174 kW
174 kW 4
Annual Energy Energy Electricity Energy (300days) Peak / Off- charge Hours of Usage usage Charge Energy Charge peak / Day (Rs) operation (kWh) (kWh) (Rs/Day) (Rs/Yr) Off - peak 7.00 7 1218 304.5 2131.50 639450.00 Day 11.30 2.5 0 0 0.00 0.00 Day 11.30 9 1566 391.5 4423.95 1327185.00 Day 12.30 1.5 0 0 0.00 0.00 Peak 21.00 4 0 0 0.00 0.00 Total 1966635.00 Annual Saving 404246.25
Applications
Off-peak air conditioning Industrial / process cooling District cooling
Conclusion
If the application operates during the peak hours more benefits can be taken because of higher difference of energy charge per unit between the peak and off-peak Saving balances the initial installation cost Partial load shift systems often offer the lowest combination of capital and operating cost Operating cost and net capital cost should be analyzed using the life cycle cost method or other method to determine which design is best for the project Other items to be considered are space requirement's, reliability, and ease of interface with the planned delivery equipment
Thank you
Customer Category
Maximum Fuel Demand adjustment Charge charge (% permonth of Energy (LKR/kVA) Charge)
Peak (1830hr 2230hr) Industry I-1 I-2 I-3 Street Lighting 12.50 21.00 24.00 17.00
Off-Peak Day (0530hr(2230hr1830hr) 0530hr) 600.00 3000.00 3000.00 None 15.00 15.00 15.00 0.00
7.00 6.00
11.30 10.50