Cluster Acceptance Report

Cluster Name: 115

Cluster Stage 100%


(With Respect to Launch Sites)

Prepared By:

Reviewed By:

Page 1 of 14
Table of Contents

1 INTRODUCTION....................................................................................................2

1.1 DT Route/Area..............................................................................................3
1.2 On-Air Status of Cluster..............................................................................3

2 PROCEDURE........................................................................................................5

3 CALL SUMMARY..................................................................................................5

4 RF INDICATORS DISTRIBUTION PLOTS...........................................................6

4.1 Serving Cell ID..............................................................................................6


4.2 RxLev(Sub)...................................................................................................6
4.3 RxQuality(Sub).............................................................................................8
4.3 C/I................................................................................................................9
4.4 Handover Failure........................................................................................11
4.5 Call Drop.....................................................................................................11
4.6 Data Throughput(Downlink) .....................................................................11

5 RECOMMENDATION & TECHNICAL OVERVIEW............................................13

6 PUNCH LIST .......................................................................................................14

1 Introduction

Page 2 of 14
1.1 DT Route/Area

1.2 On-Air Status of Cluster

Page 3 of 14
Cluster Completion : 100% with Respect to Launch Sites)

Page 4 of 14
2 Procedure
The procedure for the drive tests is described below:

Cluster drive tests shall perform 3 call scenarios: short call, long call, and PS call. GPRS functionality
drive tests were performed by downloading a huge file from an FTP server throughout the cluster drive
test route. Configuration of MS is as follows in the DT Kit:

 MS1= Long call (MS to MSC Test Number ,continous call )


 MS2 = Short call (MS to MSC Test Number, 30sec., 3 sec. delay)
 MS3 = EGPRS downloading
 MS4 = Idle

3 Call Summary

Content Couter & KPI Value Remark

Call Drop(Long Call) Number of Call Drops 0


Total Call duration Contionous call
Call Drop Rate(<=1.2%) 0%
Call Setup(Short Call) Number of call setup failed 0
Number of Call Attempt 91
Call Setup Succ. Rate(>=97%) 100%
Handover(Long Call) Handover Success 38
Handover Attempt 38
HO Succ. Rate( >=97%) 100%
Downlink Throughput Average Downlink Throughput 57.35

Page 5 of 14
4 RF Indicators Distribution Plots
4.1 Serving Cell ID

4.2 RxLev(Sub)

Page 6 of 14
 In this cluster most of the places having terrian issue(Hilly terrian)
Area 1& 2: Rx level was poor due to terrian issue in those places. (attached radiation pattern below)

Legend Bin count Percentage


-68 to 0 3598 50.22

Page 7 of 14
-76 to -68 1429 19.95
-84 to -76 1467 20.48
-92 to -84 622 8.68
-110 to -92 48 0.67
Total 7164 100

4.3 RxQuality(Sub)

Page 8 of 14
Legend Bin count Percentage
0-4 6992 97.60
5 93 1.30
6 64 0.89
7 15 0.21
Total 7164 100

4.3 C/I

Page 9 of 14
Legend Bin count Percentage
20 to 35 6257 91.08

Page 10 of 14
12 to 20 611 8.89
9 to 12 1 0.01
5 to 9 1 0.01
0 to 5 0 0
-10 to 0 0 0
TOTAL 6870 100

4.4 Handover Failure

No Handover failure

4.5 Call Drop

No call drop

4.6 Data Throughput(Downlink)

Page 11 of 14
GPRS was not connected in Gandhinagar site & Muvattupuzha site’s 2nd sector, informed to OMCR.

Page 12 of 14
5 Recommendation & Technical Overview

 In this cluster most of the places having terrian issue(Hilly terrian)


 We couldn’t able to change the azimuth of Muvattupuzha site’s 3rd sector, due to another
antenna obstraction.
 There is an over shoot from Muvattupuzha site , On 3rd sector mainlobe of Gandhi
nagar,Because Gandhi Nagar Site’s antenna height is 40m and Muvattupuzha site’s antenna
ht is 49 m and sharp variation in AMSL also.
 We have attached the radiation patterns for the issue sites.

Muvattupuzha 3rd sector antenna photo:

Vellorekunnam 2nd sector : Vellorekunnam 3rd sector :

Page 13 of 14
Gandhi Nagar 1st sector : Market Area 1st sector :

6 Punch List

Name / Signature of closing


Sr. No. Item Date Closed
authority

ALL TEST COMPLETED WITHOUT ANY ITEMS ON PUNCH LIST

Yes No

Page 14 of 14