Anda di halaman 1dari 36

Project Name Here:

Project Workbook Information


The project workbook allows project managers, team members, sponsors, and stakeholders to easily track and monitor project activities. It acts as a repository of key project information. Any of these worksheets can easily be broken out into separate documents or be modified to fit your particular needs. Use this information to support your status reports.

Suggested Sheets for All Projects


Data Minicharter Budget CBA Risks Filling out the Data sheet completes the header portion of all remaining sheets in the project workbook. The Project Minicharter sheet can be used as a charter for small projects or a summarization of a full charter for larger projects. The Budget sheet allows you to track original budget, expenditures to date, and any cost variance. This section can be substituted with other Excel budget planning and tracking financial sheets The Cost/Benefit Analysis sheet allows you to review the proposed project and potential alternatives and make a project selection based on a greater ROI (return on investment). The Risk Register allows you to identify, qualify, quantify, and prioritize risks (events that might happen; the uncertainty of a project), create mitigation and contingency plans, and assign risks owners. The Daily Defects Log is based on Daily Defects e-mails, and posting to Share Point, by the Jordan QA Team. These defects are to be reviewed by the Technical Project Lead, with copies to the Sponsor, DB Services, Systems Engineering The Issues Log sheet allows you to identify and monitor project issues (unplanned events that have happened). The Action Items sheet allows you to track and monitor action items assigned to team members. Action items are tasks that must be done but are too insignificant from a time perspective to track in your project schedule. The Deliverable Milestones sheet allows you to identify major deliverable milestones and the due dates, objectives, assumptions, and constraints relevant to that deliverable milestone. The Work Breakdown Structure sheet includes the activities that must be completed during a project, the effort required, all relevant dates, and the resources assigned to do the work. The Roster sheet provides contact information for all those involved on the project. The Roles and Responsibilities sheet shows the primary role of team members, any deliverables in which they are involved, and the percentage of time they are expected to work on the project. The Resource Assignment Matrix sheet shows you what type of resource is responsible for, or somehow involved with, each deliverable. The tasks listed are samples; you should update the RAM with tasks appropriate for your project. The Assumptions and Constraints sheet allows you to track project assumptions and constraints. The Decision Log sheet allows you to track all major decisions made during the course of the project. The Communication Plan sheet allows you to detail your communication plan: how you are going to communicate, whom you will be communicating with, how often, in what format, etc. The Stakeholder Analysis sheet allows you to identify stakeholders, their role, and their requirements. The Expectations sheet allows you to identify and track the expectations of various stakeholders. The Project Change Control Log sheet allows you to track all change requests that are in process or finalized. The Deliverable Acceptance Log sheet allows you to track the status of deliverable acceptances. The Man Power Effort sheet allows you to estimate/plan man power hours of your entire team by group, by specific Phase and by month. It can be used to track both plan man hours and actuals. The Project Quality Metrics sheet allows you to identify critical success criteria, related quality metrics, and their priority. In accordance with the Quality Plan, the types of QA testing required for the project

Defects Log Issues Action Miles WBS Roster R&R RAM A&C Decision Comm Stake Expectations Project Change Control Log Deliver Man Power Effort Qual Metrics IT/ QA Testing

Page 1 of 36

Project Project # Project Manager Sponsor Project artifacts Last updated Project Acctg Code

Project title here Project # here Project manager name here Sponsor name here Location of project documents here Date of update here 123456789

Page 2 of 36

Project Minicharter
Project Project Manager Project artifacts Project Acctg Code Background Project title here Project manager name here Location of project documents here 123456789 Project # Sponsor Updated

Business need and business benefits

Objectives

High Level Project Approach


(provided by Technical Lead(s), and use Deliverable Acceptance Document (DAD) Process for sign-off

Scope

In Scope

Out of Scope

Deliverables

Deliverable

Due Date

Flexibility matrix

Scope Schedule
Page 3 of 36

Flexibility matrix

Project Minicharter
Cost Key considerations Assumptions & Constraints Category Risks

Success criteria

12345-

Signatures Sponsor Signature Printed name Date

Project Manager Signature Printed name Date

Page 4 of 36

Project Minicharter
Project # here Sponsor name here Date of update here

Out of Scope

Due Date

Page 5 of 36

Project Minicharter
Risks Risk Description

Page 6 of 36

Budget
Project Project Manager Project artifacts Project Acctg Code Project title here Project manager name here Location of project documents here 123456789 Project # Project # here Sponsor Sponsor name here Updated Date of update here

Budget Status
Approved Budget

$0.00

Planned Expenditures to Date $0.00 Planned Remaining Budget $0.00

Actual Expenditures to Date $0.00 Actual Remaining Budget $0.00

Variance $0.00 Variance $0.00

Additional $ needed

Budget Details
Internal Expenses Salaries Type of resource Type of resource Type of resource Type of resource Type of resource Type of resource Other Internal Expenses Type of expense Type of expense Type of expense Total Internal Expenses External Expenses Consulting Costs Type of consulting Type of consulting Type of consulting Capital Expenditures Type of expense Type of expense Type of expense Total External Expenses Hourly Rate $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 # Hours 0.00 0.00 0.00 0.00 0.00 0.00 Total Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Cost $0.00 $0.00 $0.00

$0.00
Total Cost $0.00 $0.00 $0.00 Total Cost $0.00 $0.00 $0.00

Total Budget

$0.00 $0.00

Page 7 of 36

Cost/Benefit Analysis
Project Project Manager Project artifacts Project Acctg Code Project title here Project manager name here Location of project documents here 123456789 Project # Sponsor Updated Project # here Sponsor name here Date of update here

Project Development and Maintenance Costs


Description Cost of Project Development Salaries Other internal expenses Consulting costs Capital expenditures Total project costs Cost of Support Operational costs Nonrecurring costs Recurring costs Total ongoing support costs FY01 FY02 FY03 FY04 FY05 Total

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00

$0.00 Benefits/Savings

$0.00

$0.00

$0.00

$0.00

Current Process Total annual price New Process Total annual price Annual savings Cumulative savings Cumulative costs Cumulative total net savings

FY01

FY02

FY03

FY04

FY05

Total

$0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00

Future Value
Present Value Interest Rate # Periods Future Value $0.00

Present Value
Future Value $0.00 Interest Rate # Periods Present Value $0.00

Net Present Value


Period 1 2 3 4 5 Totals Project development cost Net present value Cash Flow Present Value

$0.00

$0.00 $0.00 $0.00

Page 8 of 36

Risk Register Project Project Manager Project artifacts Project Acctg Code Project title here Project manager name here Location of project documents here 123456789 Project # Sponsor Updated Project # here Sponsor name here Date of update here

Importance

ID

WBS

Risk Description

Probability

Impact

Detectability

Risk Category

Trigger Event/Indicator

Risk Response

Contingency Plan

Owner

Priority (Risk Rank)

Status

Date Entered

Date to Review

Map related risk back to WBS What is this risk? 1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Probability: 4: Highly likely (76%-100%) 3:Likely (51%-75%) 2: Somewhat likely (26%-50%) 1: Unlikely (0%-25%)

Detectability: 4: Determined after impact has been realized 3: Realized upon trigger event Impact 2: Immediately prior to trigger event; 4: Critical can be mitigated prior to trigger if 3: Severe monitored 1: 2: Moderate Determined well in advance of 1: Minimal occurance or trigger event 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Categories: Technical/ Quality Project Mgt Resource Schedule External

What act or event initiates either the risk occurrence or precipitates the response strategy?

Options are: Avoid Transfer Mitigate Accept

If the risk becomes a reality, what will you do in response, as a backup, or alternative/ workaround?

Who monitors this risk?

Risk Category Technical/Quality Project Mgt Resource Schedule External

Risk Response Avoid Transfer Mitigate Accept

Daily Defects Log


Project Project Manager Project artifacts Project Acctg Code Project title here Project manager name here Location of project documents here 123456789 Project # Sponsor Updated Project # here Sponsor name here Date of update here

No. 1 2 3 4 5 6 7 8 9 10

Date Identified

Defect ID

Summary

Defect Type

Project

Detected in Release

Date Resolved

Status/Comments

Issues Log
Project Project Manager Project artifacts Project Acctg Code Project title here Project manager name here Location of project documents here 123456789 Project # Sponsor Updated Project # here Sponsor name here Date of update here

ID

Issue Description

Project Impact

Action Plan/Resolution

Owner
Who manages this issue?

1 What is the issue?

How will this impact scope, schedule & How do you intend to deal with this cost? issue?

10

11

12

13

14

15

Page 12 of 36

Date Resolved

Date Entered

Importance

Date to Review

Action Items
Project Project Manager Project artifacts Project Acctg Code

Project title here Project manager name here Location of project documents here 123456789
Date Entered

Project # Sponsor Updated

Project # here Sponsor name here Date of update here

Planned Completion

ID

Action Item

Owner
Who manages this issue?

Status

Actual Completion

Comments

1 What is the item to be completed? 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Page 13 of 36

Deliverable Milestones
Project Project Manager Project artifacts Project Acctg Code
Project title here Project manager name here Location of project documents here 123456789

Project # Sponsor Updated

Project # here Sponsor name here Date of update here

ID
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Milestone

Description

Planned Actual Completion Completion

Objectives

Assumptions

Page 14 of 36

Deliverable Milestones
Project # here Sponsor name here Date of update here

Constraints

Page 15 of 36

Work Breakdown Structure


Project Project Manager Project artifacts Project Acctg Code Project title here Project manager name here Location of project documents here 123456789 Project # Sponsor Updated Project # here Sponsor name here Date of update here

Dependencies

ID
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Task

Effort Hours or Man Status Weeks

Cost

Start Date

Planned Completion

Estimate to Completion

Resource

ID # of task

Note: Suggest using Microsoft Project, Visio and other WBS software to replace this form

Page 16 of 36

Project/Governace Organizational Chart


Project Project Manager Project artifacts Project Acctg Code

Project title here Project manager name here Location of project documents here 123456789

Project # Sponsor Updated

Project # here Sponsor name here

Roster
Project Project Manager Project artifacts Project Acctg Code

Project title here Project manager name here Location of project documents here 123456789

Project # Sponsor Updated

Project # here Sponsor name here Date of update here

Name

Core/ Extended Team

Title

Dept.

Phone
000.000.0000

Cell Phone
000.000.0000

E-Mail

Project Role

Page 18 of 36

Roles and Responsibilities


Project Project Manager Project artifacts Project Acctg Code

Project title here Project manager name here Location of project documents here 123456789

Project # Sponsor Updated

No. Name

Core/ Extended Team

% Assigned

Function/Title

Project Role

Page 19 of 36

Roles and Responsibilities


Project # here Sponsor name here Date of update here

Responsibility

Page 20 of 36

RASCI Chart
(Responsibility, Approver, Supportive, Consulive, Informed)
Project Project Manager Project artifacts Project Acctg Code Project # Sponsor Updated

Functional Roles
Business Project Sponsor Project Owner A I I I I I A I S I A A A C S A IT Project Owner C S C R R A R S IT Business Partner R C R S C C S I
Stakeholder Definitions:
Project Sponsor - Person funding the project Business Project Owner - Person who owns the implementation of the project or product for the business IT Project Owner - Person who owns the IT implementation of the project and the technical support of the final solution IT Business Partner - Person who liases between the business and IT. Business SME - Person who provides expertise in requirements gathering and overall expertise in the product or solution Business Project Manager - Person who coordinates the project deliverables from the business side. IT Project Manager - Person who coordinates the IT components of the project

Activity

Business Business SME Project Manager C I C C C I I S I I S S I C I S

Project Proposal Document Project Kick Off Meeting Business Requirements Document Functional Spec Document Vendor Recommendation Project Charter Financial Review & Approval Baseline Project Schedule
RASCI Definitions:

R - Responsibility. Owns the work, process, issues or resource to complete the activity A - Approver. Approves costs, scope and in some cases the timeline. It is assumed that the Approver has financial authority or prior financial approval. S - Supportive. Provides resources or can play a supporting role in implementation. C - Consulted. Has information and/or capability needed to complete the work. I - Informed. Must be notified on results, but does not need consultation.

Page 21 of 36

IT Project Manager I R I I I R S R

Business Project Owner - Person who owns the implementation of the project IT Project Owner - Person who owns the IT implementation of the project IT Business Partner - Person who liases between the business and IT. Business SME - Person who provides expertise in requirements gathering and Business Project Manager - Person who coordinates the project deliverables from IT Project Manager - Person who coordinates the IT components of the project

Page 22 of 36

Resource Assignment Matrix


Project Project Manager Project artifacts Project Acctg Code Project title here Project manager name here Location of project documents here 123456789 Project # Sponsor Updated Project # here Sponsor name here Date of update here

Data Staging Programmer

Tech Support Specialist

Tech/Security Architect

Business Project Lead

Business Sys. Analyst

Data Staging Designer

Business End Users

Business Sponsor

Appl'n Developer

Project Manager

Business Driver

Data Steward

Data Modeler

Project Task

Project Management and Requirements


* Base your Phase and task/deliverbales in this RAM on your project schedule Initiation 1 Develop preliminary project scope 2 Identify business need 3 Develop preliminary budget 4 Identify preliminary return on investment 5 Complete project charter Planning 1 Establish project identity 2 Identify project team/resources 3 Conduct stakeholder analysis 4 Prepare draft project schedule 5 Conduct project kickoff meeting 6 Gather detailed user requirements 7 Define current business processes (as is) 8 Revise project schedule 9 Develop project communication plan 10 Develop project organizational structure 11 Identify training plan 12 Develop project quality plan 13 Develop scope management plan 14 Develop risk management plan 15 Develop change management plan 16 Develop cost management plan 17 Develop schedule management plan 18 Develop technical specifications 19 Develop technical architecture 20 Conduct project procurement 21 Finalize project budget 22 Finalize return on investment 23 Ongoing project management Design 1 Specification Review 2 Detailed Project/Product Requirements Analysis 3 Design / Develop System 4 POC Design Test and Verification 5 Design Review, Final Phase Exit Review Implementation 1 Develop training materials 2 Execute communication plan 3 Develop software 4 Develop new business processes (to be) 5 Deploy new software 6 Conduct training Closure Page 23 of 36

QA Analyst

IS Sponsor

Educator

DBA

1 Get deliverable acceptance 2 Close out contracts 3 Finalize budget 4 Finalize return on investment 5 Conduct closure survey 6 Conduct/document lessons learned 7 Archive project

Legend Creates the deliverable Input required Reviews the deliverable Approves the deliverable Notified when the deliverable is complete Owns the deliverable upon completion

C1: primary creator; C2: contributor I R A N O

Page 24 of 36

Assumptions and Constraints


Project Project Manager Project artifacts Project Acctg Code
Project title here Project manager name here Location of project documents here 123456789

Project # Sponsor Updated

Project # here Sponsor name here Date of update here

ID
1 2 3 4 5 6 7 8 9 10

Description

Comments

Type

Status

Date Entered

Page 25 of 36

Decision Log
Project Project Manager Project artifacts Project Acctg Code
Project title here Project manager name here Location of project documents here 123456789

Project # Sponsor Updated

Project # here Sponsor name here Date of update here

ID
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Decision Description

Comments

Owner

Status

Date Entered

Page 26 of 36

Communication Plan
Project Project Manager Project artifacts Project Acctg Code
Project title here Project manager name here Location of project documents here 123456789

Project # Sponsor Updated

Project # here Sponsor name here Date of update here

ID

Communication

Description
What is the description of the contents/purpose of this communication?

Frequency

Format

Owner
Who sends?

Recipient/ Attendees
Who gets?

1 What type of communication is this? 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Page 27 of 36

Stakeholder Analysis
Project Project Manager Project Artifacts Project Acctg Code
Project title here Project manager name here Location of project documents here 123456789

Project # Project # here Sponsor Sponsor name here Updated Date of update here

ID
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Stakeholder

Role

Impact

Influence

Risk Tolerance

Needs

Responsibility

Page 28 of 36

Expectations
Project Project Manager Project artifacts Project Acctg Code ID
Project title here Project manager name here Location of project documents here 123456789

Project # Sponsor Updated

Project # here Sponsor name here Date of update here

Expectation Description

Source

Must Have

Want to Have

Nice to Have

Date Identified

Page 29 of 36

Project Change Control Log


Project Project Manager Project Artifacts Project Acctg Code
Project title here Project manager name here Location of project documents here 123456789

Project # Sponsor Updated

Project # here Sponsor name here Date of update here

Change Control #

Priority

Change Request Description

Requested By

Request Date

Deadline to Resolve

Impact of Sched (days)

Impact on Cost ($)

Evaluator

Status

Date of Decision

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Page 30 of 36

Project Change Control Log


Project # here Sponsor name here Date of update here

Comments

Page 31 of 36

Deliverable Acceptance Log


Project Project Manager Project artifacts Project Acctg Code
Project title here Project manager name here Location of project documents here 123456789

Project # Sponsor Updated

Project # here Sponsor name here Date of update here

ID
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Deliverable Description

Comments

Evaluator

Status

Date of Decision

Page 32 of 36

Man Power Estimate


Project Project Manager Project artifacts Project Acctg Code Name Effort Hours Spent Project title here Project manager name here Location of project documents here
123456789

Project # Sponsor Updated

Project # here Sponsor name here Date of update here

Resource
A B C plan act plan act plan act plan act plan act plan act plan act plan act plan act plan act plan act plan act plan act plan act plan act plan act plan act

Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 33 of 36

Man Power Estimate


Project Project Manager Project artifacts Project Acctg Code Name Effort Hours Spent Project title here Project manager name here Location of project documents here
123456789

Project # Sponsor Updated

Project # here Sponsor name here Date of update here

Resource
plan act plan act plan act plan act plan act plan act plan act plan act plan act TOTAL plan act

Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

Page 34 of 36

Project Quality Metrics


Project Project Manager Project Artifacts Project Acctg Code Project title here Project manager name here Location of project documents here 123456789 Project # Sponsor Updated Project # here Sponsor name here Date of update here

ID

Critical Success Criteria

Potential Quality Metric

Priority

Metric Target

Action Plan

Page 35 of 36

IT/QA Testing Requirements Matrix


Project Project Manager Project artifacts Project Acctg Code Project title here Project manager name here Location of project documents here 123456789 Project # Sponsor Updated Project # here Sponsor name here Date of update here

The release contains the following features: 1 2 3 4 5 IMPORTANT: Test Requirements Are to Be Advised By Project Engineering Lead Business Project Lead QA Department Head

Business Sponsor

Systems Engineer

Storage Engineer

Required (Y or N)

Appl'n Developer

QA Project Lead

Project Manager

Business Driver

Testing Type

Quality Testing Requirements


QA Round 1 1 Security 2 Operational Issues 3 Baseline Development 4 Initial fail over testing 5 QA Round 2 1 Load Testing 2 Performance Testing 3 3rd Party Connectivity 4 Orchestration (internal system interfaces) 5 Validate fail over 6 Run Book review (internal system interfaces) 7 Product Support Issues (check that logs do not fill up) 8 QA Round 3 Endurance (run at 75-80% capacity for 72 hours 1 minimum) 2 Security (external interfaces) 3 4 5 QA Round 4 1 2 3 4 5

Legend
Creates the deliverable Input required Reviews the deliverable Approves the deliverable Notified when the deliverable is complete Owns the deliverable upon completion C1: primary creator; C2: contributor I R A N O Page 36 of 36

QA Supervisor

Lead Engineer

Infrastructure

QA Manager

Architecture

IT Sponsor

DBA

Anda mungkin juga menyukai