The *eat & ,aterial -alance #*,-' shows the )lowrate( conditions and composition o) process and utility streams. .ight or Wrong/
HERVE BARON
The *eat & ,aterial -alance #*,-' shows the )lowrate( conditions and composition o) process and utility streams. .ight or Wrong/ Wrong( only the process streams. 0tility streams( such as cooling water )lowrate etc.( are de)ined later on( once e1uipment is sized.
HERVE BARON
INLET
PROCESS UNIT
OUTLET
The )ollowing is true3 I2P0T )low rate #kg4hr' 5 O0TP0T )low rate #kg4hr' 6 True #mass %alance' I2P0T )low rate #kmol4hr' 5 O0TP0T )lowrate #7mol4hr' 6 8alse( i) chemical reaction has occured I2P0T enthalphy #k94hr' 5 O0TP0T enthalpy #k94hr' 6 8alse( i) heat or mechanical work has %een e:changed with outside
HERVE BARON
INLET
PROCESS UNIT
OUTLET
The )ollowing is true3 I2P0T )low rate #kg4hr' 5 O0TP0T )low rate #kg4hr' 6 True #mass %alance' I2P0T )low rate #kmol4hr' 5 O0TP0T )lowrate #7mol4hr' 6 8alse( i) chemical reaction has occurred I2P0T enthalpy #k94hr' 5 O0TP0T enthalpy #k94hr' 6 8alse( i) heat or mechanical work has %een e:changed with outside
HERVE BARON
Which Engineering document do I need to estimate the cost o) a pressure $essel/ The Process data sheet The ,echanical data sheet
HERVE BARON
Which Engineering document do I need to estimate the cost o) a pressure $essel/ The Process data sheet The ,echanical data sheet( as it indicates the e1uipment weight )rom which I can estimate the cost #)or pressure $essels( )or instance( 0;< =4kg )or car%on steel and 0;< >?4kg )or ;;'
HERVE BARON
Per @;,E -A>.A( at which pressure shall piping %e hydraulically tested/ >.B times the design pressure >.? times the design pressure The design pressure
HERVE BARON
Per @;,E -A>.A( at which pressure shall piping %e hydraulically tested/ >.B times the design pressure >.? times the design pressure The design pressure
HERVE BARON
HERVE BARON
,ention A ways to measure engineering progress Weighting o) documents and issue ,ilestones( e.g. Plot Plan I8"( P&I< I8"( etc. I8" issuance cur$es( e.g. mA o) I8" concrete( tons o) I8" steel( tons o) I8" piping isometrics
HERVE BARON
Which document issued %y the Engineering ,anager ser$es as re)erence to all Engineering disciplines/
HERVE BARON
Which document issued %y the Engineering ,anager ser$es as re)erence to all Engineering disciplines/ The Engineering <esign <ata
HERVE BARON
Which document issued %y the Engineering ,anager ser$es as re)erence to all Engineering disciplines/ The Engineering <esign <ata What are the contents o) this document/
HERVE BARON
Which document issued %y the Engineering ,anager ser$es as re)erence to all Engineering disciplines/ The Engineering <esign <ata What are the contents o) this document/
Feedsto ! ond"t"ons# o$%os"t"on# Prod& ts '(o) and s%e "'" at"ons# %er'or$an e *&arantees Batter+ ("$"ts , -atter+ ("$"ts ond"t"ons .es"*n r"ter"a S"te ("$at" ond"t"ons/ 0"n1$a2 te$%erat&re# ra"n1sno)# )"nd# se"s$"
2013 Herv Baron
3%%(" a-(e odes and standards Ut"("t"es ond"t"ons/ F&e( *as o$%os"t"on# %ress&re# e(e tr" %o)er/ vo(ta*e et 4 Re*&(ator+ re5&"re$ents/ E$"ss"on ("$"ts et 4
HERVE BARON
Put the )ollowing tasks in order *@COP P&I< re$iew meeting %etween "O,P@2D and "O2T.@"TO. Issue o) P&I<s )or .e$iew #I8.' Issue o) P&I<s )or <esign #I8<' Issue o) P&I<s )or "onstruction #I8"'
2013 Herv Baron
HERVE BARON
Put the )ollowing tasks in order Issue o) P&I<s )or .e$iew #I8.' P&I< re$iew meeting %etween "O,P@2D and "O2T.@"TO. Issue o) P&I<s )or <esign #I8<' *@COP Issue o) P&I<s )or "onstruction #I8"'
2013 Herv Baron
HERVE BARON
@re these items re$iewed in *@COP or *@CI</ E;< logic E1uipment spacing O$er)low o) e1uipment PE@2T location O$erpressure hazard -uilding %last resistance 8ire & Gas detection
2013 Herv Baron
HERVE BARON
@re these items re$iewed in *@COP or *@CI</ E;< logic F *@COP E1uipment spacing F *@CI< O$er)low o) e1uipment F *@COP PE@2T location F *@CI< O$erpressure hazard F *@COP -uilding %last resistance F *@CI< 8ire & Gas detection F *@CI<
2013 Herv Baron
HERVE BARON
@re the )ollowing documents used in *@COP or *@CI</ P&I<s "ause & E))ects P8<s Plot Plan *&, 2013 Herv Baron
HERVE BARON
@re the )ollowing documents used in *@COP or *@CI</ P&I<s F *@COP "ause & E))ects F *@COP P8<s F *@CI< Plot Plan 6 *@CI< *&,- F *@CI<
2013 Herv Baron
HERVE BARON
@re the )ollowing disciplines attending *@COP( *@CI< or %oth/ Process ;a)ety Plant layout
HERVE BARON
@re the )ollowing disciplines attending *@COP( *@CI< or %oth/ Process F *@COP ;a)ety F *@CI< Plant layout F *@CI<
HERVE BARON
The Inspection and Test Plan speci)ies the e:tent o) 2on <estructi$e E:amination and tests. .ight or wrong/
HERVE BARON
The Inspection and Test Plan speci)ies the e:tent o) 2on <estructi$e E:amination and tests. .ight or wrong/ Wrong( it speci)ies the attendance For notF o) the Purchaser to these e:amination and tests. The e:tent is speci)ied o) e:amination4tests in the code.
HERVE BARON
To speci)y means to de)ine the duty whereas to design is to size. .ight or wrong/
HERVE BARON
To speci)y means to de)ine the duty whereas to design is to size. .ight or wrong/ .ight
HERVE BARON
The material re1uisition contains The 1uantities to %e supplied The technical re1uirements The inspection re1uirements The list o) applica%le documents
HERVE BARON
The material re1uisition contains The 1uantities to %e supplied The technical re1uirements 6 Wrong3 The technical re1uirements are contained in the speci)ication#s' and the data sheet. The ,. gi$es the list o) the applica%le speci)ication#s' and data sheet %ut does not contain the technical re1uirements themsel$es. The inspection re1uirements 6 Wrong3 these are )ound in the spec4code. The list o) applica%le documents
2013 Herv Baron
HERVE BARON
8or more in)ormation andG to get on top o) Engineering in hours( not years! Get the Guide!
HERVE BARON
HERVE BARON
HERVE BARON
HERVE BARON
8or more in)ormation andG to get on top o) Engineering in hours( not years! @ uni1ue synthesis and re)erence manual ?HH pages( ?BH illustrations
HERVE BARON
8or more in)ormation andG to get on top o) Engineering in hours( not years! @ uni1ue synthesis and re)erence manual ?HH pages( ?BH illustrations
HERVE BARON
8or more in)ormation andG to get on top o) Engineering in hours( not years! @ uni1ue synthesis and re)erence manual ?HH pages( ?BH illustrations
HERVE BARON
HERVE BARON
HERVE BARON
2ot endorsed data and relyFupon data mean the same thing. .ight or Wrong/
HERVE BARON
2ot endorsed data and relyFupon data mean the same thing. .ight or Wrong/ .ight. It means the Engineer is not responsi%le )or this data. I) it changes( the Engineer is entitled to a change order.
HERVE BARON
On an typical large EP" Pro ect o) A year duration( the I8" P&I<s are usually issued at which month o) the Pro ect/ ,onth J ,onth K ,onth >? ,onth >B ,onth >L
2013 Herv Baron
HERVE BARON
On an typical large EP" Pro ect o) A year duration( the I8" P&I<s are usually issued at which month o) the Pro ect/ ,onth J ,onth K ,onth >? ,onth >B ,onth >L
2013 Herv Baron
HERVE BARON
HERVE BARON
HERVE BARON
@s per the piping code )or oil & gas plants #@;,E4@2;I -A>.A'( the wall thickness o) a line Is proportional to the line diameter Is proportional to the s1uare o) the line diameter Is proportionally to the line pressure Is proportionally to the s1uare o) the line pressure <epends on the manu)acturing process o) the line pipe
2013 Herv Baron
HERVE BARON
@s per the piping code )or oil & gas plants #@;,E4@2;I -A>.A'( the wall thickness o) a line Is proportional to the line diameter Is proportional to the s1uare o) the line diameter Is proportionally to the line pressure Is proportionally to the s1uare o) the line pressure <epends on the manu)acturing process o) the line pipe3 w.t. o) seamless pipe is less than that o) welded pipe
HERVE BARON
The essential electrical power consumers are de)ined %y ;a)ety Electrical Process
HERVE BARON
The essential electrical power consumers are de)ined %y ;a)ety Electrical Process3 they are the consumers to which %ackedFup #diesel' power shall %e supplied
HERVE BARON
This 1uestion relates to the respecti$e roles within the Engineering personnel. The 1uestion is3 The designer per)orms the calculations and the Engineer check them. .ight or wrong/
HERVE BARON
This 1uestion relates to the respecti$e roles within the Engineering personnel. The 1uestion is3 The designer per)orms the calculations and the Engineer check them. Wrong( calculations are done %y Engineers.
HERVE BARON
"ar%on steel withstands temperature down to3 F=JM" F?KM" F?HM" HM"
HERVE BARON
"ar%on steel withstands temperature down to3 F=JM" F?KM" F?HM" HM"
HERVE BARON
8or each o) the )ollowing e1uipment( does Engineering speci)y o) design/ *eat e:changers .otating e1uipment Packages Pressure Nessels -oilers 8ired E1uipment
2013 Herv Baron
HERVE BARON
8or each o) the )ollowing e1uipment( does Engineering speci)y o) design/ *eat e:changers 6 design shell & tu%es( speci)ies other types .otating e1uipment F speci)ies Packages F speci)ies Pressure Nessels F designs -oilers F speci)ies 8ired E1uipment F speci)ies
2013 Herv Baron
HERVE BARON
What is the go$erning )actor that determine the strength o) pipeFrack/ 2um%er and size o) supported pipes Wind
HERVE BARON
What is the go$erning )actor that determine the strength o) pipeFrack/ 2um%er and size o) supported pipes Wind( as wind e:ercises horizontal loads( which ha$e much more impact on the design than $ertical loads
HERVE BARON
What is the go$erning )actor )or the sizing o) steel mem%ers o) pipeF racks4structures/ ;teel yield strength ;tructure de)lection
HERVE BARON
What is the go$erning )actor )or the sizing o) steel mem%ers o) pipeF racks4structures/ ;teel yield strength ;tructure de)lection
HERVE BARON
The )ollowing is ad usted at ;ite during commissioning4;tartF0p ;ettings o) controllers ;ettings o) alarms ;etting o) trips
HERVE BARON
The )ollowing is ad usted at ;ite during commissioning4;tartF0p ;ettings o) controllers ;ettings o) alarms ;etting o) trips
HERVE BARON
The P&I< re$iew entails3 checking that the needed alarms and trips are pro$ided checking that the re1uired e1uipment and $al$es isolations are pro$ided checking that the drains( $ents are pro$ided checking $ersus similar e1uipment4unit P&I< checking the ade1uacy o) the e1uipment design pressure and temperature checking the allocation o) piping class and insulation type
HERVE BARON
The P&I< re$iew entails3 checking that the needed alarms and trips are there checking that the re1uired e1uipment and $al$es isolations are pro$ided checking that the drains( $ents are pro$ided checking $ersus similar e1uipment4unit P&I< checking the ade1uacy o) the e1uipment design pressure and temperature checking the allocation o) piping class and insulation type
HERVE BARON
Piping #@;,E' )langes e:ist up to >JO and ?BHH l%s / ?=O and ?BHH l%s/ AJO and >BHH l%s/ =LO and >BHH l%s/
HERVE BARON
Piping #@;,E' )langes e:ist up to >JO and ?BHH l%s( a%o$e that hu%s #see picture' ha$e to %e used ?=O and ?BHH l%s/ AJO and >BHH l%s/ =LO and >BHH l%s/
HERVE BARON
Instrumentation discipline is split in A specialties3 8ield instrumentation ;ystems Installation .ight or Wrong/
HERVE BARON
HERVE BARON
;tress calculations are re1uired )or3 large diameter lines thick lines )ragile lines lines su% ect to high temperature lines connected to rotating e1uipment
2013 Herv Baron
HERVE BARON
;tress calculations are re1uired )or all the types listed! large diameter lines thick lines )ragile lines lines su% ect to high temperature lines connected to rotating e1uipment
2013 Herv Baron
HERVE BARON
The 2<E re1uirements )or a pressure $essel are speci)ied in3 The engineering speci)ication The engineering data sheet The engineering re1uisition The code
HERVE BARON
The 2<E re1uirements )or a pressure $essel are speci)ied in3 The engineering speci)ication The engineering data sheet The engineering re1uisition The code
HERVE BARON
The wall thickness o) lines is indicated on which o) the )ollowing engineering document#s'/ the P&I< the line list the piping class speci)ication the isometric drawing
HERVE BARON
The wall thickness o) lines is indicated on which o) the )ollowing engineering document#s'/ the P&I< the line list the piping class speci)ication 6 not )or large diameters )or which the w.t. is calculated with the line design pressure! the isometric drawing
2013 Herv Baron
HERVE BARON
Electrical discipline is split in ? specialties3 ,edium Noltage #,N' Eow $oltage #EN'( lighting and small power .ight or Wrong/
HERVE BARON
Electrical discipline is split in ? specialties3 ,edium Noltage #,N' Eow $oltage #EN'( lighting and small power Wrong
HERVE BARON
HERVE BARON
Piping routing drawings are produced at 8EE< stage. .ight or Wrong/ .ight( %ut )or main process lines only. This is where the money is. .emem%er that the 8EE< is to estimate the cost 6 and allow EP" contractors to %id.
HERVE BARON
HERVE BARON
HERVE BARON
The )ollowing documents contain redundant in)ormation P&I< and line list Process <ata ;heet and consumers list Process <ata sheet and ,echanical <ata ;heet P&I< and instrument list *eat & ,aterial -alance and Process <ata ;heet @ll o) the a%o$e
2013 Herv Baron
HERVE BARON
The )ollowing documents contain redundant in)ormation P&I< and line list3 line num%ers( piping class Process <ata ;heet and consumers list3 power consumption Process <ata sheet and ,echanical <ata ;heet3 design pressure4temp P&I< and instrument list3 instrument num%ers *eat & ,aterial -alance and Process <ata ;heet3 )lowrate( operating conditions
2013 Herv Baron
HERVE BARON
The design and construction code applied in the Oil & Gas industry )or pressure $essels is @;,E NIII @PI BE @2;I -A>.A @;,E I
HERVE BARON
The design and construction code applied in the Oil & Gas industry )or pressure $essels is @;,E NIII @PI BE @2;I -A>.A @;,E I
HERVE BARON
Post Weld *eat treatment is speci)ied %y Piping and Pressure Nessel codes a%o$e a certain Temperature Pressure Wall thickness
HERVE BARON
Post Weld *eat treatment is speci)ied %y Piping and Pressure Nessel codes a%o$e a certain Temperature Pressure Wall thickness3 a%o$e >K.Pmm )or piping #@2;I -A>.A' and a%o$e ALmm )or ordinary "; plates #@;,E NIII di$. >'