CRONOGRAMA VALORIZADO DE OBRA

PROYECTO: CREACION DE ESCALERA PARA EL ACCESO AL 2DO NIVEL DEL PABELLON DE 5TO GRADO DE PRIMARIA, EN LA IEP N 20135 DISTRITO DE CHILCA - CAETE - LIMA
DISTRITO

: CHILCA

M.D.CH.

PROVINCIA

: CAETE

FECHA : 07/08/2014
FECHA : 07/08/2015

M.D.CH.

REGION

: LIMA

MES 1
ITEM

DESCRIPCIN

UNID.

METRADO

MES 2

PRECIO PARCIAL METRADO PARCIAL METRADO PARCIAL


30 dias

01
01.01
01.02
01.03
02
02.01
02.02
02.03
02.04
03
03.01
03.02
03.03
03.04
03.05
03.06
03.07
03.08
04
04.01

07
07.01
07.02
07.03
07.04
07.05

OBRAS PROVISIONALES
Cartel de identificacion de la obra 3.60m.2.40m
Demolicin de Estructuras Existentes
Transporte de Equipo Liviano y Herramientas
OBRAS PRELIMINARES
Limpieza de Terreno Manual
Trazo, Niveles y Replanteo
Elementos de Prevencin
Elementos de Proteccin
MOVIMIENTO DE TIERRAS
Excavacin Manual para Zapatas
Excavacion manual de zanjas para cimientos
Corte supericial manual para veredas
Relleno Compactado con material de prestamo
Relleno de zanjas apisonado con material propio en capas de 0.20m
Refine, nivelacin y compactacin de superficie interior
Elim.Mat.Carg.Manual/Volquete 10M3, V=30, D=5Km
Afirmado de 4" para vereda
CONCRETO SIMPLE
Concreto solado mezclado 1:12 - cemento - hormigon;e=10cm
Concreto cimentacion corridos mezclado 1:10 cemento-hormigon 30%
piedra mediana
Concreto F'c=175kg/cm2 sobrecimiento reforzado
Acero Corrugado Fy =4200 Kg/cm2 Grado 60
Encofrado y desencofrado normal en s/c
CONCRETO ARMADO
ZAPATAS
Concreto zapatas fc=210kg/cm2
Acero Corrugado Fy =4200 Kg/cm2 Grado 60
COLUMNAS
Concreto columnas fc=210kg/cm2
Encofrado y desencofrado normal en columnas
Acero Corrugado Fy =4200 Kg/cm2 Grado 60
VIGAS
Concreto vigas fc=210kg/cm2
Encofrado y desencofrado normal en vigas
Acero Corrugado Fy =4200 Kg/cm2 Grado 60
LOSA ALIGERADA
Concreto en losa aligerada fc=210kg/cm2
Encofrado y desencofrado de losa aligerada
Acero Corrugado Fy =4200 Kg/cm2 Grado 60
Ladrillo hueco arcilla h = 15cm para techo aligerado
ESCALERA
Concreto en losa aligerada fc=210kg/cm2
Encofrado y desencofrado de losa aligerada
Acero Corrugado Fy =4200 Kg/cm2 Grado 60
ALBAILERIA
Muros de ladrillo KK de arcilla - 18 Huecos de soga con mezcla 14 x
15cm
REVOQUES Y ENLUCIDOS
Tarrajeo muros exteriores
Tarrajeo muros interiores
Tarajeo de cieloraso
Tarrajeo de columnas (incluido aristas)
Tarrajeo de vigas (incluido aristas)

07.06

Tarrajeo fondo de pasos-contrapasos-descanso y fondo de escalera

m2

28.44

31.13

885.34

08.00
08.01
08.02
08.03
08.04
08.05
08.06

PISOS Y VEREDAS
Concreto falsopiso mezclado 1:6 cemento - hormigon e=0.10 m
m2
Concreto contrapiso de 48.mm.
m2
Piso de cemento pulido e= 5cm. (4cm Mortero 1:5 Acabado 1cm Mortero 1:2)m2
Encofrado y desencofrado normal en veredas
m2
Concreto en veredas fc = 175 kg/cm2 e=0.10 m
m2
Juntas Asfaltica en veredas
m

29.08
29.08
29.08
1.91
9.75
7.80

20.75
22.06
22.84
32.42
6.86
23.92

603.41
641.50
664.19
61.92
66.89
186.58

04.02
04.03
04.04
04.05
05
05.01
05.01.01
05.01.02
05.02
05.02.01
05.02.02
05.02.03
05.03
05.03.01
05.03.02
05.03.03
05.04
05.04.01
05.04.02
05.04.03
05.04.04
05.05
05.05.01
05.05.02
05.05.03
06
06.01

15 dias

954.68
58.53
100.21

954.68
256.95
100.21

1.00
4.39
1.00

954.68
256.95
100.21

0.00
0.00
0.00

0.00
0.00
0.00

m2
m2
est
est

45.03
2.82
45.03
2.04
1.00 249.70
1.00 1,325.25

126.98
91.86
249.70
1,325.25

45.03
45.03
1.00
1.00

126.98
91.86
249.70
1,325.25

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

m3
m3
m3
m3
m3
m3
m3
m2

6.48
9.36
1.60
13.53
0.83
37.95
34.88
10.69

209.30
264.51
30.14
550.94
18.77
147.25
1,006.64
95.14

6.48
9.36
1.60
13.53
0.83
37.95
34.88
0.00

209.30
264.51
30.14
550.94
18.77
147.25
1,006.64
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
10.69

0.00
0.00
0.00
0.00
0.00
0.00
0.00
95.14

m2

8.10

19.57

158.52

8.10

158.52

0.00

0.00

m3

9.36

140.88

1,318.64

m3
kg
m2

3.71
69.86
14.83

224.99
3.68
48.27

834.71
257.08
715.84

9.36
3.71
69.86
14.83

1,318.64
834.71
257.08
715.84

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

m3
kg

5.76
90.40

246.78
3.68

1,421.45
332.67

5.76
90.40

1,421.45
332.67

0.00
0.00

0.00
0.00

m3
m2
kg

5.18
61.36
722.41

369.50
52.03
3.68

1,914.01
3,192.56
2,658.47

5.18
61.36
722.41

1,914.01
3,192.56
2,658.47

0.00
0.00
0.00

0.00
0.00
0.00

m3
m2
kg

1.95
65.86
668.60

269.18
58.64
3.68

524.90
3,862.03
2,460.45

1.95
65.86
668.60

524.90
3,862.03
2,460.45

0.00
0.00
0.00

0.00
0.00
0.00

m3
m2
kg
und

7.80
39.00
133.17
328.41

269.18
38.93
3.68
2.33

2,099.60
1,518.27
490.07
765.20

7.80
39.00
133.17
328.41

2,099.60
1,518.27
490.07
765.20

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

m3
m2
kg

5.40
18.04
384.40

363.74
73.38
3.68

1,964.20
1,323.78
1,414.59

0.00
0.00
0.00

0.00
0.00
0.00

5.40
18.04
384.40

1,964.20
1,323.78
1,414.59

m2

50.82

55.41

2,815.94

50.82

2,815.94

0.00

0.00

m2
m2
m2
m2
m2

53.31
63.09
24.81
13.78
21.44

20.40
18.71
29.04
24.85
33.47

1,087.52
1,180.41
720.48
342.43
717.60

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

63.09
24.81
13.78
21.44

1,180.41
720.48
342.43
717.60

0.00

0.00

28.44

885.34

0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00

29.08
29.08
29.08
1.91
9.75
7.80

603.41
641.50
664.19
61.92
66.89
186.58

und
m3
glb

1.00
4.39
1.00

32.30
28.26
18.84
40.72
22.61
3.88
28.86
8.90

CRONOGRAMA VALORIZADO DE OBRA


PROYECTO: CREACION DE ESCALERA PARA EL ACCESO AL 2DO NIVEL DEL PABELLON DE 5TO GRADO DE PRIMARIA, EN LA IEP N 20135 DISTRITO DE CHILCA - CAETE - LIMA
DISTRITO

: CHILCA

M.D.CH.

PROVINCIA

: CAETE

FECHA : 07/08/2014
FECHA : 07/08/2015

M.D.CH.

REGION

: LIMA

MES 1
DESCRIPCIN

ITEM
09.00
09.01
09.02
09.03
09.04
09.05
10.00
10.01
1.02
11.00
11.01
11.02
11.03
11.04
11.05
11.06
11.07
11.08
11.09
12.00
12.01

UNID.

PINTURA
Pintura latex en cielo raso (2 manos)
m2
Pintura latex en vigas -viguetas y columnas (2 manos)
m2
Pintura latex en muros interiores (2 manos)
m2
Pintura latex en muros exteriores (2 manos)
m2
Pintura en cielo raso en fondo de escalera (2 manos)
m2
CARPINTERIA DE MADERA
Puerta de madera tableros rebajados de 4.5mm, segn diseo
m2
Ventana de madera, segn diseo
est
INSTALACIONES ELECTRICAS
Salida de techo c/tubo.Sel(3/4), cable TW 14, caja liviana
pto
Salida de pared c/tubo.Sel(3/4), cable TW 14, caja liviana
pto
Salida de pared (braquetes) c/tubo.Sel(3/4), cable TW 14, caja liviana
pto
Salida p/luz c/tubo.Sel(3/4), cable TW 14, caja liviana
pto
Salida p/tomacorri.bipolar doble c/tubo.Sel(3/4), cable TW 14, caja liviana pto
Braquete economico BE 1x20w AF
und
Artefacto fluorescente Ras-E con equipo y lampara de 2x40w
und
Artefacto fluorescente plafn de 32 w circular con equipo, lmpara y pantallaund
acrlica
Tablero de distribucion con caja metalica
und
PRUEBAS DE CALIDAD
Pruebas de calidad
und
COSTO DIRECTO
GASTOS GENERALES 10%
UTILIDAD 10%
SUB TOTAL
IMPUESTO (IGV 18%)
TOTAL DE PRESUPUESTO
PORCENTAJES

METRADO

MES 2

PRECIO PARCIAL METRADO PARCIAL METRADO PARCIAL


30 dias

15 dias

22.60
47.62
67.46
67.46
11.38

10.47
8.71
8.53
7.90
13.00

236.62
414.77
575.43
532.93
147.94

0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00

22.60
47.62
67.46
67.46
11.38

236.62
414.77
575.43
532.93
147.94

0.68
1.00

350.00
135.00

238.00
135.00

0.00
0.00

0.00
0.00

0.68
1.00

238.00
135.00

2.00
4.00
2.00
3.00
2.00
2.00
1.00
1.00
1.00

65.67
65.67
65.67
96.63
95.18
100.89
194.81
43.10
330.93

131.34
262.68
131.34
289.89
190.36
201.78
194.81
43.10
330.93

2.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

131.34
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.00
4.00
2.00
3.00
2.00
2.00
1.00
1.00
1.00

131.34
262.68
131.34
289.89
190.36
201.78
194.81
43.10
330.93

12.00

5.10

61.20

0.00

0.00

12.00

61.20

48,747.69
4,874.77
4,874.77
58,497.23
10,529.50
69,026.73

32,804.93
3,280.49
3,280.49
39,365.91
7,085.86
46,451.77

14,986.57
1,498.66
1,498.66
17,983.89
3,237.10
21,220.99

100.00%

67.30%

30.74%

CRONOGRAMA VALORIZADO DE OBRA


PROYECTO:

CREACION DE ESCALERA PARA EL ACCESO AL 2DO NIVEL DEL PABELLON DE 5TO GRADO DE PRIMARIA, EN
LA IEP N 20135 DISTRITO DE CHILCA - CAETE - LIMA

DISTRITO

: CHILCA

PROVINCIA

: CAETE

REGION

: LIMA

GASTOS VARIABLES
Personal Profesional y Auxiliar
Descrpcin
Ingeniero Residente

Unidad

Personal

mes

%Participacin
1

Tiempo

100.00%

Sueldo/Jornal
1

Parcial

2,500.00
Subtotal

2,500.00
S/. 2,500.00

Personal Tcnico
Descrpcin
Ingeniero Residente

Unidad

Personal

mes

%Participacin
1

Tiempo

100.00%

Sueldo/Jornal
1

Parcial

635.00
Subtotal

635.00
S/. 635.00

GASTOS FIJOS
Liquidacin Final de Obra
Descrpcin
Liquidacin Final de Obra

Unidad

Personal

%Participacin

Tiempo

Sueldo/Jornal

est

Parcial

1,489.77
Subtotal

1,489.77
S/. 1,489.77

Varios
Descrpcin
tiles de escritorio

Unidad

Personal

%Participacin

Tiempo

Sueldo/Jornal

est

250.00
Subtotal
TOTAL G.G.

Parcial
250.00
S/. 250.00
S/. 4,874.77

Anda mungkin juga menyukai