Only one network used: Delays added into it, or subtracted from it progress not accounted for
2. Dynamic methods
Several networks used, updated either in real time or retrospectively progress accounted for
[AACE International Recommended Practice No.29R-03 Forensic Schedule Analysis: 5-level taxonomy, giving 8 broad methodologies described over 105 closely-typed pages]
www.scadacon.com.hk
Contents
The Mirant case Windows analysis an example Other RDA techniques Advantages and disadvantages The City Inn Case Problems of programming
www.scadacon.com.hk
Windows analysis, reviewing the course of a Project month by month, provides an excellent form of analysis to inform those controlling the Project what action they need to take to prevent delay to the Project. Without such analysis those controlling the Project may think they know what activities are on the critical path but it may well appear after a critical path analysis that they were mistaken.
www.scadacon.com.hk
Windows Analysis
The expert must not only be familiar with the chronology, he must tell the story in his report. Some would say that the software exercise counts for nothing unless backed up by the narrative.
John Marrin QC: Expert Evidence on Delay and Disruption The Tribunals Perspective
www.scadacon.com.hk
Windows Analysis
Example project: Civil Engineering Works But - exactly the same programming principles apply in building works projects
www.scadacon.com.hk
Windows Analysis
Example project: Bridge and Approach Road; Start date 01-Jan-07; Date for Completion 30-Jun-07; (6 month project) Main Contractor a bridge specialist; but not a road-works specialist so this will be sub-contracted out
www.scadacon.com.hk
66d
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk
2nd window
21d
VO2 New 0.5km of road; in poor ground (on piles) 48d delay; (20d VO1, 14d slow abutments; 14d VO2)
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk
3rd window
21d
66d delay; (20d VO1, 14d slow abutments; 14d VO2; 25d strike; -7d mitigation) SITUATION AS AT END OF JUN 07 (Close of Third Window)
www.scadacon.com.hk
www.scadacon.com.hk More than one further month lost due to poor falsework s/c productivity
4th window
21d
98d delay; (20d VO1, 14d slow abutments; 14d VO2; 25d strike; -7d mitigation; 32d poor falsework productivity)
SITUATION AS AT END OF AUG 07 (Close of Fourth Window)
www.scadacon.com.hk
www.scadacon.com.hk
5th window
21d
VO4
108d
www.scadacon.com.hk
2007 Jan 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 Jan Feb Mar Apr May 2007 Time v Delay Chart Jun Jul Aug Sep Oct
S/C issued late Lack of paving materials Slow abutments progress
1st window [20d delay] 2nd window [48d delay] 3rd window [66d delay]
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep VO4
Oct
10d
Falseworker Strike action
110 90 80 70 60 50 40 30 20 10 0 -10
100
4th window [98d Bridge complete delay]
108d late
14d
VO3
VO1
20d
VO2
www.scadacon.com.hk
www.scadacon.com.hk
VO1
21d
VO2 VO3
-108
VO4
www.scadacon.com.hk
30d
-78
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk VO1
VO2, VO3
-68d
VO4
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk
2007 Jan 110 100 90 80 70 60 50 40 30 20 10 0 -10 -20 -30 -40 -50 -60 -70 Jan Feb Mar Apr May 2007 Time v Delay Chart Jun Jul Aug Sep Oct
S/C issued late Lack of paving materials Slow abutments progress
1st window [20d delay] 2nd window [48d delay] 3rd window [66d delay]
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep VO4
10d
108d late
VO3
28d
10d
VO1
20d
VO2
www.scadacon.com.hk
www.scadacon.com.hk
www.scadacon.com.hk