Anda di halaman 1dari 3

GESCO PROFILE

GESCO Group is the mother company with two subsidiary companies


GESCO Free Zone and GESCO Hammer Casing.

GESCO Group is owned and directed by Eng. Ahmed Abdel Wahab, it was established
in 1984 as an oil service company serving the Petroleum Sector Companies, the Industrial
Companies as well as the construction field in Egypt.

GESCO Group has seven main activities run with more than 100 experienced
employees
1- Human Resources
2- Construction & Maintenance
3- Catering
4- Training & Career Development
5- Sales & Supplies
6- Agricultural Services
7- Security Services

2033, Meraag Buildings adjacent Carrefour, El Katamya Road. , Cairo, Egypt.

Tel.: +202 520 4523


+202 520 4524
+202 520 4525
+202 520 4526
+202 520 4527
+202 520 4528

Fax: +202 520 4521


+202 520 4522

Mob: +212 227 4470

Email: gesco1@gescoegypt.com
Web: www.gescoegypt.com

Course Name Code No. Duration


DG – Drilling
Fundamentals of Drilling Technology DG-1 5 days
Practical Drilling Skills DG-2 5 days
Drilling & Logging DG-3 5 days
Stimulation Techniques for Oil & Gas Wells DG-4 5 days
Advanced Drilling Techniques DG-5 5 days
Directional and Horizontal Drilling DG-6 5 days
Drilling Problems & Drilling Optimization DG-7 5 days
Cased Hole Evaluation DG-8 5 days
Horizontal and Multilateral Wells DG-9 5 days
Well Completion & Workover Operations DG-10 5 days
Mud Logging Techniques DG 11 5 days
Blowout Prevention & Well Control DG-12 5 days
Well Logging Tools and Techniques ( Level I ) DG-13 5 days
Well Logging Tools and Techniques ( Level II ) DG-14 10 days
IWCF Well Control ( Certification Courses ) DG-15 5 days
IWCF Well Intervention ( Certification Courses ) DG-16 5 days
Solids Removal Equipment Optimization DG-17 5 days
Casing and Tubular Strings Design DG 18 5 days
Disposal Techniques of Drilling Fluid Discharges DG-19 5 days
Fundamentals of Oil and Gas Well Drilling DG-20 5 days
High Pressure High Temperature Wells Drilling Technology DG-21 5 days
Multi Lateral Technology of Oil and Gas Wells DG-22 5 days
Offshore Technology DG-23 5 days
Petroleum Property Evaluation and Economics DG-24 5 days
Sand Production Prediction and Stabilization DG 25 5 days
Applied Drilling Technology DG-26 5 days
Drilling Fluids & Equipment DG-27 5 days

Course Name Code No. Duration


DG – Drilling (contd.)
Selection of Drilling, Completion Workover Field DG-28 5 days
Foam & Air Drilling Technology DG-29 5 days
Formation Damage DG-30 5 days
Methods of Preparing Drilling Fluid for Deep Drilling Wells DG-31 5 days
Modern Methods for Testing Horizontal & Vertical Gas Wells DG-32 5 days
Oil Well Cement and Cementing Practices DG-33 5 days
Workover Well Control DG-34 5 days
Basic Open Hole Interpretation DG-35 5 days
Wellhead Operation & Wellhead Measurement DG-36 10 days
Well Head Pressure Relief & Blow Down Procedures And Safety Rules DG-37 10 days
Well Testing Operations (Basic Level I ) DG-38 5 days
Wells Production Flow Into Production Separators &Their Main
DG-39 6 days
Functions
Workover & Stimulation DG-40 5 days
Workover & Stimulation DG-41 5 days
Cased Hole Logs and Production Logging DG-42 5 days
Horizontal Wells Performance, Completions and Stimulations DG-43 10 days
Well Control DG-44 5 days
Well Cementing Technology DG-45 5 days
Stuck Pipe Prevention DG-46 3 days
Workover Activities DG -47 3 days
Horizontal Well Drilling Technology DG -48 6 days
Basics Drilling Muds DG -49 5 days
Advanced Drilling Muds DG -50 5 days
Completion Design of Ultra - Deep, High Temperature and High -
DG -51 10 days
Pressure Sour
Directional Drilling DG -52 5 days
Adventures & Safety Means In Drilling & Workover Operations DG-53 6 days

Course Name Code No. Duration


DG – Drilling (contd.)
Drilling, Completion & Workover Fluids DG -54 5 days
Drilling DG -55 5 days
Engineering Approach to Horizontal and Directional
DG -56 10 days
Drilling
Drilling Technology Program (Drilling Fluids Module) DG -57 10 days
Drilling Technology Program ( Completion and Workover
DG -58 10 days
Module ).
Oil Well Stimulation DG -59 3 days
Rig Maintenance Training Program Bop Systems Module DG-60 5 days
Selection of Drilling, Completion and Workover Fluid DG -61 3 days
Well Head Control Systms DG -62 5 days
Well Completion and Workovers Design DG -63 10 days
Effective Drilling Fluid Control DG -64 5 days
HP & HT Gas and Oil Well Cement DG -65 6 days

Anda mungkin juga menyukai