Tim Lemmon
Trimble 3D Solutions
Aerial
Mobile
Terrestrial
Positioning
Benefits
Verification and delivery of result before leaving the field
Benefits
Ensure complete data coverage Verify and deliver result in the field
Trimble RealWorks
Easy Guide Step workflow
Semi automatic clearance measurement
Automation and guided workflows (per application) are critical to efficiently generate deliverables from 3D data
Various tank calibration methods standardized by ISO ISO 7507 Each countrys regulatory body develops its own standard referencing to ISO 7507
United States: API 2550/2551/2552/2553 / MPMS Germany: PTB A-4.2 China: JJG168 - 2005
Volumes to determine
Filling Volume
Sump Volume
Traditional Methods
Manual strapping method
Optical reference line method Optical triangulation Internal / external total station measurement
Trimble along with German National Metrology Institute (PTB), developed a new tank calibration method using Trimble CX
Certified by PTB (the only one worldwide)
3D Scanning Advantages
Dramatic increase in efficiency and accuracy
Result in 1 day compared to traditional 3 More accurate than traditional standards Highly repeatable
Environmentally safe
No need to contaminate water to measure sump
Barges
1 setup near reference mark (dipping plate), which defines location between sump and remaining space
14.00 m 12.40 m
0.00 m 416.393 m 2.20 m 416.328 m 2.60 m 416.133 m 2.50 m 415.861 m 2.60 m 415.418 m 2.50 m 415.040 m
1082.20 m 1998.19 m 72.331 m 1039.99 m 3038.18 m 72.315 m 1080.66 m 4118.85 m 72.382 m 1038.07 m 5156.92 m 72.263 m subtotal 5156.92 m sump volume 78.24 m total 5235.16 m
14.00 m 12.40 m
Results are exported to a filling table. Corrections for other factors still need to be applied.
No. 1 2 3 4 5 6
share of height
area
cumulative volume
circumference
0.00 m 416.393 m 2.20 m 416.328 m 2.60 m 416.133 m 2.50 m 415.861 m 2.60 m 415.418 m 2.50 m 415.040 m
1082.20 m 1998.19 m 72.331 m 1039.99 m 3038.18 m 72.315 m 1080.66 m 4118.85 m 72.382 m 1038.07 m 5156.92 m 72.263 m subtotal 5156.92 m sump volume 78.24 m total 5235.16 m
14.00 m 12.40 m
Tank Inspection
Section Deformation
Section View
Blue line: total station Green line: 3D scanning
Much more detail with 3D scanning data
Vertical Deformation
Vertical Deformation
Containment Analysis
Measure and analyze containment areas Confirm volumes, quantify deformation and check side slopes Collect factual information of any changes for as-built (QC) records
V = Vi + Vp + VA + VB + VL Vi volume of each ring Vp correction for hydrostatic effects VA correction for deadwood VB bottom volume VL correction for tank tilt