CONTENTS
CHAPTER
TITLE
PAGE
DECLARATION DEDICATION ACKNOWLEDGEMENT ABSTRACT CONTENTS LIST OF TABLES LIST OF FIGURES LIST OF APPENDICES
CHAPTER 1
INTRODUCTION
Background Problem Statement Objectives Scope and Limitation of the Study Brief and Methodology
1 2 4 4 5
viii
CHAPTER 2
LITERATURE REVIEW
Introduction Malaysian School Projects Method of Awarding Contract 2.3.1 Traditional Design, Tender and Construct Contract 2.3.2 2.3.3 Design and Build Contract Construction Management Contract
7 8 9
9 10 11 12
2.4 2.5
Main Contract Document Project Planning and Scheduling for School Construction 2.5.1 Project Scheduling
13 14 15
2.6
Types and choice of Scheduling Method 2.6.1 Computer Application on Project Scheduling 2.6.2 2.6.3 Microsoft Project (MSP) Software Primavera Project Planner (P3) Software
15 16 17 17 18 21 22
2.7
Basic Scheduling Technique 2.7.1 2.7.2 2.7.3 2.7.4 Gantt Chart Arrow Diagram Method Precedence Diagramming Method Project Evaluation Review Technique (PERT) 2.7.5 Line of Balance
23 24 25
2.8
Summary
ix
CHAPTER 3
26
Introduction Work Breakdown Structure Level of Works Breakdown Structure Application of Work Breakdown Structure Purposes and Benefits of WBS 3.5.1 WBS in Work Identification and Assignment 3.5.2 3.5.3 3.5.4 3.5.5 3.5.6 3.5.7 WBS in Schedule Management WBS in Plans Status Reporting Cost Management Cost Estimating Budgeting and Cost Control
26 27 28 30 32
36 36 37 37 38 38 39 41 41 43
CHAPTER 4
45
Introduction Determination of the Research Objective Case Study on School Projects 4.3.1 4.3.2 Research Materials Development of Questionnaire for the
45 46 47 47
x Survey 4.4 Interview with Panel of Experts (Client) 4.4.1 Methodology of the Panel of Expert Interview 4.4.2 4.5 4.6 Structured Questionnaire Discussion 50 50 51 48 49
Analyzing the WBS (Case Study) Preliminary Guidelines for Preparing WBS for Project Scheduling/ Construction Programme
52 54
4.7
CHAPTER 5
55
5.1 5.2
Introduction Effect of Registration Grade and Type of Documentation on the Completion of School Projects
55
70
5.3
5.4
CHAPTER 6
72
Introduction Preparation of WBS Proposed Format of WBS Presentation Guidelines for the Designing of WBS Criteria in Developing the WBS
72 73 74 78 81
xi 6.6 6.7 Checklist for the Preparation of WBS An Example of a WBS for a School Construction Project 6.7.1 6.7.2 Project Brief WBS on Construction of Sample Project (School Building) 85 84 84 82
CHAPTER 7
95
Introduction Managing School Projects in the Future Concept and Application of WBS in School Project Scheduling
95 96
96
7.4
7.5
xii
LIST OF TABLES
TABLE NO.
TITLE
PAGE
A typical of six-level project WBS Work Breakdown Structure Outline The summary of CIDB Registration grade and Type of Contract documentation for delayed and non-delayed school projects.
29 31
56
5.2
Summary of the expert panels and contractors involved in the case study 58
5.3
Content Analysis Summary of views from twenty respondence towards the causes of school project delay 56
5.4
Comparison of construction activities generated from Contract Document and Contract Sum Analysis 63
5.5
Comparison of construction activities based on WBS element in project schedule generated from contract document 66 85
6.1
xiii
LIST OF APPENDICES
APPENDIX
TITLE
PAGE
I II
Detailed background of respondence Questionnaires for the expert panels and contractors
104 105
xiv
LIST OF FIGURES
FIGURE NO.
TITLE
PAGE
1.1 2.1
under the traditional design, tender and construct contract 10 2.2 Contractual Relationship of all party involved under the Design and Build Type of contract 2.3 Contractual Relationship of all party involved under the Construction Management contract 2.4 2.5 2.6 3.1 3.2 Example of Gantt Chart Example of Arrow Diagramming Method Example of Precedence Diagramming Method A typical work breakdown structure An example of WBS 12 20 21 22 30 35 11