Anda di halaman 1dari 3

Form 8.2. Installation checklist: Tanks Note: A separate checklist should be included for each tank installed.

Client name: Completed by: 1. Tank description a. Type of tank: Septic tank Trash tank "oldin! tank P#mp tank S#r!e$%lo& e'#ali(ation tank b. c. )an#fact#rer: )odel #: )aterial: Concrete *ther: %iber!lass Plastic$Poly Reference #: Permit(s) #: Time:

Form

of

Date: Comments: (/ndicate if photo!raphs &ere taken)

rease trap Processin! tank Siphon tank Recirc#lation tank

d. e.

)an#fact#rer+s load,bearin! ratin!: Tank dimensions and capacities: .-terior dimensions: .-terior hei!ht of inlet in0ert: .-terior hei!ht of o#tlet in0ert: .ffecti0e depth: allons per inch (!pi): in.

(psf or ma-im#m b#rial depth) /nterior dimensions:

Total tank capacity: !al$in. !al 12 4) 12 12 4) )id 3es 3es 3es 1o !al 1o 1o !al Top

!al

Compartmented: Capacities of compartments: 1) /f compartmented dosin! tank5 &all rated: )#ltiple tanks: Capacities of m#ltiple tanks: 1) f. Tank seam 6ocation: Sections 7oined: Pre,deli0ery by s#pplier

!al 12

*nsite by s#pplier

*nsite by installer T&o,part epo-y *ther:

Tank sealant(s) #sed: 8#tyl mastic 8#tyl tapes &rap T&o,part epo-y and stainless fasteners !. 4. Tank str#ct#ral inte!rity 0erified prior to settin!

.-ca0ation$ Settin! tank a. Stake location of tank(s) b. c. d. e. 9erify re'#ired inlet$o#tlet ele0ations :ater present in e-ca0ation /f yes5 de&aterin! performed d#rin! constr#ction 3es 1o ft

8ottom of e-ca0ation .le0ation: 6e0el %ree of rock or debris 8eddin! material 12 Description: Depth: %ree of clods5 lar!e rocks5 fro(en matter and debris /f &ashed rock beddin!5 mi!ration of fines has been mana!ed Compacted 12 3es Tank oriented correctly Str#ct#ral inte!rity of tank 0erified Tank installed le0el 3es

in.

1o

f. !. h.

1o

;.

/ns#lation Tank 2ccess riser 6id

12 Type: Type: Type: 3es 12 3es 1o 1o

Comments: (/ndicate if photo!raphs &ere taken)

<.

%loatation (b#oyancy) pre0ention a. 8#oyancy calc#lation pro0ided on desi!n b. 2nti,floatation implemented: Tank collar Dead man *ther:

=. 8ackfill a. 8ackfill material: /f &ashed rock backfill5 mi!ration of fines has been mana!ed b. c. >. Compacted %ree of clods5 lar!e rocks5 fro(en matter and debris 12 3es 3es 3es 1o 1o 1o

Pipin! a. Pipin! in appropriate se'#ence (inlet$o#tlet) b. Pipe specifications (material and nominal diameter) /nlet: *#tlet$S#pply line: Ret#rn line: .lectrical cond#it: ?oints in e-ca0ated area Pipes appropriately slee0ed in e-ca0ated area Type of slee0e: Pipin! sealed (incl#din! electrical cond#it) Type of sealant: /nlet: *#tlet$S#pply line: Ret#rn line: .lectrical cond#it: Recirc#lation de0ice Type of de0ice: 12

12 ("oldin! tank) 12 12 3es 3es 3es 1o 1o 1o

c. d. e.

12 12 12 3es 1o

f. @.

8affles$compartments$0a#lts a. /nlet baffle i. Type 12 Sanitary tee ii. /nstallation by )an#fact#rer b.

Plate Contractor

:all

*#tlet baffle i. Type 12 Pipe tee or sanitary tee )odel: )an#fact#rer: ii. /nstallation by )an#fact#rer Contractor

Plate

.ffl#ent screen

c.

Compartment baffles: i. Type 12 Tee baffle ii. /nstallation by:

Slot

Center hole

)an#fact#rer iii. d. 9erify air passa!e

Contractor

Solids mana!ement Type: Shield )an#fact#rer: )odel #:

12 9a#lt &ith basket 9a#lt &ith screen

Comments: (/ndicate if photo!raphs &ere taken)

A.

Tank access and 0entin! a. 2ccess location and si(e (diameter and depth): /nlet: *#tlet: Center: b. 2ccess risers and associated lids Riser man#fact#rer: )odel #: 6id man#fact#rer: )odel #: Traffic rated (22S"T* ",4B$"S,4B) /nterior access: Second lid /nstallation Cast in place /nstalled by tank man#fact#rer /nstalled on the site by the contractor Sealant #sed in tank$riser connections Type of sealant: 9entin! Thro#!h pl#mbin! stack Tank 0ent (describe): Proprietary filter: %ilter man#fact#rer: )odel #: 12 3es 1o 3es 1o

rate

3es 1ettin!

1o 12

c.

d. e.

C.

Tank &aterti!htness testin!: 1ot re'#ired )an#fact#rer,tested %ield tested )ethod: Res#lts:

:ater Pass

9ac##m %ail 3es 12 1o

1B. Septic tank$!rease trap$holdin! tank alarm(s) a. "i!h,&ater alarm(s) present )echanical non,po&ered alarm .lectrical po&ered alarm )an#fact#rer: )odel #: b. Remote telemetry )an#fact#rer: )odel #:

3es

1o

11. %inal co0er a. )aterial: b. Sloped to allo& for settlin! and sheddin! &ater 3es Topsoil dressed )#lched 1o

14. Site stabili(ation .rosion control meas#res in place Seeded

Anda mungkin juga menyukai