(Rev0)
PTP
PTP History
n n n n
Established in 2004 Partners all with ABB background Total staff of 22 persons, with annual turnover of >3 mUSD (2012) Two major Divisions:
n
n n
Power Technology Pyramids (PJSC) - 2 2011 PTP. All rights reserved. (Rev0)
Substation Automation and Protection Power Plant applications Representation of European OEMs for supply of equipment e.g. Instruments, Controllers, Valves, compressors, etc.
PTP
Power Technology Pyramids (PJSC) - 3 2011 PTP. All rights reserved. (Rev0)
PTP
n n
Power Technology Pyramids (PJSC) - 4 2011 PTP. All rights reserved. (Rev0)
PTP
Outstanding References - 2
n
n
230kV, 400kV: 7 substations (2 according to IEC 61850) 132kV, 63kV: 3 substations (1 according to IEC 61850) 4 nos. 132kV substations (based on IEC 61850 using RTU560 HMI, 3 stations in Iran and 1 in Iraq) System design and Integration (Database, schematics, settings, etc.) Supply of material (Bay level & Station level) FAT, SAT, Training and After Sales Services
Own projects:
n
PTP scope:
n n n
Power Technology Pyramids (PJSC) - 5 2011 PTP. All rights reserved. (Rev0)
PTP
Outstanding References - 3
n
n
Hydro Electric: 8x 250MW, 8x 100MW, 3x 170MW, 4x 30MW, Steam Turbines: 1x 500MW, 3x 370MW Steam Turbines: 1x 370MW
n n n
Power Technology Pyramids (PJSC) - 6 2011 PTP. All rights reserved. (Rev0)
PTP
Our strengths:
n n n
Good reputation amongst Iranian customers/consultants Long term partnership with reputable European suppliers Trusted by consulting firms and larger contractors as an independent and reliable source of information and specialized engineering services Well-trained experts, locally available technical know-how and After Sales Services Efficient and Focused engineering applications
n n
Power Technology Pyramids (PJSC) - 7 2011 PTP. All rights reserved. (Rev0)
PTP
Power Technology Pyramids (PJSC) - 8 2011 PTP. All rights reserved. (Rev0)
PTP
Power Technology Pyramids (PJSC) - 9 2011 PTP. All rights reserved. (Rev0)
PTP