JENIS UPAH, BAHAN DAN SEWA ALAT HARGA SATUAN ( Rp. ) SATUAN KETERANGAN
KODE
UPAH
L-1 L-2 L-3 L-4 L-5 L-6 L-7 L-8 L-9 L-10 L-11 Pekerja Tukang Kepala Tukang Mandor Operator Pembantu Operator Supir Pembantu Supir Mekanik Pembantu Mekanik Kepala Pemancangan 45,000.00 65,000.00 80,000.00 70,000.00 110,000.00 70,000.00 70,000.00 50,000.00 75,000.00 60,000.00 100,000.00 OH OH OH OH OH OH OH OH OH OH OH 6,420.00 9,280.00 11,420.00 10,000.00 15,710.00 10,000.00 10,000.00 7,140.00 10,710.00 8,570.00 14,280.00 OJ OJ OJ OJ OJ OJ OJ OJ OJ OJ OJ
BAHAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25 M-26 M-27 M-28 M-29
M-30
Air Aggregate Halus Aggregat Kasar Batu Belah Batu Kali Baja Tulangan Polos U24 Baja Tulangan Ulir U39 Casing (plat baja ) Dolken Kayu 8-10/400 cm Kawat Beton Kawat Las Kayu Klas III Kerikil Bersih Koral Beton Koresene Minyak Bekesting Minyak Bensin Minyak Solar Minyak pelumas Pasir Beton bersih Pasir Pasang Pasir Urug Plamur/Dempul Cat Semen PC 40 Kg Seng Gelombang Tanah Timbun Pilihan Kayu Untuk Perancah Mutipleks 9 mm Paku Kayu 2" - 5" Vinyl Sheetpile
175.00 195,781.78 195,781.78 136,978.11 125,400.00 11,500.00 13,000.00 150,000.00 20,000.00 12,000.00 40,000.00 3,200,000.00 131,300.00 115,000.00 13,000.00 3,300.00 8,990.00 8,990.00 30,000.00 140,700.00 167,200.00 72,000.00 25,000.00 50,000.00 57,000.00 80,000.00 2,200,000.00 105,000.00 18,000.00 18,500.00
Ltr M3 M3 M3 M3 Kg Kg m2 Btg Kg kg m3 M3 m3 Ltr Liter Liter Liter Liter M3 M3 M3 Kg Zak lbr M3 M3 Lembar Kg
Kg
2,000.00
m'
97.26
/kg
100.50 119.43
/kg /kg
1,250.00
/kg
Lhokseumawe,
Februari 2013
MUHAMMAD ST Direktur
DAFTAR HARGA DASAR SATUAN UPAH, BAHAN DAN SEWA ALAT TAHUN ANGGARAN 2012
KODE
UPAH
L-3 L-4 L-6 L-7 L-8 L-10
BAHAN M-2 M-7 M-9 M-10 M-12 M-16 M-17 M-20 M-21 M-23
DAFTAR HARGA DASAR SATUAN UPAH, BAHAN DAN SEWA ALAT TAHUN ANGGARAN 2012
No.
URAIAN
KODE
HP
KAP.
HARGA ALAT
SEWA ALAT/JAM
KET.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
ASPHALT SPRAYER BULLDOZER 100-150 HP CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3.5 TON EXCAVATOR 80-140 HP GENERATOR SET MOTOR GRADER >100 HP WHEEL LOADER 1.0-1.6 M3 CONCRETE VIBRATOR WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER CONCRETE PUMP TRAILER 20 TON WELDING SET BORE PILE MACHINE TRONTON TRUK MIXER (AGITATOR)
E03 E04 E06 E07 E08 E10 E12 E13 E15 E20 E22 E23 E24 E28 E29 E32 E33 E35 E49
4.0 155.0 20.0 138.0 100.0 133.0 180.0 135.0 96.0 5.5 6.0 100.0 8.8 100.0 175.0 40.0 150.0 150.0 220.0
850.0 Liter 500.0 Liter 15.0 Ton 3.5 Ton 0.9 M3 135.0 KVA 10,800.0 1.5 M3 25.0 4,000.0 Liter 835.00 Ton 8.00 M3 20.00 Ton 250.0 Amp 20.0 Meter 15.0 Ton 5.0 M3 1,210,000,000 39,600,000 836,000,000 265,000,000 770,000,000 140,800,000 660,000,000 715,000,000 21,120,000 19,800,000 145,200,000 77,000,000 176,000,000 372,900,000 23,100,000 2,250,000,000 276,000,000 250,000,000 252,481.88 48,879.14 397,614.54 198,446.88 361,430.74 245,785.38 330,211.03 320,178.42 41,177.68 38,787.79 188,987.81 58,417.94 166,914.40 316,343.02 69,934.90 776,773.46 388,806.58 486,067.09
Lhokseumawe,
Februari 2013
MUHAMMAD ST Direktur
No.
URAIAN
KODE
KOEF.
SATUAN
KET.
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat 1
Pw Cp A W B
5 B. 1. 2. 3.
Kapastas tangki aspal BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
Ca
30,000.00
liter
C D
191,700,000 0.17698
Rupiah -
203,567.19
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
2,556.00
Rupiah
206,123.19
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Bahan Bakar Pemanasan Material = 12 ltr x Ms dan aspal (Oil Heater) Bahan Bakar Pemanas Aspal = 1/1000 *Ca*Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp
H1 H2 H3 I J K L M P T
161,820.00 943,950.00 269,700.00 135,000.00 111,825 223,650.00 15,710.00 30,000.00 1,891,655.00 2,097,778.19
Rupiah Rupiah
Khusus AMP
2. 3. 4. 5 6
Rupiah
(6.25% dan 8.75%) x B W Biaya perbaikan (12,5 % - 17,5 %) x B W Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 3 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+J+K+L+M)
D.
E. 1. 2. 3. 4. 5. 6. 7 8
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan Bahan bakar Batubara
i U1 U2 Mb Ms Mp
#REF!
Rp/kg
No.
URAIAN
KODE
KOEF.
SATUAN
KET.
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
5.
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
31,000,000 0.24323
Rupiah -
48,471.41
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
442.86
Rupiah
48,914.27
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 97,631.40 65,160.00 13,839 Rupiah Rupiah
3.
38,750.00
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
E04
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
52,000,000 0.27741
Rupiah -
64,913.88
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
520.00
Rupiah
65,433.88
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 100,688.00 21,000.00 7,150 Rupiah Rupiah
3.
32,500.00
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
CONCRETE MIXER 0.3-0.6 M3 20.0 HP 500.0 Liter 2.0 Tahun 1,500.0 Jam 7,500,000 Rupiah
E06
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
750,000 0.59170
Rupiah -
2,662.64
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
10.00
Rupiah
2,672.64
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 14,384.00 4,800.00 438 Rupiah Rupiah Rupiah
3.
875.00
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
5.
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
83,600,000 0.27741
Rupiah -
104,361.54
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
836.00
Rupiah
105,197.54
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 124,062.00 53,820.00 36,575 Rupiah Rupiah Rupiah
3.
52,250.00
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
20,000,000 0.27741
Rupiah -
24,966.88
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
200.00
Rupiah
25,166.88
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 98,890.00 36,000.00 8,750 Rupiah Rupiah
3.
12,500.00
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir / Mekanik Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
EXCAVATOR 80-140 HP 120.0 HP 0.93 M3 5.0 Tahun 2,000.0 Jam 625,000,000 Rupiah
E10
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
62,500,000 0.27741
Rupiah -
78,021.49
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
625.00
Rupiah
78,646.49
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 118,668.00 72,000.00 27,344 Rupiah Rupiah Rupiah
3.
39,062.50
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
12,300,000 0.27741
Rupiah -
15,354.63
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
123.00
Rupiah
15,477.63
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 153,729.00 37,800.00 5,381 Rupiah Rupiah Rupiah
3.
7,687.50
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
MOTOR GRADER >100 HP 135.0 HP 10,800.0 5.0 Tahun 2,000.0 Jam 510,000,000 Rupiah
E13
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
51,000,000 0.27741
Rupiah -
63,665.53
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
510.00
Rupiah
64,175.53
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 145,638.00 40,500.00 22,313 Rupiah Rupiah Rupiah
3.
31,875.00
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
WHEEL LOADER 1.0-1.6 M3 105.0 HP 1.5 M3 5.0 Tahun 2,000.0 Jam 645,000,000 Rupiah
E15
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
64,500,000 0.27741
Rupiah -
80,518.17
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
645.00
Rupiah
81,163.17
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 113,274.00 31,500.00 28,219 Rupiah Rupiah Rupiah
3.
40,312.50
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
THREE WHEEL ROLLER 6-8 T 55.0 HP 8.0 Ton 5.0 Tahun 2,000.0 Jam 264,000,000 Rupiah
E16
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
26,400,000 0.27741
Rupiah -
32,956.28
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
264.00
Rupiah
33,220.28
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 59,334.00 41,250.00 11,550 Rupiah Rupiah Rupiah
3.
16,500.00
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
TANDEM ROLLER 6-8 T. 82.0 HP 8.1 Ton 5.0 Tahun 2,000.0 Jam 366,300,000 Rupiah
E17
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
36,630,000 0.27741
Rupiah -
45,726.83
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
366.30
Rupiah
46,093.13
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 88,461.60 61,500.00 16,026 Rupiah Rupiah Rupiah
3.
22,893.75
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
38,610,000 0.27741
Rupiah -
48,198.55
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
386.10
Rupiah
48,584.65
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 108,419.40 75,375.00 16,892 Rupiah Rupiah Rupiah
3.
24,131.25
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
VIBRATORY ROLLER 5-8 T. 82.0 HP 7.050 Ton 5.0 Tahun 2,000.0 Jam 431,200,000 Rupiah
E19
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
43,120,000 0.27741
Rupiah -
53,828.58
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
431.20
Rupiah
54,259.78
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 88,461.60 61,500.00 18,865 Rupiah Rupiah Rupiah
3.
26,950.00
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
CONCRETE VIBRATOR 5.5 HP 25.0 4.0 Tahun 1,000.0 Jam 18,100,000 Rupiah
E20
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
1,810,000 0.32923
Rupiah -
5,363.23
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
36.20
Rupiah
5,399.43
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 4,944.50 825.00 1,131 Rupiah Rupiah Rupiah
3.
3,167.50
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
69,300,000 0.27741
Rupiah -
86,510.22
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
693.00
Rupiah
87,203.22
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 237,336.00 165,000.00 30,319 Rupiah Rupiah Rupiah
3.
43,312.50
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 2 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
WATER PUMP 70-100 mm 6.0 HP 3.0 Tahun 2,000.0 Jam 10,200,000 Rupiah
E22
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
1,020,000 0.41635
Rupiah -
1,911.04
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
10.20
Rupiah
1,921.24
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 6,472.80 3,600.00 446 Rupiah Rupiah Rupiah
3.
637.50
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
WATER TANKER 3000-4500 L. 100.0 HP 4,000.0 Liter 5.0 Tahun 2,000.0 Jam 135,200,000 Rupiah
E23
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
13,520,000 0.27741
Rupiah -
16,877.61
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
135.20
Rupiah
17,012.81
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 89,900.00 42,000.00 5,915 Rupiah Rupiah Rupiah
3.
8,450.00
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
7,700,000 0.41635
Rupiah -
14,426.49
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
77.00
Rupiah
14,503.49
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 7,911.20 2,112.00 3,369 Rupiah Rupiah Rupiah
3.
4,812.50
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
12,600,000 0.24323
Rupiah -
13,790.90
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
126.00
Rupiah
13,916.90
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 89,900.00 24,000.00 5,513 Rupiah Rupiah Rupiah
3.
7,875.00
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
37,290,000 0.24323
Rupiah -
40,814.49
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
372.90
Rupiah
41,187.39
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 157,325.00 52,500.00 16,314 Rupiah Rupiah Rupiah
3.
23,306.25
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
2,010,000 0.27741
Rupiah -
2,509.17
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
20.10
Rupiah
2,529.27
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 35,960.00 3,600.00 879 Rupiah Rupiah Rupiah
3.
1,256.25
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
220,000,000 0.24323
Rupiah -
240,793.46
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
2,200.00
Rupiah
242,993.46
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 161,820.00 112,500.00 96,250 Rupiah Rupiah Rupiah
3.
137,500.00
Rupiah
4. 5.
Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
L M P S
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
CONCRETE PAN MIXER 134 HP 600.00 Liter 10.0 Tahun 1,500.0 Jam 0 Rupiah
E43
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
0 0.17698
Rupiah -
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
Rupiah
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms H 144,559.20 Rupiah
2.
I J
100,500.00 -
Rupiah Rupiah
3. 4. 5.
Perawatan dan = (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
K L M P T
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
TRUK MIXER (AGITATOR) 220 HP 5.00 M3 5.0 Tahun 2,000.0 Jam 250,000,000 Rupiah
E49
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
25,000,000 0.27741
Rupiah -
31,208.59
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
250.00
Rupiah
31,458.59
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms H 237,336.00 Rupiah
2.
I J
165,000.00 10,938
Rupiah Rupiah
3. 4. 5.
Perawatan dan = (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
K L M P T
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
A. 1. 2. 3. 4.
URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat
Pw Cp A W B
5.
B. 1. 2. 3.
BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W
C D
27,600,000 0.17698
Rupiah -
29,308.58
Rupiah
b. Asuransi, dll =
0.002 x B W = (E+F)
368.00
Rupiah
29,676.58
Rupiah
BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms H 161,820.00 Rupiah
2.
I J
112,500.00 16,100
Rupiah Rupiah
3. 4. 5.
Perawatan dan = (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 3 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)
K L M P T
D.
E. 1. 2. 3. 4. 5. 6. 7.
LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
i U1 U2 Mb Ms Mp
No.
URAIAN
KO DE
HP
KAP.
HARGA ALAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53
ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3.5 TON DUMP TRUCK 10 TON EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER TRONTON COLD MILLING ROCK DRILL BREAKER COLD RECYCLER HOT RECYCLER AGGREGAT (CHIP) SPREADER ASPHALT DISTRIBUTOR SLIP FORM PAVER CONCRETE PAN MIXER CONCRETE BREAKER ASPAHLT TANKER CEMENT TANKER CONDRETE MIXER (350) VIBRATING RAMMER TRUK MIXER (AGITATOR) BORE PILE MACHINE CRANE ON TRACK 75-100 TON BLENDING EQUIPMENT ASPHALT LIQUID MIXER
E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E36 E37 E38 E39 E40 E41 E42 E43 E44 E45 E46 E47 E48 E49 E50 E51 E52 E34a
150.0 72.4 4.0 140.0 60.0 20.0 138.0 100.0 190.0 120.0 190.0 180.0 135.0 70.0 105.0 55.0 82.0 100.5 82.0 5.5 220.0 6.0 100.0 8.8 4.7 0.0 345.0 100.0 175.0 25.0 125.0 40.0 150.0 5.0 150.0 248.0 3.0 900.0 400.0 115.0 115.0 105.0 134.0 290.0 190.0 190.0 20.0 4.2 220.0 125.0 200.0 50.0 40.0
30.0 T/Jam 10.0 Ton 850.0 Liter 5,000.0 5,000.00 500.0 Liter 15.0 Ton 3.5 Ton 10.0 Ton 0.9 10.0 135.0 10,800.0 0.8 1.5 8.0 8.1 9.0 7.1 25.0 30.0 4,000.0 835.00 121.00 1,330.00 2,005.00 8.00 20.00 2.50 35.0 250.0 2,000.0 1,000.0 15.0 1,000.0 2.2 3.0 3.5 4,000.0 2.5 600.0 20.0 4,000.0 4,000.0 350.0 80.0 5.0 60.0 75.0 30.0 M3 ton KVA 10,800.00 M3 M3 Ton Ton Ton Ton 25.00 T/Jam Liter Ton Ton 1,330.00 2,005.00 M3 Ton Ton Ton Amp Meter Liter Ton m M M M Liter M Liter m3/jam liter liter liter KG M3 CM Ton Ton
1,917,000,000 310,000,000 132,000,000 520,000,000 85,800,000 7,500,000 836,000,000 200,000,000 330,000,000 625,000,000 165,000,000 123,000,000 510,000,000 623,700,000 645,000,000 264,000,000 366,300,000 386,100,000 431,200,000 18,100,000 693,000,000 10,200,000 135,200,000 77,000,000 29,150,000 29,150,000 159,500,000 126,000,000 372,900,000 122,100,000 1,000,000,000 20,100,000 2,200,000,000 16,500,000 276,000,000 100 770,000,000 100 100 100 70,000,000 100 100 100 100 100 35,000,000 100 380,000,000 100 100 100 16,500,000
2,097,778.19 290,004.95 71,301.84 252,481.88 155,350.84 48,879.14 397,614.54 198,446.88 449,769.85 361,430.74 411,475.92 245,785.38 330,211.03 298,477.03 320,178.42 187,564.28 260,684.11 299,112.18 275,746.38 41,177.68 598,880.47 38,787.79 188,987.81 58,417.94 51,896.84 32,475.26 886,904.35 166,914.40 316,343.02 99,767.50 471,011.57 69,934.90 776,773.46 39,068.19 364,927.94 367,450.35 276,503.23 1,173,193.25 555,292.25 236,030.52 218,905.78 190,730.66 264,953.29 419,354.03 300,595.80 274,402.40 77,144.79 45,993.51 397,340.81 229,881.59 286,760.42 115,712.64 103,076.19
20,000.0 Liter
KET.
No.
URAIAN
KODE
KOEFISIEN
SATUAN
KETERANGAN
I 1 2 3 4
5 6 7 8 9 10 II 1
ASUMSI Bahan dasar (Batu dan Pasir) diterima di lokasi Alat Pemecah Batu (di Base Camp) Kegiatan dilakukan di dalam lokasi Base Camp Hasil produksi Alat Pemecah Batu : - Agregat Halus - Agregat Kasar Berat Isi Bahan : - Batu / Gravel - Pasir - Batu Pecah Harga Satuan Bahan Dasar : - Batu Kali - Pasir Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Kapasitas Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Faktor Kehilangan Material Agregat Halus masih perlu dicampur dengan pasir METHODE PELAKSANAAN Wheel Loader mengangkut batu/gravel dari tumpukan dan menuangkannya ke Alat Pemecah Batu. Batu/gravel dipecah dengan Alat Pemecah Batu (Stone Crusher) sehingga menghasilkan Agregat Batu Pecah Kasar dan Halus. Agregat Halus dicampur dengan pasir menggunakan Loader PERHITUNGAN HARGA SATUAN AGREGAT PRODUKSI ST. CRUSHER Kerja Stone Crusher memecah gravel : - Waktu kerja Stone Crusher - Produksi Stone Crusher 1 jam - Kebutuhan batu/gravel 1 jam
30.00 70.00 1.20 1.40 1.35 125,400.00 140,700.00 598,880.47 320,178.42 30.00 1.50 0.85 0.90 1.10
Kap. Bucket
Tst Qb Qg
Batu pecah
1.b.
Kerja Wheel Loader melayani Stone Crusher : - Kap. Angkut / rit = (Fa2 x Cp2) - Waktu Siklus (Muat, Tuang, Tunggu, dll) - Waktu kerja W.Loader memasok gravel = {(Qg : Ka) x Ts} : 60 menit Biaya Produksi Batu Pecah / M3 = {(Tst x Rp3) + (Tw x Rp4)} : Qb Harga Satuan Batu Pecah Produksi St.Crusher / M3 = {(Qg : Qb) x Fh x Rp1} + Bp
Ka Ts Tw
M3 menit Jam
1.c.
Bp
40,599.28
Rp./M3
1.d.
HSb
195,781.78
Rp./M3
Berlanjut
No.
URAIAN
KODE
KOEFISIEN
SATUAN
KETERANGAN
III.2.
HARGA SATUAN AGREGAT PECAH MESIN 5-10 & 10-20 mm ( berlaku juga untuk Aggregat 20-30 mm) Agregat Kasar Produksi Stone Crusher = 70% (Tertahan saringan # 4 = 4,75mm) Harga Satuan Agregat Kasar / M3 = (K x HSb) / K HARGA SATUAN AGREGAT PECAH MESIN 0-5 mm (Agregat Halus) Agregat Halus Produksi Stone Crusher = 30% Harga Agregat Halus Prod. Stone Crsh.= (H x HSb) / H
K HSAk
70.00 195,781.78
III.3. 3.a.
H Hs1
30.00 195,781.78
% Rupiah
per 1 M3
1. 2. 3. 4. 5. 6. 7. 8 9
M01 - P a s i r Pasang M01 - P a s i r Beton M02 - Batu Kali M06 - Batu Belah/Batu Quarry Besar M07 - G r a v e l M10 - Aspal Cement (Pelabuhan) M16 - S i r t u M44 - Pasir Urug M08 - Tanah Timbun M09 - Material Pilihan
M3 M3 M3 M3 M3 KG M3 M3 M3 M3
Ke Base Camp Ke Lokasi Pek. Ke Lokasi Pek. Ke Lokasi Pek. Ke Base Camp Ke Base Camp Ke Lokasi Pek. Ke Lokasi Pek. Ke Lokasi Pek. Ke Lokasi Pek.
Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3
Km 292+300
Km 295+000
3,00 km2,00 km
Lokasi Quarry
Catatan : Julok - Idi Rayeuk Idi Rayeuk - Lokasi Proyek Total Sumber Quarry Julok s/d Lokasi Proyek Lokasi Proyek - Base Camp Total Sumber Quarry s/d Base Camp Jarak Quarry Bt. Kali/Belah ke B. Camp diperkirakan Jarak Quarry Bt. Kali/Belah ke Lokasi Proyek diperkirakan Jarak Quarry Pasir ke Base Camp diperkirakan Jarak Quarry Pasir ke Lokasi Proyek diperkirakan = 24 km = 2 km = 26 km = 0,50 km = 18,50 km = 20,00 km = 20,00 km = 20,00 km = 20,00 km
No.
URAIAN
KODE
KOEF.
SATUAN
I. 1 2 3 4 5 6 7 II. 1 2 3
ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi Base Camp Harga satuan pasir di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume pasir URUTAN KERJA Pasir digali dengan Excavator Excavator sekaligus memuat pasir hasil galian ke dalam Dump Truck Dump Truck mengangkut pasir ke lokasi Base Camp PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10
III.
Rp1
19,076.25
Rupiah
DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain
No.
URAIAN
KODE
KOEF.
SATUAN
Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q2) x RpE08
Q2
1.68
M3 / Jam
Rp2
118,148.09
Rupiah
IV.
HARGA SATUAN DASAR BAHAN DI LOKASI BASE CAMP Harga Satuan Dasar Pasir = ( RpM01 + Rp1 + Rp2 ) Dibulatkan : M01 M01 167,224.34 167,200.00 Rupiah Rupiah
No.
URAIAN
KODE
KOEF.
SATUAN
I. 1 2 3 4 5 6 7 II. 1 2 3
ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke Lokasi Pekerjaan Harga satuan batu kali di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume batu kali URUTAN KERJA Batu kali digali dengan Excavator Excavator sekaligus memuat batu kali hasil galian ke dalam Dump Truck Dump Truck mengangkut batu kali ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10
III.
Rp1
13,006.53
Rupiah
DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain
No.
URAIAN
KODE
KOEF.
SATUAN
Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q2) x RpE08
Q2
2.41
M3 / Jam
Rp2
82,381.20
Rupiah
IV.
HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar Batu kali = ( RpM02 + Rp1 + Rp2 ) Dibulatkan : M02 M02 125,387.73 125,400.00 Rupiah Rupiah
No.
URAIAN
KODE
KOEF.
SATUAN
I. 1 2 3 4 5 6 7 8 9 II. 1 2 3
ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke Lokasi Pekerjaan Harga satuan batu kali di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Harga Satuan Dasar Wheel Loader Harga Satuan Upah Pekerja Berat volume batu belah URUTAN KERJA Batu kali digali dengan Excavator Batu kali dibelah oleh Pekerja Dengan Wheel Loader batu belah dimuat ke Dump Truck yang mengangkut batu belah ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10
III. 3.a
13,006.53
Rupiah
3.b
WHEEL LOADER Kapasitas Bucket Faktor Bucket Faktor Efisiensi Alat Waktu sklus - Muat - Lain-lain Kapasitas Produksi / Jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q2) x RpE15
No.
URAIAN
KODE
KOEF.
SATUAN
3.c
DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain
Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q3) x RpE08 3.d PEKERJA Produksi menentukan : Excavator Hasil galian batu / hari = Q1 x 7 Jam Kebutuhan Pekerja Biaya Pekerja / M3 = { (7 Jam x P) : Qt } x RpL01
Q3
1.45
M3 / Jam
Rp3
136,978.11
Rupiah
Q1 Qt P
Rp4
3,465.47
Rupiah
IV.
HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar Batu belah = ( RpM06 + Rp1 + Rp2 + Rp3 + Rp4 ) Dibulatkan : M06 M06 200,593.77 200,600.00 Rupiah Rupiah
No.
URAIAN
KODE
KOEF.
SATUAN
I. 1 2 3 4 5 6 7 II. 1 2 3
ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke Lokasi Pekerjaan Harga satuan Gravel di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume gravel URUTAN KERJA Gravel digali dengan Excavator Excavator sekaligus memuat gravel hasil galian ke dalam Dump Truck Dump Truck mengangkut gravel ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10
III.
Rp1
27,747.27
Rupiah
DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain
No.
URAIAN
KODE
KOEF.
SATUAN
Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q2) x RpE08
Q2
2.70
M3 / Jam
Rp2
73,521.77
Rupiah
IV.
HARGA SATUAN DASAR BAHAN DI LOKASI BASE CAMP Harga Satuan Dasar Gravel = ( RpM07 + Rp1 + Rp2 ) Dibulatkan : M07 M07 131,269.04 131,300.00 Rupiah Rupiah
No.
URAIAN
KODE
KOEF.
SATUAN
I. 1 2 3 4 5 6 7 II. 1 2 3
ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi Base Camp Harga satuan Sirtu di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume sirtu URUTAN KERJA Sirtu digali dengan Excavator Excavator sekaligus memuat sirtu hasil galian ke dalam Dump Truck Dump Truck mengangkut sirtu ke lokasi Base Camp PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10
III.
Rp1
12,139.43
Rupiah
DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain
No.
URAIAN
KODE
KOEF.
SATUAN
Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q2) x RpE08
Q2
2.53
M3 / Jam
Rp2
78,517.22
Rupiah
IV.
HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar Sirtu = ( RpM16 + Rp1 + Rp2 ) Dibulatkan : M16 M16 110,656.65 110,700.00 Rupiah Rupiah
I. 1 2 3 4 5 6 7 II. 1 2 3
ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi pekerjaan Harga satuan pasir urug di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume pasir urug URUTAN KERJA pasir urug digali dengan Excavator Excavator sekaligus memuat pasir urug hasil galian ke dalam Dump Truck Dump Truck mengangkut pasir urug ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10
III.
Rp1
21,677.55
Rupiah
DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain
No.
URAIAN
KODE
KOEF.
SATUAN
Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q2) x RpE08
Q2
5.63
M3 / Jam
Rp2
35,276.62
Rupiah
IV.
HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar pasir urug = ( RpM44 + Rp1 + Rp2 ) Dibulatkan : M44 M44 71,954.17 72,000.00 Rupiah Rupiah
No.
URAIAN
KODE
KOEF.
SATUAN
I. 1 2 3 4 5 6 7 II. 1 2 3
ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi pekerjaan Harga satuan pasir beton di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat isi volume pasir beton URUTAN KERJA pasir urug digali dengan Excavator Excavator sekaligus memuat pasir urug hasil galian ke dalam Dump Truck Dump Truck mengangkut pasir urug ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10
III.
Rp1
35,422.48
Rupiah
DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain
No.
URAIAN
KODE
KOEF.
SATUAN
Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q2) x RpE08
Q2
2.64
M3 / Jam
Rp2
75,311.69
Rupiah
IV.
HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar pasir urug = ( RpM44 + Rp1 + Rp2 ) Dibulatkan : M44 M44 140,734.17 140,700.00 Rupiah Rupiah