Anda di halaman 1dari 1

8

2
2
8
R.C.C. FOUNDATION
2 NO'S 1" B.S.P. DRAIN HOLES
(THE PUMP INTERIOR CAN BE
KEPT CLEAN BY LETTING OUT
PART OF THE WATER ENTERING
IN TO THE PUMP THROUGH THESE DRAINS)
H
CONDITION
TO SUIT THE SOIL 9
FORM FOUNDATION BOLTS ARE
NOT REQUIRED.

SILENCER RESTS ON PLATE
BRICK CONSTRUCTION
6
0
0
1
6
5
2820
425
20
1
4
11
240
Type
FOR ELEC. MOTOR FRAME
280 M --
280 S -- 274 A =
419 B =
B =
A = 248
368
Dimension Dist.
MOTOR
=
B
=
17
18
1300
16
A
19
FOR REUSE AFTER COOLING)
CHANNEL IRON BASE FRAME
SILENCER CUM WATER SEPARATOR
Refer "GARUDA" catelog for bare pump dimensions
This pump has four outlet flanges two pointing towards the
right and two pointing towards the left of the pump this
lay-out shows the right side outlet flanges joined by a manyfold and
connected to a silencer and left side outlet flanges blanked.
For ease of maintenance provision should be made to lift
the pump and transfer to c trolly kept on the side of the
foundation while planning the layout.
This drawing shows a typical layout and subject to change
without notice. Use "GARUDA" certified drawing
--------- Not GARUDA Scope of supply.
All dimensions are in mm only. Unless otherwise stated.
MARKED ON THE PUMP
THIS IS NOT A PRESSURE VESSSEL
HENCE DONOT FIX ANY VALVE
IN THE 150 NB OUTLET LINE
DIRECTION OF ROTATION
6
1
7
1
5
200N.B.
AIR IN LET
1
9
6
5

2
10
5
02.
01.
03.
AIR OUT LET 150 N.B.
THIS CAN BE LEAD TO
OUT SIDE OF THE PLANE
04.
06.
05.
BELT
PULLEY
MOTOR (BSBK SCOPE)
SLIDE RAIL 19.
20.
18.
17.
1300
FOUNDATION PLAN
A
1
2
0
0

M
in
625
8
5
0
3
150 NB
100
700
230
2600
PULLEY
BALL VALVE
RAGULATING VALVE
16.
14.
15.
VACUUM GAUGE
STRAINER
PRESSURE GAUGE 12.
13.
11.
625
PUMP
=
550
=
07. FOUNDATION BOLT
FOUNDATION BOLT
FOUNDATION BOLT
SEAL WATER PIPE
09.
10.
08.
STRAINER(perforated sheet)
DISCHARGE MANIFOLD
05.
06.
04.
03.
GARUDA / STD.
90 KW
SPC 4250
02 M.S.
G / STD. 01
do
do
STD.
do
GM./STD. 01
01
Range:0 to 760 mmHg
Range:0to3.5 kg/cm
1 1/2"BSP
|a|.s|/e.01OO
Thd size 3/8" BSP
|a|.s|/e.01OO
Thd size 3/8" BSP
01 STD.
CI/STD. 01
STD. 01
08 do 5/8" BSWx200 N
GARUDA / STD.
5/8" BSWx200 N
04 do
M.S. 01
do 08
GARUDA / STD.
GARUDA / STD.
GARUDA / STD.
GARUDA / STD.
01 M.S.
do 01
M.S.
do
02
01
SEAL WATER OUTLET 65 N.B.
(SEAL WATER TO DRAIN OR SUMP
VACUUM PUMP
SUCTION MANIFOLD
NAME OF PARTS
NO.
02.
01.
ITEM
PCD O D N B
0184
0188
80
40
014G
098
GARUDA / STD.
GARUDA / STD.
SPACIFICATION
M.S.
Catelog
GARUDA
01
01
MATL. QTY.
HOLES h0LE 0
018
014
4
4
MOTOR
1
8
0
B
2
4
0
330
700
1
2
2
0
1220
WATER
DRAIN
3
0
0
M
IN
.
1
4
0
0
1
8
0
0
7
5
4
and shaft assy.
to remove rotor
Distance required
200
150 NB
GL
100 100
2
5
0
625
1
8
0
3
9
06
0
0
1
3
0
5
Alternative
AIR&WATER
outlet
5
0
GARUDA
5
0
7
0
2
5
0
-
2
8
0
1
3
0
7
6
5
m
a
x
G.L.
SPACER
700
3
5
5
0
1
5
0
6
0
each itm
WT.
in kgs.
812 SPC PlTCh0
2
1500
115
100
115
6
30
150
200 088G
0285 0285
0292 018
018 8
8
Dimension Dist. Type
SCHEDULE=x
B = 349
D250M-- A = 305 04
FOUDATION BOLTS
4-POCKETS 100 SQ. FOR
(GROUND FIXING)
STATIC LOAD ON FOUNDATION IS :4125 KGS.
DYNAMIC LOAD 1725 KGS.
SAMIR
PRADIP
12
13
14 15
5/8" BSWx200 N
A
8
C
B
DATE
7 6
R.No.
REVISIONS
5
DESCRIPTION
E
D
F
8 7 6 5
2 4
APPD. CHKD. BY
3 1
C
4 3 2
D
E
1
F
NOTES:-
B
A
APPROVED
DATE
DESIGNED
DRAWN
CHECKED
SCALE DRG. No.
N.T.S.
REV.
1
Sheet 1 of 1
14/4/2010
NEW DELHI
OWNER/PROJ ECT
OWNER'S ENGINEER
ADANI POWER MAHARASHTRA LIMITED
NO. DT.
RELEASE STATUS
PURPOSE
FOR APPROVAL
FOR TENDER ONLY
M
A
N
F
./
F
O
RMECH.
ELECT.
CIVIL/STR.
C
O
N
S
T
DATE SIGNATURE
EMPLOYER
POWERGEN INFRASTRUCTURE (L.L.C)
G.A. DRAWING OF VACUUM PUMP
BE/ A-388/ GXL/ 2000/ 001
PRADIP
-
VATVA ; AHEMEDABAD.
(MODEL : GXL - 2000)
VENDOR
CAPAClTY . 845O N/h|.
VACUUM : 15" Hg
SEAL WATER INLET 40N.B.
SUITABLE FOR DRINKING
SCALE FORMING MINERALS
TY 4.O T0 G.O m / h|.AhY wATER
PURPOSE FREE FROM SOLIDS
PRESSuRE O.5 T0 O.9Kg/CN
1. ALL DIMENSIONS ARE IN mm. UNLESS OTHERWISE SPECIFIED.
2. ALL FLANGES AS PER BS-10, TABLE-D.
3. INSPECTION & TESTING SHALL BE AS PER APPROVED QAP.
QTY. : 18 NOS.
29.04.10 1 REVISIONS AS PER CLIENT COMMENT'S SAINI A.P SVS
1
1
1
1
CAT - A1 Approved
CAT - A2 Approved subject to incorporation of comments.
Resubmit.
CAT - A3 Not Approved. Resubmit.
CAT - I For information only.
FI Letter Ref. No. Date:
TK
Signature
Initials:
FICHTNER Consulting Engineers (India)
Private Limited, (FI) Chennai.
VENDOR DRAWING / DOCUMENT REVIEW STATUS
This document has been reviewed as noted with regard to general Conformity
with the Contract Specifications and requirements. The Vendor/ Contractor is
responsible for correctness of design, calculation and details. Approval of this
document doe not relieve the Vendor / Contractor of his responsibility in
carrying out the work correctly and fulfilling the complete requirements of the
contract nor does it limit the Purchaser's rights under the contract.
CATEGORY - A1
M. Das
Digitally signed by M. Das
DN: cn=M. Das, o=Adani Power Ltd.,
ou=Corporate Engineering,
email=mrinal.das@adanipower.com,
c=IN
Date: 2010.05.03 11:51:08 +05'30'

Anda mungkin juga menyukai