of Technology, Taiwan, and his PhD degree in Electrical Engineering from the University of Strathclyde, Glasgow, UK, in 1984 and 1992, respectively. Since 1992, he has been an associate professor in the Department of Electrical Engineering, National Kaohsiung University of Applied Sciences, Taiwan. His research interests include wind energy conversion systems, photovoltaic power systems, distributed power systems, and smart microgrid.

Jin-Yuan Lin received his BS and MS degrees in Automatic Control Engineering from Feng Chia University, Taiwan, in 1981 and 1984, respectively, and his PhD degree in 2002 from National Tsing Hua University, Taiwan. He has been involved in activities in both academic and industrial areas since 1986. At present, he is an associate professor at the Department of Electrical Engineering, National United University, Taiwan. His main research interests are in the areas of mechatronics control, systematic integration, power system, and micro-controller design.

Wen-Shiush Chen was born in Miao-Li, Taiwan, on 23 June 1957. He received his BS and MS degrees in electrical engineering from National Cheng Kung University in 1980 and 1983, respectively. He earned his PhD degree from the Department of Electrical Engineering, Chung Yuan Christian University, in 2008. He had been a lecturer at the Department of Electrical Engineering, National United University (NUU) during 19872008. In 2008, he was promoted to an associate professor of the Department of Electrical Engineering of NUU. His research interests include numerical eld analysis, optimization insulation designs, electrical insulation, and polluted insulators.

Wen-Liang Huang received his BS and MS degrees in electrical engineering from Chung Yuan Christian University, Taiwan, and the University of Nebraska-Lincoln, USA, respectively. Currently, he is an associate professor at the Department of Electrical Engineering, National Kaohsiung University of Applied Science, Taiwan. His research interests include green energy education, digital learning, and power system planning.

Copyright 2012 John Wiley & Sons, Ltd.

Int. J. Numer. Model. 2013; 26:140150 DOI: 10.1002/jnm

Anda mungkin juga menyukai