Title
Network Phase Drive Date
Signature
Prepared by
Checked by(PULSE)
Approved by(Operator)
Contents
1. 2. 3. EXECUTIVE SUMMARY. ..................................................................................................................................................... 3 TEST SETUP. ........................................................................................................................................................................... 3 DT PERFORMANCE. ............................................................................................................................................................ 4 3.1 3.2 3.3 3.4 3.5 4. 2G RX LEVEL VARIATION (IDLE). ........................................................................................................................................ 4 2G RX LEVEL VARIATION (DEDICATED MODE).................................................................................................................... 5 2G RX QUALITY VARIATION. ............................................................................................................................................... 6 TIMING ADVANCE(TA) VARIATION. ..................................................................................................................................... 7 BAD EVENTS: ...................................................................................................................................................................... 8 IDLE UE COVERAGE SAMPLE PATCHES -01 ...................................................................................................................... 9 DEDICATED MODE UE COVERAGE SAMPLE PATCHES -01 .............................................................................................. 10 DEDICATED MODE UE QUALITY SAMPLE PATCHES -01 .................................................................................................. 11 DEDICATED MODE UE DROPPED CALL SAMPLE PATCHES-01 ......................................................................................... 12 DEDICATED MODE UE HANDOVER FAILURE SAMPLE PATCHES-01 ................................................................................ 13 DEDICATED MODE UE BLOCKED CALL SAMPLE PATCHES-01 ......................................................................................... 14 DEDICATED MODE UE PING-PONG HANDOVER SAMPLE PATCHES-01 ............................................................................ 15
ANALYSIS & RECOMMENDATION FOR BAD EVENTS/PATCHES ...................................................................... 9 4.1 4.2 4.3 4.4 4.5 4.6 4.7
5.
CONCLUSION ..................................................................................................................................................................... 16
1. Executive Summary.
This document is a report for the sample cluster drive in "xxxx" area. This will provide all the issues found in the field during the drive test with root cause analysis. The following activities have been taken during the network optimization of mentioned Cluster. Physical Verification of Sites for any discrepancies in implementation versus planning data. Parameter consistency checks and implementation of Change Requests if required. Coverage optimization by means of physical changes at site. Neighbor Relations Added & Deleted during optimization.
2. Test Setup.
Following devices and tools used during this cluster drive & Optimization to analyze network performance by means of accessibility, mobility & retain ability.
Devices Configuration Device Type of MS1 MS2 Call Idle Voice Call Mode 2G Locked 2G Locked Duration From Start to End 30 Sec. Call/ 10 Sec idle between calls to allow reselection 30 Min. Call/10 Sec idle between calls to allow reselection 2G Scanner Comments
MS3
Voice Call
2G Locked
MS4 Tools;
Scanner
TEMS Investigation 13.1 TEMS Discovery 3.2.1 MapInfo professional 11.0 Actix Analyzer 4.05
3.2
3.3
2G Rx Quality variation.
3.4
3.5
Bad Events:
LAC Update SR (Target 99.99%) Xxx Retain ability Call Setup Complete Drop Call (Target 99.3%) Xxx Xxx
4. Analysis & Recommendation for Bad events/patches 4.1 Idle UE Coverage Sample Patches -01
Analysis Approach: 1. Physical optimization : The building obstructions in coverage path of main serving cell must be checked since this is dense urban cluster. Proper Azimuth & tilts must be applied and impact must be also checked then and there. Recommendations for new site or cell splitting or external power booster (Downlink).
2. Parameter optimization : Enhancing the parameter control downlink power boost technology. The serving cell idle BA list (Neighbor list) & access permitted parameter (NCCPERM) must be rechecked in order to have proper cell resection. Cell resection controlling parameters (CRO, TO and PT) can be tuned so that cell would initiate the resection at proper condition. Bot operator defined default values also will be also taken into consideration.
4.2
Analysis Approach: 1 Physical optimization : Identify the best server & Proper Azimuth/tilts must be ensured. Alarm free RBS operation must be ensured (reading RBS Alarm log). The building obstructions in coverage path of main serving cell must be checked (cell relocation may require) since this is dense urban cluster. According to the coverage demand & subscriber density, the antenna type can be changed Recommendations for new site or cell splitting or external power booster (Downlink).
Parameter optimization : BA list & Neighbor tuning. RBS & Channel power control parameters retune(Ex: BSPWRB, BSPWRB, BSPWRMIN so )
10
4.3
Analysis Approach: 1 Physical optimization : Interferer Identification & Elimination of overshooting cells (Can be double checked by cell level measurement report recoding) with proper tilt planning. 2 Frequency reuses pattern analysis & new BCCH/BSIC planning. Parameter optimization : Interferer channel power control parameters retune. Improving performance by fine tune the better cell handover parameters. Hooping, AMR and HR/FR controlling parameter retune.
11
4.4
Analysis Approach: Dropped call reasons (Ex: Hardware issue, Quality issue, Signaling issue, traffic demand analysis so on...) identification & proper remedies. Monitoring Call drops rate for busy and non-busy hours using row stats. Cable SWAP tracing, identification & rectification (all the way from dTRU to Antenna Tx/Rx Port). Uplink interference analysis & recommendation for TMA. Call trace log analysis.
12
4.5
Analysis Approach: Handover Failure causal (Ex: Hardware issue, TCH unavailability, BA list tuning, Missing neighbor etc) identification & proper remedies. Monitoring handover attempt & HSR for busy and non-busy hours using row stats. Cable SWAP tracing, identification & rectification (all the way from dTRU to Antenna Tx/Rx Port). Uplink interference analysis & recommendation for TMA. Impairments analysis in handover control parameters.
13
4.6
Analysis Approach: Resource Availability analysis (Ex: SDCCH, TCH & PDCH) & recommendations for capacity expansion. HCS parameter tuning for dual band cell or different channel group. Optimizing the availability of resources with a proper parameter tuning (Ex: AMR/HR/FR & Dynamic PDCH allocations).
14
4.7
Analysis Approach: The overlapping coverage zone of serving cell & candidate cells must be identified & restricted properly with proper Azimuth/tilt planning. Locating parameter also can be used to tune the handover performance.
15
5. Conclusion
The report shows the clear picture of the 2G network performance according to the cluster Drive Test carried out. The above mentioned bad patches and the events were thoroughly analyzed with the drive test logs, OSS KPI and the RNC parameter configurations and the recommendations have been made. Once you approved the recommendations we will do the necessary modifications and then the DT will be carried out to show the network performance has improved.
****End of Document***