PowerCon,Optimized
PowerSolutions,
Inc.
VPBusinessDevelopment
21Gunton Drive
Toronto.
Ontario
MgW3G9
Attn:LeonH.Wasser,MBA,P.Eng.

RE:Installationof PowerKureConditioningSystemat HuskyInjectionMoldingSystems

DearMr.Wasser.

HuskyInjectionMoldingSystemsLtd.is a plasticinjection machineandtoolingmanufacturer locatedin


Since2001,we havebeenproactively
Bolton,Ontario. leveragingtechnologyto optimize ourfacilitiesand
provideleadershipto thecommunity for environementalstewardship.Hundreds of lightfixtureshavebeen
replaced,dozensof motorshavebeenmodifiedwithvariablespeeddrivesand disciplined controlsystem
havebeeninstalledto substantiallyimproveof energyetficiency.A numberof buildingheatsystemswere
replacedwithlow intensityradiantheat,entirebuildingroofingsystemswerereplacedwithdoublethe
insulation
value,daylightingandevena demandresponse program was recentlylaunched to curtailenergy
duringperiodsof peakloadingin the province.

overthe last8 years,no onetechnology


Withall the changesto our infrastruce comescloseto the
effectivenessof our PowerKure powerconditioningsystem.The remarkable resultswereimmediatelyevident
as our powerfactorimprovedfrom90%to over97o/o, the harmonicdisturbances measuredon our electronic
circuitsdropped10fold,andmostremarkable ourcertifiedfieldtestingrevealed
a dropin demandandnet
energyconsumption of over7%.The resultswereso conclusive fromthe energyauditorswho supervisedthe
test- HHAngus- thatthe Electrical SafetyAuthorityinspectorand Huskyuppermanagement wereleft
speechless.

Huskyhassinceinstalled PowerKureon all buildings


in Boltontotaling860,000sq ft.,the Husky
ManufacturingBuildingin Vermont220,000sq.ft.,the HuskyHotRunnerMoldsbuilding in Luxembourg
224,000sq.ft.andthe FirstNations75,000sq.ft.manufacturing buildingin Niigon,Ontario.

Thanksverymuchfor yoursupportduringthe implementation of thistechnology


and I wouldnot hesitateto
providea reference
to all partiesconsidering
the installation
of the PowerKureConditioningSystem.