COMPLETED

PROJECTS
CURRENT TIME SDN BHD
N PROJECT TITLE CONTRAC CONTRA YEAR CLIENT CONSULTANT
O T VALUE CT
(RM) DURATIO
N
1 Supply, modify and install
“GM D&O” and “GM E&C” full
high cabinet c/w nyatoh
cabinet and glass shelves at 250,000.00 3 Month 2001 Nippon Oil Design and Built
Nippon Oil Exploration (M) Exploration Sdn Bhd
Ltd.
2 Renovation work at level 35,
Petronas Twin Tower 2,
Petronas Twin Tower for
Nippon Oil Exploration (M) 345, 170.00 2 Month 2001 Nippon Oil Nippon
Ltd. Exploration Sdn Bhd Exploration Sdn
Bhd
3 Proposed renovation works
for Amerada Hess (M) Ltd. At
550,158.00 3 Month 2001 Amerada Hess (M) Design & Built
level 9, Menara Tan & Tan,
Ltd Current Time Sdn
Kuala Lumpur
Bhd
4 Kerja- kerja membekal dan
memasang jubin karpet di
25,880.00 2 Week 2001 Malaysia Airlines Design & Built
tingkat 3, bangunan
System Bhd Current Time Sdn
Pentadbiran 1,
Bhd
Kompleks A, Subang
5 Office furniture supply at 31st
Floor, Menara Citibank, Jalan
150,560.00 1 Month 2001 Lundin Malaysia Design & Built
Ampang for Lundin Malaysia
Limited Current Time Sdn
Limited
Bhd
6 Proposed minor renovation
works for Tabung Haji
750,000.00 3 Month 2002 Tabung Haji Mutiara Reka Sdn
Properties, Sikamat,
Properties Bhd
Seremban, N. Sembilan

INTERIOR AND BUILDING


SERVICE

COMPLETED
PROJECTS
CURRENT TIME SDN BHD

INTERIOR AND BUILDING SERVICE


7 Proposed interior builder works
for Affin Banks Card Centre at
137,230.00 2 Weeks 2002 Affin Bank Berhad Affin Bank Berhad
Block C-13-1, C-13-4, C-13-5,
Megan Phileo Avenue, Jalan Yap
Kwan Seng, Off Jalan Ampang
8 Proposed Interior design and
renovation work for Kelantan
260,000.00 2 Month 2002 Kelantan Delight Mutiara Reka Sdn
Delight Restaurant at 18th Floor,
Restaurant Bhd
MBF Plaza, Jalan Yap Kwan Seng,
Kuala Lumpur-Phase III
9 Design and Built of office interior
fitout work for Murphy Sarawak
3,359,840.0 10 Month 2002 Murphy Sarawak Design & Built
oil Co. Ltd at 18th Floor, MBF
0 Oil Co Ltd. Current Time Sdn
Plaza, Jalan Yap Kwan Seng, Kuala
Bhd
Lumpur -phase III
10 Proposed for Built of shed and Sireh Pinang Design & Built
bunk in Selayang District Officer Landscaping Current Time Sdn
195,000.00 1 Month 2003
Area Bhd
11 Proposed renovation works for
LinBrook Services Sdn Bhd at 14th
2,450,954.0 6 Month 2003 LinBrook Services Design & Built
floor, Kompleks Antarabangsa,
0 Sdn Bhd Current Time Sdn
Kuala Lumpur
Bhd
12 Proposed renovation works at
level 9, bangunan MAS, Jalan
820,933.30 3 Month 2003 Malaysia Airlines Design & Built
Sultan Ismail, Kuala Lumpur For
Berhad Current Time Sdn
Malaysia Airlines System Bhd
Bhd
13 Renovation of Staff’s House 227,890.00 2 Month 2003 Bank Muamalat
under Al-Istina Concept at No. 32, Malaysia Berhad
Design & Built
Jalan Puteri 7/15, Bandar Tasik
Current Time Sdn
Puteri, 48000 Rawang
Bhd

COMPLETED
PROJECTS
CURRENT TIME SDN BHD
INTERIOR AND BUILDING SERVICE
14 Supply and Install of new Design & Built
mobile portion to MAS Office at Current Time
33,201.35 2 Weeks 2003 Malaysia Airlines
Bangunan MAS, Jalan Sultan Sdn Bhd
System Berhad
Ismail, Kuala Lumpur
15 Proposed renovation works for Arkitek Ibnu
Block 6, 6C & 6D at Tadika and Adam
210,500.00 5 Weeks 2003 Celcom (M) Sdn Bhd
Taska Celcom
16 Supply and Install tempered Design & Built
glass door handle complete Current Time
107,000.00 1 Month 2003 Celcom Technology
with sandblast sticker and door Sdn Bhd
(M) Sdn Bhd
handle complete with all
accessories and iron
mongeries.
17 Design and Built of office Design & Built
Interior fitout works for Murphy Current Time
4,242,380.00 10 Month 2003 Murphy Sarawak Oil
Sarawak Oil Co Ltd at 15th floor, Sdn Bhd
Co. Ltd
MBF Plaza, Jalan Yap Kwan
Seng, Kuala Lumpur-phase IV
18 Proposed to Renovate Interior Arkitek Ilham
Design in 1st Floor, Office Cipta
1,285,620.00 3 Month 2004 Bank Islam Malaysia
Building at Lurah Temerloh,
Berhad
Pahang
19 Renovation works for IT Arkitek Ilham
Division at 17th floor, Menara Karya
658,650.00 2 Month 2004 Celcom (M) Sdn Bhd
TR, 161b, Jalan Ampang, 50450
Kuala Lumpur
20 Supply and Install filling Design & Built
cabinet, computer workstation Current Time
5,850.00 1 Week 2004 TNB Generation Sdn
and low cabinet at Operation Sdn Bhd
Bhd
Room for TNB Generation Sdn
Bhd Jalan Bangsar, Kuala
Lumpur
COMPLETED
PROJECTS
CURRENT TIME SDN BHD

INTERIOR AND BUILDING SERVICE


21 Supply and install timber built-in 3,350.00 1 Weeks 2004 TNB Generation Sdn Design & Built
cabinet at G.M room 5th floor for Bhd Current Time Sdn
TNB Generation Sdn Bhd Jalan Bhd
Bangsar, Kuala Lumpur
22 Proposed Supply and Install 2,87,877.0 3 Month 2004 TNB Generation Sdn Design & Built
Office Furniture for TNB 0 Bhd Current Time Sdn
Generation Sdn Bhd at Level 16, Bhd
P.J Tower, Amcorp Mall, Petaling
Jaya
23 Supply and Install Steel Gate at 6,900.00 1 Weeks 2004 Rumah Ehsan MDHS Design & Built
Rumah Ehsan including cleaning Current Time Sdn
and painting work Bhd
24 Proposed supply and install Office 280,902.00 1 Month 2004 TNB Generation Sdn Design & Built
Furniture for TNB Generation Sdn Bhd Current Time Sdn
Bhd at Level 16, P.J Tower Amcorp Bhd
Mall, Petaling Jaya- Repeat Order
25 Proposed House Renovation at 45,900.00 1 Month 2004 En. Abdul Munir Design & Built
Seksyen 18, Shah Alam, Selangor Current Time Sdn
Bhd
26 Proposed reins statement work to 45,900.00 2 Weeks 2005 EON Bank Berhad Eon Bank Berhad
EON Bank Alor Gajah Melaka
27 Proposed House Renovation at 30,317.00 2 Weeks 2005 EON BankBerhad Eon Bank Berhad
Seksyen 18, Shah Alam, Selangor
28 Proposed reins statement work to 52,500.00 4 Weeks 2205 EON Bank Berhad EON Bank Berhad
EON Bank Klang, Selangor.

COMPLETED
PROJECTS
CURRENT TIME SDN BHD

INTERIOR AND BUILDING SERVICE


29 Upgrade and Renovating work for 1,106,208.0 2 Month 2005 HUKM Common Vantage
physiotherapy unit UKM Hospital 0 Sdn Bhd
30 Residential Project at Kota 5,662,254. July 3rd – 2004 Life Development Life
Benut, Pontian District, Johore 00 July 4th Sdn Bhd Development
Sdn Bhd
31 Proposed for Upgrading the 315,400.00 4 Months 2004 UiTM Shah Alam UiTM Shah Alam
hostel room, for
administration office training
center, UiTM Kg. Gajah Perak
32 Civil and Structural Works for 6,173,374. 10 Month 2005 Felcra Berhad Felcra Berhad
Felcra Kota Semarahan Palm 00
Oil Mill, Kota Samarahan,
Sarawak
COMPLETED
PROJECTS
CURRENT TIME SDN BHD

ROAD DEVELOPING AND MAINTAINENCE SERVICE

NO PROJECT TITLE CONTRACT CONTRAC YEAR CLIENT CONSULTANT


VALUE T
(RM) DURATIO
N
1 Proposed for developing
infrastructure and utility, at
12,000,000.00 MARDI Khairi Consultant
MARDI Headquarters,
Serdang, Selangor
2 Double storey junction Khairi Consultant
between Jalan Pudu, Jalan 70,000,000.00 DBKL
Imbi and Jalan Hang Tuah,
Kuala Lumpur
3 Proposed for build Jalan 80,000,000.00 Khairi Consultant
Segambut from KTM Bridge
DBKL
to Mont Kiara, Kuala Lumpur.
4 Proposed for upgrading Jalan Khairi Consultant
Lama Bangi to Putrajaya,
45,000,000.00
Simpang Tiga Jenderam,
Selangor Darul Ehsan.
5 Proposed for upgrading Khairi Consultant
existing road from Gemas to
180,000,000.0
Ayer Hitam, Johor
0
6 Proposed for Upgrading 180,000,000.0 Khairi Consultant
existing Federal Road, 0
DBKL
KM54, Sg. Buloh, Selangor

COMPLETED
PROJECTS
CURRENT TIME SDN BHD

ROAD DEVELOPING AND MAINTAINENCE SERVICE


7 Proposed for building road from 14,500,000.0
Bukit Belachan to Kg.Tasek 0
MPAJ Khairi Consultant
Tambahan, Hulu Langat District,
Ampang Selangor
8 Repairing and Maintenance roads
in Penang, Path 6, from Bulatan
75,000,000.0 MBPP Khairi Consultant
Bagan Jermal/ Jalan Kelawai to Mar
0
Vista, Tanjung Bungah, Penang
9 Maintaining and repairing works
on Highway’s cliff and other
75,000,000.0 Khairi Consultant
related work at path 4, east-west
0
Highway,
10 Continuing works from Kerling to
Kq. Sungai Tengi, Hulu Selangor,
30,000,000.0 Khairi Consultant
Selangor.
0
11 Repairing and Maintaining
Highway cliff at KM6.2 and KM6.4,
6,300,000.00 Khairi Consultant
Jalan Kompleks Radar Martello,
Bukit Ibam, Pahang
12 Proposed for upgrading Jalan Bukit
bintang/ Jalan Pudu (phase 1 –
1,300,000.00 DBKL Khairi Consultant
Design and built road divider near
Jalan Pudu/Jalan Bukit Bintang
junction, Kuala Lumpur
13 Access road for main Industrial
area (phase 1), Bandar Amanjaya,
7,000,000.00 Khairi Consultant
Sungai Petani Kedah.