DAFTAR HARGA DASAR SATUAN UPAH, BAHAN DAN SEWA ALAT TAHUN ANGGARAN 2013

JENIS UPAH, BAHAN DAN SEWA ALAT HARGA SATUAN ( Rp. ) SATUAN KETERANGAN

KODE

UPAH
L-1 L-2 L-3 L-4 L-5 L-6 L-7 L-8 L-9 L-10 L-11 Pekerja Tukang Kepala Tukang Mandor Operator Pembantu Operator Supir Pembantu Supir Mekanik Pembantu Mekanik Kepala Pemancangan 45,000.00 65,000.00 80,000.00 70,000.00 110,000.00 70,000.00 70,000.00 50,000.00 75,000.00 60,000.00 100,000.00 OH OH OH OH OH OH OH OH OH OH OH 6,420.00 9,280.00 11,420.00 10,000.00 15,710.00 10,000.00 10,000.00 7,140.00 10,710.00 8,570.00 14,280.00 OJ OJ OJ OJ OJ OJ OJ OJ OJ OJ OJ

BAHAN M-1 M-2 M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25 M-26 M-27 M-28 M-29
M-30

Air Aggregate Halus Aggregat Kasar Batu Belah Batu Kali Baja Tulangan Polos U24 Baja Tulangan Ulir U39 Casing (plat baja ) Dolken Kayu 8-10/400 cm Kawat Beton Kawat Las Kayu Klas III Kerikil Bersih Koral Beton Koresene Minyak Bekesting Minyak Bensin Minyak Solar Minyak pelumas Pasir Beton bersih Pasir Pasang Pasir Urug Plamur/Dempul Cat Semen PC 40 Kg Seng Gelombang Tanah Timbun Pilihan Kayu Untuk Perancah Mutipleks 9 mm Paku Kayu 2" - 5" Vinyl Sheetpile

175.00 195,781.78 195,781.78 136,978.11 125,400.00 11,500.00 13,000.00 150,000.00 20,000.00 12,000.00 40,000.00 3,200,000.00 131,300.00 115,000.00 13,000.00 3,300.00 8,990.00 8,990.00 30,000.00 140,700.00 167,200.00 72,000.00 25,000.00 50,000.00 57,000.00 80,000.00 2,200,000.00 105,000.00 18,000.00 18,500.00

Ltr M3 M3 M3 M3 Kg Kg m2 Btg Kg kg m3 M3 m3 Ltr Liter Liter Liter Liter M3 M3 M3 Kg Zak lbr M3 M3 Lembar Kg
Kg

2,000.00

m'

97.26

/kg

100.50 119.43

/kg /kg

1,250.00

/kg

Lhokseumawe,

Februari 2013

Konsultan Perencana CV. TIARA NAD ENGINEERING

MUHAMMAD ST Direktur

DAFTAR HARGA DASAR SATUAN UPAH, BAHAN DAN SEWA ALAT TAHUN ANGGARAN 2012
KODE

UPAH
L-3 L-4 L-6 L-7 L-8 L-10

BAHAN M-2 M-7 M-9 M-10 M-12 M-16 M-17 M-20 M-21 M-23

DAFTAR HARGA DASAR SATUAN UPAH, BAHAN DAN SEWA ALAT TAHUN ANGGARAN 2012

DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA


BIAYA

No.

URAIAN

KODE

HP

KAP.

HARGA ALAT

SEWA ALAT/JAM

KET.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

ASPHALT SPRAYER BULLDOZER 100-150 HP CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3.5 TON EXCAVATOR 80-140 HP GENERATOR SET MOTOR GRADER >100 HP WHEEL LOADER 1.0-1.6 M3 CONCRETE VIBRATOR WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER CONCRETE PUMP TRAILER 20 TON WELDING SET BORE PILE MACHINE TRONTON TRUK MIXER (AGITATOR)

E03 E04 E06 E07 E08 E10 E12 E13 E15 E20 E22 E23 E24 E28 E29 E32 E33 E35 E49

4.0 155.0 20.0 138.0 100.0 133.0 180.0 135.0 96.0 5.5 6.0 100.0 8.8 100.0 175.0 40.0 150.0 150.0 220.0

850.0 Liter 500.0 Liter 15.0 Ton 3.5 Ton 0.9 M3 135.0 KVA 10,800.0 1.5 M3 25.0 4,000.0 Liter 835.00 Ton 8.00 M3 20.00 Ton 250.0 Amp 20.0 Meter 15.0 Ton 5.0 M3 1,210,000,000 39,600,000 836,000,000 265,000,000 770,000,000 140,800,000 660,000,000 715,000,000 21,120,000 19,800,000 145,200,000 77,000,000 176,000,000 372,900,000 23,100,000 2,250,000,000 276,000,000 250,000,000 252,481.88 48,879.14 397,614.54 198,446.88 361,430.74 245,785.38 330,211.03 320,178.42 41,177.68 38,787.79 188,987.81 58,417.94 166,914.40 316,343.02 69,934.90 776,773.46 388,806.58 486,067.09

Lhokseumawe,

Februari 2013

Konsultan Perencana CV. TIARA NAD ENGINEERING

MUHAMMAD ST Direktur

URAIAN ANALISA ALAT

No.

URAIAN

KODE

KOEF.

SATUAN

KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat 1

Pw Cp A W B

ASPHALT MIXING PLANT 150.0 30.0 10.0 1,500.0 1,917,000,000.0

E01 HP T/Jam Tahun Jam Rupiah

5 B. 1. 2. 3.

Kapastas tangki aspal BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

Ca

30,000.00

liter

C D

191,700,000 0.17698

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

203,567.19

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

2,556.00

Rupiah

Biaya Pasti per Jam C. 1.

206,123.19

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Bahan Bakar Pemanasan Material = 12 ltr x Ms dan aspal (Oil Heater) Bahan Bakar Pemanas Aspal = 1/1000 *Ca*Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp

H1 H2 H3 I J K L M P T

161,820.00 943,950.00 269,700.00 135,000.00 111,825 223,650.00 15,710.00 30,000.00 1,891,655.00 2,097,778.19

Rupiah Rupiah

Khusus AMP

2. 3. 4. 5 6

Rupiah

(6.25% dan 8.75%) x B W Biaya perbaikan (12,5 % - 17,5 %) x B W Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 3 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+J+K+L+M)

Rupiah Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7 8

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan Bahan bakar Batubara

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

#REF!

Rp/kg

URAIAN ANALISA ALAT

No.

URAIAN

KODE

KOEF.

SATUAN

KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

ASPHALT FINISHER 72.4 10.0 6.0 1,400.0 310,000,000

E02 HP Ton Tahun Jam Rupiah

5.

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

31,000,000 0.24323

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

48,471.41

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

442.86

Rupiah

Biaya Pasti per Jam C. 1. 2.

48,914.27

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 97,631.40 65,160.00 13,839 Rupiah Rupiah

3.

Perawatan dan perbaikan

38,750.00

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 241,090.69 290,004.95

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

BULLDOZER 100-150 HP 140.0 HP 5.0 Tahun 2,000.0 Jam 520,000,000 Rupiah

E04

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

52,000,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

64,913.88

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

520.00

Rupiah

Biaya Pasti per Jam C. 1. 2.

65,433.88

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 100,688.00 21,000.00 7,150 Rupiah Rupiah

3.

Perawatan dan perbaikan

32,500.00

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 187,048.00 252,481.88

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

CONCRETE MIXER 0.3-0.6 M3 20.0 HP 500.0 Liter 2.0 Tahun 1,500.0 Jam 7,500,000 Rupiah

E06

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

750,000 0.59170

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

2,662.64

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

10.00

Rupiah

Biaya Pasti per Jam C. 1. 2.

2,672.64

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 14,384.00 4,800.00 438 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

875.00

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 46,206.50 48,879.14

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

CRANE 10-15 TON 138.0 15.0 5.0 2,000.0 836,000,000

E07 HP Ton Tahun Jam Rupiah

5.

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

83,600,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

104,361.54

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

836.00

Rupiah

Biaya Pasti per Jam C. 1. 2.

105,197.54

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 124,062.00 53,820.00 36,575 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

52,250.00

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 292,417.00 397,614.54

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

DUMP TRUCK 3.5 TON 100.0 3.5 5.0 2,000.0 200,000,000

E08 HP Ton Tahun Jam Rupiah

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

20,000,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

24,966.88

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

200.00

Rupiah

Biaya Pasti per Jam C. 1. 2.

25,166.88

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 98,890.00 36,000.00 8,750 Rupiah Rupiah

3.

Perawatan dan perbaikan

12,500.00

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

10,000.00 7,140.00 173,280.00 198,446.88

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir / Mekanik Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 10,000.00 7,140.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

EXCAVATOR 80-140 HP 120.0 HP 0.93 M3 5.0 Tahun 2,000.0 Jam 625,000,000 Rupiah

E10

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

62,500,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

78,021.49

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

625.00

Rupiah

Biaya Pasti per Jam C. 1. 2.

78,646.49

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 118,668.00 72,000.00 27,344 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

39,062.50

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 282,784.25 361,430.74

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

GENERATOR SET 180.0 135.0 5.0 2,000.0 123,000,000

E12 HP KVA Tahun Jam Rupiah

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

12,300,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

15,354.63

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

123.00

Rupiah

Biaya Pasti per Jam C. 1. 2.

15,477.63

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 153,729.00 37,800.00 5,381 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

7,687.50

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 230,307.75 245,785.38

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

MOTOR GRADER >100 HP 135.0 HP 10,800.0 5.0 Tahun 2,000.0 Jam 510,000,000 Rupiah

E13

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

51,000,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

63,665.53

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

510.00

Rupiah

Biaya Pasti per Jam C. 1. 2.

64,175.53

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 145,638.00 40,500.00 22,313 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

31,875.00

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 266,035.50 330,211.03

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

WHEEL LOADER 1.0-1.6 M3 105.0 HP 1.5 M3 5.0 Tahun 2,000.0 Jam 645,000,000 Rupiah

E15

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

64,500,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

80,518.17

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

645.00

Rupiah

Biaya Pasti per Jam C. 1. 2.

81,163.17

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 113,274.00 31,500.00 28,219 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

40,312.50

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 239,015.25 320,178.42

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

THREE WHEEL ROLLER 6-8 T 55.0 HP 8.0 Ton 5.0 Tahun 2,000.0 Jam 264,000,000 Rupiah

E16

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

26,400,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

32,956.28

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

264.00

Rupiah

Biaya Pasti per Jam C. 1. 2.

33,220.28

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 59,334.00 41,250.00 11,550 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

16,500.00

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 154,344.00 187,564.28

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

TANDEM ROLLER 6-8 T. 82.0 HP 8.1 Ton 5.0 Tahun 2,000.0 Jam 366,300,000 Rupiah

E17

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

36,630,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

45,726.83

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

366.30

Rupiah

Biaya Pasti per Jam C. 1. 2.

46,093.13

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 88,461.60 61,500.00 16,026 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

22,893.75

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 214,590.98 260,684.11

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

TIRE ROLLER 8-10 T. 100.5 9.0 5.0 2,000.0 386,100,000

E18 HP Ton Tahun Jam Rupiah

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

38,610,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

48,198.55

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

386.10

Rupiah

Biaya Pasti per Jam C. 1. 2.

48,584.65

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 108,419.40 75,375.00 16,892 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

24,131.25

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 250,527.53 299,112.18

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

VIBRATORY ROLLER 5-8 T. 82.0 HP 7.050 Ton 5.0 Tahun 2,000.0 Jam 431,200,000 Rupiah

E19

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

43,120,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

53,828.58

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

431.20

Rupiah

Biaya Pasti per Jam C. 1. 2.

54,259.78

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 88,461.60 61,500.00 18,865 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

26,950.00

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 221,486.60 275,746.38

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

CONCRETE VIBRATOR 5.5 HP 25.0 4.0 Tahun 1,000.0 Jam 18,100,000 Rupiah

E20

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

1,810,000 0.32923

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

5,363.23

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

36.20

Rupiah

Biaya Pasti per Jam C. 1. 2.

5,399.43

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 4,944.50 825.00 1,131 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

3,167.50

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 35,778.25 41,177.68

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

STONE CRUSHER 220.0 30.0 5.0 2,000.0 693,000,000

E21 HP T/Jam Tahun Jam Rupiah

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

69,300,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

86,510.22

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

693.00

Rupiah

Biaya Pasti per Jam C. 1. 2.

87,203.22

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 237,336.00 165,000.00 30,319 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

43,312.50

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 2 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 20,000.00 511,677.25 598,880.47

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

WATER PUMP 70-100 mm 6.0 HP 3.0 Tahun 2,000.0 Jam 10,200,000 Rupiah

E22

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

1,020,000 0.41635

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

1,911.04

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

10.20

Rupiah

Biaya Pasti per Jam C. 1. 2.

1,921.24

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 6,472.80 3,600.00 446 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

637.50

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 36,866.55 38,787.79

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

WATER TANKER 3000-4500 L. 100.0 HP 4,000.0 Liter 5.0 Tahun 2,000.0 Jam 135,200,000 Rupiah

E23

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

13,520,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

16,877.61

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

135.20

Rupiah

Biaya Pasti per Jam C. 1. 2.

17,012.81

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 89,900.00 42,000.00 5,915 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

8,450.00

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 171,975.00 188,987.81

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

PEDESTRIAN ROLLER 8.8 835.000 3.0 2,000.0 77,000,000

E24 HP Ton Tahun Jam Rupiah

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

7,700,000 0.41635

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

14,426.49

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

77.00

Rupiah

Biaya Pasti per Jam C. 1. 2.

14,503.49

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 7,911.20 2,112.00 3,369 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

4,812.50

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 43,914.45 58,417.94

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

CONCRETE PUMP 100.0 8.00 6.0 2,000.0 126,000,000

E28 HP M3 Tahun Jam Rupiah

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

12,600,000 0.24323

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

13,790.90

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

126.00

Rupiah

Biaya Pasti per Jam C. 1. 2.

13,916.90

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 89,900.00 24,000.00 5,513 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

7,875.00

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 152,997.50 166,914.40

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

TRAILER 20 TON 175.0 20.00 6.0 2,000.0 372,900,000

E29 HP Ton Tahun Jam Rupiah

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

37,290,000 0.24323

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

40,814.49

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

372.90

Rupiah

Biaya Pasti per Jam C. 1. 2.

41,187.39

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 157,325.00 52,500.00 16,314 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

23,306.25

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 275,155.63 316,343.02

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

WELDING SET 40.0 250.00 5.0 2,000.0 20,100,000

E32 HP Amp Tahun Jam Rupiah

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

2,010,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

2,509.17

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

20.10

Rupiah

Biaya Pasti per Jam C. 1. 2.

2,529.27

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 35,960.00 3,600.00 879 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

1,256.25

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 67,405.63 69,934.90

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

BORE PILE MACHINE 150.0 2,000.00 6.0 2,000.0 2,200,000,000

E33 HP Meter Tahun Jam Rupiah

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

220,000,000 0.24323

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

240,793.46

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

2,200.00

Rupiah

Biaya Pasti per Jam C. 1. 2.

242,993.46

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms Pelumas Biaya bengkel = (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W (12,5 % - 17,5 %) x B W H I J 161,820.00 112,500.00 96,250 Rupiah Rupiah Rupiah

3.

Perawatan dan perbaikan

137,500.00

Rupiah

4. 5.

Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

L M P S

15,710.00 10,000.00 533,780.00 776,773.46

Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

CONCRETE PAN MIXER 134 HP 600.00 Liter 10.0 Tahun 1,500.0 Jam 0 Rupiah

E43

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

0 0.17698

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

Rupiah

Biaya Pasti per Jam C. 1.

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms H 144,559.20 Rupiah

2.

Pelumas Biaya bengkel

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

I J

100,500.00 -

Rupiah Rupiah

3. 4. 5.

Perawatan dan = (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

K L M P T

0.00 15,710.00 30,000.00 290,769.20 290,769.20

Rupiah Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

TRUK MIXER (AGITATOR) 220 HP 5.00 M3 5.0 Tahun 2,000.0 Jam 250,000,000 Rupiah

E49

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

25,000,000 0.27741

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

31,208.59

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

250.00

Rupiah

Biaya Pasti per Jam C. 1.

31,458.59

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms H 237,336.00 Rupiah

2.

Pelumas Biaya bengkel

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

I J

165,000.00 10,938

Rupiah Rupiah

3. 4. 5.

Perawatan dan = (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 1 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

K L M P T

15,625.00 15,710.00 10,000.00 454,608.50 486,067.09

Rupiah Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

URAIAN ANALISA ALAT


No. URAIAN KODE KOEF. SATUAN KET.

A. 1. 2. 3. 4.

URAIAN PERALATAN Jenis Peralatan Tenaga Kapasitas Alat Baru : a. Umur Ekonomis b. Jam Kerja Dalam 1 Tahun c. Harga Alat

Pw Cp A W B

TRONTON 150.0 15.0 10.0 1,500.0 276,000,000

E35 HP Ton Tahun Jam Rupiah

5.

B. 1. 2. 3.

BIAYA PASTI PER JAM KERJA Nilai Sisa Alat = 10 % x B Faktor Angsuran Modal = i x (1 + i)^A (1 + i)^A - 1 (B-C)xD W

C D

27,600,000 0.17698

Rupiah -

Biaya Pasti per Jam : a. Biaya Pengembalian Modal =

29,308.58

Rupiah

b. Asuransi, dll =

0.002 x B W = (E+F)

368.00

Rupiah

Biaya Pasti per Jam C. 1.

29,676.58

Rupiah

BIAYA OPERASI PER JAM KERJA Bahan Bakar = (12%-15%) x Pw x Ms H 161,820.00 Rupiah

2.

Pelumas Biaya bengkel

= (2.5%-3%) x Pw x Mp (6.25% dan 8.75%) x B W

I J

112,500.00 16,100

Rupiah Rupiah

3. 4. 5.

Perawatan dan = (12,5 % - 17,5 %) x B perbaikan W Operator = ( 1 Orang / Jam ) x U1 Pembantu Operator = ( 3 Orang / Jam ) x U2 Biaya Operasi per Jam = (H+I+K+L+M)

K L M P T

23,000.00 15,710.00 30,000.00 359,130.00 388,806.58

Rupiah Rupiah Rupiah Rupiah Rupiah

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E. 1. 2. 3. 4. 5. 6. 7.

LAIN - LAIN Tingkat Suku Bunga Upah Operator / Sopir Upah Pembantu Operator / Pmb.Sopir Bahan Bakar Bensin Bahan Bakar Solar Minyak Pelumas PPN diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan

i U1 U2 Mb Ms Mp

12.00 15,710.00 10,000.00 8,990.00 8,990.00 30,000.00

% / Tahun Rp./Jam Rp./Jam Liter Liter Liter

DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA


BIAYA

No.

URAIAN

KO DE

HP

KAP.

HARGA ALAT

SEWA ALAT/JAM (di luar PPN)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53

ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3.5 TON DUMP TRUCK 10 TON EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER TRONTON COLD MILLING ROCK DRILL BREAKER COLD RECYCLER HOT RECYCLER AGGREGAT (CHIP) SPREADER ASPHALT DISTRIBUTOR SLIP FORM PAVER CONCRETE PAN MIXER CONCRETE BREAKER ASPAHLT TANKER CEMENT TANKER CONDRETE MIXER (350) VIBRATING RAMMER TRUK MIXER (AGITATOR) BORE PILE MACHINE CRANE ON TRACK 75-100 TON BLENDING EQUIPMENT ASPHALT LIQUID MIXER

E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E36 E37 E38 E39 E40 E41 E42 E43 E44 E45 E46 E47 E48 E49 E50 E51 E52 E34a

150.0 72.4 4.0 140.0 60.0 20.0 138.0 100.0 190.0 120.0 190.0 180.0 135.0 70.0 105.0 55.0 82.0 100.5 82.0 5.5 220.0 6.0 100.0 8.8 4.7 0.0 345.0 100.0 175.0 25.0 125.0 40.0 150.0 5.0 150.0 248.0 3.0 900.0 400.0 115.0 115.0 105.0 134.0 290.0 190.0 190.0 20.0 4.2 220.0 125.0 200.0 50.0 40.0

30.0 T/Jam 10.0 Ton 850.0 Liter 5,000.0 5,000.00 500.0 Liter 15.0 Ton 3.5 Ton 10.0 Ton 0.9 10.0 135.0 10,800.0 0.8 1.5 8.0 8.1 9.0 7.1 25.0 30.0 4,000.0 835.00 121.00 1,330.00 2,005.00 8.00 20.00 2.50 35.0 250.0 2,000.0 1,000.0 15.0 1,000.0 2.2 3.0 3.5 4,000.0 2.5 600.0 20.0 4,000.0 4,000.0 350.0 80.0 5.0 60.0 75.0 30.0 M3 ton KVA 10,800.00 M3 M3 Ton Ton Ton Ton 25.00 T/Jam Liter Ton Ton 1,330.00 2,005.00 M3 Ton Ton Ton Amp Meter Liter Ton m M M M Liter M Liter m3/jam liter liter liter KG M3 CM Ton Ton

1,917,000,000 310,000,000 132,000,000 520,000,000 85,800,000 7,500,000 836,000,000 200,000,000 330,000,000 625,000,000 165,000,000 123,000,000 510,000,000 623,700,000 645,000,000 264,000,000 366,300,000 386,100,000 431,200,000 18,100,000 693,000,000 10,200,000 135,200,000 77,000,000 29,150,000 29,150,000 159,500,000 126,000,000 372,900,000 122,100,000 1,000,000,000 20,100,000 2,200,000,000 16,500,000 276,000,000 100 770,000,000 100 100 100 70,000,000 100 100 100 100 100 35,000,000 100 380,000,000 100 100 100 16,500,000

2,097,778.19 290,004.95 71,301.84 252,481.88 155,350.84 48,879.14 397,614.54 198,446.88 449,769.85 361,430.74 411,475.92 245,785.38 330,211.03 298,477.03 320,178.42 187,564.28 260,684.11 299,112.18 275,746.38 41,177.68 598,880.47 38,787.79 188,987.81 58,417.94 51,896.84 32,475.26 886,904.35 166,914.40 316,343.02 99,767.50 471,011.57 69,934.90 776,773.46 39,068.19 364,927.94 367,450.35 276,503.23 1,173,193.25 555,292.25 236,030.52 218,905.78 190,730.66 264,953.29 419,354.03 300,595.80 274,402.40 77,144.79 45,993.51 397,340.81 229,881.59 286,760.42 115,712.64 103,076.19

20,000.0 Liter

DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

KET.

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: AGREGAT KASAR & HALUS : PENGADAAN AGREGAT KASAR & HALUS : M3

URAIAN ANALISA HARGA SATUAN

No.

URAIAN

KODE

KOEFISIEN

SATUAN

KETERANGAN

I 1 2 3 4

5 6 7 8 9 10 II 1

ASUMSI Bahan dasar (Batu dan Pasir) diterima di lokasi Alat Pemecah Batu (di Base Camp) Kegiatan dilakukan di dalam lokasi Base Camp Hasil produksi Alat Pemecah Batu : - Agregat Halus - Agregat Kasar Berat Isi Bahan : - Batu / Gravel - Pasir - Batu Pecah Harga Satuan Bahan Dasar : - Batu Kali - Pasir Biaya Operasi Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Kapasitas Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Faktor Efisiensi Alat : - Pemecah Batu (Stone Crusher) - Wheel Loader Faktor Kehilangan Material Agregat Halus masih perlu dicampur dengan pasir METHODE PELAKSANAAN Wheel Loader mengangkut batu/gravel dari tumpukan dan menuangkannya ke Alat Pemecah Batu. Batu/gravel dipecah dengan Alat Pemecah Batu (Stone Crusher) sehingga menghasilkan Agregat Batu Pecah Kasar dan Halus. Agregat Halus dicampur dengan pasir menggunakan Loader PERHITUNGAN HARGA SATUAN AGREGAT PRODUKSI ST. CRUSHER Kerja Stone Crusher memecah gravel : - Waktu kerja Stone Crusher - Produksi Stone Crusher 1 jam - Kebutuhan batu/gravel 1 jam

H K D1 D2 D3 Rp1 Rp2 Rp3 Rp4 Cp1 Cp2 Fa1 Fa2 Fh

30.00 70.00 1.20 1.40 1.35 125,400.00 140,700.00 598,880.47 320,178.42 30.00 1.50 0.85 0.90 1.10

% % Ton/M3 Ton/M3 Ton/M3 Rp./M3 Rp./M3 Rp./Jam Rp./Jam Ton/Jam M3 -

Berongga Berongga Berongga

Kap. Bucket

3 III III.1. 1.a.

= (Fa1 x Cp1) : D3 = (Fa1 x Cp1) : D1

Tst Qb Qg

1.00 18.89 21.25

Jam M3/Jam M3/Jam

Batu pecah

1.b.

Kerja Wheel Loader melayani Stone Crusher : - Kap. Angkut / rit = (Fa2 x Cp2) - Waktu Siklus (Muat, Tuang, Tunggu, dll) - Waktu kerja W.Loader memasok gravel = {(Qg : Ka) x Ts} : 60 menit Biaya Produksi Batu Pecah / M3 = {(Tst x Rp3) + (Tw x Rp4)} : Qb Harga Satuan Batu Pecah Produksi St.Crusher / M3 = {(Qg : Qb) x Fh x Rp1} + Bp

Ka Ts Tw

1.35 2.00 0.52

M3 menit Jam

1.c.

Bp

40,599.28

Rp./M3

1.d.

HSb

195,781.78

Rp./M3
Berlanjut

ITEM PEMBAYARAN JENIS PEKERJAAN SATUAN PEMBAYARAN

: AGREGAT KASAR & HALUS : PENGADAAN AGREGAT KASAR & HALUS : M3

URAIAN ANALISA HARGA SATUAN Lanjutan 1

No.

URAIAN

KODE

KOEFISIEN

SATUAN

KETERANGAN

III.2.

HARGA SATUAN AGREGAT PECAH MESIN 5-10 & 10-20 mm ( berlaku juga untuk Aggregat 20-30 mm) Agregat Kasar Produksi Stone Crusher = 70% (Tertahan saringan # 4 = 4,75mm) Harga Satuan Agregat Kasar / M3 = (K x HSb) / K HARGA SATUAN AGREGAT PECAH MESIN 0-5 mm (Agregat Halus) Agregat Halus Produksi Stone Crusher = 30% Harga Agregat Halus Prod. Stone Crsh.= (H x HSb) / H

K HSAk

70.00 195,781.78

% Rupiah Di Luar PPN

III.3. 3.a.

H Hs1

30.00 195,781.78

% Rupiah

per 1 M3

HARGA & JARAK RATA-RATA DARI SUMBER BAHAN (QUARRY)


No. URAIAN SATUAN HARGA ROYALTY (Rp) 30,000.00 30,000.00 30,000.00 40,000.00 30,000.00 JARAK QUARRY ( Km ) 16.00 16.00 16.00 16.00 16.00 25.00 20,000.00 15,000.00 10,000.00 15,000.00 16.00 10.00 0.00 5.00 KET.

1. 2. 3. 4. 5. 6. 7. 8 9

M01 - P a s i r Pasang M01 - P a s i r Beton M02 - Batu Kali M06 - Batu Belah/Batu Quarry Besar M07 - G r a v e l M10 - Aspal Cement (Pelabuhan) M16 - S i r t u M44 - Pasir Urug M08 - Tanah Timbun M09 - Material Pilihan

M3 M3 M3 M3 M3 KG M3 M3 M3 M3

Ke Base Camp Ke Lokasi Pek. Ke Lokasi Pek. Ke Lokasi Pek. Ke Base Camp Ke Base Camp Ke Lokasi Pek. Ke Lokasi Pek. Ke Lokasi Pek. Ke Lokasi Pek.

Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3

PETA LOKASI QUARRY


Ke Banda Aceh Km 289+100
Lokasi Quarry Patumbak - Gravel - Batu Kali - Batu Belah

Km 292+300

5,00 km Ke Medan Km 299+000

Km 295+000

3,00 km2,00 km

Base Camp ke Rantau Prapat

Lokasi Quarry

Catatan : Julok - Idi Rayeuk Idi Rayeuk - Lokasi Proyek Total Sumber Quarry Julok s/d Lokasi Proyek Lokasi Proyek - Base Camp Total Sumber Quarry s/d Base Camp Jarak Quarry Bt. Kali/Belah ke B. Camp diperkirakan Jarak Quarry Bt. Kali/Belah ke Lokasi Proyek diperkirakan Jarak Quarry Pasir ke Base Camp diperkirakan Jarak Quarry Pasir ke Lokasi Proyek diperkirakan = 24 km = 2 km = 26 km = 0,50 km = 18,50 km = 20,00 km = 20,00 km = 20,00 km = 20,00 km

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M01a - Pasir Pasang Lokasi : Quarry Tujuan : Base Camp

No.

URAIAN

KODE

KOEF.

SATUAN

HARGA SATUAN (Rp.)

I. 1 2 3 4 5 6 7 II. 1 2 3

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi Base Camp Harga satuan pasir di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume pasir URUTAN KERJA Pasir digali dengan Excavator Excavator sekaligus memuat pasir hasil galian ke dalam Dump Truck Dump Truck mengangkut pasir ke lokasi Base Camp PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10

L RpM01 RpE10 RpE09 Bil

16.00 1.00 1.00 1.00 1.60

Km M3 Jam Jam ton/m3

30,000.00 361,430.74 198,446.88

III.

(E10) V Fb Fa Ts1 T1 T2 Ts1 Q1

0.93 0.90 0.83 1.20 1.00 2.20 18.95

M3 menit menit menit M3 / Jam

Rp1

19,076.25

Rupiah

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

3.50 0.90 25.00 40.00 6.93 38.40 24.00 1.00 70.33

ton KM/Jam KM/Jam menit menit menit menit menit Bersambung

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M01a - Pasir Pasang Lokasi : Quarry Tujuan : Base Camp Lanjutan HARGA SATUAN (Rp.)

No.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Q2

1.68

M3 / Jam

Rp2

118,148.09

Rupiah

IV.

HARGA SATUAN DASAR BAHAN DI LOKASI BASE CAMP Harga Satuan Dasar Pasir = ( RpM01 + Rp1 + Rp2 ) Dibulatkan : M01 M01 167,224.34 167,200.00 Rupiah Rupiah

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M02 - Batu Kali Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

KODE

KOEF.

SATUAN

HARGA SATUAN (Rp.)

I. 1 2 3 4 5 6 7 II. 1 2 3

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke Lokasi Pekerjaan Harga satuan batu kali di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume batu kali URUTAN KERJA Batu kali digali dengan Excavator Excavator sekaligus memuat batu kali hasil galian ke dalam Dump Truck Dump Truck mengangkut batu kali ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10

L RpM02 RpE10 RpE09 Bil

16.00 1.00 1.00 1.00 1.44

Km M3 Jam Jam ton/m3

30,000.00 361,430.74 198,446.88

III.

(E10) V Fb Fa Ts1 T1 T2 Ts1 Q1

0.93 0.75 0.83 0.75 0.50 1.25 27.7884

M3 menit menit menit M3 / Jam

Rp1

13,006.53

Rupiah

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

3.50 0.83 40.00 60.00 5.25 24.00 16.00 5.00 50.25

ton KM/Jam KM/Jam menit menit menit menit menit Bersambung

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M02 - Batu Kali Lokasi : Quarry Tujuan : Lokasi Pekerjaan Lanjutan HARGA SATUAN (Rp.)

No.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Q2

2.41

M3 / Jam

Rp2

82,381.20

Rupiah

IV.

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar Batu kali = ( RpM02 + Rp1 + Rp2 ) Dibulatkan : M02 M02 125,387.73 125,400.00 Rupiah Rupiah

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M06 - Batu Belah Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

KODE

KOEF.

SATUAN

HARGA SATUAN (Rp.)

I. 1 2 3 4 5 6 7 8 9 II. 1 2 3

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke Lokasi Pekerjaan Harga satuan batu kali di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Harga Satuan Dasar Wheel Loader Harga Satuan Upah Pekerja Berat volume batu belah URUTAN KERJA Batu kali digali dengan Excavator Batu kali dibelah oleh Pekerja Dengan Wheel Loader batu belah dimuat ke Dump Truck yang mengangkut batu belah ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10

L RpM06 RpE10 RpE09 RpE15 RpL01 Bil

20.00 1.00 1.00 1.00 1.00 1.00 1.60

Km M3 Jam Jam Jam Jam ton/m3

40,000.00 361,430.74 198,446.88 320,178.42 6,420.00

III. 3.a

(E10) V Fb Fa Ts1 T1 T2 Ts1 Q1

0.93 0.75 0.83 0.75 0.50 1.25 27.7884

M3 menit menit menit M3 / Jam

Rp1 (E15) V Fb Fa Ts1 T1 T2 Ts1 Q2 Rp2

13,006.53

Rupiah

3.b

WHEEL LOADER Kapasitas Bucket Faktor Bucket Faktor Efisiensi Alat Waktu sklus - Muat - Lain-lain Kapasitas Produksi / Jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q2) x RpE15

1.50 0.75 0.83 0.75 0.50 1.25 44.82 7,143.65

M3 menit menit menit M3 / Jam Rupiah Bersambung

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M06 - Batu Belah Lokasi : Quarry Tujuan : Lokasi Pekerjaan Lanjutan HARGA SATUAN (Rp.)

No.

URAIAN

KODE

KOEF.

SATUAN

3.c

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

3.50 0.83 40.00 60.00 4.72 41.68 27.79 1.00 75.19

ton KM/Jam KM/Jam menit menit menit menit menit

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q3) x RpE08 3.d PEKERJA Produksi menentukan : Excavator Hasil galian batu / hari = Q1 x 7 Jam Kebutuhan Pekerja Biaya Pekerja / M3 = { (7 Jam x P) : Qt } x RpL01

Q3

1.45

M3 / Jam

Rp3

136,978.11

Rupiah

Q1 Qt P

27.7884 M3 / Jam 194.5188 M3 / 7 jam 15.00 Orang

Rp4

3,465.47

Rupiah

IV.

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar Batu belah = ( RpM06 + Rp1 + Rp2 + Rp3 + Rp4 ) Dibulatkan : M06 M06 200,593.77 200,600.00 Rupiah Rupiah

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M07 - Gravel Lokasi : Quarry Tujuan : Base Camp

No.

URAIAN

KODE

KOEF.

SATUAN

HARGA SATUAN (Rp.)

I. 1 2 3 4 5 6 7 II. 1 2 3

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke Lokasi Pekerjaan Harga satuan Gravel di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume gravel URUTAN KERJA Gravel digali dengan Excavator Excavator sekaligus memuat gravel hasil galian ke dalam Dump Truck Dump Truck mengangkut gravel ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10

L RpM07 RpE10 RpE09 Bil

20.00 1.00 1.00 1.00 2.20

Km M3 Jam Jam ton/m3

30,000.00 361,430.74 198,446.88

III.

(E10) V Fb Fa Ts1 T1 T2 Ts1 Q1

0.93 0.90 0.83 1.20 2.00 3.20 13.03

M3 menit menit menit M3 / Jam

Rp1

27,747.27

Rupiah

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

10.00 0.90 30.00 60.00 20.94 40.00 20.00 10.00 90.94

ton KM/Jam KM/Jam menit menit menit menit menit Bersambung

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M07 - Gravel Lokasi : Quarry Tujuan : Base Camp Lanjutan HARGA SATUAN (Rp.)

No.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Q2

2.70

M3 / Jam

Rp2

73,521.77

Rupiah

IV.

HARGA SATUAN DASAR BAHAN DI LOKASI BASE CAMP Harga Satuan Dasar Gravel = ( RpM07 + Rp1 + Rp2 ) Dibulatkan : M07 M07 131,269.04 131,300.00 Rupiah Rupiah

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M16 - Sirtu Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

KODE

KOEF.

SATUAN

HARGA SATUAN (Rp.)

I. 1 2 3 4 5 6 7 II. 1 2 3

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi Base Camp Harga satuan Sirtu di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume sirtu URUTAN KERJA Sirtu digali dengan Excavator Excavator sekaligus memuat sirtu hasil galian ke dalam Dump Truck Dump Truck mengangkut sirtu ke lokasi Base Camp PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10

L RpM16 RpE10 RpE09 Bil

16.00 1.00 1.00 1.00 1.51

Km M3 Jam Jam ton/m3

20,000.00 361,430.74 198,446.88

III.

(E10) V Fb Fa Ts1 T1 T2 Ts1 Q1

0.93 0.90 0.83 0.60 0.80 1.40 29.77

M3 menit menit menit M3 / Jam

Rp1

12,139.43

Rupiah

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

3.50 0.83 40.00 60.00 4.67 24.00 16.00 1.00 45.67

ton KM/Jam KM/Jam menit menit menit menit menit Bersambung

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M16 - Sirtu Lokasi : Quarry Tujuan : Lokasi Pekerjaan Lanjutan HARGA SATUAN (Rp.)

No.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Q2

2.53

M3 / Jam

Rp2

78,517.22

Rupiah

IV.

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar Sirtu = ( RpM16 + Rp1 + Rp2 ) Dibulatkan : M16 M16 110,656.65 110,700.00 Rupiah Rupiah

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M44 - Pasir Urug Lokasi : Quarry Tujuan : Lokasi Pekerjaan No. URAIAN KODE KOEF. SATUAN HARGA SATUAN (Rp.)

I. 1 2 3 4 5 6 7 II. 1 2 3

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi pekerjaan Harga satuan pasir urug di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat volume pasir urug URUTAN KERJA pasir urug digali dengan Excavator Excavator sekaligus memuat pasir urug hasil galian ke dalam Dump Truck Dump Truck mengangkut pasir urug ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10

L RpM44 RpE10 RpE09 Bil

10.00 1.00 1.00 1.00 1.42

Km M3 Jam Jam ton/m3

15,000.00 361,430.74 198,446.88

III.

(E10) V Fb Fa Ts1 T1 T2 Ts1 Q1

0.93 0.90 0.83 1.50 1.00 2.50 16.67

M3 menit menit menit M3 / Jam

Rp1

21,677.55

Rupiah

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T2 T3 T4 Ts2

10.00 0.83 30.00 50.00 25.34 20.00 12.00 5.00 62.34

ton KM/Jam KM/Jam menit menit menit menit menit Bersambung

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M44 - Pasir Urug Lokasi : Quarry Tujuan : Lokasi Pekerjaan Lanjutan HARGA SATUAN (Rp.)

No.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Q2

5.63

M3 / Jam

Rp2

35,276.62

Rupiah

IV.

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar pasir urug = ( RpM44 + Rp1 + Rp2 ) Dibulatkan : M44 M44 71,954.17 72,000.00 Rupiah Rupiah

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M1c- Pasir Beton Lokasi : Quarry Tujuan : Lokasi Pekerjaan

No.

URAIAN

KODE

KOEF.

SATUAN

HARGA SATUAN (Rp.)

I. 1 2 3 4 5 6 7 II. 1 2 3

ASUMSI Menggunakan alat berat Kondisi Jalan : baik Jarak Quarry ke lokasi pekerjaan Harga satuan pasir beton di Quarry Harga Satuan Dasar Excavator Harga Satuan Dasar Dump Truck Berat isi volume pasir beton URUTAN KERJA pasir urug digali dengan Excavator Excavator sekaligus memuat pasir urug hasil galian ke dalam Dump Truck Dump Truck mengangkut pasir urug ke lokasi pekerjaan PERHITUNGAN EXCAVATOR Kapasitas Bucket Faktor Bucket Faktor Efisiensi alat Waktu siklus - Menggali / memuat - Lain-lain Kap. Prod. / jam = V x Fb x Fa x 60 Ts1 Biaya Excavator / M3 = (1 : Q1) x RpE10

L RpM44 RpE10 RpE09 Bil

16 1.00 1.00 1.00 2.35

Km M3 Jam Jam ton/m3

30,000.00 361,430.74 198,446.88

III.

(E10) V Fb Fa Ts1 T1 T2 Ts1 Q1

0.93 0.80 0.80 1.50 2.00 3.50 10.20

M3 menit menit menit M3 / Jam

Rp1

35,422.48

Rupiah

DUMP TRUCK Kapasitas bak Faktor efisiensi alat Kecepatan rata-rata bermuatan Kecepatan rata-rata kosong Waktu siklus - Muat = (V x 60)/(Q1 x Bil) - Waktu tempuh isi = (L/v1) x 60 - Waktu tempuh kosong = (L/v2) x 60 - Lain-lain

(E09) V Fa v1 v2 Ts2 T1 T1 T2 T4 Ts2

10.00 0.83 25.00 60.00 25.02 38.40 16.00 1.00 80.42

ton KM/Jam KM/Jam menit menit menit menit menit Bersambung

ANALISA HARGA DASAR SATUAN BAHAN


Jenis : M1c- Pasir Beton Lokasi : Quarry Tujuan : Lokasi Pekerjaan Lanjutan HARGA SATUAN (Rp.)

No.

URAIAN

KODE

KOEF.

SATUAN

Kapasitas Produksi / Jam = V x Fa x 60 Ts2 x Bil Biaya Dump Truck / M3 = (1 : Q2) x RpE08

Q2

2.64

M3 / Jam

Rp2

75,311.69

Rupiah

IV.

HARGA SATUAN DASAR BAHAN DI LOKASI PEKERJAAN Harga Satuan Dasar pasir urug = ( RpM44 + Rp1 + Rp2 ) Dibulatkan : M44 M44 140,734.17 140,700.00 Rupiah Rupiah