UNIVERSITI TEKNOLOGI MARA FINAL EXAMINATION

COURSE COURSE CODE EXAMINATION TIME

: : : :

MEASUREMENT OF CONSTRUCTION WORKS III (PAPER 2) QSD231/201 APRIL 2009 3 HOURS

INSTRUCTIONS TO CANDIDATES This question paper consists of two (2) parts: PART A (1 Question) PART B (1 Question)

Answer ALL questions from PART A and PART B : i) ii) Answer PART A in the Slip-sort Paper and Schedule Paper. Answer PART B in the Answer Booklet. Start each answer on a new page.

All measurement shall be in strict accordance with the principles laid down in the Malaysian Standard Method of Measurement of Building Works 2 nd Edition (SMM2). Marks will be given based on correct principles and accuracy of measurement, accurate and completeness of descriptions and understanding of construction principles. Do not bring any material into the examination room unless permission is given by the invigilator. 5. 6. Candidates are allowed to use calculators. Please check to make sure that this examination pack consists of: i) ii) Hi) iv) v) vi) vii) viii) the Question Paper a three-page Appendix 1 (Drawing No. PUB/QSD231/201/P2/1-3) a two-page Appendix 2 an Answer Booklet - provided by the Faculty an Answer Booklet's Cover - provided by the Faculty Schedule Paper - provided by the Faculty Slip-sort Papers - provided by the Faculty SMM2 - provided by the Faculty

DO NOT TURN THIS PAGE UNTIL YOU ARE TOLD TO DO SO


This examination paper consists of 3 printed pages
Hak Clpta Universlti Teknologi MARA CONFIDENTIAL

CONFIDENTIAL

AP/APR 2009/QSD231/201

PARTB

Please refer to Appendix 2 for costing information.

QUESTION 1 Built-up rate for the following items which are extracted from the Bill of Quantities;

a)

300mm x 300mm approved plate glass mirror fixed with 6mm thick waterproof plywood backing rubber gasket with aluminium channel strip edging and fixing with chromium plated headed screws to tiled wall. - NO (10 marks)

b) Formwork to horizontal soffit of suspended slab. - M2 (10 marks) c) Reinforced in-situ concrete Grade 30 in suspended slab, thickness exceeding 300mm thick. - M3 (By Machine) (15 marks) d) Steel fabric reinforcement to B.S 4483 Ref. A 252 with 150mm side and end laps in concrete wall. - M2 (5 marks) e) 25mm nominal bore Class B galvanised mild steel pipe to B.S 1387 with screwed socket joints in the running length fixed with metal clips, plugged and screwed to brickwork, concrete or stonework at 1.20m centers. - M (10 marks)

END OF QUESTION PAPER

Hak Cipta Unfversiti Teknologi MARA

CONFIDENTIAL

CONFIDENTIAL

APPENDIX 2(1)

AP/APR 2009/QSD231/201

COST INFORMATION

MATERIAL

Cement Sand (1520 kg per m3) Aggregate (1600 kg per m3)

RM 13.00 per bag RM 15.00 per tonne RM 35.00 per tonne

Plywood (1.20mx2.40m) Timber (1.42 m3 per tonne) Nails (0.35kg per m2) Quantity of timber for strut and support Fabric Reinforcement Ref. A 252 Lapping Tying wire & Spacer block 300mm x 300mm x 6mm thick glass mirror Waterproof plywood Chrome Plated screws (2 nos.) Aluminium Channel Rubber Gasket 25mm Diameter Class B GMS Screw Metal Clip PLANT Concrete mixer 14/10 (conversion factor of 0.02832) Interest Maintenance cost Transportation cost Resale value Concrete mixer working intermittently Economic life Average working days per year Diesel (2.25 litre per hour) Lubricating oil (0.20 litre per hour)
LABOUR COST Skilled Labour General Labour
Hak Cipta Universiti Teknologi MARA

RM 52.00 per piece RM 1,200.00 per tonne RM 4.50 per kg 0.06 m3 per m2 RM 15.00 per m2 12% 10% RM 100.00 per no RM 70.00 per m2 RM 1.20 per no RM 5.00 per m RM 0.80 per m RM 38.00 per 6m RM 1.50 per no RM 0.50 per no

RM 38,000.00 12% per annum 2.5% per annum 1.8% per annum RM 4,000.00 At the rates of 10 mixes perhr 6 years 280 days RM 1.00 per litre RM 7.00 per litre

RM 75.00 per day RM 45.00 per day CONFIDENTIAL

CONFIDENTIAL

APPENDIX 2(2)

AP/APR 2009/QSD231/201

COST INFORMATION

LABOUR CONSTANT

Concrete Transporting and placing of concrete Labour for concrete mixing operation Fabric Reinforcement Unloading and Storing Bending, Cutting, Fixing & Tying Formwork Erecting Dismantling Plumbing Jointing & Fixing

8.00 hours per m3 (1 general labour) 4 general labour

1 general labour (0.15 hours per m2) 1 skilled labour (0.33 hours per m2)

1 skilled labour (1.00 hours per m2) 1 general labour (0.75 hours per m2) 1 general labour (0.75 hours per m2)

1 skilled labour (0.25 hours per m) 1 general labour (0.25 hours per m)

Sanitary Fitting Time Taken for fixing of mirror

1 skilled labour (15 minutes per no)

Hak Cipta Universal Teknologi MARA

CONFIDENTIAL

CONFIDENTIAL

APPENDIX 1 (1)

AP/APR 2009/QSD231/201 (PAPER 2)

3400

3400

1500

3300

><-

UNIVERSITITEKNOLOGI MARA

I RISING MAIN.

25 JZfG.I RISING MAIN.20.0 G.l DOWN SERVICE PIPE DROP TO SERVE BATH 2 AND BATH 3
?' 7L

NOTES:

20 Sf G.I DOWN SERVICE PIPE DROP TO SERVE BATH 3.

At

77~

UTILITY

40'$ G.I SCOUR PIPES COMBINED WITH 40 \ G.I OVERFLOW PIPES DISCHARGE TO NEAREST BATHROOM.

BEDROOM 4

<x>|_>L
m a. a. CD

fa j
->'-

&

BEDROOM 2

\-4>

YOU MAY MAKE ALL NECESSARY AND REASONABLE ASSUMPTIONS WHERE APPLICABLE PROJECT TITLE:

z i o o z

C5 fit

LIVING
jj #

DINING
H iiii ii

PROPOSED NEW BUNGALOW HOUSE AT PINGGGIRAN RAPAT, IPOH FOR EN. HAI KARL 20t,G.I DOWN PIPE SERVICE PIPE DROP TO SERVE BATH 1 DRAWING TITLE:

-3<-

CARPORCH TERRACE

- > <

GROUND FLOOR PLAN AND FIRST FLOOR PLAN


ELEMENT:

- > '

QSD231(PAPER2)
CHECKED BY:

< $ >METER I3400 3600 1S00


-

NATASHA KHALIL DRAWN BY SCALE DATE HISHAM 1:100 APRIL 2009

GROUND FLOOR PLAN


Hak Cipta Universiti Teknologi MARA

FIRST FLOOR PLAN

DRAWING NO. :

PUB/QSD231/201/P2/1

CONFIDENTIAL

CONFIDENTIAL

APPENDIX 1 (2)

AP/APR 2009/QSD231/201 (PAPER 2)

YOU MAY MAKE ALL NECESSARY AND REASONABLE ASSUMPTIONS WHERE APPLICABLE

PROPOSED NEW BUNGALOW HOUSE AT PINGGGIRAN RAPAT, IPOH FOREN.HAIKARL

SECTION X-X AND SECTION Y-Y


ELEMENT:

SECTION X-X

SECTION Y-Y

QSD231(PAPER2)
CHECKED BY:

NATASHA KHALIL DRAWN BY SCALE DATE HISHAM 1:100 APRIL 2009

DRAWING NO. : PUB/QSD231/201/P2/2

Hak Cipta Universlti Teknologi MARA

CONFIDENTIAL

CONFIDENTIAL

APPENDIX 1 (3)

AP/APR 2009/QSD231/201 (PAPER 2)

UNIVERSITI TEKNOLOGI MARA NOTES: 1. ALL COLD WATER SUPPLY PIPE SHALL BE GALVANISED MILD STEEL (gms) to BS 1387 WITH SCREWED.
200 GALLONS WATER STORAGE TANK.

NOTES:

2. ALL PIPE INTERNALLY SHALL BE CONCEALED UNLESS TO OTHERWISE INDICATED. 3. PIPES BURIED UNDERGROUND SHALL BE AT DEPTH OF 400mm. 4. ALL VALVES & TAPS SHALL BE BRASS TO BS 1018.
200 GALLONS WATER STORAGE TANK.

-200

YOU MAY MAKE ALL NECESSARY AND REASONABLE ASSUMPTIONS WHERE APPLICABLE PROJECT TITLE:

&

^
-1S0^- / Sq s< ^
PROPOSED NEW BUNGALOW HOUSE AT PINQGGIRAN RAPAT, 1POH FOR EN. HAIKARL AS0 DRAWING TITLE:

BATH1

SCHEMATIC DIAGRAM FOR COLD WATER SUPPLY


ELEMENT:

QSD231(PAPER2)
CHECKED BY:

NATASHA KHAUL DRAWN BY HISHAM

SCHEMATIC DIAGRAM FOR COLD WATER SUPPLY

SCALE
DATE

NO TO SCALE
APRIL 2009

DRAWING NO. :

PUB/QSD231/201/P2/3

Hak Clpta Universiti Teknologi MARA