Project No.

DESIGN CALCULATION
SHEET

Mechanical & Industrial Department

Date

E0328

4-Jun-2004

Sheet No.

Computed by
M.G.

Checked by
H.A.

Approved by
T.Z.

CAIRO - EGYPT
Subject Tertiary Chilled Water Pumps
Building Sharm El-Sheikh Airport New Terminal Building
MECHANICAL ROOM L46 K
Total chilled water required:

126.1 l/s

1998 gpm

42.0 l/s

666 gpm

For 3 pumps:

Pump Head Components


A- Pipe Losses
Dia

Length supply and


return

Flow

Eq.leng

Friction
Losses
losses
ft/100ft
ft
0.80
0.29

in
12.00

m
9.6

ft
31.50

ft
36.22

GPM
1999

L/s
126.10

8.00

4.0

13.12

15.09

1005

63.43

1.70

0.26

8.00

2.2

7.22

8.30

876

55.25

1.40

0.12

6.00

30.4

99.74

114.70

677

42.71

2.80

3.21

6.00

26.2

85.96

98.85

564

35.60

2.00

1.98

6.00

6.4

21.00

24.15

417

26.30

1.30

0.31

5.85 ft

Sub-Total-1

B- Accessories Losses

Pump
AHU

Friction
losses

Dia

Quantity

Eq.leng

Flow

no.
1.0
1.0
1.0
1.0

ft
7
170
60
7

gpm
666
666
666
666

ft/100ft

Gate Valve
Globe Valve
Check Valve
Gate Valve

in
6.00
6.00
6.00
6.00

Gate Valve
2-way Control Valve
Balancing Valve
Strainer
Coil

6.00
6.00
6.00
6.00
-

2.0
1.0
1.0
1.0
1.0

7
170
170
110

417
417
417
417
417

1.3
1.3
1.3
1.3

Item

2.80
2.80
2.80
2.80

Sub-Total-2
Sub Total
Sub Total
Total with 10% safety

Losses
ft
0.20
4.76
1.68
0.20
0.182
2.21
2.21
1.43
9.2
22.06

ft

28 ft
9 m
9 m

Project No.
DESIGN CALCULATION
SHEET

Mechanical & Industrial Department

Date

E0328

Sheet No.

Computed by
M.G.

Checked by
H.A.

Approved by
T.Z.

CAIRO - EGYPT
Subject Tertiary Chilled Water Pumps
Building Sharm El-Sheikh Airport New Terminal Building

4-Jun-2004

MECHANICAL ROOM L46 K


Total chilled water required:

126.1 l/s

1998 gpm

42.0 l/s

666 gpm

For 3 pumps:

Pump Head Components


A- Pipe Losses
Dia

Length supply and


return

in
12.00

m
4.8

ft
15.75

Flow

Eq.leng
ft
18.11

GPM
1999

L/s
126.10

Friction
Losses
losses
ft/100ft
ft
0.80
0.14

8.00

2.0

6.56

7.55

1005

63.43

1.70

0.13

3.00

38.0

124.67

143.37

130

8.18

3.80

5.45

2.50

13.0

42.65

49.05

77

4.86

4.50

2.21

2.50

23.0

75.46

86.78

65

4.09

3.30

2.86

2.50

19.4

63.65

73.20

57

3.58

2.50

1.83

1.50

27.2

89.24

102.62

21

1.30

3.20

3.28

1.25

27.8

91.21

104.89

15

0.96

3.80

3.99

1.25

2.0

6.56

7.55

14

0.89

3.30

0.25

1.25

3.6

11.81

13.58

13

0.84

2.80

0.38

1.25

3.0

9.84

11.32

11

0.69

2.20

0.25

1.25

6.2

20.34

23.39

10

0.64

1.80

0.42

1.25

6.0

19.69

22.64

0.59

1.60

0.36

1.25

1.0

3.28

3.77

0.54

1.60

0.06

1.00

4.8

15.75

18.11

0.38

2.50

0.45

1.00

1.6

5.25

6.04

0.33

1.80

0.11

0.75

14.6

47.90

55.09

0.21

2.50

1.38

0.75

5.6

18.37

21.13

0.14

1.30

0.27

0.75

15.2

49.87

57.35

0.07

0.50

0.29

24.11 ft

Sub-Total-1

B- Accessories Losses
Quantity

Eq.leng

Flow

Pump

no.
1.0
1.0
1.0
1.0

ft
7
170
60
7

gpm
666
666
666
666

ft/100ft

Gate Valve
Globe Valve
Check Valve
Gate Valve

in
6.00
6.00
6.00
6.00

Fan Coil Unit

Friction
losses

Dia

Gate Valve
2-way Control Valve
Balancing Valve
Globe Valve
Strainer
Coil

0.75
0.75
0.75
0.75
0.75
-

1.0
1.0
1.0
1.0
1.0
1.0

0.9
22
22
22
4

1.1
1.1
1.1
1.1
1.1
1.1

0.5
0.5
0.5
0.5
0.5

Item

2.80
2.80
2.80
2.80

Sub-Total-2
Sub Total
Sub Total
Total with 10% safety

Losses
ft
0.20
4.76
1.68
0.20
0.0045
0.11
0.11
0.11
0.02
2.1
9.29 ft

33 ft
10 m
11 m

* The friction loss in the line leading to the AHU with the largest pressure drop was calculated as 9 m.

Project No.
DESIGN CALCULATION
SHEET

Mechanical & Industrial Department

Date

E0328

4-Jun-2004

Sheet No.

Computed by
M.G.

Checked by
H.A.

Approved by
T.Z.

CAIRO - EGYPT
Subject Tertiary Chilled Water Pumps
Building Sharm El-Sheikh Airport New Terminal Building
MECHANICAL ROOM L112 K
Total chilled water required:

45.6 l/s

723 gpm

For 2 pumps:

22.8 l/s

361 gpm

Pump Head Components


A- Pipe Losses
Dia

Length supply and


return

Flow

Eq.leng

Friction
Losses
losses
ft/100ft
ft
0.90
0.22

in
8.00

m
6.4

ft
21.00

ft
24.15

GPM
723

L/s
45.60

6.00

19.6

64.30

73.95

673

42.44

2.90

2.14

6.00

16.8

55.12

63.39

491

30.99

1.70

1.08

6.00

21.2

69.55

79.99

489

30.88

1.70

1.36

6.00

21.2

69.55

79.99

420

26.49

1.20

0.96

6.00

19.6

64.30

73.95

418

26.38

1.20

0.89

6.00

5.2

17.06

19.62

263

16.62

0.50

0.10

6.00

10.0

32.81

37.73

262

16.51

0.50

0.19

6.65 ft

Sub-Total-1

B- Accessories Losses

Pump
AHU

Friction
losses

Dia

Quantity

Eq.leng

Flow

no.
1.0
1.0
1.0
1.0

ft
7
170
60
7

gpm
361
361
361
361

ft/100ft

Gate Valve
Globe Valve
Check Valve
Gate Valve

in
6.00
6.00
6.00
6.00

Gate Valve
2-way Control Valve
Balancing Valve
Strainer
Coil

6.00
6.00
6.00
6.00
-

1.0
1.0
1.0
1.0
1.0

7
170
170
110

262
262
262
262
262

0.5
0.5
0.5
0.5

Item

1.00
1.00
1.00
1.00

Sub-Total-2
Sub Total
Sub Total
Total with 10% safety

Losses
ft
0.07
1.70
0.60
0.07
0.035
0.85
0.85
0.55
5
9.73

ft

16 ft
5 m
5 m

Project No.
DESIGN CALCULATION
SHEET

Mechanical & Industrial Department

Date

E0328

Sheet No.

Computed by
M.G.

Checked by
H.A.

Approved by
T.Z.

CAIRO - EGYPT
Subject Tertiary Chilled Water Pumps
Building Sharm El-Sheikh Airport New Terminal Building

4-Jun-2004

MECHANICAL ROOM L112 K


Total chilled water required:

45.6 l/s

723 gpm

For 2 pumps:

22.8 l/s

361 gpm

Pump Head Components


A- Pipe Losses
Dia

Length supply and


return

Flow

Eq.leng

Friction
Losses
losses
ft/100ft
ft
0.90
0.11

in
8.00

m
3.2

ft
10.50

ft
12.07

GPM
723

L/s
45.60

6.00

9.8

32.15

36.98

673

42.44

2.90

1.07

6.00

8.4

27.56

31.69

491

30.99

1.70

0.54

6.00

10.6

34.78

39.99

489

30.88

1.70

0.68

6.00

10.6

34.78

39.99

420

26.49

1.20

0.48

6.00

9.8

32.15

36.98

418

26.38

1.20

0.44

4.00

12.2

40.03

46.03

155

9.76

1.30

0.60

2.50

34.0

111.55

128.28

52

3.27

2.10

2.69

2.00

7.2

23.62

27.17

45

2.85

3.80

1.03

2.00

6.6

21.65

24.90

39

2.43

3.20

0.80

2.00

6.0

19.69

22.64

32

2.01

2.10

0.48

1.50

22.0

72.18

83.01

19

1.17

2.90

2.41

1.25

1.4

4.72

5.43

13

0.80

2.70

0.15

1.25

6.0

19.69

22.64

11

0.69

2.10

0.48

1.25

5.6

18.37

21.13

0.58

1.70

0.36

1.00

1.0

3.28

3.77

0.47

3.50

0.13

1.00

6.0

19.69

22.64

0.36

2.50

0.57

0.75

1.5

4.86

5.58

0.25

4.00

0.22

0.75

4.4

14.44

16.60

0.18

2.50

0.42

0.75

11.8

38.71

44.52

0.07

0.35

0.16

13.80 ft

Sub-Total-1

B- Accessories Losses
Quantity

Eq.leng

Flow

Pump

no.
1.0
1.0
1.0
1.0

ft
7
170
60
7

gpm
361
361
361
361

ft/100ft

Gate Valve
Globe Valve
Check Valve
Gate Valve

in
6.00
6.00
6.00
6.00

Fan Coil Unit

Friction
losses

Dia

Gate Valve
2-way Control Valve
Balancing Valve
Globe Valve
Strainer
Coil

0.75
0.75
0.75
0.75
0.75
-

1.0
1.0
1.0
1.0
1.0
1.0

0.9
22
22
22
4

1.1
1.1
1.1
1.1
1.1
1.1

0.5
0.5
0.5
0.5
0.5

Item

1.00
1.00
1.00
1.00

Sub-Total-2
Sub Total
Sub Total
Total with 10% safety

Losses
ft
0.07
1.70
0.60
0.07
0.0045
0.11
0.11
0.11
0.02
2.1
4.89 ft

19 ft
6 m
6 m

* The friction loss in the line leading to the AHU with the largest pressure drop was calculated as 5 m.

Project No.
DESIGN CALCULATION
SHEET

Mechanical & Industrial Department

Date

E0328

4-Jun-2004

Sheet No.

Computed by
M.G.

Checked by
H.A.

Approved by
T.Z.

CAIRO - EGYPT
Subject Tertiary Chilled Water Pumps
Building Sharm El-Sheikh Airport New Terminal Building
MECHANICAL ROOM L01 K
Total chilled water required:

97.8 l/s

1551 gpm

For 2 pumps:

48.9 l/s

775 gpm

Pump Head Components


A- Pipe Losses
Dia

Length supply and


return

in
10.00

Flow

Eq.leng

Friction
Losses
losses
ft/100ft
ft
1.10
1.44

m
34.8

ft
114.17

ft
131.30

GPM
1551

L/s
97.83

10.00

4.0

13.12

15.09

1443

91.07

0.95

0.14

6.00

14.0

45.93

52.82

533

33.62

1.80

0.95

6.00

3.0

9.84

11.32

530

33.41

1.80

0.20

2.74 ft

Sub-Total-1

B- Accessories Losses

Pump
AHU

Friction
losses

Dia

Quantity

Eq.leng

Flow

no.
1.0
1.0
1.0
1.0

ft
9
220
80
9

gpm
775
775
775
775

ft/100ft

Gate Valve
Globe Valve
Check Valve
Gate Valve

in
8.00
8.00
8.00
8.00

Gate Valve
2-way Control Valve
Balancing Valve
Strainer
Coil

6.00
6.00
6.00
6.00
-

2.0
1.0
1.0
1.0
1.0

7
170
170
110

530
530
530
530
530

1.8
1.8
1.8
1.8

Item

1.00
1.00
1.00
1.00

Sub-Total-2
Sub Total
Sub Total
Total with 10% safety

* The friction loss in the line leading to the farthest FCU was calculated as 8 m.

Losses
ft
0.09
2.20
0.80
0.09
0.252
3.06
3.06
1.98
11.4
22.93

ft

26 ft
8 m
9 m

Project No.
DESIGN CALCULATION
SHEET

Mechanical & Industrial Department

Date

E0328

Sheet No.

Computed by
M.G.

Checked by
H.A.

Approved by
T.Z.

CAIRO - EGYPT
Subject Tertiary Chilled Water Pumps
Building Sharm El-Sheikh Airport New Terminal Building

4-Jun-2004

MECHANICAL ROOM L01 K


Total chilled water required:

97.8 l/s

1551 gpm

For 2 pumps:

48.9 l/s

775 gpm

Pump Head Components


A- Pipe Losses
Dia

Length supply and


return

in
10.00

m
17.4

10.00

2.0

8.00

7.8

8.00

16.0

8.00

Flow

Eq.leng

Friction
Losses
losses
ft/100ft
ft
1.10
0.72

ft
65.65

GPM
1551

L/s
97.83

6.56

7.55

1443

91.07

0.95

0.07

25.59

29.43

911

57.45

1.40

0.41

52.49

60.37

814

51.35

1.00

0.60

18.2

59.71

68.67

774

48.84

0.95

0.65

8.00

14.2

46.59

53.58

714

45.07

0.80

0.43

6.00

11.4

37.40

43.01

635

40.06

2.50

1.08

6.00

7.6

24.93

28.67

531

33.51

1.80

0.52

6.00

20.4

66.93

76.97

516

32.54

1.70

1.31

6.00

22.2

72.83

83.76

305

19.22

0.65

0.54

6.00

7.6

24.93

28.67

301

19.01

0.65

0.19

4.00

4.0

13.12

15.09

201

12.67

2.20

0.33

1.50

15.6

51.18

58.86

19

1.18

2.90

1.71

1.25

35.0

114.83

132.05

17

1.07

4.50

5.94

1.25

4.0

13.12

15.09

16

1.00

4.00

0.60

1.25

4.6

15.09

17.36

15

0.95

3.70

0.64

1.25

5.6

18.37

21.13

14

0.88

3.20

0.68

1.25

2.8

9.19

10.56

13

0.81

2.70

0.29

1.00

2.8

9.19

10.56

0.36

2.50

0.26

1.00

5.6

18.37

21.13

0.29

2.00

0.42

0.75

5.6

18.37

21.13

0.22

2.50

0.53

0.75

5.8

19.03

21.88

0.15

1.30

ft
57.09

B- Accessories Losses
Quantity

Eq.leng

Flow

Pump

no.
1.0
1.0
1.0
1.0

ft
9
220
80
9

gpm
775
775
775
775

ft/100ft

Gate Valve
Globe Valve
Check Valve
Gate Valve

in
8.00
8.00
8.00
8.00

Fan Coil Unit

Friction
losses

Dia

Gate Valve
2-way Control Valve
Balancing Valve
Globe Valve
Strainer
Coil

0.75
0.75
0.75
0.75
0.75
-

1.0
1.0
1.0
1.0
1.0
1.0

0.9
22
22
22
4

2.4
2.4
2.4
2.4
2.4
2.4

1.7
1.7
1.7
1.7
1.7

Item

0.28

18.21 ft

Sub-Total-1

1.00
1.00
1.00
1.00

Sub-Total-2
Sub Total
Sub Total
Total with 10% safety

Losses
ft
0.09
2.20
0.80
0.09
0.0153
0.374
0.374
0.374
0.068
1.6
5.99 ft

24 ft
7 m
8 m

Project No.
DESIGN CALCULATION
SHEET

Mechanical & Industrial Department

Date

E0328

4-Jun-2004

Sheet No.

Computed by
M.G.

Checked by
H.A.

Approved by
T.Z.

CAIRO - EGYPT
Subject Tertiary Chilled Water Pumps
Building Sharm El-Sheikh Airport New Terminal Building
MECHANICAL ROOM L80 K
Total chilled water required:

78.9 l/s

1251 gpm

For 2 pumps:

39.5 l/s

626 gpm

Pump Head Components


A- Pipe Losses
Dia

Length supply and


return

Flow

Eq.leng

Friction
Losses
losses
ft/100ft
ft
0.70
0.36

in
10.00

m
13.6

ft
44.62

ft
51.31

GPM
1251

L/s
78.93

8.00

9.8

32.15

36.98

721

45.48

0.90

0.33

8.00

7.8

25.59

29.43

719

45.37

0.90

0.26

6.00

4.0

13.12

15.09

553

34.87

2.00

0.30

6.00

2.0

6.56

7.55

502

31.65

1.80

0.14

1.39 ft

Sub-Total-1

B- Accessories Losses

Pump
AHU

Friction
losses

Dia

Quantity

Eq.leng

Flow

no.
1.0
1.0
1.0
1.0

ft
7
170
60
7

gpm
775
775
775
775

ft/100ft

Gate Valve
Globe Valve
Check Valve
Gate Valve

in
6.00
6.00
6.00
6.00

Gate Valve
2-way Control Valve
Balancing Valve
Strainer
Coil

6.00
6.00
6.00
6.00
-

1.0
1.0
1.0
1.0
1.0

7
170
170
110

502
502
502
502
502

1.8
1.8
1.8
1.8

Item

3.80
3.80
3.80
3.80

Sub-Total-2
Sub Total
Sub Total
Total with 10% safety

Losses
ft
0.27
6.46
2.28
0.27
0.126
3.06
3.06
1.98
10.7
28.20

ft

30 ft
9 m
10 m

Project No.
DESIGN CALCULATION
SHEET

Mechanical & Industrial Department

Date

E0328

Sheet No.

Computed by
M.G.

Checked by
H.A.

Approved by
T.Z.

CAIRO - EGYPT
Subject Tertiary Chilled Water Pumps
Building Sharm El-Sheikh Airport New Terminal Building

4-Jun-2004

MECHANICAL ROOM L80 K


Total chilled water required:

78.9 l/s

1251 gpm

For 2 pumps:

39.5 l/s

626 gpm

Pump Head Components


A- Pipe Losses
Dia

Length supply and


return

in
10.00

m
6.8

6.00

2.4

6.00

9.0

6.00

7.0

6.00

Flow

Eq.leng

Friction
Losses
losses
ft/100ft
ft
0.70
0.18

ft
25.66

GPM
1251

L/s
78.93

7.87

9.06

530

33.45

1.80

0.16

29.53

33.96

350

22.09

0.95

0.32

22.97

26.41

275

17.35

0.55

0.15

6.6

21.65

24.90

273

17.24

0.55

0.14

3.00

2.0

6.56

7.55

113

7.13

2.80

0.21

2.50

4.4

14.44

16.60

51

3.21

2.00

0.33

1.50

7.4

24.28

27.92

25

1.55

4.00

1.12

1.50

13.0

42.65

49.05

23

1.44

3.80

1.86

1.50

2.0

6.56

7.55

18

1.15

2.60

0.20

1.25

9.8

32.15

36.98

15

0.94

4.00

1.48

1.25

69.6

228.35

262.60

14

0.87

3.50

9.19

1.25

6.4

21.00

24.15

12

0.76

2.40

0.58

1.25

6.4

21.00

24.15

10

0.65

1.80

0.43

1.25

6.4

21.00

24.15

0.54

1.60

0.39

1.00

6.4

21.00

24.15

0.43

3.50

0.85

1.00

6.4

21.00

24.15

0.32

1.80

0.43

0.75

11.0

36.09

41.50

0.21

2.50

ft
22.31

1.04

19.06 ft

Sub-Total-1

B- Accessories Losses
Quantity

Eq.leng

Flow

Pump

no.
1.0
1.0
1.0
1.0

ft
7
170
60
7

gpm
775
775
775
775

ft/100ft

Gate Valve
Globe Valve
Check Valve
Gate Valve

in
6.00
6.00
6.00
6.00

Fan Coil Unit

Friction
losses

Dia

Gate Valve
2-way Control Valve
Balancing Valve
Globe Valve
Strainer
Coil

0.75
0.75
0.75
0.75
0.75
-

1.0
1.0
1.0
1.0
1.0
1.0

0.9
22
22
22
4

3.3
3.3
3.3
3.3
3.3
3.3

3
3
3
3
3

Item

3.80
3.80
3.80
3.80

Sub-Total-2
Sub Total
Sub Total
Total with 10% safety

Losses
ft
0.27
6.46
2.28
0.27
0.027
0.66
0.66
0.66
0.12
2
13.40

ft

32 ft
10 m
11 m

* The friction loss in the line leading to the AHU with the largest pressure drop was calculated as 10 m.

Project No.
DESIGN CALCULATION
SHEET

Mechanical & Industrial Department

Date

E0328

Sheet No.

Computed by
M.G.

Checked by
H.A.

Approved by
T.Z.

CAIRO - EGYPT
Subject Tertiary Chilled Water Pumps
Building Sharm El-Sheikh Airport New Terminal Building

4-Jun-2004

MECHANICAL ROOM L80 K


Total chilled water required:

78.9 l/s

1251 gpm

For 2 pumps:

39.5 l/s

626 gpm

Pump Head Components


A- Pipe Losses
Dia

Length supply and


return

in
10.00

m
6.8

6.00

2.4

6.00

9.0

6.00

7.0

6.00

Flow

Eq.leng

Friction
Losses
losses
ft/100ft
ft
0.70
0.18

ft
25.66

GPM
1251

L/s
78.93

7.87

9.06

530

33.45

1.80

0.16

29.53

33.96

350

22.09

0.95

0.32

22.97

26.41

275

17.35

0.55

0.15

6.6

21.65

24.90

273

17.24

0.55

0.14

3.00

2.0

6.56

7.55

113

7.13

2.80

0.21

2.50

4.4

14.44

16.60

51

3.21

2.00

0.33

2.00

21.6

70.87

81.50

26

1.66

1.70

1.39

1.50

2.6

8.53

9.81

24

1.54

3.90

0.38

1.25

7.2

23.62

27.17

14

0.86

3.50

0.95

1.25

34.4

112.86

129.79

13

0.79

3.00

3.89

1.25

9.0

29.53

33.96

11

0.72

2.00

0.68

1.25

2.0

6.56

7.55

10

0.65

1.80

0.14

1.25

6.8

22.31

25.66

0.56

1.60

0.41

1.25

4.2

13.78

15.85

0.51

1.20

0.19

1.00

2.2

7.22

8.30

0.46

3.50

0.29

1.00

3.4

11.15

12.83

0.41

2.50

0.32

1.00

4.0

13.12

15.09

0.36

2.50

0.38

0.75

8.0

26.25

30.18

0.21

2.50

0.75

0.75

4.6

15.09

17.36

0.14

1.30

0.23

0.75

17.0

55.77

64.14

0.07

0.40

ft
22.31

B- Accessories Losses

Pump
Fan Coil
Unit

Friction
losses

Dia

Quantity

Eq.leng

Flow

no.
1.0
1.0
1.0

ft
7
170
7

gpm
775
775
775

ft/100ft

Gate Valve
Globe Valve
Gate Valve

in
6.00
6.00
6.00

Gate Valve
2-way Control Valve
Globe Valve
Strainer
Coil

0.75
0.75
0.75
0.75
-

1.0
1.0
1.0
1.0
1.0

0.9
22
22
4

1.1
1.1
1.1
1.1
1.1

0.5
0.5
0.5
0.5

Item

0.26

10.51 ft

Sub-Total-1

3.80
3.80
3.80

Sub-Total-2
Sub Total
Sub Total
Total with 10% safety

Losses
ft
0.27
6.46
0.27
0.0045
0.11
0.11
0.02
2.1
9.34 ft

20 ft
6 m
7 m

Project No.
DESIGN CALCULATION
SHEET

Mechanical & Industrial Department

Date

E0328

Sheet No.

Computed by
M.G.

Checked by
H.A.

Approved by
T.Z.

CAIRO - EGYPT
Subject Tertiary Chilled Water Pumps
Building Sharm El-Sheikh Airport New Terminal Building

4-Jun-2004

MECHANICAL PLANT
Total chilled water required:

5.0 l/s

79 gpm

For 1 pumps:

5.0 l/s

79 gpm

Pump Head Components


A- Pipe Losses

Dia

Length supply and


return

Flow

Eq.leng

Friction
Losses
losses
ft/100ft
ft
4.70
0.53

in
2.50

m
3.0

ft
9.84

ft
11.32

GPM
79

L/s
4.99

2.50

2.0

6.56

7.55

57

3.58

2.40

0.18

2.00

4.6

15.09

17.36

44

2.80

3.50

0.61

2.00

2.0

6.56

7.55

40

2.54

3.00

0.23

2.00

6.6

21.65

24.90

34

2.12

2.40

0.60

1.25

66.2

217.19

249.77

17

1.06

4.50

11.24

13.38 ft

Sub-Total-1
B- Accessories Losses

Pump
Fan Coil
Unit

Friction
losses

Dia

Quantity

Eq.leng

Flow

no.
1.0
1.0
1.0
1.0

ft
2.8
69
25
2.8

gpm
79
79
79
79

ft/100ft

Gate Valve
Globe Valve
Check Valve
Gate Valve

in
2.50
2.50
2.50
2.50

Gate Valve
2-way Control Valve
Globe Valve
Strainer
Coil

1.25
1.25
1.25
1.25
-

1.0
1.0
1.0
1.0
1.0

1.5
38
38
9

1.1
1.1
1.1
1.1
1.1

4.5
4.5
4.5
4.5

Item

4.70
4.70
4.70
4.70

Sub-Total-2
Sub Total
Sub Total
Total with 10% safety

Losses
ft
0.13
3.24
1.18
0.13
0.0675
1.71
1.71
0.405
3.6
12.17 ft

26 ft
8 m
9 m

Project No.
DESIGN CALCULATION

E0328

SHEET

Mechanical & Industrial Department

Computed by
M.G.

Checked by
H.A.

Approved by
T.Z.

PRIMARY PUMPS
Total chilled water required:
For 10 pumps:

353.4 l/s

5601 gpm

35.3 l/s

560 gpm

Pump Head Components


A- Pipe Losses
Eq.leng

Flow

ft

ft

GPM

L/s

Frictionlos
ses
ft/100ft

56.76

65.27

5601

353.39

0.56

0.37

181.10

208.27

2801

176.70

1.40

2.92

8.20

9.43

560

35.34

2.10

0.20

62

204.72

235.43

5601

353.39

0.56

1.32

20

23.95

27.54

5601

353.39

0.56

0.15

20

15

48.88

56.22

5601

353.39

0.56

0.31

Pipe Run

Dia

Length

in

From Primary
To Chillers
At Chiller
From Chillers
Bypass
To Primary

20

17

12

55

20

Losses
ft

5.27 ft

Sub-Total-1

B- Accessories Losses

Pump
Chiller

Friction
losses

Dia

Quantity

Eq.leng

Flow

no.
1
1
1
1
1

ft
60
170
7
7
-

gpm
560
560
560
560
560

ft/100ft

Chiller

in
6
6
6
6
-

2.10
2.10
2.10
2.10
-

ft
1.26
3.57
0.15
0.15
10.70

Globe valve

170

560

2.10

3.57

Gate valve
Sub-Total-2

560

2.10

0.29

Item
Check valve
Globe valve
Gate Valve
Gate Valve

Losses

19.69

Sub-Total
Sub Total
Total with 10% safety

14-Apr-2004

Sheet No.

CAIRO - EGYPT
Subject Primary chilled water pumps
Building Sharm El-Sheikh Airport New Terminal Building

Date

25 ft
8 m
8 m

Project No.
DESIGN CALCULATION

E0328

SHEET

Mechanical & Industrial Department

Computed by
M.G.

Checked by
H.A.

Approved by
T.Z.

SECONDARY PUMPS
Total chilled water required:

353.4 l/s

5601 gpm

For 3 pumps:

117.8 l/s

1867 gpm

Pump Head Components


A- Pipe Losses

in

ft

ft

GPM

L/s

Frictionlos
ses
ft/100ft

20

25

82.02

94.32

5601

353.39

0.56

0.53

20

150

492.13

565.94

5523

348.45

0.52

2.94

16

250

820.21

943.24

3972

250.62

0.90

8.49

12

75

246.06

282.97

1974

124.53

0.75

2.12

10

160

524.93

603.67

1251

78.93

0.75

4.53

Dia

Length

Eq.leng

Flow

Losses
ft

18.61 ft

Sub-Total-1

B- Accessories Losses

Air
Seperator

Pump

Item
Check valve
Globe valve
Gate Valve
Gate Valve
Pressure Drop

Friction
losses

Dia

Quantity

Eq.leng

Flow

in
10
10
10
10

no.
1
1
1
1

ft
100
280
12
12

gpm
1867
1867
1867
1867

ft/100ft

1.70
1.70
1.70
1.70

ft
1.70
4.76
0.20
0.20

5601

4.00

Losses

10.87

Sub-Total-2

Sub-Total
Sub Total
Total with 10% safety

14-Apr-2004

Sheet No.

CAIRO - EGYPT
Subject Primary chilled water pumps
Building Sharm El-Sheikh Airport New Terminal Building

Date

29 ft
9 m
10 m

Project No.
DESIGN CALCULATION

Q0206

SHEET

Mechanical & Industrial Department

1-

Computed by
H.A

Checked by
L.N

Approved by
T.Z.

Chilled water Flow

CHP-66-02

Total flow:

2-

173.7 l/s

= 2753.2 gpm

Pump Head
A- Pipe Losses

1
2
3
4
5
6
7
8
9
10
11

Diameter
in.
12
12
12
10
10
10
8
5
5
5
5

length length Equ. L


m
ft.
ft.
8
26
30
22
72
83
9
30
34
12
39
45
12
39
45
20
66
75
3
10
11
14
46
53
24
79
91
8
26
30
6
20
23

Flow
fr.
Losses
gpm ft/100ft
ft.
2753.2 1.4
0.4226
2731.6 1.4
1.1621
2720.9 1.4
0.4754
1331.2 0.9
0.4075
1329.5 0.9
0.4075
1327.7 0.9
0.6791
1029.3 1.6
0.1811
384.0
2.5
1.3205
380.0
2.5
2.2638
304.1
1.7
0.5131
152.0
0.55 0.1245
5.0558

B- Accessories Losses

AHU-93-1

Pump

Item
Isolating valve
Globe valve
Isolating valve
2-way control
strainer
Gate Valve
Globe valve
Coil

Dia
in.
12
12
12
5
5
5
5

Qty.
1
1
1
1
1
2
1
1

Equ. L Flow
Fr.
Losses
ft.
gpm ft/100ft
ft.
13
2753.2 0.8
0.104
320 2753.2 0.8
2.56
13
2753.2 0.8
0.104
55
152
2.7
1.485
152
0.94
6
152
2.7
0.324
140
152
2.7
3.78
152
11.8

sub total=
10% safety=
Total=
Total=

21
26
3
29
9

12-Jul-2003

Sheet No.

CAIRO - EGYPT
Subject Circulating chilled water pumps
Building Qatar National Library

Date

ft
ft
ft
ft
m

Project No.

Date

Q0206

7-Dec-03

Sheet No.

Mechanical & Industrial Department

CAIRO - EGYPT

Computed by

1 of 1

Subject
Building

Hoda

Checked by
T.Z.

Approved by
T.Z.

secondry pump
1-

Chilled water Flow

Total flow:

2-

0.28 l/s

4.4 gpm

Pump Head
A- Pipe Losses

Diameter
in.
8

length
m
140

length
ft.
459

Equ. L
ft.
528

Flow
gpm
941.0

fr.
ft/100ft
1.7

Losses
ft.
8.979659
8.979659

Qty.

Equ. L
ft.
13
250
120
320
13
55
27
2.3
55

Flow
gpm
4.4
4.4
4.4
4.4
4.4
60.56
60.56
60.56
60.56
60.56

Fr.
ft/100ft
0.8
0.8
0.8
0.8
0.8
2.7
2.7
2.7
2.7
2.7

Losses
ft.
0.104
2
0.96
2.56
0.104
1.485
0.729
0.0621
1.485
11.8

B- Accessories Losses

AHU-93-1

Pump

Item
Isolating valve
Basket strainer
Silent check valve
Globe valve
Isolating valve
2-way control
strainer
Gate Valve
Globe valve
Coil

Dia
in.
12
12
12
12
12
2.5
2.5
2.5
2.5

1
1
1
1
1
1
1
1
1
1

sub total=
10% safety=
Total=
Total=

21
30
3
33
10

ft
ft
ft
ft
m