Power Plant Training Course Schedule

Power Plant Training Course Schedule Schedule Weeks Orientation and visit to Sangam Power Plant 1 Theory classes (power plant basics) 6 General Practical training at Sangam Power Plant 2 Advance Theory Classes 8 Power Plant Simulator Training 2 Project Work 1 Intensive Practical Training 6 Total 26

Practical Training Methodology


After initial theoretical study of 6 weeks , we have arranged 2 weeks General Practical Training at Sangam ( I ) captive Power Plants .We have made the complete schedule of 2 weeks for Training of our students. Engineers from Sangam (I) are deputed to impart Training. Our Training officers also associate the Students during Training and help students in their learning and solving their problems.At the end of each day training , we give student the assignment based on full day training. After our Theoretical study is over, we depute students for intensive Training for 6 weeks in Power Plant at Sangam ( I ) , Nitin Spinners , HZL, Chanderiya . OGTL Biomass plant , Chipa Barod , and Aditya Birla group Power Plants where they are under direct control of Plant Incharges. The students have to make the Training report after their general Training and Intensive Training.

Power Plant Simulator


A 2 week Training is imparted on Power Plant Simulator of 210 MW supplied by M/s Triangle Simulator. Mumbai after completion of Theory classes. We are taking the services of experts of M/s Triangle Simulator for Training of our students.

Project Report
After the end of the theoretical study and Practical Training students are given the project work, where they have to do deep study on any particular topic and give the report within a week time. SCHEDULE OF MINOR POWER PLANT TRAINING AT SANGAM (I) LTD. Training Day Course Content Section Coal handling Coal analysis , BELT CONVEYOR, Ground hopper, Tripping, Crusher, 1 plant Feeder, Vibrant screen etc. Air Fans & Primary air fan, Secondary air fan & ID fan, Damper, power cylinder, 2 auxiliary IGV etc. 3 DM Plant Process of Make Up Water For Boiler Boiler drum(internals, safety, vents), super heater, water walls, blow 4 Boiler & auxiliary down, chemical dosing, riser, down comers, soot blower etc

Assignment A B C D

5 6 7 8 9 10 11 12 13 14 15

Flue gas path, Economizer, APH, ESP, compressor, ash handling E system Boiler & auxiliary Steam path(main steam line, PRDS). F Boiler & auxiliary deaerator, L.P.&H.P dosing, BFP, feed control station etc. G Turbine & Overview of turbine, extraction of turbine, barring gear, gear box, other H auxiliary parts of turbine etc. Turbine & LPH, HPH, lube oil system, lube oil purification unit, lube oil cooler, oil I auxiliary pumps etc. Turbine & Governing system, emergency stop valve, main steam line vents, control J auxiliary oil unit, etc. Turbine & Cooling tower, CWP, ACWP, condenser (ACC+WCC) K auxiliary Turbine & Ejector, GSC etc. L auxiliary Electrical Generator, exciter, Neutral grounding transformer, VFDs, switch yard M Instrumentation Control Valve,PLC System,DCS System N Test of Training O Boiler & auxiliary

Note :