Special Forces Appendix C Snow and Ice Loading Appendix EE Robert Lake Senior Development Engineer Transpower NZ Ltd.

Special Forces
Forces due to Short-Circuit Currents; Creeping Snow (on foundations/lower part of structure); Earthquakes; and, Mining Subsidence.

Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

20/07/2011

Forces due to Short-Circuit Currents


Different for simplex or bundled phases; IEC60865-1 provides simplified method; Based on initial/everyday tension in system; Terminal or landing spans, short strain spans critical, but may affect several spans from substation; Produces increased conductor tensions which may be greater than wind or other loading induced tensions.
Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

Forces due to Short-Circuit Currents


Only 2-phase short-circuit current considered; Pinch tensile force from sub-conductor attraction; Swing tensile force due to phase to phase attraction; Vertical drop tensile force due to phase to phase attraction; IEC60865-1 provides some example calculations.
Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

20/07/2011

Forces due to Short-Circuit Currents


Wn Coincident wind pressure of 25% ultimate; Ft tensions for non short-circuit spans; Fsc* maximum tension from 3 cases in IEC60865-1; 1.25 factor for exceptional load; Loading considered to be too quick to affect foundation significantly.
Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

Creeping Snow
Loading will probably be different in all situations; May involve taller pedestal outstands on foundations designed to accommodate lateral loading.

Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

20/07/2011

Earthquakes
Very topical; Generally not a major issue with loading for transmission lines; Location relative to fault line is important; Distribution poles with mounted transformers can involve significant impact; AS1170.4-2007 Australian actions; and, NZS1170.5-2004 New Zealand actions.

Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

Earthquakes
Need to allow for potential settlement, rotation and/or translation movements; Seismic mass to include all permanent attachments; Fundamental period; Ductility factor by material/structure type; Cables/conductor behaviour linear springs.

Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

20/07/2011

Earthquakes
Types of analysis:
Equivalent static force method symmetrical and consistent stiffness and mass, relative low structure height; Modal response spectrum analysis significant mass or stiffness variations; and, Time history analysis method large guyed structures.

Combination of effects multiple directions; Second order effects P- effects.


Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

Earthquakes

Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

20/07/2011

Earthquakes

Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

Earthquakes

Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

20/07/2011

Earthquakes

Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

Earthquakes

Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

20/07/2011

Earthquakes

Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

Earthquakes

Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

20/07/2011

Mining Subsidence
Areas subject to underground mining, close to large excavations of weaker material, or dewatering activities e.g. geothermal activity Likely to be more significant for towers than for poles; Tie-beams can be used between all four legs to minimise differential settlement; Loading will depend on potential for differential settlement, extent of settlement etc.
Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

Snow and Ice Loading


With or without coincident wind; Variation with altitude/location; Australian requirements:
Ice above 800m; Ice above 500m in Tasmania.

New Zealand requirements:


Snow and Ice varies widely.

Guidelines only. Use local knowledge e.g. BoM if available.


Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

20/07/2011

Snow and Ice Loading


Australia generally:
12mm, 900kg/m3, 100Pa wind, -5 C; Assumed 50yr return period; Unbalanced loading should be considered.

Tasmania:
All areas; Structure ice area; Defined wind Pa; Apply 100m lower in some areas.
Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

Snow and Ice Loading


New Zealand:
Based on 50yr return period loading; Uses a reliability multiplier instead of varying return period as used for wind; Allows to apply higher factor for special assets; Snow and ice loads from Table EE3 multiplied by Mrel; Conductor temperature under snow 0C; Conductor temperature under ice varies with altitude.
Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

10

20/07/2011

Snow and Ice Loading


New Zealand:
As per IEC60826, unbalanced tensions based on 70% of full loading on one side and 30% on other side; Large deviations/ terminations suggest full ice on one side only; Care with post or pin insulators which limit flexibility of system.
Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

Snow and Ice Loading


New Zealand:
Wind load from AS/NZS1170.2 for relevant return period; Only SW, S, or SE wind directions; Snow 400kg/m3; Ice 700kg/m3; Differential snow/ice for torsion and longl.
Australian Panel B2 Overhead Line Design Seminar AS/NZS 7000:2010 Overhead Line Design Sydney 28 & 29 March 2011

11

20/07/2011

Special Forces Appendix C Snow and Ice Loading Appendix EE Questions ?