United States Department of the Interior National Park Service

Class A Construction Cost Estimate

BASIS OF ESTIMATE
PROJECT INFORMATION
Project: Park: Park Apha: PMIS: Estimate Date: Prepared By: Company: Address: City, State Zip: Phone: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate Date Estimator Name Company Address City Phone

BACKGROUND SUPPORTING MATERIAL (Scope of Work):


Briefly describe scope of work included in the estimate, plan dates, exclusions, etc. List any Government Furnished Property (GFP)

SOURCE OF COST DATA:


Document all sources of cost information used in the estimate. (Attach additional information if necessary)

ESTIMATE ASSUMPTIONS:
Describe any assumptions made to prepare estimate and highlight areas needing clarification for future estimates.

MAJOR CHANGES FROM PREVIOUS ESTIMATE:


Describe any major changes in scope of work, materials, systems, assumptions, etc. from the previous estimate version.

182609235.xlsx.ms_office Basis of Estimate

Page 1 of 83

Print Date: 10/23/2013

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

BASIS OF ESTIMATE
PROJECT INFORMATION
Project: Park: Park Apha: PMIS: Estimate Date: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate Date

DESCRIPTION OF MARK-UP & ADD-ONS: Design Contingency: Standard. General Conditions: Government General Conditions: Contractor Overhead: Contractor Profit: Contracting Method Adjustment: Annual Inflation Escalation Factor: Time Until Project Midpoint (Months)
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0
Explain & Justify Explain & Justify Explain & Justify Explain & Justify Explain & Justify Describe anticipated contract method and justify value used. Projected annual inflation rate. Number of months from estimate (or data) date until the projects midpoint of construction.

When usin

OTHER COMMENTS:
Provide any additional information, qualifications, etc.

182609235.xlsx.ms_office Basis of Estimate

Page 2 of 83

Print Date: 10/23/2013

United States Department of the Interior National Park Service

Class A Construction Cost Estimate


Project: Project Name Park: Park Name Park Alpha: Park Alpha Code PMIS Number: TBD or PMIS number if known General Contractor Overhead
0.00%

PROJECT COST SUMMARY

Estimate By: Date: Reviewed By: Date: General Contractor Profit


0.00%

Estimator Name Estimate Date

Bid Item No.

Bid Item Description

Total Material Cost

Total Labor Cost

Total Equipment Cost

Total Direct Construction Costs

Design Contingency
0.00%

General Conditions
0.00%

Contracting Method Adjustment


0.00%

0.00%

Inflation Escalation Month APR s


0 $

Bid Item Total


-

Bid Item:

Asset / Project Element 1


WBS L2 WBS L2 WBS L2 WBS L2 WBS L2 WBS Description WBS Description WBS Description WBS Description WBS Description

TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ -

Total - Bid Item

Bid Item:

Asset / Project Element 1 Asset / Project Element 2


WBS L2 WBS L2 WBS L2 WBS L2 WBS L2 WBS Description WBS Description WBS Description WBS Description WBS Description

$
$

TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

Total - Bid Item

Bid Item:

Asset / Project Element 2 Asset / Project Element 3


WBS L2 WBS L2 WBS L2 WBS L2 WBS L2 WBS Description WBS Description WBS Description WBS Description WBS Description

$
$

TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

Total - Bid Item

Bid Item:

Asset / Project Element 3 Asset / Project Element 4


WBS L2 WBS L2 WBS L2 WBS L2 WBS L2 WBS Description WBS Description WBS Description WBS Description WBS Description

$
$

TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

Total - Bid Item

Bid Item:

Asset / Project Element 4 Asset / Project Element 5


WBS L2 WBS L2 WBS L2 WBS L2 WBS L2 WBS Description WBS Description WBS Description WBS Description WBS Description

$
$

TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

Total - Bid Item

Asset / Project Element 5

TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

182609235.xlsx.ms_office Project Cost Summary

Page 3 of 83

Print Date: 10/23/2013, 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate


Project: Project Name Park: Park Name Park Alpha: Park Alpha Code PMIS Number: TBD or PMIS number if known General Contractor Overhead
0.00%

PROJECT COST SUMMARY

Estimate By: Date: Reviewed By: Date: General Contractor Profit


0.00%

Estimator Name Estimate Date

Bid Item No.

Bid Item Description

Total Material Cost

Total Labor Cost

Total Equipment Cost

Total Direct Construction Costs

Design Contingency
0.00%

General Conditions
0.00%

Contracting Method Adjustment


0.00%

0.00%

Inflation Escalation Month APR s


0 $

Bid Item Total


-

Bid Item:

Asset / Project Element 6


WBS L2 WBS L2 WBS L2 WBS L2 WBS L2 WBS Description WBS Description WBS Description WBS Description WBS Description

TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any): $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ -

Total - Bid Item

Bid Item:

Asset / Project Element 6 Asset / Project Element 7


WBS L2 WBS L2 WBS L2 WBS L2 WBS L2 WBS Description WBS Description WBS Description WBS Description WBS Description

$
$

TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

Total - Bid Item

Bid Item:

Asset / Project Element 7 Asset / Project Element 8


WBS L2 WBS L2 WBS L2 WBS L2 WBS L2 WBS Description WBS Description WBS Description WBS Description WBS Description

$
$

TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

Total - Bid Item

Bid Item:

Asset / Project Element 8 Asset / Project Element 9


WBS L2 WBS L2 WBS L2 WBS L2 WBS L2 WBS Description WBS Description WBS Description WBS Description WBS Description

$
$

TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

Total - Bid Item

Bid Item:

Asset / Project Element 9 10 Asset / Project Element 10


9
WBS L2 WBS L2 WBS L2 WBS L2 WBS L2 WBS Description WBS Description WBS Description WBS Description WBS Description

$
$

TOTAL VALUE OF GOVERNMENT FURNISHED PROPERTY (if any):

Total - Bid Item

10 Asset / Project Element 10

$ $

Total Bid Items 1-10

182609235.xlsx.ms_office Project Cost Summary

Page 4 of 83

Print Date: 10/23/2013, 8:54 AM

United States Department of the Interior National Park Service Class A Construction Cost Estimate
Project: Park: Park Alpha: PMIS Number: Project Name Park Name Park Alpha Code TBD or PMIS number if known Bid Item Number BID ITEM 1 Asset / Project Element / Description Asset / Project Element / Description

BID ITEM COST SUMMARY

Estimate By: Date: Reviewed By: Date:

Estimator Name Estimate Date

Size/Count 0

Units Unit

Item No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

WBS
A10 A20 B10 B20 B30 C10 C20 C30 D10 D20 D30 D40 D50 E10 E20 F10 F20 G10 G20 G30 G40 G50 XX XX XX

Description
Foundations Basement Construction Superstructure Exterior Enclosure Roofing Interior Construction Stairs Interior Finishes Conveying Systems Plumbing Systems HVAC Fire Protection Electrical Equipment Furnishings Special Construction Selective Building Demolition Site Preparation Site Improvements Site Mechanical Utilities Site Electrical Utilities Other Site Construction Special Use - 1 Special Use - 2 Special Use - 3 Subtotal Direct Construction Costs

Material Cost/Unit
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Total Material Cost


$0.00 -

Labor Cost/Unit Total Labor Cost


#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ -

Equipment Cost/Unit
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Total Equipment Cost


$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Direct Cost/Unit
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Total Direct Costs


$0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0

NET Cost/Unit
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Total NET Costs


#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

Total Value of Government Furnished Property (GFP) Inc. in Direct Cost . Direct Cost Subtotal without GFP . $ Design Contingency 0.00% Total Direct Construction Costs Standard General Conditions Government General Conditions Subtotal NET Construction Cost Overhead Profit Estimated NET Construction Cost Contracting Method Adjustment Inflation Escalation 0.00% 0.00% 0.00% 0 0.00% 0.00%

In most cases GFP is normally zero see footnote-

Applied to Total Direct Construction Cost less GFP Applied to Total Direct Construction Cost less GFP

Months

Annual Rate =

0.00%

Inc. Bonds & CMA

Total Estimated NET Cost of Construction

$0 $0

GFP costs only apply when the Government pre-purchases items, or provides other materials out of Government inventory, to be installed by contractor. Adjustments and Markup on GFP only include Inflation Escalation; No other adjustment factors or O&P markup have been applied.

182609235.xlsx.ms_office Bid Item 1 Summary

Page 5 of 83

Print Date: 10/23/2013, 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: A10 Foundations


MATERIAL Uniformat II WBS Code
A1010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

STANDARD FOUNDATIONS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

STANDARD FOUNDATIONS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


A1020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SPECIAL FOUNDATIONS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SPECIAL FOUNDATIONS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1 - A10 - Foundations

6 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: A10 Foundations


MATERIAL Uniformat II WBS Code
A1030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SLAB ON GRADE Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SLAB ON GRADE

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1 - A10 - Foundations

7 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: A10 Foundations


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: A10 Foundations


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

A10

Foundations

Unit

$0

182609235.xlsx.ms_office, Item 1 - A10 - Foundations

8 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: A20 Basement Construction


MATERIAL Uniformat II WBS Code
A2010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

EQUIPMENT Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost

BASEMENT EXCAVATION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASEMENT EXCAVATION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


A2020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASEMENT WALLS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASEMENT WALLS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-A20 Basement

9 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: A20 Basement Construction


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-A20 Basement

10 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: A20 Basement Construction


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: A20 Basement Construction


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

A20

Basement Construction

Unit

$0

182609235.xlsx.ms_office, Item 1-A20 Basement

11 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: B10 Superstructure


MATERIAL Uniformat II WBS Code
B1010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

FLOOR CONSTRUCTION Description vbn Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

FLOOR CONSTRUCTION

1000

Unit

$0 $

$0 $

$0 $

$0

MATERIAL Uniformat II WBS Code


B1020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

ROOF CONSTRUCTION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

ROOF CONSTRUCTION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-B10 Superstructure

12 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: B10 Superstructure


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-B10 Superstructure

13 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: B10 Superstructure


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: B10 Superstructure


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

B10

Superstructure

Unit

$0

182609235.xlsx.ms_office, Item 1-B10 Superstructure

14 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

OP

Summary Item: B20 Exterior Enclosure


MATERIAL Uniformat II WBS Code
B2010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

EXTERIOR WALLS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

EXTERIOR WALLS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


B2020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

EXTERIOR WINDOWS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

EXTERIOR WINDOWS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-B20 Exterior Enclosure

15 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

OP

Summary Item: B20 Exterior Enclosure


MATERIAL Uniformat II WBS Code
B2030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

EXTERIOR DOORS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

EXTERIOR DOORS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-B20 Exterior Enclosure

16 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

OP

Summary Item: B20 Exterior Enclosure


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: B20 Exterior Enclosure


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

B20

Exterior Enclosure

Unit

$0

182609235.xlsx.ms_office, Item 1-B20 Exterior Enclosure

17 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: B30 Roofing


MATERIAL Uniformat II WBS Code
B3010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

ROOF COVERINGS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

ROOF COVERINGS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


B3020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

ROOF OPENINGS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

ROOF OPENINGS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-B30 Roofing

18 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: B30 Roofing


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-B30 Roofing

19 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: B30 Roofing


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: B30 Roofing


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

B30

Roofing

Unit

$0

182609235.xlsx.ms_office, Item 1-B30 Roofing

20 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: C10 Interior Construction


MATERIAL Uniformat II WBS Code
C1010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

INTERIOR PARTITIONS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

INTERIOR PARTITIONS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


C1020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

INTERIOR DOORS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

INTERIOR DOORS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-C10 Interior Construct.

21 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: C10 Interior Construction


MATERIAL Uniformat II WBS Code
C1030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code FITTINGS Description Description Description Description Description Description Description Description

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

FITTINGS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-C10 Interior Construct.

22 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: C10 Interior Construction


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: C10 Interior Construction


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

C10

Interior Construction

Unit

$0

182609235.xlsx.ms_office, Item 1-C10 Interior Construct.

23 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: C20 Stairs


MATERIAL Uniformat II WBS Code
C2010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

STAIR CONSTRUCTION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

STAIR CONSTRUCTION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


C2020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

STAIR FINISHES Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

STAIR FINISHES

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-C20 Stairs

24 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: C20 Stairs


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-C20 Stairs

25 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: C20 Stairs


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: C20 Stairs


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

C20

Stairs

Unit

$0

182609235.xlsx.ms_office, Item 1-C20 Stairs

26 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: C30 Interior Finishes


MATERIAL Uniformat II WBS Code
C3010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

EQUIPMENT Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost

WALL FINISHES Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

WALL FINISHES

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


C3020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

FLOOR FINISHES Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

FLOOR FINISHES

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-C30 Interior Finishes

27 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: C30 Interior Finishes


MATERIAL Uniformat II WBS Code
C3030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

CEILING FINISHES Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

CEILING FINISHES

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-C30 Interior Finishes

28 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: C30 Interior Finishes


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: C30 Interior Finishes


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

C30

Interior Finishes

Unit

$0

182609235.xlsx.ms_office, Item 1-C30 Interior Finishes

29 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D10 Conveying Systems


MATERIAL Uniformat II WBS Code
D1010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code ELEVATORS Description Description Description Description Description Description Description Description

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

ELEVATORS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


D1020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

ESCALATORS & MOVING WALKS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

ESCALATORS & MOVING WALKS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-D10 Conveying Systems

30 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D10 Conveying Systems


MATERIAL Uniformat II WBS Code
D1030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

MATERIAL HANDLING SYSTEMS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

MATERIAL HANDLING SYSTEMS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


D1090 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

OTHER CONVEYING SYSTEMS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

OTHER CONVEYING SYSTEMS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-D10 Conveying Systems

31 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D10 Conveying Systems


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: D10 Conveying Systems


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

D10

Conveying Systems

Unit

$0

182609235.xlsx.ms_office, Item 1-D10 Conveying Systems

32 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D20 Plumbing Systems


MATERIAL Uniformat II WBS Code
D2010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

PLUMBING FIXTURES Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

PLUMBING FIXTURES

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


D2020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

DOMESTIC WATER DISTRIBUTION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

DOMESTIC WATER DISTRIBUTION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-D20 Plumbing

33 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D20 Plumbing Systems


MATERIAL Uniformat II WBS Code
D2030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SANITARY WASTE Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SANITARY WASTE

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


D2040 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

RAIN WATER DRAINAGE Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

RAIN WATER DRAINAGE

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-D20 Plumbing

34 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D20 Plumbing Systems


MATERIAL Uniformat II WBS Code
D2050 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SPECIAL PLUMBING SYSTEMS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SPECIAL PLUMBING SYSTEMS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


D2090 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

OTHER PLUMBING SYSTEMS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

OTHER PLUMBING SYSTEMS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: D20 Plumbing Systems


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

D20

Plumbing Systems

Unit

$0

182609235.xlsx.ms_office, Item 1-D20 Plumbing

35 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D30 HVAC


MATERIAL Uniformat II WBS Code
D3010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

ENERGY SUPPLY Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

ENERGY SUPPLY

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


D3020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

HEAT GENERATING SYSTEMS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

HEAT GENERATING SYSTEMS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-D30 HVAC

36 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D30 HVAC


MATERIAL Uniformat II WBS Code
D3030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

COOLING GENERATING SYSTEMS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

COOLING GENERATING SYSTEMS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


D3040 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

DISTRIBUTION SYSTEMS (HVAC) Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

DISTRIBUTION SYSTEMS (HVAC)

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-D30 HVAC

37 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D30 HVAC


MATERIAL Uniformat II WBS Code
D3050 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

TERMINAL & PACKAGE UNITS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

TERMINAL & PACKAGE UNITS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


G3060 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

CONTROLS & INSTRUMENTATION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

CONTROLS & INSTRUMENTATION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-D30 HVAC

38 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D30 HVAC

Total Cost:

$0

MATERIAL Uniformat II WBS Code


G3070 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SPECIAL HVAC SYSTEMS & EQUIPMENT Description Description Description Description Description Description Description Description SPECIAL HVAC SYSTEMS &

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

EQUIPMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


G3080 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SYSTEM TESTING & BALANCING Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SYSTEM TESTING & BALANCING

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-D30 HVAC

39 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D30 HVAC


MATERIAL Uniformat II WBS Code
G3090 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

OTHER HVAC SYSTEMS & EQUIPMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

OTHER HVAC SYSTEMS & EQUIPMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: D30 HVAC


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit Total Material Cost LABOR Labor Cost/Unit Total Labor Cost EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit Total Cost

D30

HVAC

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-D30 HVAC

40 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D40 Fire Protection


MATERIAL Uniformat II WBS Code
D4010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

FIRE PROTECTION SPRINKLERS SYSTEMS Description Description Description Description Description Description Description Description FIRE PROTECTION SPRINKLERS

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SYSTEMS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


D4020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

STANDPIPE & HOSE SYSTEMS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

STANDPIPE & HOSE SYSTEMS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-D40 Fire Protection

41 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D40 Fire Protection


MATERIAL Uniformat II WBS Code
D4030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

FIRE PROTECTION SPECIALTIES Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

FIRE PROTECTION SPECIALTIES

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


D4090 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

OTHER FIRE PROTECTION SYSTEMS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

OTHER FIRE PROTECTION SYSTEMS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-D40 Fire Protection

42 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D40 Fire Protection


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: D40 Fire Protection


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

D40

Fire Protection

Unit

$0

182609235.xlsx.ms_office, Item 1-D40 Fire Protection

43 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D50 Electrical


MATERIAL Uniformat II WBS Code
D5010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

ELECTRICAL SERVICE & DISTRIBUTION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

ELECTRICAL SERVICE & DISTRIBUTION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


D5020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

LIGHTING & BRANCH WIRING Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

LIGHTING & BRANCH WIRING

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-D50 Electrical

44 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D50 Electrical


MATERIAL Uniformat II WBS Code
D5030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

COMMUNICATIONS & SECURITY Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

COMMUNICATIONS & SECURITY

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


D5040 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SPECIAL ELECTRICAL SYSTEMS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SPECIAL ELECTRICAL SYSTEMS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-D50 Electrical

45 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: D50 Electrical


MATERIAL Uniformat II WBS Code
D5090 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

OTHER ELECTRICAL SYSTEMS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

OTHER ELECTRICAL SYSTEMS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: D50 Electrical


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

D50

Electrical

Unit

$0

182609235.xlsx.ms_office, Item 1-D50 Electrical

46 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: E10 Equipment


MATERIAL Uniformat II WBS Code
E1010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

COMMERCIAL EQUIPMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

COMMERCIAL EQUIPMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


E1020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

INSTITUTIONAL EQUIPMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

INSTITUTIONAL EQUIPMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-E10 Equipment

47 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: E10 Equipment


MATERIAL Uniformat II WBS Code
E1030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

VEHICULAR EQUIPMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

VEHICULAR EQUIPMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


E1090 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

OTHER EQUIPMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

OTHER EQUIPMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-E10 Equipment

48 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: E10 Equipment


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: E10 Equipment


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

E10

Equipment

Unit

$0

182609235.xlsx.ms_office, Item 1-E10 Equipment

49 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: E20 Furnishings


MATERIAL Uniformat II WBS Code
E2010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

EQUIPMENT Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost

FIXED FURNISHINGS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

FIXED FURNISHINGS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


E2020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

MOVABLE FURNISHINGS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

MOVABLE FURNISHINGS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-E20 Furnishings

50 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: E20 Furnishings


MATERIAL Uniformat II WBS Code
E2090 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

OTHER FURNISHINGS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

OTHER FURNISHINGS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-E20 Furnishings

51 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: E20 Furnishings


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: E20 Furnishings


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

E20

Furnishings

Unit

$0

182609235.xlsx.ms_office, Item 1-E20 Furnishings

52 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: F10 Special Construction


MATERIAL Uniformat II WBS Code
F1010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SPECIAL STRUCTURES Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SPECIAL STRUCTURES

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


F1020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

INTEGRATED CONSTRUCTION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

INTEGRATED CONSTRUCTION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-F10 Special Construction

53 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: F10 Special Construction


MATERIAL Uniformat II WBS Code
F1030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SPECIAL CONSTRUCTION SYSTEMS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SPECIAL CONSTRUCTION SYSTEMS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


F1040 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SPECIAL FACILITIES Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SPECIAL FACILITIES

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-F10 Special Construction

54 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: F10 Special Construction


MATERIAL Uniformat II WBS Code
F1050 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SPECIAL CONTROLS & INSTRUMENTATION Description Description Description Description Description Description Description Description SPECIAL CONTROLS &

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

INSTRUMENTATION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: F10 Special Construction


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

F10

Special Construction

Unit

$0

182609235.xlsx.ms_office, Item 1-F10 Special Construction

55 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: F20 Selective Building Demolition


MATERIAL Uniformat II WBS Code
F2010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BUILDING ELEMENTS DEMOLITION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BUILDING ELEMENTS DEMOLITION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


F2020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

HAZARDOUS COMPONENTS ABATEMENT Description Description Description Description Description Description Description Description HAZARDOUS COMPONENTS

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

ABATEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-F20 Selective Demo.

56 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: F20 Selective Building Demolition


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-F20 Selective Demo.

57 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: F20 Selective Building Demolition


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: F20 Selective Building Demolition


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

F20

Selective Building Demolition

Unit

$0

182609235.xlsx.ms_office, Item 1-F20 Selective Demo.

58 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G10 Site Preparation


MATERIAL Uniformat II WBS Code
G1010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code SITE CLEARING Description Description Description Description Description Description Description Description

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SITE CLEARING

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


G1020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SITE DEMOLITION & RELOCATIONS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SITE DEMOLITION & RELOCATIONS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-G10 Site Preparation

59 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G10 Site Preparation


MATERIAL Uniformat II WBS Code
G1030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SITE EARTHWORK Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SITE EARTHWORK

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


G1040 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

HAZARDOUS WASTE REMEDIATION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

HAZARDOUS WASTE REMEDIATION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-G10 Site Preparation

60 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G10 Site Preparation


MATERIAL Uniformat II WBS Code
G1090 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

OTHER SITE PREPARATION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

OTHER SITE PREPARATION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: G10 Site Preparation


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

G10

Site Preparation

Unit

$0

182609235.xlsx.ms_office, Item 1-G10 Site Preparation

61 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G20 Site Improvements


MATERIAL Uniformat II WBS Code
G2010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code ROADWAYS Description Description Description Description Description Description Description Description

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

ROADWAYS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


G2020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code PARKING LOTS Description Description Description Description Description Description Description Description

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

PARKING LOTS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-G20 Site Improvements

62 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G20 Site Improvements


MATERIAL Uniformat II WBS Code
G2030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

PEDESTRIAN PAVING Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

PEDESTRIAN PAVING

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


G2040 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SITE DEVELOPMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SITE DEVELOPMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-G20 Site Improvements

63 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G20 Site Improvements


MATERIAL Uniformat II WBS Code
G2050 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code LANDSCAPING Description Description Description Description Description Description Description Description

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

LANDSCAPING

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


G2060 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SITE FURNISHINGS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SITE FURNISHINGS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: G20 Site Improvements


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0!
64 of 83

LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0

Total Material Cost $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0

TOTALS Total Cost/Unit #DIV/0! Total Cost

G20

Site Improvements

Unit

$0

182609235.xlsx.ms_office, Item 1-G20 Site Improvements

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G30 Site Mechanical Utilities


MATERIAL Uniformat II WBS Code
G3010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

WATER SUPPLY Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

WATER SUPPLY

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


G3020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SANITARY SEWER Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SANITARY SEWER

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-G30 Site Mechanical

65 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G30 Site Mechanical Utilities


MATERIAL Uniformat II WBS Code
G3030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code STORM SEWER Description Description Description Description Description Description Description Description

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

STORM SEWER

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


G3040 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

HEATING DISTRIBUTION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

HEATING DISTRIBUTION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-G30 Site Mechanical

66 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G30 Site Mechanical Utilities


MATERIAL Uniformat II WBS Code
G3050 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

COOLING DISTRIBUTION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

COOLING DISTRIBUTION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


G3060 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

FUEL DISTRIBUTION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

FUEL DISTRIBUTION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-G30 Site Mechanical

67 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G30 Site Mechanical Utilities

Total Cost:

$0

MATERIAL Uniformat II WBS Code


G3090 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

OTHER SITE MECHANICAL UTILITIES Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

OTHER SITE MECHANICAL UTILITIES

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: G30 Site Mechanical Utilities


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit Total Material Cost LABOR Labor Cost/Unit Total Labor Cost EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit Total Cost

G30

Site Mechanical Utilities

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-G30 Site Mechanical

68 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G40 Site Electrical Utilities


MATERIAL Uniformat II WBS Code
G4010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

ELECTRICAL DISTRIBUTION Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

ELECTRICAL DISTRIBUTION

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


G4020 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code SITE LIGHTING Description Description Description Description Description Description Description Description

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SITE LIGHTING

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-G40 Site Electrical

69 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G40 Site Electrical Utilities


MATERIAL Uniformat II WBS Code
G4030 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SITE COMMUNICATIONS & SECURITY Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SITE COMMUNICATIONS & SECURITY

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


G4090 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

OTHER SITE ELECTRICAL UTILITIES Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

OTHER SITE ELECTRICAL UTILITIES

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-G40 Site Electrical

70 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G40 Site Electrical Utilities


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: G40 Site Electrical Utilities


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0!
71 of 83

LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0

Total Material Cost $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0

TOTALS Total Cost/Unit #DIV/0! Total Cost

G40

Site Electrical Utilities

Unit

$0

182609235.xlsx.ms_office, Item 1-G40 Site Electrical

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G50 Other Site Construction


MATERIAL Uniformat II WBS Code
G5010 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

SERVICE & PEDESTRIAN TUNNELS Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

SERVICE & PEDESTRIAN TUNNELS

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


G5090 MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

OTHER SITE SYSTEMS & EQUIPMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

OTHER SITE SYSTEMS & EQUIPMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-G50 Other Site Const.

72 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G50 Other Site Construction


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-G50 Other Site Const.

73 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: G50 Other Site Construction


MATERIAL Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: G50 Other Site Construction


MATERIAL Uniformat II WBS Code Description Quantity Unit Material Cost/Unit #DIV/0!
74 of 83

LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0

Total Material Cost $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0

TOTALS Total Cost/Unit #DIV/0! Total Cost

G50

Other Site Construction

Unit

$0

182609235.xlsx.ms_office, Item 1-G50 Other Site Const.

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: XX
Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Special Use - 1
MATERIAL Description Quantity Unit Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-Special Use 1

75 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: XX
Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Special Use - 1
MATERIAL Description Quantity Unit Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-Special Use 1

76 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: XX
Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Special Use - 1
MATERIAL Description Quantity Unit Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

Equipment Cost/Unit
$ $ $ $ $ $ $ $ -

EQUIPMENT Total Equipment Cost


$0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: XX
Uniformat II WBS Code

Special Use - 1
MATERIAL Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

XX

Special Use - 1

Unit

$0

182609235.xlsx.ms_office, Item 1-Special Use 1

77 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: XX
Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Special Use - 2
MATERIAL Description Quantity Unit Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-Special Use 2

78 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: XX
Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Special Use - 2
MATERIAL Description Quantity Unit Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1-Special Use 2

79 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: XX
Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Special Use - 2
MATERIAL Description Quantity Unit Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: XX
Uniformat II WBS Code

Special Use - 2
MATERIAL Description Quantity Unit Material Cost/Unit #DIV/0! Total Material Cost $0 LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0 EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0 TOTALS Total Cost/Unit #DIV/0! Total Cost

XX

Special Use - 2

Unit

$0

182609235.xlsx.ms_office, Item 1-Special Use 2

80 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: XX
Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Special Use - 3
MATERIAL Description Quantity Unit Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1 -Special Use 3

81 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: XX
Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Special Use - 3
MATERIAL Description Quantity Unit Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

182609235.xlsx.ms_office, Item 1 -Special Use 3

82 of 83

10/23/2013 8:54 AM

United States Department of the Interior National Park Service

Class A Construction Cost Estimate

LINE ITEM COST SUMMARY


Project: Park: Park Alpha: PMIS: Project Name Park Name Park Alpha Code TBD or PMIS number if known Estimate By: Estimator Name Date: Estimate Date
Reviewed By: Date:

Summary Item: XX
Uniformat II WBS Code
BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

Special Use - 3
MATERIAL Description Quantity Unit Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Cost:
LABOR Labor Cost/Unit
$ $ $ $ $ $ $ $ -

$0

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

MATERIAL Uniformat II WBS Code


BASE CODE MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code MF-2004 Code

LABOR Labor Cost/Unit


$ $ $ $ $ $ $ $ -

Description

Quantity

Unit

Material Cost/Unit
$ $ $ $ $ $ $ $ -

Total Material Cost


$0 $0 $0 $0 $0 $0 $0 $0

Total Labor Cost


$0 $0 $0 $0 $0 $0 $0 $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost


$ $ $ $ $ $ $ $ $0 $0 $0 $0 $0 $0 $0 $0

TOTALS Total Cost/Unit


$ $ $ $ $ $ $ $ -

Total Cost

BASE ELEMENT Description Description Description Description Description Description Description Description

0 0 0 0 0 0 0 0

Unit Unit Unit Unit Unit Unit Unit Unit

$0 $0 $0 $0 $0 $0 $0 $0

SUBTOTAL

BASE ELEMENT

Unit

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

#DIV/0!

$0

Summary Item: XX
Uniformat II WBS Code

Special Use - 3
MATERIAL Description Quantity Unit Material Cost/Unit #DIV/0!
83 of 83

LABOR Labor Cost/Unit #DIV/0! Total Labor Cost $0

Total Material Cost $0

EQUIPMENT Total Equipment Equipment Cost/Unit Cost #DIV/0! $0

TOTALS Total Cost/Unit #DIV/0! Total Cost

XX

Special Use - 3

Unit

$0

182609235.xlsx.ms_office, Item 1 -Special Use 3

10/23/2013 8:54 AM