Consultancy Services for Third Party Quality Audit

in Joint Venture with

MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

CONTENTS

1.0 2.0 3.0 3.1 3.2 3.3 4.0

Project Background Out Line Tasks to be carried out Findings of the Site Reports Summary of Audit opinion Corrective actions. Progress of works with reference to mile stones. Activities of Third Party Quality Audit Consultant

2 3 5 6 8 8 10

Page 1 of 159

MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

1. Project Background Andhra Pradesh (AP) state has one of the longest coastal belts in India. Out of 67,362 Km of road network in the state, the nine coastal districts cover 26,000 km of road length. Every year during the period of April-May and September-December, cyclonic situations set in to the Bay of Bengal. With the recent changes in climatic conditions, the catastrophic events are increasing resulting in very devastating cyclones like Laila, Jal etc where the loss is enormous. In the 97 years ranging from 1892 to 1989, there were as many as 67 cyclones within the State. It is essential to provide safe residential accommodation to the vulnerable population during any eventuality or disaster due to natural calamities such as cyclones and associated tidal waves and storm surges. The project is formulated based on experiences of Government of Andhra Pradesh in mitigating such disasters during the past and also keeping in view the existing facilities available in the project area in Andhra Pradesh. The Government of India has applied for a credit of US$ 255 Million equivalent from the International Development Association (IDA) toward the cost of National Cyclone Risk Mitigation Project (NCRMP), and it intends to apply the proceeds to payments for goods, works, related services and consulting services under this Project. National Cyclone Risk Mitigation Project (NCRMP) Project Implementation Unit (PIU), Andhra Pradesh, headquartered at Hyderabad has invited the consultants to submit proposals for providing the consultancy services for Third Party Quality Audit for 9 coastal districts namely Srikakulam, Vijayanagaram, Visakhapatnam, East Godavari, West Godavari, Krishna, Guntur, Prakasam and Nellore. The project Construction of Multipurpose Cyclone Shelters, Roads to Cyclone Shelters, Roads to habitations, Roads & Bridges and Saline Embankments under NCRMP is funded by International Development Association and received through Government of India. This consultancy is envisaged to audit the quality of works being implemented by various line departments working under PIU. To provide Consulting Services of Third Party Quality Auditor for Construction of Multipurpose Cyclone Shelters, Roads to Cyclone Shelters, Roads to habitations, and Roads and Bridges under NCRMP in 9 coastal districts The Commissioner for Disaster Management & Project Director, Project Implementation Unit (PIU) NCRMP has selected Egis International in JV with Egis India Consulting Engineers (I) Pvt. Ltd. On 15th April13, the Contract for Consultancy Service was signed between The Commissioner for Disaster Management & Project Director, Project Implementation Unit (PIU) NCRMP and the Egis International in JV with Egis India Consulting Engineers (I) Pvt. Ltd.

Page 2 of 159

MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

2. Outline of tasks to be carried out The scopes of services for the Third Party Quality Audit (TPQA) assignment are A. The consultant will prepare an inception report within 30 days from signing of the contract that details the method agreed during negotiations to be employed in performing the services. B. C. Assist SPIU in resolving issues related to Non compliances. The field testing being conducted by the implementation staff will be observed and when doubts arise in such observations another sample will be taken and will be tested independently to verify whether it is as per the standards or not. D. The consultant will review civil work components of the cyclone shelters and related roads & bridges of these buildings and compliances and non-compliances will be reported regularly to PIU and line department. E. F. Consultants will visit the sites for each stage of work and audit The consultant will visit the construction sites randomly without prior information to the implementing agency, along with the regular site visits. The consultant will be submitting weekly reports before the 3rd day of the following week. Monthly reports, quarterly reports, annual reports will be submitted as per the scheduled time plan. In case of noncompliance the consultant will be reporting the same to the concerned SPIU representative along with photo documentation and will be suggesting the corrective measures. Regular feedback will be given with regards to compliance of suggested corrective measures. Wherever compliances are not happening, a report should be submitted to the SPIU and line departments and if necessary Stop Work notices will be issued through the Engineer in-charge. G. The consultant will be presenting the quarterly review status which will be giving clear idea of the quality and quantum of work in progress. It gives a clear idea of the compliances and noncompliances of the works, the remedial measured suggested & taken up for non-compliances and the modifications needed in the work plan basing on the experiences in the lapsed quarter. H. The consultant will assist SPIU in ensuring the works, by way of reporting, are carried out as per specifications, quality & quantity and towards achieving the desired results. Any defective work noticed by the consultant shall be reported immediately and suggest corrective measures to the field engineers, for immediate rectification and give feedback to SPIU with regards to compliance of suggested corrective measures. Wherever compliances are not happening, a report will be submitted to the SPIU& line department.

Page 3 of 159

MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

I.

The consultant will participate in the workshops / trainings administrated by the PIUs / line departments, quarterly and also as and when called for to give their inputs and also to act as resource persons as and when needed.

J.

The competency of the implementation staff will be verified and reported to SPIU and suitable suggestions will be made.

K.

The work plans of the implementation agency will be observed and suitable modifications will be suggested basing on the past experiences in the sites.

L.

The consultant will prescribe suitable formats for progress reporting and the same formats will be used to report regularly.

M. The consultant will advise on the required site audit procedures for individual duties and responsibilities, including detailed inspection schedules and check lists. N. The Third Party Quality Audit will carry out additional tests, where a prime facie doubt arises related to quality of works and / or compliance of standards using mobile laboratory available with the consultant or nearby approved laboratories. The consultant shall advise few more labs for testing suitably, which after the approval of the SPIU / line departments, can be used for testing. O. Review the workers safety standards being followed in the construction site to avoid any type of losses / damages, as far as possible. P. The tests shall include all common tests as specified in Terms of Reference (ToR). Consultant will take the samples and get it tested in accredited/approved laboratories which will be first inspected and recommended for accrediting by Consultant under the project by SPIU. The identification and certification of the testing agency will be specific to the tests that can be carried out in a particular laboratory. Q. The Consultant will establish a mobile laboratory exclusively for Embankments. R. Surprise field visits will be carried out without advance information to the Line departments and Contractors. S. At the end of every week the Consultant will submit a report containing the details of field visits undertaken during the week indicating the date of visit. In addition to the site level reports and weekly report, consolidated reports would be submitted every month and quarter, compiling the findings in the site reports, summary audit opinion, corrective actions, progress of works and

Page 4 of 159

MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

issues etc. The Consultant will also make presentations on audit findings at the designated forums as and when required by the client.

3.0 Findings of the Site Reports: Third Party Quality Audit engineers are inspecting the NCRMP works at regular intervals. The inspections are being carried out as per the TOR of the agreement.

During inspections, TPQA engineers are verifying the test records, adequacy of machinery and work force, safety measures taken and site related problems if any. They are also carrying out all the field tests on the materials, on work done or being done. Some minor corrective measures which can be attended immediately are being got done in the presence of TPQA engineers, during their inspections. Samples are collected for laboratory testing for tests like California Bearing Ratio (CBR) tests on sub base and sub grade materials, confirmatory Safe Bearing Capacity (SBC) for buildings and bridges, mechanical and chemical properties of steel and tests on cement whenever doubt arises about the quality of cement. Measurements are also being verified with reference to the drawings. Special attention is being paid for verification of reinforcement details, concrete and bituminous works.

For concrete works, cement content, water cement ratio, proportioning of mix, workability, temperature, placement of concrete, compaction and curing for concrete work is being monitored by TPQA during TPQA inspections. Similarly, bitumen content, gradation of mix, temperature and compaction of bituminous works is being monitored during TPQA inspections for bituminous works.

All the details of site visits and findings etc. are given in detail in the MPRs in different formats and work wise details are furnished in a separate check memo booklet attached to this Monthly Progress Report. The check memo format was communicated by SPIU.

Whenever, non-compliances are noticed, Non-Compliance Reports are being issued and their compliance is closely monitored. Suitable corrective measures are also being suggested as per the Quality Assurance Plan. After the compliance is received, the respective NCR is being closed.

Page 5 of 159

MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

The summary of site visits, NCRs issued during the month and Quality Control Tests done are tabulated hereunder.
No of Site visits by TPQA Quality control Tests done Passed Failed

Sl. No.

District

Number of NCR Issued

1 2 3 4 5 6 7 8 9

Srikakulam Vizianagaram Visakhapatnam East Godavari West Godavari Krishna Guntur Prakasam Nellore
Total

26 7 8 25 21 40 29 39 31 226

0 0 0 0 0 0 0 0 0 0

29 7 4 83 35 60 4 82 133 437

1 0 0 0 0 0 0 0 0 1

3.1 Summary of Audit Opinion Engineers of TPQA consultant are visiting the NCRMP at regular intervals and are issuing Site Inspection Reports and Quality Control (Audit) Reports. List of all the works for which Quality Control Reports are given during October, 2013 is presented in this MPR. The overall quality of NCRMP works is satisfactory. But progress of the works is not as desired. Line departmental officers need to focus on improving the progress of works. Action Taken Reports (ATR) are not being received from the line departmental officers. The list of pending ATRs, division wise will be furnished separately. Some important observations of the QCRs are summarized in the table below. Suitable instructions may be issued to the line departmental officers in this regard.

Page 6 of 159

MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

Summary of TPQA observations requiring attention of SPIU in Quality Audit Reports. Sl. No 1 Description of item Remarks ATRs for QCRs are not received from line departmental officers. All the others are delaying them. Prompt submission of ATRs will serve the purpose of issuing QCR. Despite requesting several times, TPQA is not receiving or shown the work program and ESMF for any work. TPQA supplied the model format for ESMF plan also. Necessary guidance will be extended by TPQA in preparation of the plan if necessary. Contractor is not establishing QC lab for many road works. For small road works, necessary field testing equipment shall be made available at site by the contractor so that the field officers can also conduct the QC tests. One QC lab for one package of road works at a central location shall be provided. At some places, site inspection registers are not maintained. Instructions of the inspecting officers are not being written in the register. Some inspecting officers are issuing inspection reports. These reports are to be attached in the register. On many roads, electrical pole are near the carriageway. They are preventing proper compaction around them and are likely to cause accidents. No provision is made towards shifting of electrical poles and other utilities like water supply pipe lines. On some works, proper safety gear is not provided for the personnel at the worksite. No provision is made towards providing guard stones or guide posts in the contract document or in the sanctioned estimate. They are essential to prevent accidents. When a road is raised by about 0.3m or so, the local approach roads joining the new road require re-grading for a length of 5 to 10m to prevent damage to the new road and also to provide smooth access for the local public. For many such roads no provision is made in the contract document or the sanctioned estimate for protective works. If the protective measures are not taken up, the works are not fit to withstand disasters. For some works, sanction of Extension of Agreement Time is not being obtained before the lapse of sanctioned agreement time.

Action Taken Reports Contractors work program and Environmental and Social Management Framework (ESMF) plan.

Quality control lab

Site inspection register

Electrical poles near the carriageway and other utilities

Safety gear for workers Guard stones or guide posts along the outer edges of sharp curves and in front of culverts to prevent accidents during night time Re-grading of approaches joining the new road Protective works for roads running on canals and tank bunds and where the formation height is more than 2m Obtaining EOAT before expiry of agreement time

10

Page 7 of 159

MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

3.2 Corrective actions: Corrective actions for all the likely non-compliances are suggested as per standard specifications adopted in the contract documents in the Quality assurance Plan submitted. Accordingly for various non-compliances, corrective actions are suggested and getting implemented. Some of the corrective actions are discussed hereunder: 1. Gradation non - compliance: In collection of aggregates for GSB Granular Sub Base), WMM (Wet Mix Macadam), WBM (Water Bound Macadam), OGPC (Open Grade Premix Carpet), Seal Coat, SDBC (Semi Dense Bituminous Concrete) and concrete fine aggregate collections, whenever gradation is not satisfied, corrective actions were suggested by TPQA to make the gradation compliant with the specified one. Generally, it was done by adding the missing or deficient sizes and re-breaking higher sized materials. 2. Density - compliance: Whenever relative compaction is deficient in compacted layers of earthwork, shoulders, GSB layers, WBM layers or WMM layers, re-compaction is done by scarifying, watering to OMC (Optimum Moisture Content) and compaction to achieve the specified relative compaction 3. Deficiency in thickness: NCRs were issued when thickness of GSB, WBM, WMM or sub-grade layer thickness is found to be less than the specified thickness. After the suggested corrective action is done, the NCR s are being closed after verification. 4. Stop work notice: Stop work notice was issued in one work, when temperature of bituminous mix is not as required. The machinery was changed and temperature is as required, stop work order was revoked. In some cases, the corrective actions are being carrying out in the presence of TPQA engineers. 3.3 Progress of works with reference to mile stone prescribed in the contract agreement and other important issues viz., availability of sites, obstructions etc., Progress of works with reference to mile stone prescribed in the contract agreement and other important issues viz., availability of sites, obstructions etc., Progress of work with reference to milestone is reviewed in each audit report of the work. In the monthly progress report, availability of site and other issues are discussed in the statement of status of works. As instructed, all the sites were inspected prior to entrustment were inspected and preliminary DPR (Detailed Project Report) review booklet was submitted vide letter dated 24-062013. The progress of works with reference to mile stone, stage of work and site related problems is described in detail in Annexure A of the MPR. Failure to furnish the contactors work program is not helping our cause.

Page 8 of 159

MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

District wise Summary of Work Progress


Sl. No. District Up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not started Works deleted Total No of works

1 2 3 4 5 6 7 8 9

Srikakulam Vizianagarm Visakhapatnam East Godavari West Godavari Krishna Guntur Prakasam Nellore
Total

14 2 1 5 1 15 2 4 1 45

19 1 0 10 25 16 2 10 15 98

2 2 2 3 3 7 0 4 5 28

7 1 8 4 2 10 2 17 18 69

3 0 0 3 2 2 3 0 0 13

4 0 0 0 0 0 0 0 0 4

49 6 11 25 33 50 9 35 39 257

From the above, the progress of works is not satisfactory, in Srikakulam, East Godavari, Krishna and Guntur Districts. As far as roads are concerned, the progress can be speeded up before the end of second milestone. For roads, Milestone distribution of work is not done appropriately. Serious attention is necessary for MPCS (Multi-Purpose Cyclonic Shelter) buildings in Srikakulam, East Godavari and Guntur District. Some works are not started as the site is not handed over and for some works: contractor has not started even after the site is handed over. The ongoing strike is also hampering the progress of works. A separate review meeting with the SEs, EEs and contractors of MPCS works may be held by the Chief Engineer, Panchayat Raj, NCRMP and the workwise program charted out. They need to apprise the SPIU about their program to complete all MPCS works as planned.

Page 9 of 159

MONTHLY REPORT
Consultancy Services for Third Party Quality Audit (TPQA) for National Cyclone Risk Mitigation Project (NCRMP)

4.0 Activities of Third Party Quality Audit Consultant.

All the activities of TPQA consultant, such as status of TPQA visits, Quality Audit reports, NCR status reports, status of Quality Control tests and other reports are summarized in the tables and furnished in this Monthly Progress Report as detailed below. Status of NCRMP Year-1 works are given in Table-1 Spillover works statement for the Year-1 works are given in Table-2 Details of Spillover works for the year-1 works are given in Table-3 Agreements communicated for NCRMP Year-2 works statement given in Table-4 Overall statement of Agreements communicated Year-2 works + Spillover Year-1 works statement is given in Table-5 Final QCRs to be submitted for the Year-1 works statement is given in Table-6 Status of works communicated agreements and spill over works abstract is given in Table-7 Work wise status for all 9 districts are enclosed as Annexure-A District wise NCR submitted are enclosed as Annexure-B District wise QC tests conducted are enclosed as Annexure-C District wise Civil Engineers, Environmental and Social staff and Electrical engineers site visits abstract and details of visits are enclosed as Annexure-D District wise Surprise site visits abstract enclosed as Annexure-E Statement of Quality Control Audit reports submitted by TPQA Consultant in the month of October-2013 is enclosed as Annexure-F. Photographs of TPQA visits are enclosed as Annexure-G.

Page 10 of 159

Status of NCRMP Year-1 works as on 14.04.2013


No. of works Completed Roads (R&B) No. of Final Reports Submitted No. of works(Under Concluded Agreements) Roads (R&B) S.no Bridges District RHB RCS

TABLE - 1
No. of works under Progress Roads (R&B) No. of works deleted

Bridges

Bridges

MPCS

MPCS

MPCS

Total

Total

1 Srikakulam 2 Vizianagaram 3 Visakhapatnam 4 East Godavari 5 West Godavari 6 Krishna 7 Guntur 8 Prakasham 9 Nellore
Total

6 8 2 10 5 3 14 16 64

8 6 8 3 12 7 10 54

2 7 3 2 14

4 2 2 1 9

1 1 2

21 3 21 13 10 8 17 24 26 143

6 0 8 2 10 5 3 14 16 64

8 0 6 7 0 3 12 7 8 51

0 0 6 2 0 0 0 2 0 10

3 2 0 0 0 0 1 1 0 7

1 1 0 0 0 0 0 0 0 2

18 3 20 11 10 8 16 24 24 134

12 3 14 8 10 8 11 24 24 114

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 2 2

2 0 0 1 0 0 0 0 0 3

1 0 0 0 0 0 1 0 0 2

0 0 0 0 0 0 0 0 0 0

Total

RHB

RHB

RCS

RCS

3 0 0 1 0 0 1 0 2 7

0 0 1 1 0 0 0 0 0 2

Total No. of works entrusted in Year-1 = 143 nos No. of works completed by 14.04.2013 = 129 nos

No. of works deleted = 2 nos Spillover works in to Year 2 = 143 2 129 = 12 nos

Page 11 of 159

Abstract of pending Spill over (NCRMP Year-1) works (which were not completed by 14.04.2013)
PR Sl. No. District MPCS RCS RHB TOTAL R&B Bridges I & CAD Saline Embankment Works

TABLE - 2
TOTAL Packages Works

Packages Works Packages Works Packages Works Packages Works Packages Works Packages

1 Srikakulam 2 Vizianagaram 3 Visakhapatnam 4 East Godavari 5 West Godavari 6 Krishna 7 Guntur 8 Prakasam 9 Nellore Total

1 0 1 1 0 0 0 0 0 3

2 0 1 1 0 0 0 0 0 4

0 0 0 0 0 0 1 0 1 2

0 0 0 0 0 0 1 0 2 3

2 0 0 0 0 0 0 0 0 2

3 0 0 0 0 0 0 0 0 3

3 0 1 1 0 0 1 0 1 7

5 0 1 1 0 0 1 0 2 10

1 0 0 0 0 0 1 0 0 2

1 0 0 0 0 0 1 0 0 2

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

4 0 1 1 0 0 2 0 1 9

6 0 1 1 0 0 2 0 2 12

Page 12 of 159

STATUS OF SPILL OVER (NCRMP YEAR-1) WORKS AS ON 31.10.2013


Sl. No 1 2 3 Srikaulam 4 R&B bridge RHB District Categ ory Packages allotted under Phase - 1 NCRMP/B-W/AP/RHB/PRED/ 01/Polaki/006 NCRMP/B-W/AP/RHB/PRED/ 01/Polaki/005 NCRMP/B-W/AP/Br/R&B/ 01/Uppugedda/002 s.no Names of works under each package 1 2 3 Road from R&B road Mobagam to Duubakavanipeta via Gajapathinagaram Road from Talasamudram to Dola Regulator Road from R&B road Edulavalasa - Killam to Jonnam via Talasamudram Construction of High level bridge across Uppugedda at KM 7/6 of Srikakulam muncipal limits to Pukkalapeta via Killipalem Construction of Cyclone shelter at Kollipadu Construction of Cyclone Shelter at Runku Construction of CS at Venkayyapalem Construction of CS at Pedaraghavulapeta of Uppalaguptam Mandal Reconstruction of HLB @Km2/4 of Bapatla Pandurangapuram Road across perali drain Road from R&B Road Alluru to Yadavapalem Road from @ 56/8 to C.K road to Periyavettu kuppam CS Providing BT road to Pedapannamgadu in Tada Mandal Agreement No. / Date /2010-11, Dt. 30.04.2011 /2010-11, Dt. 30.04.2011 /2011-12, Dt. 30.04.2011 47/20102011,Dt17.12.2 010 G.o rt No 451 dt 06.04.2010 G.o rt No 451 dt 06.04.2010 /2011-12, Dt. 03.10.2011 78/2011-12 Dt:17.10.2011 78/2010-11 1.12.2010 2011-2012 1.11.2011 14.09.2012 14.09.2012 Work Status completed completed completed Work in Progress Work in Progress Work in Progress Completed Completed Work is in progress completed work in progress Work completed Remarks

TABLE - 3

completed completed completed Deck Slab completed. Retaining wall and finishing works are in progress Brick work, Plastering and Flooring are under progress 1st floor Brick work in progress Finishing works nearing completion

5 MPCS 6 7 8 9 Guntur 10 11 12 SPSR Nellore RCS Visakhapat MPCS nam East Godavari MPCS Bridges

NCRMP/B-W/AP/MPCS/PRED/ 01/Santhabommalli/005 NCRMP/B-W/AP/MPCS/PRED/ 03/Rambilli/004 NCRMP/B-W/AP/MPCS/PRED/ 04/ Uppalaguptam/002 NCRMP/B-W/AP/Br/R&B/ 07/Bapatla/011 NCRMP/B-W/AP/RCS/PRED/ 07/PV Palem/001 NCRMP/B-W/AP/RCS/PRED/ 09/Tada/009

5 6 1 1 4 6 3 2

For approach road, GSB & WMM Works completed, traffic allowed. Finishing works nearing completion work completed, FQCR Submitted
WBM Gr-III completed.

RCS

Black topping completed. Only road furniture is to be fixed

Page 13 of 159

Details of Agreements Communicated by SPIU to TPQA Consultant to the end of October 2013
PR Sl. No. District MPCS RCS RHB TOTAL R&B Bridges I & CAD Saline Embankment Works

TABLE - 4
TOTAL Packages Works

Packages Works Packages Works Packages Works Packages Works Packages Works Packages

1 Srikakulam 2 Vizianagaram 3 Visakhapatnam 4 East Godavari 5 West Godavari 6 Krishna 7 Guntur 8 Prakasam 9 Nellore Total

11 1 1 3 0 0 2 0 0 18

22 1 1 5 0 0 2 0 0 31

4 1 3 6 4 8 2 3 10 41

11 5 4 9 9 26 3 11 18 96

4 0 3 5 8 8 1 8 9 46

10 0 5 8 24 23 1 23 19 113

19 2 7 14 12 16 5 11 19 105

43 6 10 22 33 49 6 34 37 240

0 0 0 2 0 1 1 1 0 5

0 0 0 2 0 1 1 1 0 5

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

19 2 7 16 12 17 6 12 19 110

43 6 10 24 33 50 7 35 37 245

Page 14 of 159

TABLE - 5 Details of Agreements Communicated by SPIU to TPQA Consultant to the end of October 2013 + Spill over works of Year-1
PR Sl. No. District MPCS Packages Works RCS Packages Works RHB Packages Works TOTAL Packages Works R&B Bridges Packages Works I & CAD Saline Embankment Packages Works TOTAL Packages Works

1 Srikakulam 2 Vizianagaram 3 Visakhapatnam 4 East Godavari 5 West Godavari 6 Krishna 7 Guntur 8 Prakasam 9 Nellore Total

12 1 2 4 0 0 2 0 0 21

24 1 2 6 0 0 2 0 0 35

4 1 3 6 4 8 3 3 11 43

11 5 4 9 9 26 4 11 20 99

6 0 3 5 8 8 1 8 9 48

13 0 5 8 24 23 1 23 19 116

22 2 8 15 12 16 6 11 20 112

48 6 11 23 33 49 7 34 39 250

1 0 0 2 0 1 2 1 0 7

1 0 0 2 0 1 2 1 0 7

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

23 2 8 17 12 17 8 12 20 119

49 6 11 25 33 50 9 35 39 257

Page 15 of 159

List of Works which are completed and final QCRs to be submitted by TPQA (awaiting approval of W.E/R.E)
Sl. Dist Categ No rict ory Srikakulam 1 2 3 4 5 6 7 8 East Godavari 9 10 11 12 13 RCS NCRMP/B-W/AP/RCS/ PRED/04/Uppalaguptam/003 NCRMP/B-W /AP/MPCS/ PRED/04/ Thondangi/001 NCRMP/B-W /AP/MPCS/PRED/ 04/Thondangi/001 NCRMP/B-W/AP/RCS/PRED/ 07/Karlapalem/002 Visakhapatnam Packages allotted under Phase - 1 s.no Names of works under each package 1 RHB NCRMP/B-W/AP/RHB/PRED/ 01/Santhabommali/003 2 3 NCRMP/B-W/AP/MPCS/PRED /03/Payakaraopeta/003 MPCS NCRMP/B-W/AP/MPCS/PRED /03/Nakkapalli/002 1 2 3 4 5 1 2 3 1 2 Road from DPN R&B road to Uddandapalem Road from K. Umilada Junction to Koduru (Link Road) Road from Borubhadra, Malagam to Kollipadu via Seepuram, Gantapeta Construction of CS at Gajapathinagaram Construction of CS at Ratnayampeta Construction of CS at Patimeeda Construction of CS at Mullaparra Construction of CS at Bangarampeta Road from R&B Road to Chinaraghavulapeta Cyclone Shelter Construction of Cyclone Shelter at Lakshmanudipeta in Thondangi Construction of Cyclone Shelter at Avulamanda Road from Ganapavaram R&B Road to Pedamarpuvaripalem Road from R&B Road to Chinapuluguvaripalem Work Status Work completed Work completed Work completed Work completed Work completed Work completed Work completed Work completed Work completed Work completed Work completed Work completed Work completed

TABLE - 6

Remarks Approval of working estimate awaited Approval of working estimate awaited Approval of working estimate awaited Copy of Approved working estimate & ATRs not recived Copy of Approved working estimate & ATRs not recived Copy of Approved working estimate & ATRs not recived Copy of Approved working estimate & ATRs not recived Copy of Approved working estimate & ATRs not recived Approval of working estimate waited & ATRs not received working estimate approval not received working estimate approval not received Approval Working Estimate received Approval Working Estimate received

MPCS

Guntur

RCS

Note: Quality Audit was done for all the items of the above completed works. Pre-final QCRs were also submitted. Approval of working estimates incorporating the deviations are awaited. Immediately after the receipt of approved working estimates from the departmental officers and ATRs in few cases, final QCRs will be submitted. No. of works for which Final QCRs submitted = 116 nos ; No. of works for which Final QCRs to be submitted = 13 nos

Page 16 of 159

ABSTRACT STATUS OF NCRMP WORKS PROGRESS AS ON 31.10.2013


Review of Contract Document Work Entrusted Sl. No. Status of Works Cummulative Visits of TPQA Total No. of QC tests conducted NCRs By TPQA

TABLE - 7
Cummulative Audit Reports submitted by TPQA Electrical Audit reports Social & Env Audit reports Civil Audit Reports

Env & Social visits

Not started

Total Visits

Completed

I & CADD

Progress

1 Srikakulam 2 Vizianagaram 3 Visakhapatnam 4 East Godavari 5 West Godavari 6 Krishna 7 Guntur 8 Prakasam 9 Nellore Total

48 6 11 23 33 49 7 34 39 250

1 0 0 2 0 1 2 1 0 7

0 0 0 0 0 0 0 0 0 0

49 6 11 25 33 50 9 35 39 257

42 6 11 22 31 48 6 35 39 240

3 0 0 3 2 2 3 0 0 13

39 6 8 19 31 48 5 35 38 229

3 0 3 3 0 0 1 0 1 11

4 0 0 0 0 0 0 0 0 4

322 61 168 152 245 257 173 346 329 2053

23 9 9 8 41 24 0 18 24 156

10 0 14 8 0 0 0 0 0 32

355 70 191 168 286 281 173 364 353 2241

581 133 606 536 386 292 74 1071 1329 5008

15 1 10 1 20 12 1 19 17 96

12 1 2 1 20 5 1 14 12 68

Pending

Deleted

District PR

Electrical Engg visits

Civil Engineers visits

R&B - Bridges

Started

Issued

Closed

3 0 8 0 0 7 0 5 5 28

37 9 29 18 27 34 7 62 52 275

23 9 9 8 42 23 0 18 24 156

8 0 14 7 0 0 0 0 0 29

Page 17 of 159

Annexure - A

Status of Works

Page 18 of 159

Consolidated Abstract Status of NCRMP Works as on 31.10.2013

RATE OF PROGRESS OF WORKS up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not Started Deleted Total No of Works

No of works 45 98 28 69 13 4 257

120 100 80 60 40 20 0 up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not Started Deleted 98

69 45 28 13 4

Page 19 of 159

Abstract Status of NCRMP Works in Prakasam District 31.10.2013

RATE OF PROGRESS OF WORKS up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not Started Total No of works

No of works 4 10 4 17 0 35

18 16 14 12 10 8 6 4 2 0 up to 10% 11 to 40% 41 to 70% 4 4 10

17

0 71 to 100% Works Not Started

Page 20 of 159

Status of NCRMP works in Prakasam District 31.10.2013


Sl. No. Package Nos. of Pkg 1 2 Agreement Amount (Lakhs)/ Date 4 Project code catagory Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8 Sl.No of work 9 1 AGG Length Value (Mts) of work (Lakhs) 12 870 13 57.22 Date of commen cement of work 14 Total % of % of Value of Reasons Value of work work Work for nonTPQA work done done for done for started observation done in for the the package works work Package (Lakhs) 16 7.50 17 13% 18 19 20 21

Name of the Work

Stage of work

10 Y2-228

11 Road from R&B road to Motupalli CS Road from Km1/2+186 of Chinaganjam Railway gateBapaianagar ZP Road to Ramachandranagar H/o Kothapalem Motupalli R&B Road to Nirikshanagiri (via) Rudramambapuram CS in Motupalli G.P. Road from R&B road to Mattigunta CS Vedullapalli Vodarevu R&B road to CS at Vijayalakshmipuram Pakala PR Road to Chellammagaripattapupale m CS Pakala PR road to Potthaiahgaripalem CS, Kranthinagar Revu. Woollapalem R&B road to Devalampallipalem CS Road from Tangutur to Ananthavaram

15 GSB In Progress

2 NCRMP/B-W/ AP/RCS/ PRED/08/ Chinaganjam & Chirala/006 24.05.14 24.08.13 24.01.14 CC, Earth work, CC, WBM, Shoulders, 25.05.14 GSB, WBM Shoulders BT & Road (32%) (54%) Furniture (100%)

Y2-229

836

44.54

GSB Completed

7.00

16% For the package, progress of works is slow and not as per Milestone

Y2-230

233.00 / 25.03.13

15.05.13

RCS

34.00 GSB In Progress 15.50 15%

13%

2276

102.57

Y2-231

363

13.21

GSB In Progress

2.00

15%

Y2-232

482

15.78

Earth Work in Progress GSB Completed, WBM Grade-II Completed, CD Completed & CC Completed 02.04.13 GSB Completed, CC Completed

2.00

13%

6 13.05.14 WBM Gr13.12.13 13.08.13 III, BT, WBM Gr-II, Earth work Shoulders, 14.05.14 CC & CD & GSB Earth work Works (32%) & Road (54%) Furniture (100%)

Y2-233

1200

55.59

32.00

58% For the Package, progress of works is slow and not as per Milestone

Y2-235

NCRMP/B-W/ AP/RCS/ PRED/08/ S.Konda & Tangutur/010

247.00 / 14.03.13

RCS

Y2-234

2150

102.15

65.00

64%

113.50

23%

1200

47.81

Earth Work in Progress GSB Completed, CC Pavement in Progress GSB Completed, CC Completed, Shoulders in Progress 15.03.13 GSB Completed, CC Completed, WBM GradeII, WBM Grade-III & OGPC + SC Completed, Shoulders in Progress

5.00

10%

Y2-236

640

41.70

11.50

28%

Y2-239

NCRMP/B-W/ AP/RCS/ PRED/08/ Ulavapadu /009

169.00 / 11.03.13

10.03.14

10.03.14 CC10.08.13 1.390km, 10.12.13 Earth BT, GSB, WBM Work, CD Shoulders, Gr-II, CCWorks Earth Work 1km (42%) (29%) & Road Furniture (100%)

Y2-238

10

Road from Z.P. road to Srirampattapupalem

2040

111.73

106.00

95%

160.00 54.00 96%

95%

11

Road from ZP road to Pallipalem of Chakicharala

800

56.54

For the package, progress of works is ahead of Milestones.

RCS

Page 21 of 159

Sl. No. Package Nos. of Pkg 1 2

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9 12

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 600 13 36.71

Date of commen cement of work 14

Stage of work

Total % of % of Value of Reasons Value of work work Work for nonTPQA work done done for done for started observation done in for the the package works work Package (Lakhs) 16 35.00 17 95% For the package Progress of works are as per Milestone 18 19 20 21

10 Y2-387

11 R&B Road to Pulavaripalem Road from Chinnaganjam Rly gate to Bapaiahnagar Road from R & B road to Kothaplem Motupalli R & B Road to Krishna Nagar Road from R & B Road to Yanadi Sangam Jeedichetlapalem R&B road to Kunkuduchetlapalem KEM R&B road to Chinapattapupalem Salt Road from Madnur ZP road to Pedapattapupalem Madnur ZP road to Swarnandhrapattapupalem Madnur ZP road to Bapujiyanadi colony Salt Road from Madnur ZP road to Namburi yanadi colony Salt Road from Madnur ZP road to Thotagunta yanadi colony Road from Tangutur to Tallapalem (via) Velagapudi (Km 4/5 to 7/465)

15 GSB Completed, CC Completed, Shoulders in Progress

14

Y2-389

NCRMP/B-W/ AP/RHB/ PRED/08/ Chinaganjam /012

307.00 / 11.03.13

10.06.13, 10.11.13 11.05.14 Earth Work WBM, CD & BT & Road 11.05.14 & GSB CC works Furniture (32%) (54%) (100%)

24.03.13

Y2-388

13

5577

187.50

1925

83.06

GSB Completed, CC Completed, WBM GradeII, WBM Grade-III Completed, Shoulders in Progress

RHB

168.75

90%

265.75

87%

62.00

75%

15 NCRMP/B-W/ AP/RHB/ PRED/08/ Chinaganjam /013 197.00 / 19.03.13 18.08.13 18.12.13 18.03.14 Earth work WBM, CD BT & Road 18.03.14 & GSB Works & Furniture (26%) CC (44%) (100%)

Y2-390

360

23.37 15.05.13

GSB In Progress

3.00

13%

16

850

48.19

Earth Work in Progress

5.00

10%

21.00

12%

17

Y2-392

2170

126.27

Earth Work in Progress

13.00

10%

For the package Progress of works are slow and not as per Milestone

18

Y2-397

Y2-391

RHB

900

43.13 GSB Completed, CC Completed, WBM GradeII, WBM Grade-III Completed, Shoulders in Progress 20.03.13

34.50

80%

19 10.04.14 10.09.14 WBM Gr-II, CC, 10.11.13 WBM Gr-III Shoulders, 10.09.14 Earth work, & CD BT & Road GSB (47%) Works Furniture (65%) (100%)

Y2-398

973

53.69

48.50

90%

21

Y2-400

NCRMP/B-W/ AP/RHB/ PRED/08/ Kothapatnam/0 20

Y2-399

20

800

43.11

39.50 GSB Completed, CC Completed, Shoulders in Progress GSB Completed, CC Completed, WBM GradeII, WBM Grade-III Completed, Shoulders in Progress

92% 218.50 80%

256.00 / 11.03.13

285

16.57

15.50

94%

For the package Progress of works are as per Milestone

RHB

22

Y2-401

975

47.89

39.00

81%

23

Y2-402

1100

51.75

41.50

80%

NCRMP/B-W/ AP/RHB/ PRED/08/ Tangutur/021

143.00 / 14.04.13

10.04.14 10.01.14 10.09.13 Shoulders, WBM, CD 10.04.14 Earth work, BT & Road Works & GSB (20%) Furniture CC (55%) (100%)

24

2965

143.00

05.04.13

GSB Completed, CC Completed & WBM GradeII in Progress

66.00

63%

66.00

46%

Progress of work is as per Milestone

Y2-403

RHB

Page 22 of 159

Sl. No. Package Nos. of Pkg 1 2 NCRMP/B-W/ AP/RHB/ PRED/08/ Tangutur/022

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 13

Date of commen cement of work 14 14.04.13

Stage of work

Total % of % of Value of Reasons Value of work work Work for nonTPQA work done done for done for started observation done in for the the package works work Package (Lakhs) 16 17 18 19 20 21 Progress of work is as per Milestone

10

11 Road from TanguturRavivaripalem road @1/2 KM to Pasukuduru.

15 GSB Completed, CD Works Completed & CC Completed

131.00 / 14.03.13

13.12.13 13.03.14 13.08.13 WBM Gr-II, Shoulders, 13.03.14 Earth work, CD Works BT & Road GSB (20%) & CC Furniture (55%) (100%)

25

Y2-404

RHB

2900

131.00

70.00

53%

70.00

53%

Y2-405

26 NCRMP/B-W/ AP/RHB/ PRED/08/ NG Padu/011 19.01.14 19.06.14 WBM Gr-II, CC, 19.09.13 WBM Gr-III Shoulders, 19.06.14 Earth work, & CD BT & Road GSB (25%) Works Furniture (49%) (100%)

Road from Kanuparthy to Kukkalavaripalem Road from Kanuparthy to Yanadi Sangam Road from Kanuparthy to MS Pattapupalem

800

39.55 09.04.13

GSB In Progress

8.50

21% For the package Progress of works are as per Milestone

229.00 / 20.03.13

Y2-406

RHB

27

1500

71.83

GSB Completed

23.00

32%

70.50

19%

28

Y2-407

2300

118.31

GSB Completed GSB Completed, CC Completed, WBM GradeII, WBM GradeIIICompleted,Shoulder is in Progress SB Completed, CC Completed, WBM GradeII, WBM Grade-III Completed, OGPC + SCCompletedShoulders in GSB Completed, CC Completed, WBM GradeII, WBM GradeIIICompleted,Shoulder is in Progress GSB Completed, CC Completed, Shoulders in Progress GSB Completed, CC Completed, WBM GradeII, WBM Grade-III & OGPC + SC Completed, Shoulders in Progress GSB Completed, CC in Progress, WBM Grade-II, WBM Grade-III & OGPC + SC in Completed. Shoulders in Progress 20.03.13

39.00

33%

29

Road from KEM R&B Road to Vajjireddypalem Pattapupalem

Y2-409

1185

58.50

44.00

75%

Y2-410

30 NCRMP/B-W/ AP/RHB/ PRED/08/ Kothapatnam /019 14.02.14 14.06.14 WBM Gr-II, CC-50%, 14.09.13 WBM Gr-II, Shoulders, 14.06.14 Earth work, CC-50% & BT & Road GSB (29%) CD Works Furniture (35%) (100%)

KEM R & B road to Pinnivaripalem

1650

62.08

58.00

93% For the package Progress of works are as per Milestone

31

Y2-411

10

240.00 / 15.03.13

RHB

Salt Road from Madnur ZP road to Chinnapattapupalem

215.50 31.50 93%

74%

800

33.89

Y2-412

32

KEM R & B road to E. Pallipalem

650

29.20

29.00

99%

33

Road from KEM R & B road to Chenchupapayapalem

Y2-413

1550

56.72

53.00

93%

11

NCRMP/B-W/ AP/RHB/ PRED/08/ Ulavapadu /016

359 / 11.03.13

10.02.14 10.06.14 WBM Gr-II, CC10.09.13 WBM Gr-III Shoulders, 10.06.14 Earth work, & CD BT & Road GSB (12%) Works Furniture (64%) (100%)

34

5380

359.00

20.03.13

Road From M.C road to West ST colony of Veerapalli

319.00

89%

319.00

89%

For the package progress of work is as per Milestone

Y2-414

RHB

Page 23 of 159

Sl. No. Package Nos. of Pkg 1 2

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 13

Date of commen cement of work 14

Stage of work

Total % of % of Value of Reasons Value of work work Work for nonTPQA work done done for done for started observation done in for the the package works work Package (Lakhs) 16 17 18 19 20 21 For the package progress of work is as per Milestone

10

11

15

12

NCRMP/B-W/ AP/Br/ R&B/08/ Ongole/023

372.00 / 12.04.13

11.08.13 11.04.14 Completion 11.12.13 Completion of Completion of entire 11.09.14 Foundation upto below work s upto Sill Deck Salb including Level (47%) approaches (35%) (100%)

35

Reconstruction of High level bridge at Km. 11/10 of Ongole - Kothapatnam road

20.04.13

4 vents of 16m span

Y2-455

Bridge

372.00

Sinking of Well Curbs in progress

37.00

10%

37.00

10%

Page 24 of 159

Abstract Status of NCRMP Works in SPSR Nellore District as on 31.10.2013

RATE OF PROGRESS OF WORKS up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not Started Total No of works

No of works 1 15 5 18 0 39

20 18 16 14 12 10 8 6 4 2 0 up to 10% 11 to 40% 41 to 70% 1 5 15

18

0 71 to 100% Works Not Started

Page 25 of 159

Status of NCRMP works in SRSP Nellore District 31.10.2013


Sl. No. Package Nos. of Pkg 1 2 Agreement Amount (Lakhs)/ Date 4 Project code catagory Milestone/ Financial Targets (%) DFC First 5 6 13.2.13 Earthwork, Pipe culverts, GSB & CC pavement (49%) Second 7 Third 8 Sl.No of work 9 1 AGG Length Value (Mts) of work (Lakhs) 12 2000 13 71.83 15.09.12 2 Providing BT road to Pedapannamgadu in Tada Mandal Approach road to Labbipalem 1015 32.47 Earth work, GSB WBM GrII & III and BT completed. GSB and CC pavement are completed Y2-241 32 99% Date of commen cement of work 14 Value of work done in 16 67 Total % of % of Value of Reasons work work Work for nonTPQA done done for done for started observation for the the package works work Package (Lakhs) 17 93% 99 95% 18 19 20 21 Progress of work is not within the mile stones as per value of work done. Extension of time has to be taken Progress of work is with in the mile stones as per value of work done.

Name of the Work

Stage of work

10 Y2-240

11 Road from @ 56/8 to C.K road to Periyavettu kuppam CS

15 Earth work, GSB and WBM Gr-II & WBM Gr-III are completed.

NCRMP/B-W/ AP/RCS/ PRED/09/ Tada/009

104.300 14.09.2012

13.09.13

13.06.13 WBM Gr-II, Gr-III and Shoulders (86%)

13.09.13 BT and Road furniture. (100%)

NCRMP/B-W/ AP/RCS/ PRED/09/ Alluru/012 NCRMP/B-W/ AP/RCS/ PRED/09/ Bogole/013

RCS

24.3900 18.03.2013

58.99 20.03.2013

17.06.13 17.08.13 CC Earthwork, CD Pavement & 17.09.13 Works, and Shoulders GSB (9%) (90%) 19.10.13 19.07.13 WMM, CD Earthwork, 19.09.13 Works and and GSB Shoulders (35%) (73%) 19.09.13 Earthwork, CD 19.06.14 Works, CC Pavement and GSB (54%)

17.09.13 Road furniture. (100%) 19.12.13 BT and Road furniture. (100%) 19.06.14 BT and Road furniture (100%) 27.02.14 12 Months: BT & Road Furniture of all works (100%)

Y2-242

RCS

420

24.39

0.1.05.13

21

86%

21

86%

Y2-243

Road from R & B road to Pathakadapalem

1400

58.99

01.05.13

Earth work for widening is done. GSB Progress

RCS

21

36%

21

36%

Y2-245

NCRMP/B-W/ AP/RCS/ PRED/09/ I. Pet/018

369.51 20.03.2013

19.02.14 WMM, and Shoulders (74%)

RCS

Road from Ramudupalem on R&B road to Pallipalem Road from Korutur to Pattapupalem

3600

209.93 21.03.13

Earth work, GSB and CC pavement are completed. WMM is Progress Earth work, vented road dam, CD works &. GSB Completed. WMM is in progress

Y2-244

150

71% 265 72%

2250

159.58

115

72%

Progress of work is with in the mile stones as per value of work done. Pogress of work is with in the mile stones as per value of work done.

NCRMP/B-W/ AP/RCS/ PRED/09/ Kavali/020

166.89 28.02.2013

27.07.13 5Months: Earth 27.02.14 Work, GSB (24%)

27.11.13 9 Months: WMM, CD works (72%)

Road from 230/6 Km of M.C Raod to Pedapattapupalem

6200

166.89

Earth work for widening, vented road dam GSB 01.03.13 completed.WMM is in progress Earth work and GSB are completed. Earth work, GSB are completed. WMM in progress 01.04.13 Earth work & GSB are completed. Earth work & GSB are completed.

Y2-246

RCS

105

63%

105

63%

Y2-249 Y2-248 Y2-247

Road from R&B road to Utukuru Pallipalem Road Ponnapudi R&B Road to Ramachendrapuram. Ponnapudi R&B road to Busagadipalem Road from Ponnapudi R&B Road to Lakshimipuram Road from R&B Road to Ramalingapuram

3800

141

31

22%

11

Y2-250

NCRMP/B-W/ AP/RCS/ PRED/09/ Vidavaluru /021

497.800 20.03.2013

19.02.14 19.06.14 11 Months: 15 Months: 19.09.13 WMM, CC BT & Road 6Months: Earth 19.06.14 Pavement of Furniture Work, GSB all works, of all (21%) CD works works. (78%) (100%)

2000

132.8

69

52%

RCS

10

1900

98

21

21%

147

30%

1000

54

12

22%

Progress of work is with in the mile stones as per value of work done.

12

Y2-251

1700

72

Earth work is completed

14

19%

Page 26 of 159

Sl. No. Package Nos. of Pkg 1 2 NCRMP/B-W/ AP/RCS/ PRED/09/ Chillakur/ 014

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 20.09.13 Earthwork, and GSB. (39%) Second 7 20.12.13 WMM, CD Works, CC Pavement & Shoulders (84%) 20.12.13 WMM, CD Works, CC Pavement & Shoulders (82%) 18.12.13 WMM,CD Works, CC Pavement & Shoulders (56%) Third 8 19.03.14 BT and Road furniture. (100%) 20.03.14 BT and Road furniture (100%) 19.03.14 BT and Road furniture (100%) Sl.No of work 9

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 13

Date of commen cement of work 14

Stage of work

Value of work done in 16

Total % of % of Value of Reasons work work Work for nonTPQA done done for done for started observation for the the package works work Package (Lakhs) 17 18 19 20 21

10

11 Road from R&B Road Lingavaram to Narravaripalem

15 Earth work for widening is completed.GSB Completed.WMM is in Progress

293.28 21.03.2013

20.03.14

13

Y2-252

RCS

6808

293.28

22.03.13

134.5

46%

134.5

46%

NCRMP/B-W/ AP/RCS/ PRED/09/ Chillakur/015

112.77 21.03.2013

20.03.14

20.08.13 Earthwork, and GSB. (38%)

14

Road from R&B road (via) Narravaripalrm to Srinivasa Satram

2260

112.77

01.04.13

Earth work for widening is completed.GSB Completed.WMM is in Progress

61

54%

61

54%

Progress of work is with in the mile stones as per value of work done.

Y2-253

RCS

21.03.13 15 Road from R&B Road to Doruvukatta road (via) Allmpadu, Deyyaladibba Road from Kotha Kudur Katepalli road to Patha Pattapupalem Road from C.S. Puram to Edurupalem Mahlakshmi puram to Sagara Sangamam (via) Muthyalathopu Pattapupalem Road from R&B road Nelaturu to Ananthavaram CS 4320 157.2 Earth work for widening, GSB, CC pavement ,CD works , WMM and BT completed. Jungle clearance is in progress From km 0.0 to km 1.2 Earth work, GSB, WMM , BT completed 01.07.13 2600 65.66 Earth work for widening, WMM and BT Completed. CD works completed. Jungle clearance is in progress 63 96% Y2-254 151 96% 151 96%

NCRMP/B-W/ AP/RCS/ PRED/09/ Kota/016

157.200 20.03.2013

19.03.14

19.08.13 Earthwork, and GSB. (21%)

RCS

16

Y2-255

600

25.67

8%

18

19 21.10.13 WMM, CD Works, CC Pavement & Shoulders (79%) 17.12.13 WMM, CD Works, CC Pavement & Shoulders (77%)

Y2-258

Y2-257

NCRMP/B-W/ AP/RCS/ 10 PRED/09/ T.P.Gudur & Muthukur /019

172.98 15.03.2013

14.02.14 14.06.14 14.09.13 11 Months: 15 Months: 6Months: Earth WMM, CD BT and 14.06.14 Work, GSB works, CC Road (17%) Pavement Furniture (76%) (100%)

Y2-256

17

2200

74.31

34

46% 100 58%

progress of work is with in the mile stones as per value of work done.

RCS

100

7.34

14% progress of work is with in the mile stones as per value of work done. Progress of work is slightly behind the mile stones as per value of work done.

NCRMP/B-W/ AP/RCS/ 11 PRED/09/ Tada/024

97.55 22.03.2013

21.03.14

21.07.13 Earthwork, and GSB. (35%)

21.12.13 BT and Road furniture (100%)

20

Road from @ Km 65/4 of CK Road to Tada Kuppam CS

1900

97.55

23.03.13

Earth work for widening,CD, GSB and WMM and BT completed.

Y2-259

RCS

90

92%

87

89%

NCRMP/B-W/ AP/RHB/ 12 PRED/09/ Allur/018

120.86 18.03.2013

17.03.14

17.08.13 Earthwork, and GSB.(16%)

17.03.14 BT and Road furniture. (100%)

21

Road from R.I Road to C.R. Palem (via) Sambhunipalem

Y2-419

RHB

4000

120.86

01.06.13

CD works is progress.

16

13%

16

13%

Page 27 of 159

Sl. No. Package Nos. of Pkg 1 2

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 17.12.13 WMM, CD Works, CC Pavement and Shoulders (49%) Third 8 Sl.No of work 9 22 17.03.14 BT and Road furniture. (100%)

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 3000 13 134

Date of commen cement of work 14

Stage of work

Value of work done in 16 105

Total % of % of Value of Reasons work work Work for nonTPQA done done for done for started observation for the the package works work Package (Lakhs) 17 78% 18 19 20 21

10 Y2-420

11 Salt Road from Iskapalli to Salt fields at Kotha Kurrupattapupalem Road from R&B road to Zuvvagu Lakshmipuram Road from R&B Road to Zuvvagu Annagaripalem R&B road to Pedanattu Pattapupalem Pedapattapupalem to Nandempuram Ponnapudi-Utukur road to Pattapupalem Road from R&B road to Venkatareddypalem Ponnapudi R&B road to Anjanayapuram Ponnapudi Utukur road to Srigowripuram Ponnapudi Utukur R&B road To Kothuru Road from Ponnapudi Utukur R&B road to Prasanthi giri colony Ponnapudi R&B road to Venkatanarayanapuram Road from Ponnapudi R&B road to Ponnapudi Mypadu R&B Road to Kollimittapalem Nellore Mypadu R&B Road to West Pattapupalem

15 Earth work, GSB & WMM are completed. CD works completed.

NCRMP/B-W/ AP/RHB/ 13 PRED/09/ Allur/019

249.24 18.03.2013

17.03.14

17.08.13 Earthwork, and GSB (24%).

23

1800

84

19.03.13

Earth work for widening done. GSB in progress Earth work, GSB, WMM, CD works and CC Road are completed. Earth work for widening done. GSB completed

12

14%

140

56%

24 03.03.14 12 Months: BT & Road Furniture complete of work. (100%)

Y2-422

2100

31.24

23

74%

Progress of work is with in the mile stones as per value of work done.

Y2-424

NCRMP/B-W/ AP/RHB/ 14 PRED/09/ Kavali/024

134.45 04.03.2013

3.08.13 5Months: Earth 03.03.14 Work, GSB (32%)

3.12.13 9 Months: WMM, CD works, shoulders (69%)

25

Y2-423

Y2-421

RHB

2100

57.28 01.06.13

18

31% 74 55% Progress of work is with in the mile stones as per value of work done. 56 23%

RHB

26

2800

77.17

Earth work, GSB and WMM are progress Earth work for widening and GSB completed. 21.03.13 Sub Grade in progress Earth work for widening and GSB is in progress. Earth work for widening and GSB is in progress. Earth work for widening and GSB completed. Earth work for widening, GSB,WMM & BT are 21.03.13 completed. Earth work for widening, GSB , WMM & BT are completed. Earth work, GSB & CC pavement are completed Earth work for widening, GSB and WMM completed Earth work , GSB & CC road is completed

56

73%

NCRMP/B-W/ AP/RHB/ 15 PRED/09/ Vidavaluru /025

247.63 20.03.2013

20.12.13 20.03.14 9 Months: 12 Months: 20.08.13 WMM, CC BT & Road 5Months: Earth 19.03.14 Pavement of Furniture Work, GSB all works, of all (27%) CD works, works. (84%) (100%)

27

Y2-429 Y2-428 Y2-427 Y2-426 Y2-425

2800

137

42

31%

RHB

28

1100

58.63

15

26%

29

950

52

21

40%

30

1100

68.0

15

22%

33

Y2-432 Y2-431

NCRMP/B-W/ AP/RHB/ 16 PRED/09/ Vidavaluru /026

294.86 20.03.2013

20.06.14 20.02.14 15 Months: 11 Months: 20.09.13 BT and WMM, CC 6Months: Earth Road 19.06.14 Pavement of Work, GSB Furniture all works, (23%) of all CD works, works. (88%) (100%)

31

800

54.86

22

40% Progress of work is with in the mile stones as per value of work done.

RHB

32

Y2-430

1200

68

67

99%

207

70%

1200

70

69

99%

34 19.03.14 12 Months: BT & Road Furniture remaining all items. (100%)

500

34

34

100% Progress of work is with in the mile stones as per value of work done.

36

Y2-434

NCRMP/B-W/ AP/RHB/ 17 PRED/09/ I.Peta/027

186.24 20.03.2013

19.08.13 5Months: Earth 19.03.14 Work, GSB (20%)

19.12.13 9 Months: WMM, CD works, (89%)

35

Y2-433

2350

126.6 21.03.13

105

83% 153 82%

RHB

900

59.64

48

80%

Page 28 of 159

Sl. No. Package Nos. of Pkg 1 2

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 7.11.13 9 Months: WMM, CD works, (82%) Third 8 7.02.14 12 Months: BT & Road Furniture (100%). 18.06.14 4 Months: BT & Road Furniture remaining all items. (100%) 7.01.14 2 Months: BT & Road Furniture (100%) Sl.No of work 9

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 13

Date of commen cement of work 14

Stage of work

Value of work done in 16

Total % of % of Value of Reasons work work Work for nonTPQA done done for done for started observation for the the package works work Package (Lakhs) 17 18 19 20 21

10

11 Road from Thirumalammapalem R&B Road to Gajulapalli Koneru

NCRMP/B-W/ AP/RHB/ 18 PRED/09/ V.Chalam/021

69.400 08.02.2013

7.07.13 5Months: Earth 07.11.13 Work, GSB (22%)

37

2400

69.4

15 From km 0/0 to km 2.00, Earth work, GSB, CD works, WMM & BT are 09.02.13 completed. From Km 2.0 to 2.4 work could not be completed due to court case. Earth work for widening and GSB are completed. WMM work is in progress.

Y2-435

RHB

65

94%

65

94% Progress of work is with in the mile stones as per value of work done.

NCRMP/B-W/ AP/RHB/ 19 PRED/09/ Kota/022

252.640 19.03.2013

18.09.13 6Months: Earth 18.06.14 Work, GSB (23%)

18.02.13 5 Months: WMM, CD works, (82%)

38

Road from R&B road Kothapatnam to Yamadinnepalem (via) Srinivasasatram

Y2-436

RHB

6100

252.64

20.03.13

70

28%

61

24%

NCRMP/B-W/ AP/RHB/ 20 PRED/09/ Kota/023

53.87 508.02.2013

7.06.13 4Months: Earth 07.11.13 Work, GSB (24%)

7.9.13 3 Months: WMM, CD works, (81%)

39

Road from at km 22/5 of Yamadinne palem road to Gunnampadia

1320

53.87

Earth work for widening, GSB, CD 09.02.13 works, WMM and BT Completed. CC pavement completed.

52

97%

52

97%

Progress of work is ahead of the mile stones as per value of work done.

Y2-437

RHB

Page 29 of 159

Abstract Status of NCRMP Works in Visakhapatnam District as on 31.10.2013

RATE OF PROGRESS OF WORKS up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not Started Total No of works

No of works

1 0 2 8 0
11

9 8 7 6 5 4 3 2 1 0 up to 10% 1 0 11 to 40% 41 to 70% 2

0 71 to 100% Works Not Started

Page 30 of 159

Status of NCRMP works in Visakhapatnam District as on 31.10.2013


Agreement Amount (Lakhs)/ Date Sl. No. Package Nos. of Pkg 1 2 Project code catagory Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8 Sl.No of work 9 AGG Date of Length Value commence (Mts) of work ment of (Lakhs) work 12 13 14 Re start after getting approval of foundation re design on 29.06.12 Total % of % of Value of Reasons Value of work work Work for nonwork done for TPQA observation done for done for started done in the the work package works Package (Lakhs) 16 17 18 19 20 21

Name of the Work

Stage of work

10

11

15

NCRMP/B-W/ AP/MPCS/ PRED/03/ Rambillii/004

02.07.201 02.01.12 02.07.12 2 EOAT Ground 02.04.12 Completio 75.06 approved Floor Casting of n of all 03.10.2011 up to Plinth all slabs items of 25.07.201 Leve work 3

Construction of cyclone shelter at Venkayyapalem

75.06

All slabs, brick work, plastering, wood joinery, flooring,plumbing, painting completed.

75.06

100%

75.06

100%

Working estimate preparation/approva l is awaiting.

Y2-048

MPCS

NCRMP/B-W/ AP/MPCS/ PRED/03/ S Rayavaram /009

MPCS

129.92 20.04.2013

19.04.13

19.09.13 19.04.13 Ground 19.01.14 Completio Floor Casting of n of all Plinth all floors items of Level work

Construction of CS at Bangarampalem I & II H/o Vakadu. (Type D)

129.92

20.04.13

Earthwork excavation started and stop due to site dispute. Alternate site is identified and approval is pending.

0%

0%

0%

The village proposed to be aquired for navel base purpose. Hence the field officers are informed to higher otherties for cancellation of the work

Y2-057

NCRMP/B-W/ AP/RCS/ PRED/03/ Bheemili/005

78.44 11.03.2013

10.07.13 Earthwork , Pipe 10.12.13 culverts of all works(10 %)

Y2-166

10.10.13 WBM Gr-II, Gr-III and CC pavement of all work (54.76%)

10.12.13 BT, Shoulders and Road furniture complete of all works (100%)

Road from R&B road to Chinanagamayyapalem CS

1525

47.29

11.03.13

RCS

WBM Gr-II From KM 0.000 to Km 0.800 completed. Three nos. CD works completed. WBM Gr-III From KM 0.000 to Km 0.800 completed. OGPC +Seal coat from Km 0.00 to KM 0.800 completed. WBM Gr-II ( From km0.00 to 1.057 ) and CC Road work ( From km 1.057 to KM 1.107 ) completed . WBMGr-III and OGPC + Seal coat from 0.00 to Km1.057 completed. Earth work for widening, CC Road work, shoulder works are completed from KM 0.000 to KM 0.8538 and from KM 0.8845 KM 1.072

26

55%

45% value of work is not able to do due to site dispute with forest dept.@

Y2-165

55

70%

Road from R&B road to Annavaram CS

1100

31.15

11.03.13

30

96%

NCRMP/B-W/ AP/RCS/ PRED/03/ S Rayavaraam /006

56.46 07.03.2013

06.12.13 06.07.13 Shoulders Earth 06.10.13 , Road 06.12.13 work, CC CC Road furniture road (67.18%) & CC road (29.28%) (100%)

Y2-167

Road from R&B road to Revupolavaram CS

RCS

1065

56.46

07.03.13

56

99%

56

99%

Page 31 of 159

Agreement Amount (Lakhs)/ Date

Sl. No. Package Nos. of Pkg 1 2

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9

Name of the Work

AGG Date of Length Value commence (Mts) of work ment of (Lakhs) work 12 13 14

Stage of work

Total % of % of Value of Reasons Value of work work Work for nonwork done for TPQA observation done for done for started done in the the work package works Package (Lakhs) 16 17 18 19 20 21

10

11

15 Earth work, sub grade,GSB, shoulders and CC Road work completed from KM 0.000 to KM 0.610.

NCRMP/B-W/ AP/RCS/ PRED/03/ Rambilli/007

38.78 11.03.2013

10.09.13 Wearing 10.06.13 coat, 10.08.13 Earthwork shoulders 10.09.13 CC Road , GSB ( and Road ( 89.45) 15%) furniture complete ( 100%)

Y2-168

Road from R&B road to Kothapatnam CS

RCS

650

38.78

11.03.13

39

101%

38.7

100%

Road from R&B road to Rajavaram

425

14.38

07.03.13

One pipe culvert, WBM Gr-II, Gr-III and OGPC seal coat Work is completed From KM 0.0 to KM 0.425 Sub grade with selected earth(Gravel): From km 0.640 to 0.750, from KM 1.190 to Km 1.764 completed. Earth work and WBM Gr-II completed From KM 0.000 to KM 0.012, from KM 0.030 to KM 1.764. GSB : 1488 Meters From KM 0.030 to KM 0.094, from KM 0.340 to KM 1.764 completed. CD works (4 nos) and Retaining wall completed.WBM Gr-III Rolling is progress.. 4 Nos pipe culverts completed. From Km 0/106 to Km 1/600 and from km 2/0 to km 2/620 GSB,WBM GrII,Grade-III and OGPC + Seal coat completed. From KM 1.600 to Km 2.0 and From KM 2.620 to KM 2.720 GSB work completed.

14

94%

6.4% value of One pipe culvert work is not executed as the field officers proposed that it is not required.

Y2-280 Y2-281

NCRMP/B-W/ AP/RHB/ PRED/03/ Payakaraopeta /005

189.59 07.03.2013

06.10.13 Earthwork , 06.06.14 Pipeculver ts,GSB ( 35.8%)

06.04.14 WBM Gr06.06.14 II,Gr-III BT and and Road shoulders furniture & CC ( 100%) Pavement ( 72.6%)

Road from Rajala R&B Road to Rajaraidupalem

1764

65.34

07.03.13

32

49%

RHB

138

73%

Road from R&B road to Gajareddipalem via Venkaypalem

Y2-282

2614

109.87

07.03.13

92

84%

Page 32 of 159

Agreement Amount (Lakhs)/ Date

Sl. No. Package Nos. of Pkg 1 2

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9

Name of the Work

AGG Date of Length Value commence (Mts) of work ment of (Lakhs) work 12 13 14

Stage of work

Total % of % of Value of Reasons Value of work work Work for nonwork done for TPQA observation done for done for started done in the the work package works Package (Lakhs) 16 17 18 19 20 21

10

11

15 One single row and one two row pipe culvert works completed. Retaining wall work completed for 62.55 Meters ( 62.55m in km 0/600 ). Earth work, GSB and CC pavement From Km 0/0323 to Km 0/4021, from Km 0/689 to 0/9294 and Cross Road from Km 0/328 to 0/498 Completed

NCRMP/B-W/ AP/RHB/ PRED/03/ Payakaraopeta /008

62.04 07.03.2013

06.12.13 CC drain, 06.07.13 CD works, Earth,GSB 06.10.13 Shoulders 06.12.13 ,Retaining CC Road and Road wall ( (86%) furniture 22%) complete (100%)

10

Road from Z.P Road Palmanpeta to Korlayyapeta

1110

62.04

07.03.13

60

96%

60

96%

CC drain, body walls and parapet walls for one CD work is not done.

NCRMP/B-W/ AP/RHB/ PRED/03/ Atchutapuram /009

26.09 07.03.2013

06.06.13 06.09.13 Earth 06.08.13 Shoulders 06.09.13 work,CC CC Road and Road Road (70.81%) furniture (26.22%)

Y2-283

RHB

11

Road from R&B Road to Vadapalem

450

26.09

07.03.13

Shoulders and CC Road completed from KM 0.000 to KM 0.4244

Y2-284

RHB

26

100%

26

100%

Page 33 of 159

Abstract Status of NCRMP Works in Srikakulam Districtas as on 31.10.2013

RATE OF PROGRESS OF WORKS up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not Started Works Deleted Total No of works

No of works 14 19 2 7 3 4 49

20 18 16 14 12 10 8 6 4 2 0 up to 10% 14

19

7 3 4

11 to 40%

41 to 70%

71 to 100%

Works Not Started

Works Deleted

Page 34 of 159

Status of NCRMP works in Srikakulam District as on 31.10.2013


Agreement Amount (Lakhs)/ Date Sl. No. Package Nos. of Pkg 1 2 NCRMP/B-W/ AP/MPCS/ PRED/01/ Santhabommali /005 Project code catagory Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8 Sl.No of work 9 1 AGG Length Value (Mts) of work (Lakhs) 12 13 112.03 Nov-11 Construction of CS at Runku Construction of MPCS in Amalapadu 112.03 Finishing work is in progress DELETD Line Dept officers are taken position of required land from Gramkantam. The villagers wanted to construct the CS at Amalapadu. 108 96% Date of commen cement of work 14 Total % of % of Value of Value of work work Work work done for done for done for done in the the work package Package (Lakhs) 16 111 17 99% 219.00 98% 18 19 Reasons for non-started works 20

Name of the Work

Stage of work

TPQA observation

10 Y2-005 Y2-002 Y2-001

11 Construction of CS at Kollipadu

15 Finishing work is in progress

21

EOAT 224.07 approved 17.10.11 up to 04.09.13

16.03.12 16.08.12 16.01.13 Ground Casting of Completet Floor first floor ion of all Plinth roof slabs works Level of of all (100% all works works Value)

MPCS

Y2-006

Y2-009 Y2-008 Y2-007

NCRMP/B-W/ AP/MPCS/ PRED/01/ V.Kotturu/003

MPCS

475.07 09.03.13

08.11.13 08.04.14 08.09.14 Ground Casting of Completet Floor all slabs ion of all 08.09.14 Plinth of all works Level of works (100% all works (65.27% Value) (28.72%) Value)

Construction of MPCS in Angavanipeta

86.4

Not started

0%

0 5 Construction of MPCS in Ch.Batasalavanipeta Construction of MPCS in Chintavanipeta Construction of MPCS in U.Narisingapally 86.4 DELETED

0%

DELETED

Not started PCC for Footings, footings, pedestals and columns up to bottom of plinth beam are completed, Back filling in foundation is in progress. PCC, Footings, Columns below plinth level completed. Back filling in fondation is in progress. PCC, Footings completed. Columns is in progress. DELETED

0%

Construction of MPCS in Bypalli (Type C)

Y2-010

117.38

25

21%

NCRMP/B-W/ AP/MPCS/ PRED/01/ V.Kotturu/004

MPCS

8.09.14

Y2-011

422.27 9.03.13

8.11.13 8.04.14 8.09.14 Ground Casting of Completet Floor all slabs ion of all Plinth of all works Level of works (100% all works (59.64% Value) (24.34%) Value)

Construction of MPCS in Chinavanka (Type C)

119.1

19

16%

55.5

17%

Progress of work is behind the mile stones. Contractor has to speed up the work to achive the progress.

10

Construction of MPCS in Chinakotturu (Type A) Construction of CS in Chinajuttuvanipalem (Type A)

Y2-012

89.21

11.5

13%

11

Y2-013

Page 35 of 159

Agreement Amount (Lakhs)/ Date

Sl. No. Package Nos. of Pkg 1 2 NCRMP/B-W/ AP/MPCS/ PRED/01/ Ranastalam /008

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 13

Date of commen cement of work 14

Stage of work

Total % of % of Value of Value of work work Work work done for done for done for done in the the work package Package (Lakhs) 16 17 18 19

Reasons for non-started works 20

TPQA observation

10

11

15 Earth work excavation completed, PCC Completed. Reinforcement for footings is in progress.

21

MPCS

88.75 15.03.13

14.03.14

14.09.13 14.2.14 14.06.14 Ground Casting of Completet Floor all slabs ion of all Plinth of all works Level of works (100% all works (67% Value) (21%) Value) 19.03.14 19.12.13 Completet Casting of ion of all all slabs. works (60.23% (100% Value) Value)

12

Construction of MPCS in Kommaravanipeta (Type A)

Y2-018

88.75

15.03.13

6.4

7%

2%

NCRMP/B-W/ AP/MPCS/ PRED/01/ Kavati/011

MPCS

80.83 20.03.13

19.08.13 Ground Floor 19.03.14 Plinth Level (28.51%)

13

Construction of MPCS in Ch.Karrivanipalem (Type B)

Y2-023

80.83

15.08.13

Earth work is in progress

1%

1%

Site is handed over to the Progress of work is contractor. But behind the mile the contractor stones. Contractor started the earth has to speed up the work excavation work to achive the in the month of progress. August.

NCRMP/B-W/ AP/MPCS/ PRED/01/ Sompeta/012

MPCS

88.78 15.03.13

14.03.14

19.08.13 19.03.14 19.12.13 Ground Completet Casting of Floor ion of all all slabs. Plinth works (67% Level (100% Value) (33%) Value)

14

Construction of MPCS in Ramayyapatnam (Type B)

88.78

15.03.13

PCC completed

5.5

6%

5.5

6%

Progress of work is behind the mile stones. Contractor has to speed up the work to achive the progress.

Y2-024

NCRMP/B-W/ AP/MPCS/ PRED/01/ V.Kotturu / 013

MPCS

239.55 15.03.13

16

Y2-026

14.09.13 14.02.14 14.06.14 Ground Casting of Completet Floor all slabs ion of all 14.06.14 Plinth of all works Level of works (100% all works (52.58% Value) (22.97%) Value)

15

Construction of MPCS in Metturur (Type D)

119.775 15.03.13

PCC for Footings, footings, pedestals and columns up to bottom of plinth beam are completed, Back filling in foundation is in progress.

Y2-025

23

19%

23

10% Site is handed over to the contractor. The contractor has to start the work.

Progress of behind themile stones. Contractor has to speed up the work to achive the progress.

Construction of MPCS in Nuvvalarevu (Type D)

119.775

Not started

0%

NCRMP/B-W/ AP/MPCS/ PRED/01/ Santhabommall i /014

MPCS

116.89 20.03.13

19.03.14

19.08.13 19.03.14 Ground 19.12.13 Completet Floor Casting of ion of all Plinth all slabs. works Level (% Value) (100% (21%) Value)

17

Construction of MPCS in R.Sunnapally (Type C)

116.89

20.03.13

Earth work is in progress

2%

2%

The contractor started the earth work excavation in the month of July. Awaiting for SBC result.

Y2-027

Page 36 of 159

Agreement Amount (Lakhs)/ Date

Sl. No. Package Nos. of Pkg 1 2

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9 18

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 13 125.78

Date of commen cement of work 14 15.03.13

Stage of work

Total % of % of Value of Value of work work Work work done for done for done for done in the the work package Package (Lakhs) 16 38 17 30% 18 19

Reasons for non-started works 20

TPQA observation

10 Y2-028

11 Construction of MPCS in Calingapatnam (Type D)

15 Plinth beam completed

21

19

Y2-029

NCRMP/B-W/ AP/MPCS/ PRED/01/ Gara/015

MPCS

251.57 15.03.13

14.09.13 14.2.14 14.06.14 Ground Casting of Completet Floor all slabs ion of all 14.06.14 Plinth of all works Level of works (100% all works (59.88% Value) (28.43%) Value)

Construction of MPCS in Bandaruvanipeta (Type D)

125.78

Earthwork Excavation, PCC for footings, RCC footings, pedestals and columns upto 15.03.13 bottom of plinth beam work completed. Back filling in foundation completed. PCC completed, Reinforcement for footings is in progress.

68.5 30.5 24%

27%

Progress of work behind the mile stones. Contractor has to speed up the work to achive the progress.

10

NCRMP/B-W/ AP/MPCS/ PRED/01/ Polaki/018

MPCS

92.48 15.03.13

14.03.14

14.12.13 14.08.13 14.03.14 Casting of Ground Completet all slabs Floor ion of all of all Plinth works works Level (100% (68% (15%) Value) Value)

20

Construction of MPCS in Akkuvaram (Type C)

92.48

15.03.13

7.5

8%

7.5

8%

Progress of work is behind the mile stones. Contractor has to speed up the work to achive the progress. Site is handed over to the Progress of work is contractor. But behind the mile the contractor stones. Contractor started the earth has to speed up the work excavation work to achive the in the month of progress. June Progress of work is behind the mile stones. Contractor has to speed up the work to achive the progress.

Y2-030

11

22

Y2-032

NCRMP/B-W/ AP/MPCS/ PRED/01/ Ranastalam /016

MPCS

178.26 15.03.13

14.09.13 14.2.14 14.06.14 Ground Casting of Completet Floor all slabs ion of all 14.06.14 Plinth of all works Level of works (100% all works (58.56% Value) (26.01%) Value) 02.10.13 02.03.14 02.07.14 Ground Casting of Completet Floor all slabs ion of all 02.07.14 Plinth of all works Level of works (100% all works (63.11% Value) (29.19%) Value) 14.08.13 Earth work, Pipe culverts,G 14.03.14 SB and CC Pavement s of all works (44.97%) 14.12.14 WBM Gr- 14.03.14 II, Gr-III, BT and CD works Road and furniture shoulders of all of all works works (100% (70.33% Value) Value)

21

Construction of MPCS in Jaganadhapuram (Type B)

89.43

PCC, Footings & columns below 15.03.13 plinth beam completed and back filling is in progress. PCC completed, Reinforcement, 15.03.13 shuttering for footings completed. Footings, columns below plinth beam completed Earth work Completed Earth work completed Earth work completed 15.03.13 Earth work and GSB completed Earth work completed

Y2-031

17

19% 33.00 19%

Construction of MPCS in Kottamukkam (Type A) Construction of MPCS in Patadibbalapalem (Type A) Construction of MPCS in Bontalakoduru (Type B) Road from Chinnavanka to Gopaladavooru Road from MN peta Road to Kondavooru and to CS Road from R&B Road to S.J. Puram Road from Kothapeta Road to Sainooru CS 3675

88.72

16

18%

12

24

Y2-037

NCRMP/B-W/ AP/MPCS/ PRED/01/ Etcherla/017A

23

Y2-036

89.91 03.04.13 86.87

19

21% 21 12%

MPCS

176.94 03.04.13

2%

25

Y2-148 Y2-147 Y2-146 Y2-145

63.32

2% Working estimate is prepared for changing the WBM layer to WMM layer, approval is awaiting.

13

NCRMP/B-W/ AP/RCS/ PRED/01/ V.Kottoru/001

26

500

23.50

4% 5 4%

136.07 15.03.13

RCS

27

265

19.13

10%

28

785

30.10

3%

Page 37 of 159

Agreement Amount (Lakhs)/ Date

Sl. No. Package Nos. of Pkg 1 2

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second Third

Sl.No of work 9

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 13

Date of commen cement of work 14

Stage of work

Total % of % of Value of Value of work work Work work done for done for done for done in the the work package Package (Lakhs) 16 17 18 19

Reasons for non-started works 20

TPQA observation

NCRMP/B-W/ AP/RCS/ 14 PRED/01/ Santhabommali /008

93.09 15.03.13

7 8 14.10.13 14.12.13 WBM GRBT and 14.07.13 II &III, road Earth CD works 14.12.13 furnishes work, GSB and CC all works (18.18%) pavement (100% (81.46% Value) Value) 14.12.14 WMM, CC 14.08.13 Pavement 14.03.14 Earth & CD BT and work, GSB works, road of all 14.03.14 shoulders furnishes works for all all works (20.72%) works (100% or (88.36% Value) 12.15% Value) or 38.09% 14.12.14 WMM, CC 14.03.14 Pavement BT raod & CD furnishes works, for all works all works (100% (71.70% Value) Value) or 24.60%

10

11

15 Earth work and Culverts completd, GSB 400 MTS Laying is in progress.

21 Progress of work is behind the mile stones. Contractor has to speed up the work to achive the progress.

29

Borubhadra Meghavaram Road to M. Maruvada

Y2-150

RCS

2000

93.09

15.03.13

16

17%

16

17%

30

15

NCRMP/B-W/ AP/RCS/ PRED/01/ Mandasa/010

31

123.36 15.03.13

32

Yeeramukkam Rati R&B road to Dunnavooru Road from Yeeramukkam Rati R&B road Geddavooru Road from R&B road Ganguwada to road to Sigalaputtuga Road from R&B road to Akkuvaram

Y2-156 Y2-155 Y2-154

350

18.79 Road widening is in progress, earth work, culverts is in progress.

3%

600

34.96 15.03.13

20% 43.5 35% Progress is with in approved mile stones.

RCS

875

39.19 CC road completed, Graverl shoulder laying is in progress Culverts,GSB completed, Road widening is in progress Road widening is in progress, culverts and GSB completed Road widening is in progress GSB completed 25.03.13 Road widening is in progress GSB completed Road widening is in progress

10%

33

Y2-157

585

30.41

29.5

97%

16

Y2-159

NCRMP/B-W/ AP/RCS/ PRED/01/ Etcherla & Ranasathalam /012

162.54 15.03.13

14.08.13 Earth work & 14.03.14 GSB of all works (23.26%) or 3%

Y2-158

34

Road from R&B road to Pathadibbalapalem

3500

121.67 15.03.13

32

26% 38 23% Progress is with in approved mile stones.

RCS

35

Road from R & B road to Pothayyapeta CS

1300

40.87

15%

Y2-269 Y2-268 Y2-267 Y2-266 Y2-265

36

Road from B.M R&B Road to Simmayyapeta Road from R&B road to Marripadu Road from R&B Road to Kakarapalli Road from R&B road to Marripadu Road from R&B road to Pethalingapuram

1350

33.52

1.5

4%

NCRMP/B-W/ AP/RHB/ 17 PRED/01/ Santhabommali /001A

118.46 25.03.13

24.09.13 Earth work & 24.06.14 GSB of all works (

24.02.14 WBM GrII, Gr-III and CD works for all works

24.06.14 BT raod furnishes all works (100% Value)

37

400

13.77

3.5

25% 20.5 17%

38

1200

34.98

26%

39

700

22.29

27%

Progress of work is behind the mile stones. Contractor has to speed up the work to achive the progress.

RHB

40

500

13.89

0.5

4%

Page 38 of 159

Agreement Amount (Lakhs)/ Date

Sl. No. Package Nos. of Pkg 1 2

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8 22.09.14 BT raod furnishes Bridge super structure & Approach slabs (100% Value) 29.01.12 BT raod furnishes all works (100% Value)

Sl.No of work 9

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 13

Date of commen cement of work 14

Stage of work

Total % of % of Value of Value of work work Work work done for done for done for done in the the work package Package (Lakhs) 16 17 18 19

Reasons for non-started works 20

TPQA observation

10

11

15

21

NCRMP/B-W/ AP/RHB/ 18 PRED/01/ Santhabommali /001B

216.17 23.03.13

22.10.13 Earth work, GSB, 22.09.14 Bridge foundatio n. (53.16%)

22.04.14 WBM GrII & III, Bridge Sub structure (79.89%)

41

Road from DPN road to Gangaram Village via Palatalagam, Srikrishnapuram

3700

216.17

Road widening completed from 0/000 to Km 3/200, Subgrade completed 23.03.13 from 0/000 to Km 3/200, Bridge execavation completed.

Y2-270

42

19%

42

19%

Bridge re design approval is awaiting.

RHB

19

42

Y2-271

NCRMP/BW/AP/RHB/PRED/ 01/Polaki/005

29.07.11 29.10.12 75.15 Earth (31.05.13 30.04.11 work & ) CD works

29.10.11 WBM GrII, Gr-III and shoulders works

Road from R&B road Edulavalasa Killam to Jonnam via Talasamudram

2700

76.10

GSB,WBM Gr-II, WBM 30.04.11 Gr-III, BT and CC road work completed

RHB

100%

100%

20

NCRMP/BW/AP/RHB/PRED/ 01/Polaki/006

44

Y1-098

RHB

4 months 29.04.12 Earth 145 (31.05.13 work, GSB 30.04.11 ) & CD works

29.04.11 29.12.11 BT raod WBM Grfurnishes II, Gr-III all works and (100% shoulders Value) works

43

Road from R&B road Mobagam to Dubbakavanipeta via Gajapathinagaram

Y2-272

2750

100.40

30.04.11

Completed

100%

100%

Road from Talasamudram to Dola Regulator

1600

43.00

30.04.11

Completed

100%

100%

21

Y2-274

NCRMP/B-W/ AP/RHB/ PRED/01/ Polaki/007

164.92 20.03.13

19.12.13 WBM Gr19.08.13 II & III, Earth CD works, work, GSB 19.03.14 CC of all pavement works of all (13.15%) works (78.91%)

19.03.14 BT raod furnishes Bridge super structure (100% Value)

45

RHB

DPN road to DL Puram jn. via Koduru, Magathapadu, Guppidipeta

2350

108.92 20.3.13

Culverts completed, WBM GR-II laying is in progress

Y2-273

53

49% 77.5 47%

46

Guppidipeta road to Chinnakoviripeta

1340

55.97

Culverts completed, WBM GR-II completed Culverts completed, WBM GR-II collection & laying is in progress 25.03.13 Culverts, CC pavement completed, WBM GrII collection is in progress.

Progress of work is ahead with respect to approved mile stones.

24.5

44%

22

Y2-276

NCRMP/B-W/ AP/RHB/ PRED/01/ Polaki/008

106.67 25.03.13

24.12.13 24.03.14 WBM Gr24.08.13 BT raod II & III, Earth furnishes cd works, work, GSB Bridge 24.03.14 CC of all super pavement works structure of all (7.3%) (100% works Value) (80.45%)

47

K.C. Road to Rajarampuram via Ampalem Revuamplam

Y2-275

0.9

57.13

19

33% 35 33% Progress of work is ahead with respect to approved mile stones.

RHB

48

KC road to Amplam (via) Urjam, Nandigam

1.6

49.73

16

32%

Page 39 of 159

Agreement Amount (Lakhs)/ Date

Sl. No. Package Nos. of Pkg 1 2

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8 Completio n of entire work including approach es 18 Months

Sl.No of work 9

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 13

Date of commen cement of work 14

Stage of work

Total % of % of Value of Value of work work Work work done for done for done for done in the the work package Package (Lakhs) 16 17 18 19

Reasons for non-started works 20

TPQA observation

10

11 Construction of High level bridge across Uppugedda at KM 7/6 of Srikakulam muncipal limits to Pukkalapeta via Killipalem

15 Approach road WMM completed, traffic alloved, Approach road SDBC work pending

21

NCRMP/B-W/ AP/Br/R&B/ 23 01/Uppugedda /002

Completio Completio 16.06.201 n of n upto 2 EOAT 119.56 foundatio below the approved 17.12.10 n up to deck slab. up to sill level. 12 30.07.13 6 Months Months

49

119.56

Aug-12

114

95%

114

95%

Due to rainy season BT laying work is not allowed by dept.

R&B- Br

Y2-438

Page 40 of 159

Abstract Status of NCRMP Works in East Godavari as on 31.10.2013

RATE OF PROGRESS OF WORKS up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not Started Total No of works

No of works 5 10 3 4 3 25

12 10 8 6 4 2 0 up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not Started 5 4 3 3 10

Page 41 of 159

Status of NCRMP works in East Godavari as on 31.10.2013


Sl. No. Package Nos. of Pkg 1 2 NCRMP/B-W/ AP/MPCS/ PRED/04/ Uppalaguptam /002 Agreement Amount (Lakhs)/ Date 4 105.65 17.10.2011 Project code catagory Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8 Sl.No of work 9 AGG Length Value (Mts) of work (Lakhs) 12 13 Date of commen cement of work 14 Total % of % of Value of Value work work Work of work done done for done for done in for the the package work Package (Lakhs) 16 17 18 19

Name of the Work

Stage of work

Reasons for nonstarted works

TPQA observation

3 MPCS

10 Y2-062

11

15

20

21 Working estimate is being prepared.

16.07.13

Construction of CS at Cyclone Pedaraghavulapeta of Shelter Uppalaguptam Mandal

105.65

24.02.12

Completed

95

90%

95

90%

Y2-075

NCRMP/B-W/ AP/MPCS/ PRED/04/ Sakhinetipally /010

MPCS

240.00 23.04.2013

21.10.13 Ground 21.03.14 21.07.14 Floor Casting of Completion 22.07.14 Plinth All Slabs of of All Level of All Works. works All Works (67%) (100%) (27%)

Construction of CS at Kesavadasupalem (Type D)

Cyclone Shelter

120

No

jungle Clerence Completed.

3.6

3% 13.6 6%

Site is handed over on 29-06-13. Contractor has not started the work until now.

Y2-074

Construction of CS at Pallipalem (Type D)

Cyclone Shelter

120

Construction of CS at Cyclone Padamatapalem (Type Shelter D)

107

Gravel collected for cattle ramp, 12.07.13 cement and steel procured. Stilt floo slab 21.06.13 form work is in progress.

Progress of work not satisfactory

10

8%

Y2-076

32

30% Original site identified is on the backside of overhead water tank and there is no dispute about the site until the tenders are finalised. After the agreement is concluded, dept officers wanted to take over the site and one group of villagers objected to the location of the prposed construction. The dispute was resolved and the village secretery has informed the officers that he would hand over the site after clearing the obstructions. So far, it was not handed over and the village secretery is on strike. It was informed that the DEE & AEE are on strike from 05-08-13

Y2-077

NCRMP/B-W/ AP/MPCS/ PRED/04/ Malikipuram /011

MPCS

214.00 22.04.2013

21.10.13 Ground 21.03.14 21.07.14 Floor Casting of Completion 21.07.14 Plinth All Slabs of of All Level of All Works. works All Works (67%) (100%) (27%)

32 5 Construction of CS at Kesanapalli (Type D) Cyclone Shelter 107 No Not Yet Started 0 0

15%

Progress of work is slow

Page 42 of 159

Sl. No. Package Nos. of Pkg 1 2

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 13

Date of commen cement of work 14

Stage of work

Total % of % of Value of Value work work Work of work done done for done for done in for the the package work Package (Lakhs) 16 17 18 19

Reasons for nonstarted works

TPQA observation

10

11

15

NCRMP/B-W/ AP/MPCS/ PRED/04/ Mamidikuduru /012

MPCS

94.00 22.04.2013

21.09.13 Ground 21.01.14 21.04.14 Floor Casting of Completion 21.04.14 Plinth All Slabs of of All Level of All Works. works All Works (67%) (100%) (27%)

Construction of CS at Karavaka (Type B)

Cyclone Shelter

94

No

Not Yet Started

Nil

Nil

Nil

Nil

20 21 Original site is identified in Indiramma colony. The villagers wanted the CS to be constructed in place of community hall in dilapidated Suitable action condition. The villagers is to be taken promised to dismantle to hand over the building and hand the site. over the site for MPCS. But so far, it was not dismantled. District Collector has seen the site and agreed in principle. Progress of work is Very slow

NCRMP/B-W/ AP/RCS/ PRED/04/ U Kothapalli /002

9.00 26.03.2013

25.07.13 25.10.13 Earth GSB & CC 25.12.13 Work & Pavement CD Works (76%) (19%)

25.12.13 Shoulders & Road Furniture (100%)

Y2-078 Y2-169

Road from R&B road to Samanthkurru Pallepalem CS Approach Road from R & B Road to Turupupalem CS Road from R & B Road to Kesanapalli (New) CS Road from R & B Road to Padamatipalem CS

120

06.07.13

Carting Earth Completed.

RCS

0.5

6%

0.5

6%

Y2-172 Y2-171 Y2-170

8 NCRMP/B-W/ AP/RCS/ PRED/04/ Malikipuram/00 9 85.00 04.04.2013 03.09.13 Earth Work, GSB (17%) 03.01.14 03.04.14 WBM & CC BT & Road Pavement Furniture (52%) (100%)

100

7.5

No

Gravel collection is in Progress. Not Yet Started

0.5

7% Work will be started after the MPCS site is handed over Progress of work is slow

RCS

03.04.14

100

No

Nil

Nil

32.5

38%

10

1880

70.5

11 NCRMP/B-W/ AP/RCS/ PRED/04/ Razole & Sakhinetipalli /010 30.05.13 Earth Work & GSB (21%)

Road from R & B Road to Katrenipadu Lanka CS

640

20.5

50.00 29.04.2013

30.09.13

30.08.13 30.09.13 WBM & CC BT & Road Pavement Furniture (81%) (100%) Road from R & B road to Kesavadasupalem (New) CS Y2-174

RCS

GSB and WBM Grade II Completed. Road A) OGPC + Seal coat completed from Km. 0.000 to 08.06.13 0.500. Road B) GSB & CC Pavement completed from Km 0.000 to 0.210. 14.06.13 Road A) GSB and CC Pavement completed from Km 0.000 to 0.320. 16.07.13 Road B) GSB and CC Pavement completed from Km.0.000 to 0.110.

32

45%

Y2-173

21

100%

50

100.00%

Progress of work is well ahead of milestones

12

430

29.5

30

100%

Page 43 of 159

Sl. No. Package Nos. of Pkg 1 2 NCRMP/B-W/ AP/RCS/ PRED/04/ Mamidikuduru /013

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 13

Date of commen cement of work 14

Stage of work

Total % of % of Value of Value work work Work of work done done for done for done in for the the package work Package (Lakhs) 16 17 18 19

Reasons for nonstarted works

TPQA observation

10

11

15 2no. Pipe Culvert Completed. EW, Selected earth completed from Km.0.500 to Km0.800 GSB and CC Pavement Completed from Km. 0.000 to Km. 0.490.

20

21

33.00 08.03.2013

07.09.13

07.05.13 07.08.13 07.09.13 Earth CD Works & Road Work & CC Furniture GSB Pavement & GSB (21%) (72%) (100%)

Y2-175

13

Road from R&B road to Karavaka CS

800

33

18.06.13

14.5

44%

14.5

44%

Villagers stop the work

RCS

NCRMP/B-W/ AP/RCS/ PRED/04/ Katrenikona /015

29.00 08.03.2013

07.05.13 Earth 07.08.13 Work, CC 07.09.14 GSB & CD Pavement Works (68%) (27%) 30.05.13 Earth Work & GSB (27%)

07.09.13 Road Furniture (100%)

14

CC Road from main proposed road to Neellarevu II CS in Neellarevu

540

29

06.07.13

29

100%

29

100%

Progress of work behind the mile stone

10

NCRMP/B-W/ AP/RCS/ PRED/04/ Allavaram/016

41.00 29.04.2013

30.09.13

30.08.13 30.09.13 WBM & CC BT & Road Pavement Furniture (68%) (100%)

Y2-177

Y2-176

RCS

15

Road from R&B road to Samanthakurru CS

380

41

02.06.13

Retaining wall and GSB Completed.

21

51%

21

51%

Work progress not satisfactory

RCS

11

Y2-290

NCRMP/B-W/ AP/RHB/ PRED/04/ Sakhinetipalli /008

94.00 30.03.2013

RHB

29.08.13 29.12.13 29.03.14 Earth WBM, CD BT & Road Work & Works & CC Furniture GSB Pavement (100%) (23%) (76%) 29.03.14 29.08.13 29.12.13 29.03.14 Earth WBM, CD BT & Road Work & Works & CC Furniture GSB Pavement (100%) (23%) (76%)

16

Road from R&B road to Korukondavari Group

Y2-289

1000

44.5

06.06.13

GSB completed

13.5

30% Progress of work is slow.

28 Road from R&B road to Gondi Kodapa

30%

17

830

49.5

12.06.13 GSB is in Progress.

14.5

29%

12

NCRMP/B-W/ AP/RHB/ PRED/04/ Allavaram/012

148.00 30.03.2013

RHB

29.08.13 29.12.13 29.03.13 Earth WBM, CC BT & Road Work & Pavement & Furniture GSB CD Works. (100%) (17%) (58%) 29.03.14 29.08.13 29.12.13 29.03.13 Earth WBM, CC BT & Road Work & Pavement & Furniture GSB CD Works. (100%) (17%) (58%)

18

BT road from Komaragiripatnam to Kadadari and to CS

3500

93

Road A) WBM Grade III completed from 09.07.13 Km 0.000 to 1.050. Road B) EW, Selected earth and GSB completed.

Y2-293

35

38% Progress of work is slow

41

28%

19

Road from R&B road Samanthakurru to Chakkavaripeta Rameswaram

Y2-294

880

55

14.07.13 GSB is in Progress.

11%

Page 44 of 159

Sl. No. Package Nos. of Pkg 1 2

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 13

Date of commen cement of work 14

Stage of work

Total % of % of Value of Value work work Work of work done done for done for done in for the the package work Package (Lakhs) 16 17 18 19

Reasons for nonstarted works

TPQA observation

10

11

15

20

21

13

Y2-296

NCRMP/B-W/ AP/RHB/ PRED/04/ Katrenikona /014

155.00 27.04.2013

RHB

26.09.13 26.01.14 26.04.14 Earth WBM, CC BT & Road Work & Pavement & Furniture GSB CD Works. (100%) (18%) (61%) 26.04.14 26.09.13 26.01.14 26.04.14 Earth WBM, CC BT & Road Work & Pavement & Furniture GSB CD Works. (100%) (18%) (61%) 29.08.13 29.11.13 29.03.14 Earth WBM & CD BT & Road Work & Works. Furniture GSB (72%) (100%) (31%) 24.05.13 Earth Work & WBM (100%) 24.09.13 BT & Road Furniture. (100%) 24.05.14 Completion up to below the Deck slab & Earth work Formation for Approaches . (87%) 24.05.14 Completion up to below the Deck slab & Earth work Formation for Approaches .(87%)

Y2-295

20

Road from Guthena deevi to Gogullanka

1920

94

No

Sub. Grade is in Progress.

11

12% Progress is slow

21 Road from R&B road to Ramalayampeta Pallamkurru (v) Sub. Grade is in Progress.

14%

21

1350

61

No

10

16%

14

NCRMP/B-W/ AP/RHB/ PRED/04/ Katrenikona /016 NCRMP/B-W/ AP/RHB/ PRED/04/ Razole/020

157.00 30.03.2013

29.03.14

22

Road from N. Kothapalli to G.Pora in Katrenikone (v)

3500

157

No

Sub. Grade is in Progress.

8%

8%

No site problem.Contractor has not yet started.

Y2-297

RHB

15

13.00 25.03.2013

24.09.13

23

Road from R&B road to Aravapalem

740

13

04.07.13

WBM Grade III completed.

4.5

35%

4.5

35%

As per Mile Stone work is not completed Agreement period is over.

16

NCRMP/B-W/ AP/Br/R&B/ 04/ Pampa Yeru-1 /015

505.00 26.03.2013

24.12.13 Completio n of Foundatio 25.09.14 n up to Well Capping. (36%)

24.09.14 Completion of entire work including approache s (100%)

Y2-298

RHB

24

Construction of Bridge at Km 43/10 of Vakalapudi - Edatam road across Pampa Yeru in EG District.

83.74

505

Abutments 1,2, Piers 1,2,3 and 4 13.04.13 Wells concrete and shinking in progress.

194

38%

194

38%

Progress of work is as per milestone

NCRMP/B-W/ AP/Br/R&B/ 17 04/Pampa Yeru2 /016

355.00 25.03.2013

24.12.13 Completio n of Foundatio 24.09.14 n up to Well Capping. (36%)

24.09.14 Completion of entire work including approache s (100%)

Y2-444

Bridge

25

Construction of Bridge at Km 43/6 of Vakalapudi - Edatam road across Pampa Yeru in EG District.

50.54

355

Abutments1 well pluging completed. Abutment 2, Piers 20.05.13 1,2, Wells concrete and shinking in progress.

140

39%

140

39%

Progress of work is as per milestone

Y2-445

Bridge

Page 45 of 159

Abstract Status of NCRMP Works in Krishna District as on 31.10.2013

RATE OF PROGRESS OF WORKS up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not Started Total No of works

No of works 15 16 7 10 2 50

18 16 14 12 10 8 6 4 2 0 up to 10% 15

16

10 7

11 to 40%

41 to 70%

71 to 100%

Works Not Started

Page 46 of 159

Status of NCRMP works in Krishna District as on 31.10.2013


Sl. No. Package Nos. of Pkg 1 2 Agreement Amount (Lakhs)/ Date 4 Project code catagory Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8 Sl.No of work 9 1 AGG Length Value (Mts) of work (Lakhs) 12 690 13 43.25 Date of commen cement of work 14 28.05.13 Total % of % of Value of Value of work work Work work done done for done for done in for the the package work Package (Lakhs) 16 30.32 17 70% 18 19 Reasons for nonstarted works 20

Name of the Work

Stage of work

TPQA observation

10 Y2-189

11 Road from R&B road to CS @ Ullipalem Road from R & B Road to CS at Jaruguvanipalem Road from R&B road to CS @ Utagundam Road from R&B road to CS @ Ramakrishna puram Road from R&B road to CS @ Chintakolla

15 Earth work,GSB ,WMM 2 nd layer completed. Earth work,Subgrade is in progress Earth work,Sub Grade,GSB ,WMM 2 nd layer completed. Earth work,GSB ,WMM 2 nd layer completed. Earth work,all cd works,GSB completed and WMM 2nd layer is in progress.

21

Y2-192 Y2-191

NCRMP/B-W/ AP/RCS/ PRED/06/ Koduru/001

111.88 21.03.2013

20.09.13 20.06.14 Jungle Earth work, clearance, prime coat, 20.02.14 earth Tack coat, WMM, CD 20.06.14 work, SDBC, works scarifying, Shoulders, (64%) GSB,Sub Road grade furniture (25%) (100%)

Y2-190

500

31.08

22.07.13

3.70

12% 69.8 62%

290

23.00

22.07.13

19.30

84%

For the package, progress of works is as per first mile stone

RCS

390

21.39

28.05.13

16.50

77%

5 20.06.14 20.09.13 Earth work, earth prime coat, work 20.02.14 Tack coat, (raod way WMM, CD 20.06.14 SDBC, cutting), works shoulders, scarifying, (68%) Road GSB furniture (27%) (100%)

Y2-193

1950

95.16

20.07.13

67.00

70%

NCRMP/B-W/ AP/RCS/ PRED/06/ Koduru/002

159.86 21.03.2013

RCS

Road from R&B road to CS @ Padalavaripalem

510

30.15

GSB,1000mm dia single row pipe culvert in KM 04.06.13 0/4 is completed. GSB,WMM 2n layer is in progress. GSB,2Numbers of 300mm dia single row pipe culvert in KM 0/6 , one number-600mm dia 04.06.13 single row pipe culvert in KM 0/4 are completed. WMM 2nd layer is in progress. Earth work,GSB, 600mm dia single row pipe culvert in KM 0/2,1/0,2/0,2/2,3/0, completed.WMM 2nd layer is in progress.

Y2-194

22.00

73% 114.0 71%

For the package, progress of works is as per first mile stone

Y2-195

Road from R&B road to CS @ Mandapakala

590

34.55

25.00

72%

Y2-197

NCRMP/B-W/ AP/RCS/ PRED/06/ Nagayalanka /003

211.30 23.03.2013

20.03.14 Embankment, 20.08.13 20.12.13 Earth work, prime coat, Earth WMM, CD Tack coat, 20.03.14 work, GSB works SDBC, (25%) (69%) shoulders, Road furniture (100%)

Road from R&B road to Ramakrishna puram R & B Road via Pathaupakali

Y2-196

3300

179.04

29.07.13

90.00

50% For the package, progress of works is as per first mile stone

R & B Road to CS at Kothaupakali

510

32.26

Earth work, all CD works,completed sub gread complete.GSB is in progress from km 29.07.13 0.00to 0.607 ,600 dia pipe culverts at 0.016,0.200,0.231and0. 430 completed,

RCS

99.0

47%

9.0

28%

Page 47 of 159

Sl. No. Package Nos. of Pkg 1 2

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9 10

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 630 13 33.90

Date of commen cement of work 14 29.07.13

Stage of work

Total % of % of Value of Value of work work Work work done done for done for done in for the the package work Package (Lakhs) 16 3.0 17 9% 18 19

Reasons for nonstarted works 20

TPQA observation

10 Y2-198

11 Road from Uppu Canal drain to CS at Nali Road from Nali R & B Road to Barrankula CS From R&B road to Bhavadevarapalli

15 1000mm dia compelted at 0.230 Earth work, All CD works, GSB completed. WMM 2nd layer is in progress. Earth work, 600 mm pipe culvert completed at .0.360 3 pipe culverts 450mm dia & 1 pipe culvert of 600mm dia is completed. Earth work progress 1 pipe culvert of 600mm dia completed. Sub grade work is in progress. RCC slab culvert 4M span completed. Earth work is in progress. Jungle clearance ,600mm dia pipe culvert completed

21

NCRMP/B-W/ AP/RCS/ PRED/06/ Nagayalanka /004

163.53 25.03.2013

12

Y2-200

24.06.14 Earth work, prime coat, 24.09.13 24.02.14 Tack Earth WMM, CD 24.06.14 coat,SDBC, work, GSB works shoulders, (14%) (66%) Road furniture (100%)

11

2430

99.78

29.07.13

50.0

50%

56.0

34%

For the package, progress of works is as per first mile stone

Y2-199

RCS

230

29.85

29.07.13

3.0

10%

Y2-201

Y2-204 Y2-203

NCRMP/B-W/ AP/RCS/ PRED/06/ Nagayalanka /005

117.18 20.03.2013

19.02.14 19.06.14 Earthwork Earth work, , Sub clearance, 19.09.13 Grade, prime coat, Earth GSB, Tack 19.06.14 work, CD WMM, CC coat,SDBC, works pavement shoulders, (24%) , CD Road works furniture (85%) (100%)

13

Road from R&B road to CS at Pedapalem

570

37.23

29.07.13

7.0

19%

RCS

14

Road from Gullalamoda R&B road to Etimoga Road from R&B to CS at China Etimoga Road from R & B Road to CS at China Kammavaripalem Road from China Zinkapalem to Gollamanda via Peda Zinkapalem Road from R&B road to CS at Gollamanda Road from ZP Road to CS at Natchugunta Road from Krishna River to Elichetladibba CS Road from Kammavanicheruvu R&B road to Venkata durgambapuram in Machilipatnam Mandal Road from R&B Road Pedayadara to Harijanawada

183

19.65

27.07.13

6.0

31%

31.0

26%

For the package progress of works slow and behind the first mile stone

15

Y2-202

210

33.79

25.05.13

15.0

44%

16

300

26.51

27.07.13

3.0

11%

227.981 22.03.2013

21.06.14

21.09.13 Earth work (3%)

RCS

18

Y2-208 Y2-207 Y2-206

NCRMP/B-W/ AP/RCS/ PRED/06/ Nagayalanka /006

21.06.14 Barrowed earth, 21.02.14 WMM,prime Earth coat, Tack work, coat,SDBC,pi GSB, sub pe culverts, grade shoulders, (24%) Road furniture (100%)
21.06.14 Barrowed 21.12.13 earth, WMM, Earth prime coat, work, Tack coat, GSB, Sub SDBC, pipe culverts, grade shoulders, (23%) Road furniture (100%)

17

2030

103.90

Jungle clearance done, 01.08.13 No further work is going on. 01.08.13 Jungle clearance done, No further work going on. Jungle clearance done, No further work going on. Jungle clearance done, No further work going on.

Y2-205

0.5

0% For the package progress of works is slow and behind the first mile stone

900

47.92

0.5

1% 2.0 1%

19

300

17.31

01.08.13

0.5

3%

20

720

58.85

01.08.13

0.5

1%

22

Y2-212

NCRMP/B-W/ AP/RCS/ PRED/06/ Machilipatnam /008

270.096 22.03.2013

21.04.14

21.08.13 Earth work, GSB,Sub grade (13%)

Y2-211

21

4100

203.77

13.04.13

RCS

Earth work, GSB, WMM completed.

100.0

49% 103.5 38%

1100

66.33

02.07.13

Earth work completed, material collected for CD works.

For the package, progress of works is as per first mile stone

3.5

5%

Page 48 of 159

Sl. No. Package Nos. of Pkg 1 2

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9 23

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 630 13 41.49

Date of commen cement of work 14 08.08.13

Stage of work

Total % of % of Value of Value of work work Work work done done for done for done in for the the package work Package (Lakhs) 16 40.0 17 96% 18 19

Reasons for nonstarted works 20

TPQA observation

10 Y2-218 Y2-217 Y2-216 Y2-215

NCRMP/B-W/ AP/RCS/ PRED/06/ Machilipatnam /010

154.21 04.06.2013

01.09.14 prime coat, Tack 03.05.14 03.12.13 coat,SDBC, Grade III, Earth shoulders, 01.09.14 WMM, CD work, GSB CC works (7%) pavement, (61%) Road furniture (100%) 21.12.201 Barrowed 3 earth, WMM, 21.08.201 scarifying, Prime coat, 3 Earth clearing Tack coat, 21.03.14 SDBC, work, GSB and shoulders, CD (10%) grubbing, works, Road GSB furniture (18%) 21.03.14 Earth work, Prime & Tack coat, 21.08.13 21.12.13 SDBC, Earth WMM,CD 21.03.14 Shoulders, work, GSB works road (20%) (68%) furniture, GSB, CD works (100%)
(100%) 21.03.2014

24

25

26

11 Road from R&B Road Karagraharam to Pallipalem Road from R&B Road Kammavaricheruvu to KPT palem Road from R&B Road Kammavaricheruvu to Malakayalanka Road from R&B Road Pallithumalapalem to Nelithippa

820

62.74

08.08.13

450

32.50

08.08.13

245

17.48

08.08.13

15 Earthwork,All CD works,GSB WMM,SDBC completed. Jungle clearance completed.Scariying work is in progress Jungle clearance completed.Scariying work is in progress Jungle clearance completed.RCC Pipes collected.

21

0.5

1% 41.5 27%

0.5

2%

For the package, progress of works is as per first mile stone

RCS

0.5

3% 153.5

NCRMP/B-W/ AP/RHB/ PRED/06/ Koduru/004

155.096 22.03.2013

27

Road from R&B Road to Narsimhapuram

3550

155.10

19.04.13

Earthwork, shoulderrs, GSB WMM ,SDBC completed.

153.5

99%

99%

Progress of work is ahead of the mile stone

Y2-328

RHB

10

Y2-330

NCRMP/B-W/ AP/RHB/ PRED/06/ Koduru/005

28

Road from R&B Road to Krishnapuram

2530

118.60

25.07.13

206.00 22.03.2013

RHB

Earth work, All CD work, GSB, WMM 2nd layer completed from km 1.200 to 2.560

Y2-329

100.0

84% 185.0 90% Over all progress of works are with in first mile stone.

29

Road from R&B road to Pedagudumotu

1850

87.40

17.05.13

All CD works,GSB, WMM and SDBC completed. Earth work, All CD works, GSB completed, WMM 2nd layer is in progress. Earth work, All CD work, GSB completed, WMM 1st layer is in progress. Earth work,All CD work, GSB completed,WMM 1st layer is in progress. Earth work, All CD work, GSB completed, WMM 1st layer is in progress from 0.00 to 1.148

85.0

97%

Y2-335

30 24.06.14 Earth work, Prime coat, 24.09.13 24.02.13 track coat, Earth WMM,CD 24.06.14 SDBC, work, GSB works Shoulders, (19.94%) (73.92%) road furniture, GSB (100%)

Road from R&B Road to Parra chivara

800

51.58

17.07.13

30.00

58%

Y2-336

Y2-337

11

NCRMP/B-W/ AP/RHB/ PRED/06/ Nagayalanka /008

31

Road from R&B road to Pedagowdapalem

810

54.90

17.07.13

28.00

51% 98.5 36% Over all progress of works are with in first mile stone.

274.69 25.03.2013

RHB

32

Road from R & B Road to Mulapalem Road from Ganapeswaram R&B Road to Pullaiahgaridibba

660

36.05

17.07.13

14.00

39%

33

Y2-338

1810

132.16

17.07.13

26.5

20%

Page 49 of 159

Sl. No. Package Nos. of Pkg 1 2

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9 34

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 1600 13 114.24

Date of commen cement of work 14 29.07.13

Stage of work

Total % of % of Value of Value of work work Work work done done for done for done in for the the package work Package (Lakhs) 16 0.5 17 0% 18 19

Reasons for nonstarted works 20

TPQA observation

10 Y2-343

11 Road from R & B Road to Indiramma Tank in Gullalamoda Construction of road from ST colony to Uppu drain in Dindi. Road from Z.P.road to Sorlagondi Road from R & B road to MPUP School in Sangameswaram Road from Matlam Z.P road to Govindarajuladibba Road from R&B road to Amudalapalli (Pennamdibba) Road from Seethannapalli R&B Road to Gollagudem Road from R&B Road to Bolugondi Road from R&B Road to Ramapuram

15 Jungle clearance work is in progress Earth work,CD works, GSB progress from km 0.00 to 1.200

21

12

36

Y2-345

NCRMP/B-W/ AP/RHB/ PRED/06/ Nagayalanka /010

373.11 22.03.2013

01.09.14 03.05.14 Prime coat, Grade III, tack coat, 03.12.13 WMM,CD SDBC, CC Earth 21.06.14 works , pavement, work, GSB Retaining Shoulders, (7%) wall road (61%) furniture (100%)

35

Y2-344

1260

104.43

29.07.13

17.0

16% 53.5 14% Progress is poor.

RHB

1380

110.23

CD work,Earthwork, GSB completed from km 29.07.13 0.00 to 0.860 is in progress. 29.07.13 Earthwork, CD works, GSB completed.WMM 2nd is in progress

11.0

10%

37

Y2-346

610

44.21

25.0

57%

Y2-350 Y2-349 Y2-348

13

NCRMP/B-W/ AP/RHB/ PRED/06/ Kruthivennu /011

320.861 14.3.2013

13.02.14

13.02.14, GSB,WMM , CD 13.09.13 works, Earth earthwork work, , prime & GSB, tack coat, WMM SDBC, (21%) shoulders retaining wall (85%)

13.06.2014 earthwork, prime coat, tack coat, SDBC, shoulders, road furniture (100%)

38

1320

72.94

In KM 1/0 600mm dia pipe culvert completed, 20.05.13 Earthwork is in progress. 01.04.13 All CD works completed. GSB work is in progress. 3 pipe culverts of 600mm dia, Earthwork completed 5 pipe culverts of 600mm dia, Earthwork completed. Work not started

Y2-347

10.0

14%

RHB

39

2000

118.63

15.0

13% 52.0 16%

40

720

51.83

01.04.13

12.0

23%

Over all package of works is behind the first mile stone

41

1200

77.44

01.04.13

15.0

19%

14

43

Y2-352

NCRMP/B-W/ AP/RHB/ PRED/06/ Kruthivennu /013

376.164 19.03.2013

17.06.14 Barrowed 17.09.13 earth, Earth shoulders, work, Sub 17.02.14 road grade, WMM, CC furniture, 17.06.14 Barrowed pavement Prime & Tack earth, (44%) coat, SDBC, GSB CC pavement, (12%) CD works (100%)

42

Y2-351

1370

96.05

0.0

0%

Road from Chinapandraka R&B Road to Uppuluru

3920

271.11

work not started

0.0

0%

Working season contractor was not started the work.

RHB

15

Y2-354

NCRMP/B-W/ AP/RHB/ PRED/06/ Kruthivennu /014

461.90 26.03.2013

25.09.13 25.02.14 Earth Sub grade 25.06.14 work, CD GSB, CC work Pavement (26%) (83%)

25.06.14 Earth work, shoulders, road furniture, Prime coat, Tack coat, SDBC 100%

44

Road from B.L road to Matlam

1950

152.00

Subgrade completed, 17.06.13 CD and GSB works is in progress

Y2-353

15.0

10% 35.0 8%

45

Road from Interu R&B road to Parvathipuram

3054

309.90

20.08.13

Earthwork completed

20.0

6%

Over all package of works is behind the first mile stone

RHB

Page 50 of 159

Sl. No. Package Nos. of Pkg 1 2

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9 46

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 1060 13 50.90

Date of commen cement of work 14 25.07.13

Stage of work

Total % of % of Value of Value of work work Work work done done for done for done in for the the package work Package (Lakhs) 16 16.0 17 31% 18 19

Reasons for nonstarted works 20

TPQA observation

10 Y2-366

11 Road from Gokavaram R & B road to Vodarevupalem Road from Gokavaram R & B road to Baduguvaripalem Road from R&B Road Thallapalem to Rayapalli Road from Manginapudi R & B Road to Pathareddypalem

15 Earthwork,All CD works,GSB completed WMM 2nd layer is in progress. Earthwork,All CD works,GSB completed.WMM 2nd layer is in progress

21

16

48

Y2-368

NCRMP/B-W/ AP/RHB/ PRED/06/ Machilipatnam /020

155.06 18.03.2013

49

Y2-369

16.04.14 Embankmen t, GSB, WMM, prime coat, Track 17.09.13 17.02.14 coat, SDBC, 16.04.14 Embankm GSB Shoulders, ent (2%) (11%) CC pavement, CD Works, Road furniture (100%)

47

Y2-367

470

35.07

25.07.13

14.0

40% Over all progress of works are with in first mile stone.

RHB

470

29.49

Earth work,GSB,450mm pipe culver completed 25.07.13 and WMM 1st layer is in progress. Earthwork,All CD works,GSB completed. WMM 2nd layer is in progress.

52.0 9.0 31%

34%

515

39.55

25.07.13

13.0

33%

17

NCRMP/BW/AP/Br/R&B/ 06/Tallapalem/ 018

827.12 30.08.13

30.07.15

30.04.14 Completio n of Foundatio n up to pile caps. Diversion road (42.23%)

30.02.15 Completion 30.10.14 up to Completio precast n up to girders, abutment wearing s, precast coat, girders revetment, (3.89%) approach road (53.287%)

50

Construction of Bridge across salt creek in KM, 11/4-6 of TallapalemNarayanapuram Road in krishna district

45

827.12 05.10.13

Earthwork completed for diversion road.Bed block completed for Shifiting of bailey Bridige for diversion

20.00

2%

20

2%

Over all progress of works are with in first mile stone.

Y2-447

Bridge

Page 51 of 159

Abstract Status of NCRMP Works in West Godavari District as on 31.10.2013

RATE OF PROGRESS OF WORKS up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not Started Total No of works

No of works 1 25 3 2 2 33

30 25 20 15 10 5 1 0 up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not Started 3 2 2 25

Page 52 of 159

Status of NCRMP works in West Godavari District as on 31.10.2013


Sl. No. Package Nos. of Pkg 1 2 Agreement Amount (Lakhs)/ Date 4 Sl.No of work 9 Project code catagory Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8 Date of AGG comme Length Value ncemen (Mts) of work t of (Lakhs) work 12 13 14 Total % of % of Value of Value work work Work of work done done for done for done in for the the package work Package (Lakhs) 16 17 18 19 Reasons for non-started works 20

Name of the Work

Stage of work

TPQA observation

10

11

15

21

NCRMP/B-W/ AP/RCS/ PRED/05/ Achanta/002

140.53 30.03.2013

29.08.2013 29.3.2014 CD Works 29.12.2013 CC (Pipe Granular Pavement, Culverts), Sub base & GSB 29.03.14 Earth work, CC Shoulders GSB, Sub Pavement & Road grade (65%) furniture (23%) (100%) 08.06.2013 07.09.2013 Earth work Shoulders, for 07.09.13 CC & Road formation, furniture Sub grade, (100%) GSB (33%)

Road from R&B road to Ayodya lanka Marrimula CS. (CC Road)

2500

140.53

Sub grade completed.

15.5

11%

15.5

11.0%

Progress of works is behind the First mile stone

05.04.13

Y2-178

RCS

NCRMP/B-W/ AP/RCS/ PRED/05/ Bhimavaram /004

7.20 08.03.2013

Construction of approach road to CS in Losari of Bhimavaram Mandal.

100

7.20

Earth work, Sub grade, GSB, CC Pavement , Shoulders & completed. Road furniture Work is in Progress.

16.05.13

7.0

97%

97%

Progress of work is as per mile stones.

Y2-181

RCS

850

56.27

02.04.13

Y2-184

NCRMP/B-W/ AP/RCS/ PRED/05/ Mogaltur/005

213.56 20.03.2013

19.09.2013 Earth work, Sub grade, 19.06.14 GSB, Pipe Culverts (17%)

880

38.63

02.04.13

Y2-185

19.02.2014 Earth work, Sub grade, GSB, WMM, Shoulders, Pipe Culverts, Prime coat, Tack coat, SDBC, Road furniture (52%)

19.06.2014 Earth work for formation, WMM, Shoulders, Pitching, Pipe Culverts, Prime coat, Tack coat, SDBC, CC Pavement, Road furniture (100%)

02.04.13

Road from R&B road to Kothakayalathippa CS Road from Narsapur Perupalem R&B road to Mandavarithota Road from Mollaparru R & B road to Mollaparru Patha Colony

Y2-182

1200

53.96

1500

64.70

02.04.13

Y2-183

Earth work, Sub grade, GSB, CD Works completed. WMM Material Collection is in Progress.

20.5

38%

22.5

35% Progress of work is as per first mile stones in this package

Earth work, Sub grade, GSB, CD Works completed. WMM Material Collection is in Progress. Scarifying is in progress. Earth work is in Progress Sub grade & GSB Completed. Earth work is in Progress Earth work, Sub grade, GSB completed.

RCS

61.5 17.5 31%

29%

Road from K.P Palem (N) Panchayat office to Metturevu Palli palem R&B road to Chinamynavanilanka

1.0

3%

NCRMP/B-W/ AP/RCS/ PRED/05/ Narsapur/006

159.14 21.03.2013

Road from P.R road to Prakasapuram

02.07.13

Y2-188

20.08.2013 CD Works (Pipe / Slab Culverts), 20.03.13 Earth work, GSB, Sub grade (56%)

20.12.2013 Granular Sub base, WMM layer & CC Pavement (82%)

20.03.2013 Prime coat, Tack coat, SDBC, Earth work, GSB Shoulders & Road Futniture (100%)

1300

62.18

02.07.13

Y2-186

21.4

34% Progress of works is behind the first mile stone in this package

PR road to Ramanujapuram

02.07.13

Y2-187

RCS

1200

64.50

15.5

24%

45.9

29%

750

32.46

Earth work, Sub grade, GSB completed.

9.0

28%

Page 53 of 159

Sl. No. Package Nos. of Pkg 1 2 NCRMP/BW/AP/ RHB/PRED/05/ Kalla/004

Agreement Amount (Lakhs)/ Date 4

DFC First 5 6 Second 7 Third 8

Sl.No of work 9

Project code

catagory

Milestone/ Financial Targets (%)

Name of the Work

Date of AGG comme Length Value ncemen (Mts) of work t of (Lakhs) work 12 13 14 15.04.13

Stage of work

Total % of % of Value of Value work work Work of work done done for done for done in for the the package work Package (Lakhs) 16 17 18 19

Reasons for non-started works 20

TPQA observation

10

11 K.G. R&B Road to Mamidipudi of Kalawapudi.

15 Earth work, GSB completed. WMM work is in Progress.

21 Progress of work is behind the first mile stone

92.36 08.03.2013

07.06.2013 07.12.2013 07.09.2013 Earth work, Prime Coat, WMM, GSB, Road Tack Coat, Schoulders furniture SDBC, (72%) (25%) (100%) 20.12.2013 Prime coat, 20.07.2013 Tack coat, , Cd Works, 20.10.2013 SDBC, Earth work, Granular Earth work, 20.12.13 GSB, Sub Sub base. GSB, grade, (71%) Shoulders (29%) & Road furniture (100%)

10

Y2-299

RHB

2080

92.36

22.7

25%

19.5

21%

NCRMP/B-W/ AP/RHB/ PRED/05/ Mogaltur/006

86.04 21.03.2013

11

1800

86.04

12.04.13

Khalipatnam R&B Road to Khalipatnam ferry

Scarifying completed. Earth Work & Culvert Work is in Progress.

10.5

12%

10.5

12%

Progress of work is behind the first mile stone

Y2-302

RHB

12 05.09.2013 Clearing & Grubbing, cutting trees, 05.06.14 Scarifying, sub grade, GSB, WMM, Pipe Culverts. (31%) 05.02.2014 Earth work, GSB, WMM, Shoulders, Pipe Culverts, Prime coat, Tack coat, SDBC, Road furniture (65%) 05.06.2014 Earth work for formation, WMM, Shoulders, Pitching, Pipe Culverts, Prime Coat, Tack Coat, SDBC (100%)

13

14

1860

81.90

15.04.13

Y2-308

NCRMP/B-W/ AP/RHB/ PRED/05/ Mogaltur/008

Narsapur Perupalem R&B Road to Melamvaripalem Perupalem (S) Perupalem Mollaparru R&B road via Sattinenivarimeraka to KD Pallavapalem Perupalem Dibbalapallipalem R&B road to Mellapallavapalem Perupalem beach R&B Road to Challavarimeraka via Mucherlavarimeraka Road from Perupalem R&B road to Dindla Road from Narsapur Perupalem R&B road to Nellipallipalem via Ambedkar colony Harijanapeta Road from Perupalem R&B Road to Kouruvaripalem

800

42.64

15.04.13

Y2-306

12.8 Earth work, Sub grade, GSB, CD Works completed.WMM Material Collection is in Progress.

30%

730

36.34

15.04.13

Y2-307

12.7

35% Progress of work is behind the first mile stone in this package

241.36 06.03.2013

RHB

68.5 24.6 30%

28%

15

1760

80.48

Earth work, Sub grade & GSB Completed. WMM Material Collection is in Progress. Sub grade, GSB completed. CD works is in Progress.

15.04.13

Y2-309

18.4

23%

NCRMP/B-W/ AP/RHB/ PRED/05/ Mogaltur/009

365.31 18.03.2013

05.09.2013 Earth work, sub grade, 17.06.14 GSB, WMM, Pipe Culverts (21%)

05.02.2014 Earth work, Sub grade, GSB, WMM, Shoulders, Pipe Culverts, Prime coat, Tack coat, SDBC, Road Furniture (53%)

05.06.2014 Earth work for formation, WMM, Shoulders, Pitching, Pipe Culverts, Prime Coat, Tack Coat, SDBC, CC Pavement (100%)

16

1600

71.26

15.04.13

Y2-310

22.0

31% For the package progress of works is as per first mile stone.

15.04.13

17

4600

200.64

Earth work, Sub grade, GSB, CD Works completed.

Y2-311

RHB

60.0

30%

106.0

29%

18

1800

93.41

15.04.13

Earth work, Sub grade, GSB, CD Works completed.

Y2-312

24.0

26%

Page 54 of 159

Sl. No. Package Nos. of Pkg 1 2

Agreement Amount (Lakhs)/ Date 4

DFC First 5 6 Second 7 Third 8 13.06.2014 Earth work, WMM, Shoulders, Pitching, Pipe Culverts, Prime Coat, Tack Coat, SDBC, CC Pavement, CD & Other Works (100%)

Sl.No of work 9

Project code

catagory

Milestone/ Financial Targets (%)

Name of the Work

Date of AGG comme Length Value ncemen (Mts) of work t of (Lakhs) work 12 13 14 20.03.13

Stage of work

Total % of % of Value of Value work work Work of work done done for done for done in for the the package work Package (Lakhs) 16 17 18 19

Reasons for non-started works 20

TPQA observation

10 Y2-313

11

15 Earth work, Sub grade, GSB, CD Works completed. WMM Material Collection is in Progress. Earth work, Sub grade & GSB completed. WMM Material Collection is in Progress. Earth work, Sub grade, GSB, CD Works completed.WMM Material Collection is in Progress.

21

NCRMP/B-W/ AP/RHB/ PRED/05/ Narsapur/010

362.93 14.03.2013

21

3750

168.14

20.03.13

Y2-315

13.09.2013 Clearing & Grubbing, Cutting trees, 13.06.14 Earth work, Scarifying, Sub grade, GSB, CD Works. (12%)

13.02.2014 Sub grade, GSB, WMM, CD Works, Prime coat, Tack coat, SDBC & other works. (60%)

19

Road from SP R&B road to Pasaladeevi

2650

155.48

47.50

31%

20

LT R&B road to Modi

800

39.31

13.7

35%

118.6

33%

For the package progress of works is as per first mile stone.

SP R&B road to Gannabathulavari palem of Chamakuripalem

20.03.13

Y2-314

RHB

57.4

34%

22

Road from R&B road to SC Colony of Pedalanka

750

52.27

Not Started

0.0

0%

After conclusion agreement some villagers objected not to taking up the work. Now issue resolved, work is likely to start shortly.

Y2-316

10

NCRMP/B-W/ AP/RHB/ PRED/05/ Narsapur/012

225.73 27.03.2013

24

250

20.42

01.04.13

Y2-318

27.06.2014 Shoulders, 27.02.2014 27.09.2013 Prime coat, Slab Earth work, Tack coat, culvert,WM Sub grade, SDBC, CC 26.06.14 M,CD GSB, Slab pavement, works, culvert road Revetment (36%) furniture (70%) etc. (100%)

RHB

23

R&B road to Rajeev Nagar of Darbharevu

1600

83.89

Not Started

0.0

0% 31.0 14%

SP R&B road to Pedathota of Turputallu R&B road to Peta of Turputallu R&B road to Pedathota of Turputallu

25

920

48.39

26

380

20.77

Sub grade, GSB, WMM, CD Works completed. Shoulders Work is in progress. Sub grade completed. Earth Work & GSB work is in Progress. Sub grade, GSB, WMM, CD Works completed. Shoulders Work is in progress.

11.0

54%

01.04.1 3

Y2-319

7.0

14%

For the package progress of works is as per Some villagers mile stone. went to court Progress of with a request two works is not to take up good and the work. At the other2 works time of DPR there are not is no objection started. The from the contractor has villagers. informed that after completing SDBC, he would speed up the other works.

Y2-317

01.04.13

Y2-320

13.0

63%

Page 55 of 159

Sl. No. Package Nos. of Pkg 1 2

Agreement Amount (Lakhs)/ Date 4

DFC First 5 6 Second 7 Third 8

Sl.No of work 9

Project code

catagory

Milestone/ Financial Targets (%)

Name of the Work

Date of AGG comme Length Value ncemen (Mts) of work t of (Lakhs) work 12 13 14 01.04.13

Stage of work

Total % of % of Value of Value work work Work of work done done for done for done in for the the package work Package (Lakhs) 16 17 18 19

Reasons for non-started works 20

TPQA observation

10 Y2-321

11 R&B road to Guttulavarimeraka

15 Earth work, Sub grade, GSB completed. WMM Material Collection is in Progress. Earth work, Sub grade, GSB completed. WMM Material Collection is in Progress. Earth work, Sub grade, GSB, CD Works completed. WMM Material Collection is in Progress. Sub grade Completed. GSB Material collection & CD Work is in Progress Earth work, Sub grade, GSB, CD Works completed. WMM Material Collection is in Progress. Scarifying, WMM & SDBC, Shoulders Completed From Km 0.00 to km 2.484. Subgrade, GSB Form Km 2.484 to 3.025 KM Completed. Earth work, Sub grade, GSB completed. CD works partially completed.WMM Material Collection is in Progress.

21

27

970

43.73

15.5

35%

11

29

R&B road to Pedaedigapalem

630

39.49

01.04.13

Y2-323

NCRMP/B-W/ AP/RHB/ PRED/05/ Narsapur/013

189.61 25.03.2013

24.08.2013 24.03.14 Earth work, Sub grade, GSB (37%)

24.12.2013 WMM, CD works and CC Road. (80%)

24.03.2014 Shoulders, Prime Coat, Tack Coat, SDBC, Road furniture & other items (100%)

28

Road from R & B Road to Pulaparthivaripalem

2000

92.45

01.04.13

Y2-322

33.5

36% 63.2 33%

11.5

29%

Progress of works is behind the first mile stone in this package

RHB

30

R&B road to Evanivarimeraka

190

13.94

01.04.13

Y2-324

2.7

19%

31 07.12.2013 Earth work, Subgrade, GSB, WMM, Shoulders, Pipe Culverts, Prime coat, Tack coat, SDBC, Road furniture (54%) 07.03.2014 Earth work, WMM, Shoulders, Pitching, Pipe Culverts, Prime coat, Tack coat, SDBC (100%)

Road from PR Road to Prakashpuram SC colony of Vemuladeevi (E)

300

18.82

22.03.13

Y2-325

8.0

43%

12

NCRMP/B-W/ AP/RHB/ PRED/05/ Narsapur/014

192.20 08.03.2013

07.08.2013 Earth work, Subgrade, 07.03.14 GSB, WMM, PiPe Culverts (23%)

RHB

32

Road from PR road to Vemuladeevi (E) colony (Via) Ralla cheruvu of Vemuladeevi (E)

3025

111.39

91.5

82%

118.7

61.76%

Progress of works is as per second mile stone.

33

1400

61.99

22.03.13

Road from PR road to Addalavarimeraka of Vemuladeevi (E)

Y2-327

22.03.13

Y2-326

19.2

31%

Page 56 of 159

Abstract Status of NCRMP Works in Vizianagaram District as on 31.10.2013

RATE OF PROGRESS OF WORKS up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not Started Total No of works

No of works

2 1 2 1 0
6

2.5 35 30 2 25 1.5 20 15 1 10 0.5 5 0

31 2

1 11

6 1 up to 10% 11 to 40% 41 to 70% 0 71 to 100% 0 Works Not Started

Page 57 of 159

Status of NCRMP works in Vizianagaram District as on 31.10.2013


Sl. No. Package Nos. of Pkg 1 2 Agreement Amount (Lakhs) / Date 4 Project code catagory Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8 Sl.No of work 9 AGG Length Value (Mts) of work (Lakhs) 12 13 Date of commen cement of work 14 Total % of Value of % of Value of Reasons work work work Work for nondone for TPQA observation done in done for done for started the Lakhs the work package works Package (lakhs) 16 17 18 19 20 21 Due to delay of site handing over by Revune Department. Date of commencement of work is 12.06.13. Progress of work is satisfactory

Name of the Work

Stage of work

10

11

15

NCRMP/B-W /AP/MPCS/ PRED/ 02/ Pusapatirega /003

MPCS

92.11 14.03.2013

13.03.14

13.08.13 13.03.14 13.12.13 Ground Completet Casting of Floor ion of all all slabs Plinth works ( 67% Level ( 100% Value) ( 27%) Value)

Construction of MPCS in Boddugurayyapeta (Type A)

92.11

Earthwork Excavation, PCC for footings, RCC footings, Back filling in foundation and Plinth 14.03.13 Beam completed. Columns up to bottom of stilt floor slab, Staircase and Ramp work are in progress. 14.03.13 Jungle clearance

Y2-041

32

35%

32

35%

Y2-160

Road from R & B Road to Gudepuvalasa CS Road from R&B road to Kavulawada CS

440

15.75

0.11

1%

Y2-161

150

17.5

14.03.13

Jungle clearance

0% Progress of work is slightly behind the mile stone. It was informed that contractor is planning to speed up the progress and wanted 3 works to be completed first and take up the other 2 works.

Y2-163

NCRMP/B-W /AP/RCS/ PRED/ 02/ Bhogapuram /001

94.96 14.03.2013

13.08.13 Earth work, Pipe 13.03.14 culverts, GSB & CC pavement (50%)

13.12.13 13.03.14 WBM GrBT and II,Gr-III Road and furniture shoulders ( 100% ) (80%)

Road from R & B Road to Roluchappidi CS

550

21.35

RCS

Earth work for widening, GSB work, WBM Gr-II 14.03.13 completed. WBM Gr-III material spreading and compaction is in progress Earth work for widning, GSB work completed. CC Road Completed.

Y2-162

12

56% 40.11 42%

Road from R&B road to Chinapathiwada CS

60

4.75

14.03.13

3.5

74%

Road from R&B road to BV peta

770

35.6

Earth work for widening, GSB work, WBM Gr-II 14.03.13 completed. WBM Gr-III material spreading and compaction is in progress

Y2-164

24.5

69%

Page 58 of 159

Abstract Status of NCRMP Works in Guntur District to the end of 31.10.2013

RATE OF PROGRESS OF WORKS up to 10% 11 to 40% 41 to 70% 71 to 100% Works Not Started Total No of works

No of works 2 2 0 2 3 9

3.5 3 2.5 2 1.5 1 0.5 0 up to 10% 11 to 40% 0 41 to 70% 71 to 100% Works Not Started 2 2 2 3

Page 59 of 159

Status of NCRMP works in Guntur District to the end of 31.10.2013


Sl. No. Package Nos. of Pkg 1 2 Agreement Amount (Lakhs)/ Date 4 Project code catagory Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8 Sl.No of work 9 AGG Length Value (Mts) of work (Lakhs) 12 13 Date of commen cement of work 14 Total % of % of Value of Value of work work work Work Reasons for non-started done done for done in done for works for the the Lakhs package work Package (Lakhs) 16 17 18 19 20 Adjoining land owner issued notice to not to start the work. He has not raised any objection during EPTRI inspection and gramasabha. Departmental officers informed that they would resolve the by involving local leaders.

Name of the Work

Stage of work

TPQA observation

10

11

15

21

1 NCRMP/B-W/ AP/RCS/ PRED/07/ Bapatla/006

93.07 01.04.2013

RCS

01.01.14 01.09.13 01.04.14 BT CD Earth & Road Works, CC work, GSB furniture Road for (5 Complete all works months)(12 months)9 months 13.64% 100% 80.56% 20.12.13 01.09.13 Earth work, GSB (5 months)11.02% 01.01.14 CD Works, CC Road for all works 9 months84.22% 01.04.14 BT & Road furniture Complete (12 months)100%

Adavipallipalem R&B Road to New Tsunami Colony (via) Krupanagar colony, Adavi Village

Y2-226

751

46.5

Work not Started

0%

18.06.13

1.5

2%

Progress of work is not with in the mile stones.

Road from R&B road to Pattapupalem

750

46.5

Earthwork Widening Completed.

Y2-227

1.50

3%

NIL

NCRMP/B-W/ AP/RCS/ PRED/07/ Nizampatnam /005

52.43 21.03.2013

21.10.13 21.07.13 WBM,WM Earth M,CD work, GSB 20.12.13 Works,CC (4 Road (7 months)months)16.81% 48.31% 21.12.13 WBM,WM M,CD Works,CC Road (9 months)55.52%

21.12.13 BT & Road furniture Complete (9 months)100%

Road from R&B road Koosoorivaripalem to Marakavaripalem

1050

52.43

390 m, C.C 03.06.13 Work completed.

20.10

40%

20.10

40%

NIL

Progress of work is ahead of mile stones as per value of work done. Revised mile stones are to be got approved.

NCRMP/B-W/ AP/RHB/ PRED/07/ Nagaram/007

120.82 21.03.13

21.08.13 Earth work, GSB 20.12.13 (5 months)24.24% 12.07.13 04 months: Completio 11.03.14 n of Foundatio ns up to sill level2.38%

21.03.14 BT & Road furniture Complete (12months)100%

Y2-225

RCS

Road from R&B Road to Gattuvaripalem

2175

120.82

CD Works Completed, 03.06.13 No Further work is going on Raft Concrete work Completed (M20 09.05.13 GRADE), piers and Abutment work in progress.

10

8%

10

8%

NIL

Progress of work is behind the mile stones.

NCRMP/B-W/ AP/BR/ R&B/07/ Pedapalli /022

137.00 12.03.2013

12.11.13, 12.03.14 , 08 12 months months : :completion completio of entire n up to work below the including deck slab - approaches47.85% 100%

Y2-379

RHB

Reconstruction of bridge across pedapalli drain at km 14/60of chandole bridge to Nizampatnam in Guntur District

3 Vents of 8m Effective span

137

23.04

19%

23.04

19%

NIL

Progress of work is behind the mile stones as per value of work done.

Y2-454

Bridge

Page 60 of 159

Sl. No. Package Nos. of Pkg 1 2

Agreement Amount (Lakhs)/ Date 4

Project code

catagory

Milestone/ Financial Targets (%) DFC First 5 6 Second 7 Third 8

Sl.No of work 9

Name of the Work

AGG Length Value (Mts) of work (Lakhs) 12 13

Date of commen cement of work 14

Stage of work

Total % of % of Value of Value of work work work Work Reasons for non-started done done for done in done for works for the the Lakhs package work Package (Lakhs) 16 17 18 19 20

TPQA observation

10

11

15

21

NCRMP/B-W/ AP/MPCS/ PRED/07/ Nizampatnam /004

MPCS

86.83 22.03.2013

22.03.14 22.12.13 22.08.13 12 months 9 months 5Months: completion casting of Plinth Laid of all all slabs -20.04% balance 52.45% works-100%

Construction of Cyclone Shelter in 35mX35 Sanjeev nagar of m Kothapalem (Type B)

86.83

22.03.013

Work not Started

0%

0%

The originally identified site is changed as per the Valuable time wishes of the villages is lost. The lost causing the delay in time shall be handing over the site. made upwith Contractor informed that he proper was sick for some time and planning. he wanted to start the work shortly. The originally identified site is changed as per the Valuable time wishes of the villages is lost. The lost causing the delay in time shall be handing over the site. made upwith Contractor informed that he proper was sick for some time and planning. he wanted to start the work shortly. Working estimate Submitted : 423 Lakhs, as against of 367 lakhs as per aggrement

NCRMP/BW/AP/MPCS/R &B/07/REPALL E/005

MPCS

123.37 22.03.2013

12 months 9 months 5Months: completion casting of Plinth Laid of all all slabs- 22.05% balance 51.52% works-100%

Y2-097 Y2-101

Construction of Cyclone Shelter in 50mX50 Lankaladibba (Typem D)

123.37

22.03.13

Work not Started

0%

0%

NCRMP/BW/AP/BR/R&B/ 07/Bapatla/011

367

6 Months: Completio n of 31.10.201 Foundatio ns up to 3 sill level

12 Months completio n up to below the Deck Slab

36 Months Completion of entire work including approaches

Reconstruction of HLB at km 2/4 of 10 BapatlaVents, Pandurangapuram 8m across Perali Drain effective in Guntur District(yspan 1)

367

Approach Road GSB & WMM Work 01.12.201 completed, 0 Revetment work in progress

Y2-451

Bridge

360

90%

360

90%

NIL

NCRMP/BW/AP/RCS/PRE D/07/P.V Palem/001

66.86

3 months :Earthwor 31.07.201 k, GSB, 2 Pipe Culverts

9 3 months Months:BT,C :Shoulder C Pavement s ,WBM and Road GR-11 furniture

Rod from R&B road to Alluru to Yadavapalem

1036m

66.86

01.11.201 1

Work completed

52.43

100%

52.43

100%

NIL

FQCR Submitted

RCS

Page 61 of 159

Annexure - B

NCR Status of Works

Page 62 of 159

SRIKAKULAM DISTRICT
Sl. No. Package No. catag Project ory code Work name Road from DPN road to gangaram village via Srikrishnapuram, palatalagam Date of Issued NCR No.

NCR STATUS AS ON 31.10.2013


Observations Remedial meassures Present status of NCR

NCRMP/B-W/AP/RHB/PRED/ 01/Santhabommali/001B.

RHB

Y2-270

17.06.13

Bridge portion execavated and barrication not NCR-8 Issued and the contractor/Line provided, Insisted to Provide strong Department is requested to take suitable barrication. remedial action . NCR-9 Issued and the contractor/Line Cyclone shelter site located in School premisis Department is requested to take suitable , Insistsed to provide strong barrication. remedial action . NCR-11 Issued to the contractor/Line department is requested to take suitable remedial action.

Pending

NCRMP/B-W/AP/MPCS/PRED/ MPCS 01/Polaki/018.

Y2-030

Construction of Cyclone shelter at Akkuvaram

17.06.13

Pending

NCRMP/B-W/AP/RCS/PRED/ 01/Mandasa/010.

RCS

Y2-157

Road from R&B road to Akkuvaram

06.07.13

11

Prior permission was not taken to Water using for road curing purpose

Pending

Page 63 of 159

VIZIANAGARAM DISTRICT
Sl. No. Package No. catagory Project code Work name Date of Issued NCR No.

NCR STATUS AS ON 31.10.2013


Observations Remedial meassures Present status of NCR

Nil

Nil

Page 64 of 159

VISAKHAPATNAM DISTRICT
Sl. No. 1 Package No. NCRMP/B-W/AP/RHB/PRED/ 03/Payakaraopeta/005 catago Project ry code RHB Work name Date of Issued 25.05.13 NCR No. 2

NCR STATUS AS ON 31.10.2013


Observations Right side compound wall is in obstruction Km2/652 to 2/658 approximaty 1mt.leftside formers place is there.no contractor and line department are tackling the land acqusition issue at Km1/6 to Km1/9 (at stretch 400mts) shoulders not widths At some locations in shoulder portion Electrical Poles prevents formation/ Compaction of Shoulders.Insisteed to shift the Electrical Poles. Remedial meassures NCR-2 Issued to take suitable remedial action before proceding with further work. Present status of NCR NCR pending

Y2-282 Road from R&B road to Gajareddypalem

NCRMP/B-W/AP/RHB/PRED/ 03/Payakaraopeta/005

RHB

Y2-280 Road from R&B Road to Rajavaram

12.06.13

NCRMP/B-W/AP/RHB/PRED/ 03/Payakaraopeta/008 3

RHB

Y2-283 Road from ZP Road Palmanpeta to Korlayyapeta

12.06.13

At some locations in shoulder portion Electrical Poles prevents formation/ Compaction of Shoulders.Insisteed to shift the Electrical Poles.

NCRMP/B-W/AP/RCS/PRED/ 03/S.Rsyavaram/006

RCS

Y2-167 Road from R&B Road to Revu polavaram cyclone sheler

12.06.13

At some locations in shoulder portion Electrical Poles prevents formation/ Compaction of Shoulders.Insisteed to shift the Electrical Poles.

NCRMP/B-W/AP/RCS/PRED/ 03/Rambilli/007

RCS

Y2-168 Road from R&B Road to Kothapatnam cyclone shelter

12.06.13

At some locations in shoulder portion Electrical Poles prevents formation/ Compaction of Shoulders.Insisteed to shift the Electrical Poles.

NCRMP/B-W/AP/RCS/PRED/ 03/Bheemili/005 6

RCS

Y2-165 Road from R&B road to Chinanagamayyapalem cyclone shelter

12.06.13

At some locations in shoulder portion Electrical Poles prevents formation/ Compaction of Shoulders.Insisteed to shift the Electrical Poles.

NCRMP/B-W/AP/RCS/PRED/ 03/Bheemili/005

RCS

Y2-166 Road from R&B Road to Annavaram cyclone shelter

12.06.13

At some locations in shoulder portion Electrical Poles prevents formation/ Compaction of Shoulders.Insisteed to shift the Electrical Poles.

NCRMP/B-W/AP/RHB/PRED/ 03/Atchuthapuram/009

RHB

Y2-284 Road from R&B Road to Vadapalem

12.06.13

At some locations in shoulder portion Electrical Poles prevents formation/ Compaction of Shoulders.Insisteed to shift the Electrical Poles.

NCR-3 Issued to take suitable remedial action before proceding with further work. The field officer are informed that they collected the demand note from AP Transco and sent from approval NCR-4 Issued to take suitable remedial action before proceding with further work. The field officer are informed that they collected the demand note from AP Transco and sent from approval. NCR-5 Issued to take suitable remedial action before proceding with further work. The field officer are informed that they collected the demand note from AP Transco and sent from approval. NCR-6 Issued to take suitable remedial action before proceding with further work. The field officer are informed that they collected the demand note from AP Transco and sent from approval. NCR-7Issued to take suitable remedial action before proceding with further work. The field officer are informed that they collected the demand note from AP Transco and sent from approval. NCR-8 Issued to take suitable remedial action before proceding with further work. The field officer are informed that they collected the demand note from AP Transco and sent from approval. NCR-9 Issued to take suitable remedial action before proceding with further work. The field officer are informed that they collected the demand note from AP Transco and sent from approval.

NCR pending

NCR pending

NCR pending

NCR pending

NCR pending

NCR pending

NCR pending

Page 65 of 159

EAST GODAVARI DISTRICT


Sl. No. Package No. catago Project ry code Work name Date of Issued NCR No.

NCR STATUS AS ON 31.10.2013


Observations Remedial meassures Present status of NCR

Nil

Page 66 of 159

WEST GODAVARI DISTRICT


Sl. No. Package No. catago Project ry code Work name Date of Issued NCR No.

NCR STATUS AS ON 31.10.2013


Observations Remedial meassures Present status of NCR

NIL

Page 67 of 159

KRISHNA DISTRICT
Sl. No. 1 Package No. catago Project ry code RCS Work name Date of Issued 12.06.13 NCR No. 3

NCR STATUS AS ON 31.10.2013


Observations Electrical poles and Service wire is inconvinent for laying of road. So please take necessary action and For GSB and Carting earth work Test reports are not submitted. Electrical pole @ 375 is in the shoulder portion. So please take necessary action for further work, Electrical pole 12 No's are existing in the shoulder portion. Deep Rain gallies are formed in shoulder portion on left side of the canal portion @ km 0/350, 0/355, 0/360, 1/340,1/350,1/450,1/470 and 1/480. They shall be rectified immediately. Electrical poles total 15 no's are existing in shoulder portion. So please take necessary action for further work. Two electrical poles is about 0.3mts at chainage 0/030,0/078 in cross road no.4 inside the carriage way. One electrical pole is about 0.5 mts at chainage 0/213 inside the carriage way Remedial meassures NCR-3 Issued and the contractor/Line Department is requested to take suitable remedial action before proceeding with further work. NCR-4 issued please shift the electrical pole as soon as possible for further work. NCR-5 issued please shift the electrical pole as soon as possible for furthur work. Present status of NCR

NCRMP/B-W/AP/RCS/PRED/ 06/Machilipatnam/008 NCRMP/B-W/AP/RCS/PRED/ 06/koduru/001 NCRMP/B-W/AP/RHB/PRED/ 06/Koduru/004

Road from kammavanicheruvu R&B road Y2-211 to Venkata durgambapuram in Bandar Mandal Y2-189 Y2-328 Road from R&B road to Cyclone Shelter @ Ullipalem Road from R&B Road to Narsimhapuram

Pending

2 3

RCS RHB

26.06.13 26.06.13

4 5

Pending Pending

NCRMP/B-W/AP/RCS/PRED/ 06/Koduru/002

RCS

Y2-193

Road from R&B road to Cyclone shelter @Chintakolla

06.08.13

NCR-8 issued please rectify

Pending

NCRMP/B-W/AP/RHB/PRED/ 06/Koduru/005 NCRMP/B-W/AP/RCS/PRED/ 06/Machilipatnam/010 NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka/008

RHB

Y2-329

Road from R&B Road to Krishnapuram Road from R&B Road Karagraharam to Pallipalem Road from R&B road to Pedagowdapalem

06.08.13

10

NCR-10 issued please shift the electrical pole as soon as possible for furthur work. NCR-11 issued please shift the electrical poles as soon as possible for furthur work. NCR-12 issued please shift the electrical pole as soon as possible for furthur work.

Pending

RCS

Y2-215

26.08.13

11

Pending

RHB

Y2-336

27.08.13

12

Pending

Page 68 of 159

GUNTUR DISTRICT
Sl. No. Package No. catago Project ry code Work name Date of Issued NCR No.

NCR STATUS AS ON 31.10.2013


Observations Remedial meassures Present status of NCR

Nil

Page 69 of 159

PRAKASAM DISTRICT
Sl. No. 1 Package No. NCRMP/B-W/AP/RHB/PRED/ 08/Kothapatnam/019 catago Project ry code RHB Work name Date of Issued 05.06.2013 NCR No. 5

NCR STATUS AS ON 31.10.2013


Observations Contraction Joints are not Provided as per MORD CLAUSE 1501.8.3 Remedial meassures NCR-5 Issued and the contractor/Line Department is requested to take suitable remedial action before proceeding with further work. NCR-12 Issued and the contractor/Line Department is requested to take suitable remedial action before proceeding with further work. NCR-13 Issued and the contractor/Line Department is requested to take suitable remedial action before proceeding with further work. NCR-16 Issued and the contractor/Line Department is requested to take suitable remedial action before proceeding with further work. NCR-19 Issued and the contractor/Line Department is requested to take suitable remedial action before proceeding with further work. Present status of NCR

Road from KEM R&B Road to Y2-410 Pinnivaripalem

Pending

NCRMP/B-W/AP/RCS/PRED/ 08/Ulavapadu/009

RCS

Road from Pallepalem of Y2-239 Chakicherla

25.06.2013

12

A Carved stone of a temple is in obstruction in carriage way at chainage 0/675 km , Protection is not provided. From Km 0/400 to Km 0/550 WBM Grade-II material is collected at site, sieve analysis tests are conducted on random samples, the gradation of the material collected is not satisfying the gradation requirements given in MORD table 400.8 Contraction Joints are not Provided as per MORD CLAUSE 1501.8.3 From Km 3.750 to Km 3.850 WBM Grade-II material is collected at site. Sieve analysis tests are conducted on random samples. The gradation of the materials collected is not satisfying the gradation requirements given in MORD table 400.8

Pending

NCRMP/B-W/AP/RCS/PRED/ 08/S Konda & Tangutur/010

RCS

Road from Pakala PR Road to Y2-233 Chellammagaripattapupalem in 5.07.2013 Singarayakonda Mandal

13

Pending

NCRMP/B-W/AP/RHB/PRED/ 08/Kothapatnam/020

RHB

Y2-402

Salt Road from Madnur ZP Road to Thotagunta Yanadi Colony in Kothapatnam Mandal

24.07.2014

16

Pending

NCRMP/B-W/AP/RHB/PRED/ 08/Chinnaganjam/012

RHB

Salt Road from Chinnaganjam Rly gate to Bapuji Yanadi Y2-388 26.07.2013 Colony in Chinnaganjam Mandal

19

Pending

Page 70 of 159

SPSR NELLORE DISTRICT


Sl. No. 1 Package No. NCRMP/B-W/AP/RCS/PRED/ 09/Kavali/020 catago Project ry code RCS Work name Date of Issued 07.06.2013 NCR No. 6

NCR STATUS AS ON 31.10.2013


Observations Remedial meassures Present status of NCR

Road from 230/6Km of M.C Y2-426 Road to Pedapattapupalem of Kavali Mandal Salt road from Iskapalli to Salt fields at Kotha Y2-420 Kurrupattapupalem of Allur madal

NCR-6 Issued and the contractor/Line Contractor fails to provide personal protective Department is requested to take suitable eqipement to the Workers remedial action before proceeding with further work. The site condition worse. Contractor fails to provide personal protective eqipement and temperory shelters to the workers. Workers do not have shelter to eat. From km1/8 to km2/0, the camber of WMM is not as specified. It requires immediate rectification. It shall be scarified and re-paved to the required uniform profile. TPQA engineers shall be informed after the rectification for verification. From km 1/8 to km 2/2 no.of electric poles are to be shifted 11 no of Electric poles.4. Action shall be taken to shift water pipe lines, two water sumps and a pressure release valve in the carriageway From km 1/8 to km 2/2. NCR-8 Issued and the contractor/Line Department is requested to take suitable remedial action before proceeding with further work. NCR-9 Issued and the contractor/Line Department is requested to take suitable remedial action before proceeding with further work.

NCR Pending

NCRMP/B-W/AP/RHB/PRED/ 09/Allur/019

RHB

07.06.2013

NCR Pending

NCRMP/B-W/AP/RHB/PRED/ 09/Kavali/024

RHB

Road from Pedapattapupalem Y2-424 07.06.2013 to Nandempuram

NCR Pending

NCRMP/B-W/AP/RCS/PRED/ 09/T.P.Gudur & Muthukur/019

RCS

Road from C.S Puram to Y2-256 Edurupalem

13.06.2013

12

NCR-12 Issued and the contractor/Line Department is requested to take suitable remedial action before proceeding with further work.

NCR Pending

NCRMP/B-W/AP/RCS/PRED/ 09/Alluru/012

RCS

Approach road to Labbipalem Y2-242 in nellore dt

25.07.2013

15

NCR-15 Issued and the contractor/Line Contraction joints are not provided until now, Department is requested to take suitable it shell be provided immediately as per MORD remedial action before proceeding with Clause1501.8.3 further work.

NCR Pending

Page 71 of 159

Annexure - C
QC Tests conducted by TPQA

Page 72 of 159

Srikakulam District
Sl. Layer/Component of Road No QC tests done to the end of Last Month Total Passed Failed

Summary of QC Tests as on 31.10.2013


QC tests done during this Month Total Passed Failed Cumulative no. of tests Total Passed Failed Remarks

1 2 3 4 5

Embankment Shoulders Granular Sub Base Base Course (WBM) TACK COAT/SDBC/OGPC

10 0 53 34 0

10 0 50 34 0

0 0 3 0 0

10 0

10 0 57 34 0

0 0 4 0 0

8 0 0

7 0 0

1 0 0

61 34 0

Tests on Materials (CD Works) 6 7 8 9 Sand Coarse Agreegate Cement Steel 99 109 3 6 56 163 18 0 551 98 105 3 6 56 149 18 0 529 1 4 0 0 0 14 0 0 22 5 5 1 0 4 5 2 0 30 5 5 1 0 4 5 2 0 29 0 0 0 0 0 0 0 0 1 104 114 4 6 60 168 20 0 581 103 110 4 6 60 154 20 0 558 1 4 0 0 0 14 0 0 23 -

10 CC cubes - sets 11 Slump test 12 Water test 13 core cutting test Total

Page 73 of 159

Vizianagaram District
Sl. Layer/Component of No Road QC tests done to the end of Last Month Total Passed Failed

Summary of QC Tests up to 31.10.2013


QC tests done during this Month Total Passed Failed Cumulative no. of tests Total Passed Failed Remarks

1 2 3 4 5

Embankment Soil /Shoulders/SGD Granular Sub Base Base Course (WMM) SDBC

0 0 12 33 0

0 0 12 32 0

0 0 0 1 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 12 33 0

0 0 12 32 0

0 0 0 1 0

Tests on Materials (CD Works) 6 7 8 9 Sand Coarse Agreegate Cement Steel & Water 14 22 1 0 4 16 24 0 126 14 21 1 0 4 16 24 0 124 0 1 0 0 0 0 0 0 2 2 1 0 0 1 0 3 0 7 2 1 0 0 1 0 3 0 7 0 0 0 0 0 0 0 0 0 16 23 1 0 5 16 27 0 133 16 22 1 0 5 16 27 0 131 0 1 0 0 0 0 0 0 2

10 pH Values 11 CC cubes 12 Workability 13 core cutting test Total

Page 74 of 159

Visakhapatnam District
Sl. No Layer/Component of Road QC tests done to the end of Last Month Total Passed Failed

Summary of QC Tests up to 31.10.2013


QC tests done during this Month Total Passed Failed Cumulative no. of tests Total Passed Failed Remarks

1 2 3 4 5

Embankment Soil - set Granular Sub Base/Shoulders Base Course (WBM) OGPC

0 5 36 107 42

0 5 36 106 41

0 0 0 1 1

0 0 4 0 0

0 0 4 0 0

0 0 0 0 0

0 5 40 107 42

0 5 40 106 41

0 0 0 1 1

Tests on Materials (CD Works) 6 7 8 9 Sand Coarse Agreegate Cement Steel & Water 60 71 10 0 26 67 163 7 8 602 60 71 10 0 26 67 163 7 8 600 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 4 0 0 0 0 0 0 0 0 0 0 60 71 10 0 26 67 163 7 8 606 60 71 10 0 26 67 163 7 8 604 0 0 0 0 0 0 0 0 0 2 -

10 pH Value 11 CC cubes 12 Workability 13 Bricks 14 Rebound Hammer Total

Page 75 of 159

East Godavari District


Sl. Layer/Component of Road No QC tests done to the end of Last Month Total Passed Failed

Summary of QC Tests as on 31.10.2013


QC tests done during this Month Total Passed Failed Cumulative no. of tests Total Passed Failed Remarks

1 2 3

Embankment Relative Compaction(FDD) Sub Grade Relative Compaction(FDD) Granual Sub Base HBG Grade III Gradation Relative Compaction (FDD) Aggregate Impact Value Water Absorption

0 12 12 7 16 3 3 5 0 1 1 3 5 0 1 1 3 2

0 12 12 7 16 3 3 5 0 1 1 3 5 0 1 1 3 2

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 3 3 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 3 3 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 12 12 7 16 6 6 5 0 1 1 3 5 0 1 1 3 2

0 12 12 7 16 6 6 5 0 1 1 3 5 0 1 1 3 2

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

WBM Grade-II Gradation Volumetric Analysis Aggregate Impact Value Water Absorption Screenings

WBM Grade-III Gradation Volumetric Analysis Aggregate Impact Value Water Absorption Screenings

Prime Coat Rate of spread of Binder

Page 76 of 159

East Godavari District


Sl. Layer/Component of Road No QC tests done to the end of Last Month Total Passed Failed

Summary of QC Tests as on 31.10.2013


QC tests done during this Month Total Passed Failed Cumulative no. of tests Total Passed Failed Remarks

7 8

Tack Coat Rate of spread of Binder OGPC Grading of 13.2mm & 11.2mm chips Temperature % of BT Content 2 4 2 2 2 2 0 2 4 2 2 2 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 4 2 2 2 2 0 2 4 2 2 2 2 0 0 0 0 0 0 0 0 2 2 0 0 0 0 2 2 0 -

Seal Coat Temperature % of BT Content

10 OGPC + SC Bitumen Extraction Test 11 Shoulder Sand Replacement (FDD) 1 Fine Agreegate Sieve Analysis Silt Content 2 Coarse Agreegate Sieve Analysis Flakiness Index Value AIV Water Absorption 3 Cement 8 3 4 4 3 8 3 4 4 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 3 4 4 3 8 3 4 4 3 0 0 0 0 0 4 4 4 4 0 0 0 0 0 0 0 0 4 4 4 4 0 0 Tests on Materials CD Works (CC Pavement and Culverts)

Page 77 of 159

East Godavari District


Sl. Layer/Component of Road No QC tests done to the end of Last Month Total Passed Failed

Summary of QC Tests as on 31.10.2013


QC tests done during this Month Total Passed Failed Cumulative no. of tests Total Passed Failed Remarks

4 5 6 7 8 1

pH Value CC cubes Workability Bricks Rebound Hammer Fine Agreegate Sieve Analysis Silt Content

7 13 64 0 0

7 13 64 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0 0

0 0 0 0

7 13 64 0 0

7 13 64 0 0

0 0 0 0 0

Tests on Materials (MPCS) 3 3 4 3 3 3 4 4 6 31 0 0 12 1 3 3 4 3 3 3 4 4 6 31 0 0 12 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 1 1 1 1 1 2 8 0 0 6 0 1 1 1 1 1 1 1 1 2 8 0 0 6 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 4 5 4 4 4 5 5 8 39 0 0 18 1 4 4 5 4 4 4 5 5 8 39 0 0 18 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -

Coarse Agreegate Sieve Analysis Flakiness Index Value AIV Water Absorption

3 4 5 6 7 8 9

Cement pH Value CC cubes Workability Bricks Rebound Hammer Steel & Water

10 SBC

Page 78 of 159

East Godavari District


Sl. Layer/Component of Road No QC tests done to the end of Last Month Total Passed Failed

Summary of QC Tests as on 31.10.2013


QC tests done during this Month Total Passed Failed Cumulative no. of tests Total Passed Failed Remarks

Tests on Materials (R&B Bridges) 1 Fine Agreegate Sieve Analysis Silt Content 2 Coarse Agreegate Sieve Analysis Flakiness Index Value AIV Water Absorption 3 4 5 6 7 8 9 Cement pH Value CC cubes Workability Bricks Rebound Hammer Steel & Water Total 21 8 8 8 6 10 18 68 0 0 6 2 453 21 8 8 8 6 10 18 68 0 0 6 2 453 0 0 0 0 0 0 0 0 0 0 0 0 0 4 2 2 2 2 2 12 22 0 0 0 1 83 4 2 2 2 2 2 12 22 0 0 0 1 83 0 0 0 0 0 0 0 0 0 0 0 0 0 25 10 10 10 8 12 30 90 0 0 6 3 536 25 10 10 10 8 12 30 90 0 0 6 3 536 0 0 0 0 0 0 0 0 0 0 0 0 0 0 8 8 8 8 0 0 2 2 2 2 0 0 10 10 10 10 0 0 -

10 SBC

Page 79 of 159

West Godavari District


Sl. Layer/Component of No Road QC tests done to the end of Last Month Total Passed Failed

Summary of QC Tests as on 31.10.2013


QC tests done during this Month Total Passed Failed Cumulative no. of tests Total Passed Failed Remarks

1 2 3 4 5 6

Embankment Shoulders Sub Grade Granular Sub Base Base Course (WMM) SDBC

0 0 81 118 29 6

0 0 81 94 27 6

0 0 12 24 2 0

0 0 0 31 4 0

0 0 0 31 4 0

0 0 0 0 0 0

0 0 81 149 33 6

0 0 81 125 31 6

0 0 12 24 2 0

Tests on Materials (CD Works) 7 8 9 Sand Coarse Aggregate Cement 19 19 5 0 34 34 6 0 351 19 19 5 0 34 34 6 0 325 0 0 0 0 0 0 0 0 38 0 0 0 0 0 0 0 0 35 0 0 0 0 0 0 0 0 35 0 0 0 0 0 0 0 0 0 19 19 5 0 34 34 6 0 386 19 19 5 0 34 34 6 0 360 0 0 0 0 0 0 0 0 38 -

10 Steel 11 CC cubes 12 Slump test 13 Water test 14 Core cutting test Total

Page 80 of 159

Krishna District
Sl. Layer/Component of Road No 1 2 3 3 4 5 6 7 8 9 10 11 12 13 14 15 Embankment Shoulders Sub grade Granular Sub Base Base Course (WMM) SDBC Sand Coarse Aggregate Cement Steel CC cubes CC Cores Slump test Field density by core cutter method Field density test by sand replacement method AIV Total

Summary of QC Tests as on 31.10.2013


QC tests done to the end of Last QC tests done during this Month Month Total Passed Failed Total Passed Failed Cumulative no. of tests Total Passed Failed Remarks

0 0 0 24 12 0 41 70 0 0 5 0 8 0 59 13 232

0 0 0 23 12 0 40 68 0 0 5 0 8 0 59 13 228

0 0 0 1 0 0 1 2 0 0 0 0 0 0 0 0 4

0 0 0 1 3 6 5 10 0 0 4 0 3 0 27 1 60

0 0 0 1 3 6 5 10 0 0 4 0 3 0 27 1 60

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 25 15 6 46 80 0 0 9 0 11 0 86 14 292

0 0 0 24 15 6 45 78 0 0 9 0 11 0 86 14 288

0 0 0 1 0 0 1 2 0 0 0 0 0 0 0 0 4

Tests on Materials (CD Works)

Page 81 of 159

Guntur District
Sl. No Layer/Component of Road

Summary of QC Tests as on 31.10.2013


QC tests done to the end of Last QC tests done during this Month Month Total Passed Failed Total Passed Failed Cumulative no. of tests Total Passed Failed Remarks

1 2 3 4 5 6 7 8 9

Embankment Shoulders Sub Grade Granual Sub Base Base Course (WMM) SDBC Concrete Cement Combined Gradation FA Sieve Analysis

0 0 0 3 1 0 6 8 4 4 7 1 6 20 10 0 0 70

0 0 0 3 1 0 6 8 4 4 7 1 6 20 10 0 0 70

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 4

0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 4

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 3 1 0 6 8 4 4 7 1 6 20 14 0 0 74

0 0 0 3 1 0 6 8 4 4 7 1 6 20 14 0 0 74

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

10 CA-Gradation 11 CA-AIV 12 CA-Water Absorption 13 Water pH Test 14 Slump 15 Concrete Cubes 16 Concrete Core 17 Rebound Hammer Total

Due to Heavy Rains no work is going on this month

Page 82 of 159

Prakasam District
Sl. Layer/Component of Road No QC tests done to the end of Last Month Total Passed Failed

Summary of QC Tests as on 31.10.2013


QC tests done during this Month Total Passed Failed Cumulative no. of tests Total Passed Failed Remarks

1 2 3

Embankment Sub Grade Granual Sub Base Gradation Relative Compaction (FDD)

0 5 112 73 49 19 16 21 54 48 26 16 22 57 12 12

0 5 112 73 47 19 16 21 54 48 26 16 22 57 12 12

0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0

0 0 8 5 0 0 0 0 0 0 0 0 0 0 0 0

0 0 8 5 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0 5 120 78 49 19 16 21 54 48 26 16 22 57 12 12

0 5 120 78 47 19 16 21 54 48 26 16 22 57 12 12

0 0 0 0 2 0 0 0 0 0 0 0 0 0 0 0

WBM Grade-II Gradation Volumetric Analysis Aggregate Impact Value Water Absorption Screenings

WBM Grade-III Gradation Volumetric Analysis Aggregate Impact Value Water Absorption Screenings

6 7

Prime Coat Rate of spread of Binder Tack Coat Rate of spread of Binder

Page 83 of 159

Prakasam District
Sl. Layer/Component of Road No QC tests done to the end of Last Month Total Passed Failed

Summary of QC Tests as on 31.10.2013


QC tests done during this Month Total Passed Failed Cumulative no. of tests Total Passed Failed Remarks

OGPC Grading of 13.2mm & 11.2mm chips Temperature % of BT Content 9 Seal Coat Temperature % of BT Content 10 OGPC + SC Bitumen Extraction Test 11 Shoulder Sand Replacement (FDD) 12 Concrete Cement Combined Gradation FA-Silt Content CA-Gradation CA-AIV CA-Water Absorption Water pH Test Slump Concrete Cubes Concrete Core Rebound Hammer Total 8

24 12 12 12 12 27 3 21 44 36 24 20 20 44 64 57 0 15 989

24 12 12 12 12 27 3 21 44 36 24 20 20 44 64 57 0 15 987

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

0 0 0 0 0 0 0 7 11 8 4 6 5 9 12 7 0 0 82

0 0 0 0 0 0 0 7 11 8 4 6 5 9 12 7 0 0 82

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

24 12 12 12 12 27 3 28 55 44 28 26 25 53 76 64 0 15 1071

24 12 12 12 12 27 3 28 55 44 28 26 25 53 76 64 0 15 1069

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2

Page 84 of 159

SPSR Nellore District


Sl. Layer/Component of No Road QC tests done to the end of Last Month Total Passed Failed

Summary of QC Tests as on 31.10.2013


QC tests done during this Month Total Passed Failed Cumulative no. of tests Total Passed Failed Remarks

1 2 3 4 5 6

Embankment Sub Grade Granual Sub Base WBM WMM MSS

96 128 280 4 123 79

96 128 279 4 109 45

0 0 1 0 0 0 17 48 17 48 6 26 6 26

0 0 0 0 0 0

96 134 306 4 140 127

96 134 305 4 140 127

0 0 1 0 0 0

Tests on Materials 7 8 9 Sand Coarse Agreegate Cement 87 49 61 0 141 4 116 28 Total 1196 85 47 61 0 141 4 116 28 1191 2 2 0 0 0 0 0 0 5 6 6 4 0 12 0 6 2 133 6 6 4 0 12 0 6 2 133 0 0 0 0 0 0 0 0 0 93 55 65 0 153 4 122 30 1329 91 53 65 0 153 4 122 30 1324 2 2 0 0 0 0 0 0 5 -

10 Steel 11 CC cubes 12 Cores 13 Slump 14 Water ph

Page 85 of 159

Annexure - D Visits by TPQA Consultants

Page 86 of 159

ABSTRACT STATUS OF NCRMP WORKS - TPQA (CIVIL ENGG) INSPECTION AS ON 30.10.2013 PR


MPCS Cummulative During this Month Up to last month Sl. No. District Works RCS Cummulative During this Month Up to last month RHB Cummulative During this Month Up to last month R&B BRIDGES Cummulative During this Month Up to last month I & CADD Total Visits SALINE EMBANKMENTS Cummulative During this Month Up to last month

Works

Works

Works

Works

1 2 3 4 5 6 7 8 9

Srikakulam Vizianagaram Visakhapatnam East Godavari West Godavari Krishna Guntur Prakasam Nellore

24 1 8 6 0 0 2 0 0 41

168 21 47 19 0 0 12 0 0 267

17 1 0 11 0 0 0 6 0 35

185 22 47 30 0 0 12 6 0 302

11 5 4 9 9 22 4 11 20 95

60 31 57 45 64 107 51 51 129 595

6 5 3 1 5 10 11 9 14 64

66 36 60 46 69 117 62 60 143 659

13 0 5 8 24 23 1 23 19 116

56 2 56 29 160 110 29 237 169 848

2 1 5 1 16 27 7 19 17 95

58 3 61 30 176 137 36 256 186 943

1 0 0 2 0 1 2 1 0 7

12 0 0 34 0 0 52 19 0 117

1 0 0 12 0 3 11 5 0 32

13 0 0 46 0 3 63 24 0 149

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0

0 0 0 0 0 0 0

322 61 168 152 245 257 173 346 329 2053

0 0 0

0 0 0

Total

Page 87 of 159

TPQA (CIVIL ENGG) SITE INSPECTIONS DURING THE MONTH OF OCTOBER-2013 Name of the District: SRIKAKULAM
Sl. No 1 2 3 Project catago Code ry Y2-002 Y2-001 Y2-159 MPCS MPCS RCS Name of work visited Construction of Cyclone shelter at Runku in Santhabommali Mandal. Construction of Cyclone shelter at Kollipadu in Santhabommali Mandal. Road from R&B road to Pothayyapeta Road from Yeeramukkam Rati R&B road to Dunnavooru Road from Borubadra, Meghavaram road to M.Maruvada DPN road to DL purtam jn via Koduru, magathapadu, Guppidipeta KC road to Amplam via Urajam,Nandigam Work stage Finishings is in progress. Finishings is in progress. Road widening in progress Road widening is in progress, earth work, culverts is in progress. Earth work and Culverts completd, GSB 400 MTS Laying is in progress. Culverts completed, WBM GR-II laying is in progress Date of visit 19.10.13 19.10.13 14.10.13, 16.10.13, 21.10.13 25.10.13 03.10.13, 25.10.13 31.10.13 25.10.13 Total visits 1 1 3

Y2-154

RCS

5 6 7

Y2-150
Y2-273 Y2-275

RCS RHB RHB

2 1 1

Y2-028

MPCS

Y2-029

MPCS

10

Y2-025

MPCS

11

Y2-010

MPCS

12

Y2-011

MPCS

13

Y2-012

MPCS

14

Y2-031

MPCS

Culverts, CC pavement completed, WBm Gr-II laying is in progress. Plinth beam, Columns upto Construction of cyclone shelter at stilt floor completed. Calingapatnam Centering for stilt floor slab is in progress. Plinth beam completed, Construction of Cyclone shelter at Columns upto stilt floor Bandaruvanipeta completed. columns below plinth beam Construction of Cyclone shelter at Metturu work is in progress & back filling is in progress columns below plinth beam Construction of Cyclone shelter at Bypalli work is in progress & backfilling is in progress PCC completed, Footings Construction of Cyclone shelter at Chinavanka completed. Columns below plinth level comleted. PCC completed, Footings Construction of Cyclone shelter at completed. Columns is in Chinakotturu progress. Foundation completed and Construction of Cyclone shelter at back filling work is in Jaganadhapuram progress Construction of Cyclone shelter at Kottamukkam PCC, Reinforcement, columns below plinth beam completed. Earth work excavation completed, PCC Completed. Reinforcement for footings is in progress.

15.10.13 24.10.13 15.10.13 24.10.13 24.10.13

24.10.13

24.10.13

24.10.13

18.10.13

15

Y2-032

MPCS

7.10.13 18.10.13 9.10.13, 22.10.13, 31.10.13

16

Y2-018

MPCS

Construction of Cyclone shelter at Komaravanipeta

Page 88 of 159

Name of the District: SRIKAKULAM


Sl. No Project catago Code ry Name of work visited Work stage Date of visit Total visits

17

Y2-037

18

Y2-438

PCC completed, Construction of Cyclone shelter at Reinforcement, columns MPCS patadibbalapalem below plinth beam completed. Approach road WMM Construction of High Level Bridge across completed, traffic allowed, Bridge Uppugedda at KM 7/6 of Srikakulam Municipal Approach road SDBC work limits to Pukkalapeta via Killipalem pending

18.10.13

30.10.13

Page 89 of 159

TPQA (CIVIL ENGG) SITE INSPECTIONS DURING THE MONTH OF OCTOBER-2013 Name of the District: VIZIANAGARAM
Sl. No 1 2 3 4 Project catago Code ry Y2-162 Y2-163 Y2-164 Y2-160 RCS RCS RCS RCS Name of work visited Road from R&B Road to Roluchappidi cyclone shelter Road from R&B road to Chinapathiwada CS Work stage Earth work, GSB and WBM gr-II Completed. WBM Gr-III Rolling work is in progress Earth work, GSB and CC Road Completed. Date of visit 28.10.13 31.10.13 28.10.13 29.10.13 28.10.13 Total visits 2 1 1 1

Earth work, GSB and WBM gr-II Road from R&B road to B.V.Peta Completed. WBM Gr-III Rolling work is cyclone shelter in progress Road from R&B Road to Jungle clearance Gudepuvalasa CS

Y2-041

1) Earthwork excavation completed. 2)PCC work completed. 3) Footings work completed. 4) Backfilling completed. 5) Construction of cyclone shelter at MPCS PlinthBeam below pcc work Completed. Buddugurayyapeta 6)Plinth Beam completed. 7)Columns upto roof level completed. 8)Ramp and staircase works are in progress. Road from Gumpam R&B Road to Pulligeddapalem (via) Palanki, Vizianagaram district.

29.10.13

Y2-279

RHB

Tender stage

31.10.13

Page 90 of 159

TPQA (CIVIL ENGG) SITE INSPECTIONS DURING THE MONTH OF OCTOBER-2013 Name of the District: VISAKHAPATNAM
Sl. No Project catago Code ry Name of work visited Work stage 4 Nos pipe culverts completed. From Km 0/106 to Km 1/600 and from km 2/0 to km 2/620 GSB,WBM Gr-II & III and OGPC + Seal coat completed. From KM 1.600 to Km 2.0 and From KM 2.620 to KM 2.720 GSB work completed. Date of visit Total visits

Y2-282

RHB

Road from R&B road to Gajareddipalem

30.10.13

Y2-168

RCS

Y2-167

RCS

Y2-284

RHB

Y2-283

RHB

Earth work, sub grade,GSB, shoulders and CC Road work completed from KM 0.000 to 0.610. Earth work for widening, CC Road work, Road from R&B Road to shoulder works are completed from KM Revupolavaram Cyclone shelter 0.000 to 0.854 and from KM 0.8845 to 1.072 Road from R&B Road to Shoulders and CC Road completed from Vadapalem KM 0.000 to KM 0.4244 One single row and one two row pipe culvert works completed. Retaining wall work completed for 62.55 Road from ZP Road Palamanpeta Meters (62.55m in km 0/600). Earth to Korlayyapeta. work, GSB and CC pavement from Km 0/0323 to Km 0/4021, from Km 0/689 to 0/9294 and Cross Road from Km 0/328 to 0/498 Completed Road from R&B road to Kothapatnam

10.10.13 11.10.13

12.10.13 10.10.13 30.10.13

03.10.13 11.10.13

Page 91 of 159

TPQA (CIVIL ENGG) SITE INSPECTIONS DURING THE MONTH OF OCTOBER-2013 Name of the District: EAST GODAVARI
Sl. No 1 Project catago Code ry Y2-297 RHB Name of work visited Road from N. Kothapalli to G.Pora in Katrenikone (v) CC Road from main proposed road to Neellarevu II CS in Neellarevu Work stage Not yet Started GSB and CC Pavement completed from Km. 0.000 to 0.490. Date of visit 23.10.13 Total visits 1

Y2-176

RCS

23.10.13

Abutments A1, A2,Piers Construction of Bridge at Km.43/10 of 1, 2, 3 and 4 Wells Y2-444 R&B Br Vakalapudi- Edatam road across Pampa Yeru in Concrete and Shinking EG DT. work is in progress

04.10.13 09.10.13 10.10.13 15.10.13 21.10.13 24.10.13 04.10.13 09.10.13 10.10.13 15.10.13 21.10.13 24.10.13

Y2-445

Abutments A1, A2,Piers 1 R&B Construction of Bridge at Km.43/6of Vakalapudi- and 2 Wells Concrete and Bridge Edatam road across Pampayeru in EG DT. Shinking work is in progress

Page 92 of 159

TPQA (CIVIL ENGG) SITE INSPECTIONS DURING THE MONTH OF OCTOBER-2013 Name of the District: WEST GODAVARI
Sl. No 1 Project catago Code ry Y2-182 RCS Name of work visited Road from R&B road to Kothakayalathippa cyclone shelter Road from Narsapur Perupalem R&B road to Mandavarithota Road from Mollaparru R & B road to Mollaparru Patha Colony R&B road to Chinamynavanilanka Work stage Date of visit Total visits 1

Y2-183

RCS

Earth work, Sub grade, GSB, CD Works completed. WMM Material Collection is in Progress.

30.10.2013 19.10.2013, 30.10.2013 30.10.2013

Y2-184

RCS

Y2-186

RCS

Y2-299

RHB

K.G. R&B Road to Mamidipudi of Kalawapudi. Road from Narsapur Perupalem R & B Road to Melamvaripalem Perupalem(S) Road from Perupalem Mollaparru R & B road via Sattinenivarimeraka to K.D.Pallavapalem Road from Perupalem Dibbalapallipalem R & B road to Mellapallavapalem Road from Perupalem beach R & B Road to Challavarimeraka via Mucherlavarimeraka

Sub grade & GSB Completed. Earth work is 10.10.2013 in Progress Earth work, GSB 22.10.2013, completed. WMM work 31.10.2013 is in Progress.

Y2-306

RHB

24.10.2013
Earth work, Sub grade, GSB, CD Works 24.10.2013 completed.WMM Material Collection is in Progress.

Y2-307

RHB

Y2-308

RHB

24.10.2013
Earth work, Sub grade & GSB Completed. WMM 19.10.2013, Material Collection is in 24.10.2013 Progress. Earth work, Sub grade, GSB, CD Works 10.10.2013, completed. WMM 29.10.2013 Material Collection is in Progress. Earth work, Sub grade & GSB completed. WMM 29.10.2013 Material Collection is in Progress. Earth work, Sub grade, GSB, CD Works 29.10.2013 completed. WMM Material Collection is in Progress.

Y2-309

RHB

10

Y2-313

RHB

Road from SP R&B road to Pasaladeevi

11

Y2-314

RHB

LT R&B road to Modi

12

Y2-315

RHB

SP R&B road to Gannabathulavari palem of Chamakuripalem

Page 93 of 159

Name of the District: WEST GODAVARI


Sl. No Project catago Code ry Name of work visited Work stage Date of visit Total visits

13

Y2-321

RHB

R&B road to Guttulavarimeraka

Earth work, Sub grade, GSB completed. WMM 23.10.2013 Material Collection is in Progress. Earth work, Sub grade, GSB completed. WMM 23.10.2013 Material Collection is in Progress. Earth work, Sub grade, GSB, CD Works 23.10.2013 completed. WMM Material Collection is in Progress. Earth work, Sub grade, GSB, CD Works 24.10.2013 completed. WMM Material Collection is in Progress. Earth work, Sub grade, GSB completed. CD works partially 24.10.2013 completed. WMM Material Collection is in Progress.

14

Y2-322

RHB

Road from R & B Road to Pulaparthivaripalem

15

Y2-323

RHB

R&B road to Pedaedigapalem

16

Y2-325

RHB

Road from PR Road to Prakashpuram SC colony of Vemuladeevi(E)

17

Y2-327

RHB

Road from PR road to Addalavarimeraka of Vemuladeevi(E)

Page 94 of 159

TPQA (CIVIL ENGG) SITE INSPECTIONS DURING THE MONTH OF OCTOBER-2013 Name of the District: KRISHNA
Sl. Project catag No Code ory 1 2 3 4 Y2-193 Y2-197 Y2-198 Y2-196 RCS RCS RCS RCS Name of work visited Road from R&B road to Cyclone shelter @ Chintakolla R & B Road to Cyclone Shelter at Kothaupakali Road from Uppu Canal drain to Cyclone shelter at Nali R & B Road to CS at Pathaupakali Work stage WMM 2nd layer in progress from Km 0/0 to 1/900. 4 numbers of 600mm dia pipe culvers completed. Scarifying work Completed. Jungle clearance and earthwork is in progress. Date of visit 01.10.13 01.10.13 20.10.13 15.10.13 Total visits 1 2 1 1

Y2-199

RCS

6 7 8

Y2-211 Y2-215 Y2-328

RCS RCS RHB

Eath work GSB,WMM 1st layer. Earth work, GSB completed at cross road no.1 from km 0/0 Road from Nali R & B Road to Barrankula to km 0/320, 600mm dia pipe Cyclone shelter culvert is in progress@ 0/2. WMM 2nd layer is in progress Road from kammavanicheruvu R&B road to Earth work, GSB, WMM 2nd Venkata durgambapuram in Bandar Mandal layer prime coat completed. Road from R&B Road Karagraharam to Pallipalem Road from R&B Road to Narsimhapuram Earth work,GSB,All CD works,WMM,SDBC completed SDBC completed

15.10.13
20.10.13 15.10.13

15.10.13 04.10.13 30.10.13 01.10.13 15.10.13 17.10.13 20.10.13 30.10.13 15.10.13 30.10.13

1 2 2

Y2-329

RHB

10

Y2-330

RHB

11

Y2-335

RHB

12

Y2-336

RHB

13

Y2-337

RHB

14

Y2-338

RHB

15

Y2-344

RHB

CD works, earth work, GSB, WMM completed from 0/0 to Road from R&B Road to Krishnapuram 0/660. Sub grade, GSB,WMM 2nd layer completed in another stretch of the road. GSB,Pipe culverts, WMM 2nd Road From R&B road to Pedagudumotu layer completed. SDBC work is in progress. Scarifying work completed. 450mm dia pipe culvert is in Road from R&B Road to Parra chivara progress. GSB work is in progress. Earth work, CD work completed. GSB, WMM 1st Road from R&B road to Pedagowdapalem layer completed from km 0/0 to 0/810. CD works , earth work, GSB Road from R & B Road to Mulapalem Village Completed,WMM 1st layer is in progress Road from Ganapeswaram R&B Road to Earth work, GSB,WMM 1st Pullaiahgaridibba layer from km 0/0 to km 1/147 completed. 600mm dia pipe culcert work Construction of road from ST colony to Uppu Completed, GSB work is in drain in Dindi. progress

15.10.13

15.10.13

15.10.13

15.10.13 22.10.13 15.10.13

Page 95 of 159

Name of the District: KRISHNA


Sl. Project catag No Code ory 16 Y2-345 RHB Name of work visited Work stage Earthwork,1000mm dia completed, GSB completed from KM 0.00 to 0.860 3 number 600mm completed. GSB completed, WMM 2layer is progress In KM 0/2,0/4,1/6,2/0 600mm dia pipe culverts completed, GSB work is progress Earth work,GSB,All CD work completed.WMM 2nd layer is in progress Earth work,All CD works,GSB,completed WMM 2nd layer is in progress Earth work,All CD works,GSB,completed WMM 1st layer is in progress Earth work,All CD works,GSB work completed,WMM 1st layer is in progress work not started work not started Bed block completed for Shifiting of bailey Bridige for divertion Date of visit 22.10.13 15.10.13 01.10.13 15.10.13 20.10.13 Total visits 2

Road from Z.P.road to Sorlagondi Road from R & B road to MPUP School in Sangameswaram Road from R&B road to Amudalapalli (Pennammadibba) Road from Gokavaram R&B road to Vodarevupalem Road from Gokavaram R & B road to Badugovanipalem Road from R&B Road Thallapalem to Rayapalli Road from Manganepudi R & B Road to Pathareddypalem Road from R&B Road to Ramapuram Road from Chinapandraka R&B Road to Uppuluru Construction of Bridge across salt creek in KM, 11/4-6 of Tallapalem-Narayanapuram Road in krishna district

17

Y2-346

RHB

18

Y2-348

RHB

19

Y2-366

RHB

05.10.13

20

Y2-367

RHB

05.10.13 17.10.13 19.10.13 20.10.13 05.10.13 19.10.13 20.10.13 20.10.13 11.10.13 15.10.13 21.10.13

21

Y2-368

RHB

22 23 24 25

Y2-369 Y2-351 Y2-352

RHB RHB RHB

2 1 1 3

Y2-447 Bridige

Page 96 of 159

TPQA (CIVIL ENGG) SITE INSPECTIONS DURING THE MONTH OF OCTOBER-2013 Name of the District: GUNTUR
Sl. No Project catago Code ry Name of work visited Work stage Date of visit 01.10.13 04.10.13 08.10.13 15.10.13 22.10.13 30.10.13 15.10.13 15.10.13 15.10.13 15.10.13 04.10.13 08.10.13 22.10.13 30.10.13 01.10.13 04.10.13 07.10.13 08.10.13 15.10.13 22.10.13 30.10.13 07.10.13 08.10.13 22.10.13 30.10.13 31.10.13 22.10.13 30.10.13 22.10.13 Total visits

Y2-454

Reconstruction of bridge across peddapalli drain Raft Concrete work Bridge at km 14/6 of chandole bridge to Nizampatnam Completed road in guntur district. Road from Ganapavaram R&B Road to Pedamarpuvaripalem

2 3 4 5 6

Y2-220 Y2-221 Y2-222

RCS RCS RCS RCS

Completed (yr-1)

1 1 1 1 4

Road from R&B Road to Chinapuluguvaripalem Completed (yr-1) Pedagollapalem PR road to Bonthagorlapalem R&B Road to Yarramvaripalem Road from R&B Krosurivariplam road to Markavaripalem Completed (yr-1) Completed (yr-1) 390 m ,CC work completed

Y2-225

RCS

Y2-379

RHB

Road from R&B road to Gattuvaripalem

CD Works Completed,

Y2-451

Reconstruction of HLB at km 2/4 of bapatla Bridge pandurangapuram across perali drain in guntur district RCS RCS Road from R&B Road to Pattapupalem Road from R&B Alluru to Yadavapalem

Revetment work in progress Earthwork Widening Completed. Completed (yr-1)

9 10

Y2-227 Y2-219

2 1

Page 97 of 159

TPQA (CIVIL ENGG) SITE INSPECTIONS DURING THE MONTH OF OCTOBER-2013 Name of the District: Prakasam
Sl. Project catago No Code ry 1 2 3 4 5 6 7 8 9 10 11 Y2-228 Y2-229 Y2-231 Y2-233 Y2-234 Y2-235 Y2-236 Y2-238 Y2-239 Y2-387 Y2-388 RCS RCS RCS RCS RCS RCS RCS RCS RCS RHB RHB Name of work visited Road from R&B road to Motupalli CS Work stage GSB In Progress Date of visit 19.10.2013 04.10.2013 19.10.2013 29.10.2013 29.10.2013 29.10.2013 29.10.2013 29.10.2013 29.10.2013 04.10.2013 04.10.2013 Total visits 1 1 1 1 1 1 1 1 1 1 1

Road from Km1/2+186 of Chinaganjam Railway gate-Bapaianagar ZP Road to GSB Completed Ramachandranagar H/o Kothapalem Road from R&B road to Mattigunta CS Road from Pakala PR Road to Chellammagaripattapupalem CS Road from Pakala PR road to Potthaiahgaripalem CS, Kranthinagar Revu. Road from Woollapalem R&B road to Devalampallipalem CS Road from Tangutur to Ananthavaram Road from Z.P. road to Srirampattapupalem GSB In Progress GSB, WBM Grade-II, CC & CD Works Completed GSB, CC & CD Works Completed Earth Work in Progress GSB Completed, CC Pavement in Progress GSB, CC Completed, Shoulders in Progress

GSB,CC,WBM Gr-II & III, Road from ZP road to Pallipalem of Chakicharala OGPC + SC Completed, Shoulders in Progress R&B Road to Pulavaripalem Road from Chinnaganjam Rly gate to Bapaiahnagar GSB, CC Completed, Shoulders in Progress

12

Y2-389

RHB

13

Y2-397

RHB

14

Y2-398

RHB

15

Y2-399

RHB

16

Y2-400

RHB

17

Y2-401

RHB

18

Y2-402

RHB

19

Y2-403

RHB

GSB, CC, WBM Grade-II & III Completed, Shoulders in Progress GSB, CC, WBM Grade-II Road from R&B Road to Kothapalem & III Completed, Shoulders in Progress GSB, CC, WBM Grade-II Road from KEM R&B road to Chinapattapupalem & III Completed, Shoulders in Progress GSB, CC, WBM Grade-II Salt Road from Madnur ZP road to & III Completed, Pedapattapupalem Shoulders in Progress GSB, CC, WBM Grade-II Road from Madnur ZP road to & III Completed, Swarnandhrapattapupalem Shoulders in Progress GSB, CC, WBM Grade-II Road from Madnur ZP road to Bapujiyanadi & III Completed, colony Shoulders in Progress GSB, CC, WBM Grade-II Salt Road from Madnur ZP road to Namburi & III Completed, yanadi colony Shoulders in Progress GSB, CC, WBM Grade-II Salt Road from Madnur ZP road to Thotagunta & III Completed, yanadi colony Shoulders in Progress GSB, CC & CD Works Road from Tangutur to Tallapalem (via) Completed & WBM GradeVelagapudi (Km 4/5 to 7/465) II in Progress

04.10.2013

30.10.2013

30.10.2013

30.10.2013

30.10.2013

30.10.2013

30.10.2013

29.10.2013

Page 98 of 159

Name of the District: Prakasam


Sl. Project catago No Code ry 20 21 Y2-404 Y2-410 RHB RHB Name of work visited Road from Tangutur-Ravivaripalem road @1/2 KM to Pasukuduru. KEM R&B road to Pinnivaripalem Salt Road from Madnur ZP road to Chinnapattapupalem KEM R&B road to E. Pallipalem Road from KEM R&B road to Chenchupapayapalem Road From M.C road to West ST colony of Veerapalli Work stage GSB, CC & CD Works Completed GSB,CC,WBM Gr-II & III, OGPC + SC Completed, Shoulders in Progress GSB,CC,WBM Gr-II & III, OGPC + SC Completed, Shoulders in Progress GSB, CC Completed, Shoulders in Progress GSB,CC,WBM Gr-II & III, OGPC + SC Completed, Shoulders in Progress GSB,CC,WBM Gr-II & III, OGPC + SC Completed, Shoulders in Progress Date of visit 09.10.2013 29.10.2013 04.10.2013 Total visits 2 1

22 23 24

Y2-411 Y2-412 Y2-413

RHB RHB RHB

30.10.2013 30.10.2013 30.10.2013 11.10.2013 12.10.2013 29.10.2013 04.10.2013 10.10.2013 12.10.2013 24.10.2013 29.10.2013 31.10.2013 31.10.2013 31.10.2013 31.10.2013 31.10.2013 31.10.2013

1 1 1

25

Y2-414

RHB

26

Y2-455

Reconstruction of High level bridge at Km. 11/10 Sinking of Well Curbs in Bridge of Ongole - Kothapatnam road in Prakasam progress District MPCS Construction of CS in K. Pallipalem (Type D) MPCS Construction of CS in Motumala (Type D) MPCS Construction of CS in Padarthy (Type D) MPCS Construction of CS in Rangaipalem (Type D) MPCS Construction of CS in Gamallapalem (Type B) MPCS Construction of CS in Madanur (Type D) Work not Started. SBC Tests Conducted. Work not Started. SBC Tests Conducted. Work not Started. SBC Tests Conducted. Work not Started. SBC Tests Conducted. Work not Started. SBC Tests Conducted. Work not Started. SBC Tests Conducted.

27 28 29 30 31 32

Y2-104 Y2-105 Y2-106 Y2-107 Y2-108 Y2-109

1 1 1 1 1 1

Page 99 of 159

TPQA (CIVIL ENGG) SITE INSPECTIONS DURING THE MONTH OF OCTOBER-2013 Name of the District: SPSR Nellore
Sl. No 1 2 3 4 5 6 Project catago Code ry RCS RHB RHB RCS RHB RHB Y2-259 Y2-434 Name of work visited Work stage Date of visit 01.10.13 04.10.13 09.10.13 04.10.13 07.10.13 30.10.13 11.10.13 16.10.13 18.10.13 31.10.13 17.10.13 19.10.13 31.10.13 18.10.13 19.10.13 31.10.13 17.10.13 31.10.13 28.10.13 28.10.13 31.10.13 29.10.13 31.10.13 30.10.13 31.10.13 31.10.13 31.10.201 31.10.13 31.10.13 31.10.13 31.10.13 Total visits 1 2 1 2 1 3

Road from @ Km 65/4 of CK Road to Tada Kuppam BTis Completed CS Road from Nellore Mypadu R&B Road to West Pattapupalem CC pavement is completed WMM is completed WMM is Completed GSB is completed BT is completed

Y2-433 Road from Mypadu R&B Road to Kollimittapalem Y2-256 Road from C.S. Puram to Edurupalem Y2-423 Road from Annagaripalem R&B road to Pedanattu Pattapupalem

Road from Ponnapudi Utukur R&B road to Y2-430 Prasanthi giri colony Y2-431 Ponnapudi R & B road to Venkatanarayanapuram

RHB

BT is completed

8 9 10 11 12 13 14 15 16 17 18 19

RCS RCS RCS RHB RCS RCS RHB RCS RHB RHB RHB RHB

Y2-251 Road from R&B Road to Ramalingapuram Y2-249 Ponnapudi R&B road to Busagadipalem Y2-248 Road Ponnapudi R&B Road to Ramachandrapuram.

CC road in progress GSB & CC road is completed. WMM progress

3 2 1 2 2 2 1 1 1 1 1 1

Y2-429 Road from Ponnapudi Utukur R&B road to Kothuru WMM progress Y2-246 Road from 230/6 Km of M.C Raod to Pedapattapupalem GSB completed.WMM progress GSB completed.WMM progress WMM completed GSB & CC road is completed. Vented road dam is progress WMM completed WMM completed CC pavement is completed

Y2-247 Road from R&B road to Utukuru Pallipalem Y2-424 Road from Pedapattapupalem to Nandempuram Y2-250 Road from Ponnapudi R&B Road to Lakshimipuram Y2-419 Y2-420 Road from R.I Road to C.R. Palem (via) Sambhunipalem Salt Road from Iskapalli to Salt fields at Kotha Kurrupattapupalem

Y2-422 Road from R&B Road to Zuvvagu Y2-421 Road from R&B road to Zuvvagu Lakshmipuram

Page 100 of 159

NCRMP WORKS - ABSTRACT OF TPQA (SOCIAL & ENV) INSPECTION STATUS UP TO OCTOBER 2013
PR
MPCS Cummulative During this Month Up to last month Sl. No. District Works RCS Cummulative During this Month Up to last month RHB Cummulative During this Month Up to last month R&B BRIDGES Cummulative During this Month Up to last month I & CADD Total Visits SALINE EMBANKMENTS Cummulative During this Month Up to last month

Works

Works

Works

Works

1 2 3 4 5 6 7 8 9

Srikakulam Vizianagaram Visakhapatnam East Godavari West Godavari Krishna Guntur Prakasam Nellore

22 1 1 5 0 0 2 0 0 31

14 0 0 0 0 0 0 0 0 14

0 3 0 3 0 0 0 0 0 6

14 3 0 3 0 0 0 0 0 20

11 5 4 9 9 26 3 11 18 96

5 0 4 0 2 5 0 2 12 30

0 4 0 1 9 5 0 0 0 19

5 4 4 1 11 10 0 2 12 49

10 0 5 8 24 23 1 23 19 113

4 0 5 0 5 3 0 16 12 45

0 2 0 4 24 10 0 0 0 40

4 2 5 4 29 13 0 16 12 85

0 0 0 2 0 0 1 1 0 4

0 0 0 0 0 0 0 0 0 0

0 0 0 0 1 0 0 0 0 1

0 0 0 0 1 0 0 0 0 1

0 0 0 0 0 2 0 0 0 2

0 0 0 0 0 1 0 0 0 1

0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 1 0 0 0 1

23 9 9 8 41 24 0 18 24 156

Total

Page 101 of 159

TPQA SITE INSPECTIONS DURING THE MONTH OF OCTOBER - 2013.


Sl. Dist Project Category No rict Code 1 RHB Y2-313 Name of work visited SP R&B Road to Pasaladeevi Work stage Sub grade and CD works completed Sub grade and CD works completed Shoulders work is in progress Scarifying completed Date of visit 26-09-13. Total visits 1 Observations / Remarks 32 electrical poles are in obstruction in the entire stretch of the road. Work Plan for the EMP implementation is not submitted by the line department. 1. A water sump is in obstruction on RHS on the shoulder at KM. 0.015. 2. A Coconut tree is in obstruction near culvert on RHS in KM. 0/2 No issues identified till date. Work Plan for the EMP implementation is not submitted by the line department. Twenty one electrical poles are in obstruction in the entire stretch of the road.Work Plan for the EMP implementation is not submitted by the line department. Four electrical poles are in obstruction in the entire stretch of the road. Work Plan for the EMP implementation is not submitted by the line department. Two water sumps on either side of the road shall be covered properly to avoid accidents at KM 0.050. Work Plan for the EMP implementation is not submitted by the line department. Twenty six electrical poles are in obstruction in the entire stretch of the road.Work Plan for the EMP implementation is not submitted by the line department. Nine electrical poles are in obstruction in the entire stretch of the road.3. Due to field canals on both sides, a pond on RHS, tanks on both the sides of the road, the width of the road became narrow up to Km. 1.800.4. A Palm tree near the carriageway on the LHS and a cement bench on the RHS are in obstruction to the road at KM. 2.050 3 electrical poles are in obstruction in the entire stretch of the road Twenty five electrical poles are in obstruction in the entire stretch of the road. Work Plan for the EMP implementation is not submitted by the line department.

RHB

Y2-315

SP R&B Road to Gannabathulavari palem of Cgamakuripalem SP R&B Road to Pedathota of Turputallu R&B Road to Peta of Turputallu Road from PR Road to Prakashpuram SC Colony of Vemuladeevi ( E ) R&B Road to Pedathota of Turputallu Road from PR Road to Vemuladeevi ( E ) colony (Via) Ralla cheruvu of Vemuladeevi ( E )

26-09-13.

3 4

RHB RHB

Y2-318 Y2-319

26-09-13. 26-09-13.

1 1

West Godavari

RHB

Y2-325

GSB completed

26-09-13.

RHB

Y2-320

GSB completed

26-09-13.

RHB

Y2-326

GSB completed

26-09-13.

RHB

Y2-299

K.G. R&B Road to Mamidipudi of Kalawapudi

GSB completed

26-09-13.

9 10

RHB RHB

Y2-306 Y2-308

Road from Narsapur Perupalem R&B Road to Melamvaripalem Perupalem Road from Perupalem-Dibbalapalem R&B Road to Mellapallavapalem

GSB completed CD works is in progress

26-09-13. 26-09-13.

1 1

Page 102 of 159

TPQA SITE INSPECTIONS DURING THE MONTH OF OCTOBER - 2013.


Sl. Dist Project Category No rict Code 11 West Godavari RHB Name of work visited Work stage GSB work is in progress CD works is in progress CD works Completed Date of visit 26-09-13. Total visits 1 Observations / Remarks Twelve electrical poles are in obstruction in the entire stretch of the road.Work Plan for the EMP implementation is not submitted by the line department. Sixteen electrical poles are in obstruction in the entire stretch of the road. Work Plan for the EMP implementation is not submitted by the line department. Twenty nine electrical poles are in obstruction in the entire stretch of the road. Work Plan for the EMP implementation is not submitted by the line department. Twenty five electrical poles are in obstruction in the entire stretch of the road. Work Plan for the EMP implementation is not submitted by the line department. Land issue resolved. Work Plan for the EMP implementation is not submitted by the line department. Sixteen electrical poles are in obstruction in the entire stretch of the road. Work Plan for the EMP implementation is not submitted by the line department. The road has insufficient width. Work Plan for the EMP implementation is not submitted by the line department. Five electirc poles are in obstruction on the shoulders of the road. Needs to be shifted to avoid accidents. Work Plan for the EMP implementation is not submitted by the line department. PUC certificates and consent copies of quarry source is not available at the site. Twenty four electirc poles are in obstruction on the shoulders of the road Needs to be shifted to avoid accidents. Work Plan for the EMP implementation is not submitted by the line department. One electirc poles are in obstruction on the shoulders of the road. Needs to be shifted to avoid accidents. Work Plan for the EMP implementation is not submitted by the line department.

Road from Perupalem beach R&B Y2-309 Road to Challavarimeraka via Mucheriavarimeraka Y2-310 Road from Perupalem R&B Road to Dindla

12

RHB

26-09-13.

13

RHB

Road from Narsapur Perupalem R&B Y2-311 Road to Nellipallipalem via Ambedkar colony Hajijanapeta Y2-312 Y2-211 Y2-199 Y2-198 Road from Perupalem R&B Road to Kouruvaripalem Road from kammavanicheruvu R&B road to Venkatadurmbapuram Road from Nali R&B Road to Barrankula CS Road from Uppu canal drain to CS at Nali Road from R&B Road to CS at Kothaupakali

26-09-13.

14 15 16 17

RHB RCS RCS RCS

CD works Completed GSB completed GSB completed Work not Yet started.

26-09-13. 15.10.13 15.10.13 15.10.13

1 1 2 2

18

Krishna

RCS

Y2-197

Earth is in Progress

15.10.13

19

RCS

Y2-196

Road from R&B Road to Ramakrihsanpuram R&B Road via Pathaupakali Road from Ganapeswaram R&B road to Pulliahgaridibba

W/MM completed

15.10.13

20

RHB

Y2-338

GSB completed

15.10.13

Page 103 of 159

TPQA SITE INSPECTIONS DURING THE MONTH OF OCTOBER - 2013.


Sl. Dist Project Category No rict Code 21 22 23 RHB RHB RHB Y2-336 Y2-335 Y2-344 Name of work visited Road from R&B road to Pedagowdapalem Road from R&B road to Parrachivara Construction of Road from ST colony to Uppu drain in Dindi Work stage Widening work is in Progress W/MM completed Culverts completed Date of visit 15.10.13 15.10.13 15.10.13 Total visits 1 1 1 Observations / Remarks One electirc poles are is in the carriageway needs to be shifted immediately. Work Plan for the EMP implementation is not submitted by the line department. No issues identified till date. Work Plan for the EMP implementation is not submitted by the line department. No issues identified till date. Work Plan for the EMP implementation is not submitted by the line department. No issues identified till date. Work Plan for the EMP implementation is not submitted by the line department. PUC certificates and consent copies of quarry source is not available at the site. Safety measures are takenup by the contractor. No issues identified till date. Work Plan for the EMP implementation is not submitted by the line department. No issues identified till date. Work Plan for the EMP implementation is not submitted by the line department. Field canal is running beside the road. Protective measures need to be taken for the safety of the road users. Work Plan for the EMP implementation is not submitted by the line department. Road completed. Personal protective equipment needs to be provided to the workers. Work Plan for the EMP implementation is not submitted by the line department.

24 Krishna

RHB

Y2-345

Road from Z.P road to Sorlagondi

GSB is in Progress

15.10.13

25 26

RHB RHB

Y2-337 Y2-346

Road from R&B road to Mulapalem Road from R&B road to MPUP School to Sangameswaram Road from R&B road to Basavavanipalem Road from R&B road to Narasimhapuram

W/MM completed GSB is in Progress

15.10.13 15.10.13

1 1

27

RHB

Y2-334

GSB is in Progress

15.10.13

28 29

RHB RHB

Y2-328

Road completed GSB is in Progress

15.10.13 15.10.13

2 1

Y2-329 Road from R&B road to Krishnapuram

Page 104 of 159

NCRMP Works - Abstract of TPQA (Electrical Engineer) Inspection Status up to October 2013 PR
Sl. No. District Works Up to last month MPCS During this Month Cummulative

1 2 3 4 5 6 7 8 9

Srikakulam Vizianagaram Visakhapatnam East Godavari West Godavari Krishna Guntur Prakasam Nellore Total

22 1 1 5 0 0 2 0 0 31

8 0 14 7 0 0 0 0 0 29

2 0 0 1 0 0 0 0 0 3

10 0 14 8 0 0 0 0 0 32

Page 105 of 159

TPQA SITE (ELECTRICAL) INSPECTIONS DURING THE MONTH OF OCTOBER - 2013


Sl. No District Project Code Name of work visited Work stage Date of visit Remarks if any

1 2 4

Srikakulam Srikakulam East Godavari

Y2-001 Y2-002 Y2-062

Construction of MPCS at Kollipadu Construction of MPCS at Runku Construction of MPCS at Padaraghavulupeta

work in progress work in progress Finishing Stage

23.10.2013 23.10.2013 24.10.2013

Page 106 of 159

Annexure - E
Surprise Visits by TPQA

Page 107 of 159

Abstract details of Surprise Inspections carried out by TPQA Consultant up to end of October 2013 Sl. No. 1 2 3 4 5 6 7 8 9 Surprise visits District
Up to Last month During this Month Cummulative

Srikakulam Vizianagaram Visakhapatnam East Godavari West Godavari Krishna Guntur Prakasam Nellore Total

44 14 29 15 25 90 36 75 60 388

5 1 3 4 7 14 27 9 10 80

49 15 32 19 32 104 63 84 70 468

Page 108 of 159

SURPRISE VISITS UP TO END OF OCTOBER 2013


District : SRIKAKULAM
Sl.No Date Habitation Name of Work Package No. Visited by Remarks

1 2 3 4 5

09.10.13 19.10.13 20.10.13 20.10.13 20.10.13

RCS

Road from R&B road to Pathadibbalapalem Road from R & B road to Pothayyapeta CS Road from Yeeramukkam Rati R&B road to Dunnavooru Road from Yeeramukkam Rati R&B road to geddavooru Road from R&B road Ganguwada to road to Sigalaputtuga

NCRMP/B-W/AP/RCS/PRED/ 01/Etcherla/012 NCRMP/B-W/AP/RCS/PRED/ 01/Mandasa/010

SE SE SE SE SE

RCS

Page 109 of 159

SURPRISE VISITS UP TO END OF OCTOBER 2013


District : VIZIANAGARAM
Sl.No Date Habitation Name of Work Package No. Visited by Remarks

29.10.13

MPCS

Construction of cyclone shelter at Buddugurayyapeta.

NCRMP/B-W/AP/MPCS/PRED/ 02/Pusapatirega/003

SE

Page 110 of 159

SURPRISE VISITS UP TO END OF OCTOBER 2013


District : VISAKHAPATNAM
Sl.No Date Habitation Name of Work Package No. Visited by Remarks

1 2 3

03.10.13 30.10.13 30.10.13

RCS RHB RHB

Road from ZP Road Palamanpeta to Korlayyapeta Road from R&B road to Gajareddipalem via Venkaypalem Road from R&B road to Vadapalem

NCRMP/B-W/AP/RHB/PRED/ 03/Payakaraopeta/008 NCRMP/B-W/AP/RHB/PRED/ 03/Payakaraopeta/005 NCRMP/B-W/AP/RHB/PRED/ 03/Atchutapuram/009

DPM SE SE

Page 111 of 159

SURPRISE VISITS UP TO END OF OCTOBER 2013


District : EAST GODAVARI
Sl.No Date Habitation Name of Work Package No. Visited by Remarks

1 2

10.10.2013 21.10.2013 10.10.2013 21.10.2013

R&B Br R&B Br

Construction of Bridge at Km.43/10 of Vakalapudi- Edatam road across Pampa Yeru in EG DT. Construction of Bridge at Km.43/6of Vakalapudi- Edatam road across Pampayeru in EG DT.

NCRMP/B-W/AP/Br/R&B/ 04/Uppiteru- vagu/014 NCRMP/B-W/AP/Br/R&B/ 04/Uppiteru- vagu/014

Site Engineer Site Engineer

Page 112 of 159

SURPRISE VISITS UP TO END OF OCTOBER 2013


District : WEST GODAVARI
Sl.No Date Habitation Name of Work Package No. Visited by Remarks

1 2 3 4 5 6 7

30.10.2013 30.10.2013 24.10.2013 24.10.2013 24.10.2013 24.10.2013 24.10.2013

RCS RCS RHB RHB RHB RHB RHB

Road from R&B road to Kothakayalathippa CS Road from Mollaparru R&B road to Mollaparru Patha Colony Road from Narsapur Perupalem R&B Road to Melamvaripalem Perupalem(S) Road from Perupalem Mollaparru R & B road via Sattinenivarimeraka to K.D.Pallavapalem Road from Perupalem Dibbalapallipalem R&B road to Mellapallavapalem Road from PR Road to Prakashpuram SC colony of Vemuladeevi(E) Road from PR road to Addalavarimeraka of Vemuladeevi(E)

NCRMP/B-W/AP/RCS/PRED/ 05/Mogaltur/005

DPM & SE DPM & SE SE

NCRMP/B-W/AP/RHB/PRED/ 05/Mogaltur/008

SE SE

NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/014

SE SE

Page 113 of 159

SURPRISE VISITS UP TO END OF OCTOBER 2013


District : KRISHNA
Sl.No Date Habitation Name of Work Package No. Visited by Remarks

1 2 3 4 5 6 7 8 9 10 11 12 13 14

15.10.13 15.10.13 15.10.13 15.10.13 15.10.13 15.10.13 15.10.13 15.10.13 15.10.13 15.10.13 15.10.13 15.10.13 15.10.13 15.10.13

RCS RCS RCS RCS RCS

R&B Road to Cyclone Shelter at Kothaupakali Road from R&B road to Ramakrishnapuram R & B Road via Pathaupakali Road from Uppu Canal drain to CS at Nali Road from Nali R&B Road to Barrankula CS Road from kammavanicheruvu R&B road to Venkata durgambapuram in Bandar Mandal Road from Ganapeswaram R&B Road to Pullaiahgaridibba Road from R&B road to Pedagowdapalem Road from R&B Road to Parra chivara Road from R&B Road to Mulapalem Village Road from R&B Road to Narsimhapuram Road from R&B Road to Krishnapuram Road from R&B road to MPUP School Sangameswaram Road from ZP road to Sorlagondi Construction of road from ST Colony to Uppu Drain Dindi

NCRMP/B-W/AP/RCS/PRED/ 06/Nagayalanka/003 NCRMP/B-W/AP/RCS/PRED/ 06/Nagayalanka/004 NCRMP/B-W/AP/RCS/PRED/ 06/Machilipatnam/008 NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka/008

SE/SOCIAL SE/SOCIAL

SE/SOCIAL
SE/SOCIAL SE/SOCIAL SE/SOCIAL SE/SOCIAL SE/SOCIAL SE/SOCIAL SE/SOCIAL SE/SOCIAL SE/SOCIAL

RHB
RHB RHB RHB RHB RHB RHB RHB RHB

NCRMP/B-W/AP/RHB/PRED/ 06/Koduru/004 NCRMP/B-W/AP/RHB/PRED/ 06/Koduru/005 NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka/010

SE/SOCIAL SE/SOCIAL

Page 114 of 159

SURPRISE VISITS UP TO END OF OCTOBER 2013


District : GUNTUR
Sl.No Date Habitation Name of Work Package No. Visited by Remarks

01.10.2013 04.10.2013 08.10.2013 15.10.2013 22.10.2013 22.10.2013 15.10.2013 15.10.2013 15.10.2013 15.10.2013 07.10.2013 08.10.2013 22.10.2013 31.10.2013 22.10.2013 30.10.2013 04.10.2013 08.10.2013 22.10.2013 30.10.2013 01.10.2013 04.10.2013 07.10.2013 08.10.2013 15.10.2013 22.10.2013 30.10.2013

BR

Reconstruction of bridge across peddapallidrain at km 14/6 of chandole bridge to Nizampatnam road

NCRMP/B-W/AP/Br/R&B/ 07/Pedapalli/022 NCRMP/B-W/AP/RCS/PRED/ 07/PV Palem/001 (Year-1 works) NCRMP/B-W/AP/RCS/PRED/ 07/karlapalem/002 (Year-1 works)

SE

2 3 4 5 6 7 8

RCS

Road from R&B Alluru to Yadavapalem Ganapavaram R&B Road to Pedamarpuvaripalem Road from R&B Road to Chinapuluguvaripalem Pedagollapalem PR road to Bonthagorlapalem R&B Road to Yarramvaripalem

DPM/SE DPM/SE DPM/SE DPM/SE DPM/SE

RCS

BR RCS

Reconstruction of HLB at km 2/4 of Bapatla Pandurangapuram across Perali drain in guntur district Road from R&B Road to Pattapupalem

NCRMP/B-W/AP/BR/R&B/ 07/Perali/011 NCRMP/B-W/AP/RCS/PRED/ 07/Bapatla/006 NCRMP/BW/AP/RCS/PRED/ 07/Nizampatnam/005

SE SE

RCS

Road from R&B Krosurivariplam road to Markavaripalem

SE

10

RHB

Road from R&B road to Gattuvaripalem

NCRMP/B-W/AP/RHB/PRED/ 07/Nagaram/007

SE

Page 115 of 159

SURPRISE VISITS UP TO END OF OCTOBER 2013


District : PRAKASAM
Sl.No Date Habitation Name of Work Package No. Visited by Remarks

1 2 3 4 5 6 7 8 9

29.10.2013 29.10.2013 29.10.2013 29.10.2013 29.10.2013 29.10.2013 04.10.2013 04.10.2013 04.10.2013

RCS RCS RCS RCS RCS RCS RHB RHB RHB

Road from Pakala PR Road to Chellammagaripattapupalem CS Road from Pakala PR road to Potthaiahgaripalem CS, Kranthinagar Revu. Road from Woollapalem R&B road to Devalampallipalem CS Road from Tangutur to Ananthavaram Road from Z.P. road to Srirampattapupalem Road from ZP road to Pallipalem of Chakicharala R&B Road to Pulavaripalem Road from Chinnaganjam Rly gate to Bapaiahnagar Road from R&B Road to Kothapalem

DPM/SE NCRMP/B-W/AP/RCS /PRED/ 08/S.Konda&Tangutur/010 DPM/SE DPM/SE DPM/SE NCRMP/B-W/AP/RCS/PRED/ 08/Ulavapadu/009 NCRMP/B-W/AP/RHB/PRED/ 08/Chinaganjam/012 DPM/SE DPM/SE DPM/SE DPM/SE DPM/SE

Page 116 of 159

SURPRISE VISITS UP TO END OF OCTOBER 2013


District : PRAKASAM
Sl.No Date Habitation Name of Work Package No. Visited by Remarks

1 2 3 4 5 6 7 8 9 10

01.11.2013 04.11.2013 04.11.2014 07.11.2013 17.11.2013 29.10.2013 30.10.2013 31.10.2013 31.10.2013 31.10.2013

RCS RHB RHB RCS RCS RHB RHB RCS RHB RHB

Road from @ Km 65/4 of CK Road to Tada Kuppam CS Road from Mypadu R&B Road to Kollimittapalem Road from Nellore Mypadu R&B Road to West Pattapupalem Providing BT surface road from C S Puram to Edurupalem Ponnapudi R&B road to Busagadipalem Road from Pedapattapupalem to Nandempuram Providing BT surface road from C S Puram to Edurupalem Salt Road from Iskapalli to Salt fields at Kotha Kurrupattapupalem Road from R&B road to Zuvvagu Lakshmipuram Road from R&B Road to Zuvvagu

NCRMP/B-W/AP/RCS/PRED/ 09/Tada/024 NCRMP/B-W/AP/RHB/PRED/ 09/I.Peta/027 NCRMP/B-W/AP/RHB/PRED/ 09/I.Peta/027 NCRMP/B-W/AP/RCS/PRED/ 09/TP Gudur & Muthukur/019 NCRMP/B-W/AP/RCS/PRED/ 09/Vidavaluru/ 021 NCRMP/B-W/AP/RHB/PRED/ 09/Kavali/024 NCRMP/B-W/AP/RCS/ PRED/ 09/TP Gudur & Muthukur/019 NCRMP/B-W/AP/RHB/PRED/ 09/Allur/019

SE.s SE.s SE.s SE.s SE.s SE.s SE.s DPM,SE.s DPM,SE.s DPM,SE.s

Page 117 of 159

Annexure - F
Audit Reports submitted by TPQA Consultant

Page 118 of 159

QCRs submitted in the month of OCTOBER-2013


Package Number NCRMP/B-W/AP/RCS/PRED/ 03/S.Rayavaram/006 NCRMP/B-W/AP/RHB/PRED/ 03/Atchuthapuram/009 NCRMP/B-W/AP/RHB/PRED/ 03/Payakaraopeta/008 NCRMP/B-W/AP/RCS/PRED/ 03/Rambilli/007 NCRMP/B-W/AP/RCS/PRED/ 04/Katrenikona/015 Name of Work Road from R&B road to Revupolavaram Cyclone Shelter in S.Rayavaram Mandal Road from R&B Road to Vadapalem in Atchuthapuram Mandal Road from ZP Road Palmanpeta to Korlayyapeta in Payakaraopeta Mandal Road from R&B road to Kothapatnam Cyclone shelter in Rambilli Mandal. CC Road from Main proposed road to Neellarevu-II Cyclone Shelter in Neellarevu of Katrenikona Mandal District Visakhapatnam Visakhapatnam Visakhapatnam Visakhapatnam East Godavari East Godavari East Godavari West Godavari West Godavari West Godavari Krishna Krishna Krishna Krishna Krishna Krishna Krishna Krishna Krishna Krishna Krishna Krishna Guntur

NCRMP/B-W/AP/Br/R&B/ 04/Pampa Construction of Bridge at Km 43/10 of Vakalapudi Edatam Road Yeru 1/015 across Pampa Yeru NCRMP/B-W/AP/Br/R&B/ 04/Pampa Yeru 1/016 NCRMP/B-W/AP/RCS/PRED/ 05/Mogaltur/005 NCRMP/B-W/AP/RHB/PRED/ 05/Mogaltur/008 NCRMP/B-W/AP/RHB/PRED/ 05/Kalla/004 NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka/010 NCRMP/B-W/AP/RHB/PRED/ 05/Koduru/004 NCRMP/B-W/AP/RHB/PRED/ 06/Machilipatnam/020 NCRMP/B-W/AP/RHB/PRED/ 06/Machilipatnam/020 NCRMP/B-W/AP/RHB/PRED/ 06/Machilipatnam/020 NCRMP/B-W/AP/RCS/PRED/ 06/Machilipatnam/010 NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka/008 NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka/008 NCRMP/B-W/AP/RHB/PRED/ 06/Koduru/005 NCRMP/B-W/AP/RHB/PRED/ 06/Machilipatnam/020 NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka/010 NCRMP/B-W/AP/RHB/PRED/ 06/Koduru/005 NCRMP/ B-W/AP/Br/R&B/ 07/Perali/011 Construction of Bridge at Km 43/6 of Vakalapudi Edatam Road across Pampa Yeru Road from Narsapur Perupalem R&B road to Mandavarithota in Mogalturu Mandal Road from Perupalem beach R&B road to Challavarimeraka via Mucherlavarimeraka in Mogalturu Mandal KG R&B Road to Mamidipudi of Kalawapudi in Kalla Mandal Road from R&B Road to MPUP School in Sangameswram of Nagayalanka Mandal Road from R&B Road to Narasimhapuram in Koduru Mandal Road from Gokavaram R&B road to Baduguvaripalem in Machilipatnam Mandal Road from Manginapudi R&B road to Pathareddypalem in Machilipatnam Mandal Road from Gokavaram R&B road to Vodarevupalem in Machilipatnam Mandal Road from R&B Road Karagraharam to Pallipalem in Machilipatnam Mandal Road from R&B road to Parrachivara in Nagayalanka Mandal Road from R&B Road to Mulapalem in Nagayalanka Mandal Road from R&B Road to Krishnapuram in Koduru Mandal Road from R&B road Thallapalem to Rayapalli in Machilipatnam Mandal Road from ZP Road to Sorlagondi in Nagayalanka Mandal Road from R&B Road to Krishnapuram in Koduru Mandal Reconstruction of HLB @ Km 2/4 of Bapatla-Pandurangapuram road across Perali drain

Page 119 of 159

Package Number NCRMP/B-W/AP/RHB/PRED/ 08/Kothapatnam/019 NCRMP/B-W/AP/RHB/PRED/ 08/Kothapatnam/019 NCRMP/B-W/AP/RHB/PRED/ 08/Kothapatnam/019 NCRMP/B-W/AP/RHB/PRED/ 08/Ulvapadu/016 NCRMP/B-W/AP/Br/R&B/ 08/Ongole/023 NCRMP/B-W/AP/RCS/PRED/ 09/T.P.Gudur & Muthukur/019 NCRMP/BW/AP/RHB/PRED/ 09/I.Peta/027 NCRMP/B-W/AP/RCS/PRED/ 09/T.P.Gudur & Muthukur/019 NCRMP/B-W/AP/RHB/PRED/ 09/Kavali/024

Name of Work Road from KEM R&B Road to Chenchupapayapalem in Kothapatnam Mandal Road from KEM R&B Road to Pinnivaripalem in Kothapatnam Mandal Salt Road from Madnur ZP Road to Chinnapattapupalem in Kothapatnam Mandal. Road from MC road to West ST colony of Veerapalli in Ulavapadu Mandal Reconstruction of High level bridge at Km. 11/10 of Ongole Kothapatnam road Road from Mahlakshmi puram to Sagara Sangamam via Muthyalathopu Pattapupalem in T.P.Gudur Mandal Road from Nellore - Mypadu R&B Road to West Pattapupalem in I.Peta Mandal Road from C.S Puram to Eduru Pattapupalem in T.P.Gudur Mandal Road from Annagaripalem R&B road to Pedanattu Pattapupalem of Kavali Mandal

District Prakasam Prakasam Prakasam Prakasam Prakasam SPSR Nellore SPSR Nellore SPSR Nellore SPSR Nellore

Page 120 of 159

Final QCRs submitted in the month of October-2013


Package Number NCRMP/BW/AP/RCS/PRED/ 07/Karlapalem/002 NCRMP/BW/AP/RCS/PRED/ 07/PV Palem/001 NCRMP/BW/AP/RCS/PRED/ 07/Karlapalem/002 Name of Work Road from R&B Road to Yaramvaripalem in Karlepalem Mandal Road from R&B Road Alluru to Yadavapalem in PV Palem Mandal Road from Pedaglapalem PR Road to Bonthagoralapalem in Karlepalem Mandal District Guntur Guntur Guntur

Page 121 of 159

Env & Social QCRs submitted in the month of October-2013


Package Number NCRMP/B-W/AP/RHB/PRED/ 05/Mogaltur/006 NCRMP/B-W/AP/RHB/PRED/ 05/Mogaltur/008 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/010 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/012 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/012 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/013 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/013 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/013 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/013 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/014 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/010 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/010 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/012 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/012 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/012 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/014 NCRMP/B-W/AP/RHB/PRED/ 05/Narsapur/014 NCRMP/B-W/AP/RHB/PRED/ 05/Kalla/004 NCRMP/B-W/AP/RHB/PRED/ 05/Mogaltur/008 NCRMP/B-W/AP/RHB/PRED/ 05/Mogaltur/008 NCRMP/B-W/AP/RHB/PRED/ 05/Mogaltur/008 NCRMP/B-W/AP/RHB/PRED/ 05/Mogaltur/009 NCRMP/B-W/AP/RHB/PRED/ 05/Mogaltur/009 NCRMP/B-W/AP/RHB/PRED/ 05/Mogaltur/009 Name of Work Khalipatnam R&B road to Khalipatnam ferry Road from Perupalem Mollaparru R&B Road via Sattinenivari meraka to K.D.Pallavapalem Road from LT R&B Road to Modi Road from R&B road to SC colony in Pedalanka Road from R&B road to Rajeev Nagar of Darbharevu Road from R&B Road to Guttulavarimeraka Road from R&B Road to Pulaparthivaripalem Road from R&B Road to Pedaedigapalem Road from R&B Road to Evanivarimeraka Road from PR Road to Addalavarimeraka of Vemuladeevi (E) SP R&B Road to Pasaladeevi SP R&B Road to Gannabathulavari palem of Cgamakuripalem SP R&B Road to Pedathota of Turputallu R&B Road to Peta of Turputallu R&B Road to Pedathota of Turputallu Road from PR Road to Prakashpuram SC Colony of Vemuladeevi ( E ) Road from PR Road to Vemuladeevi ( E ) colony (Via) Ralla cheruvu of Vemuladeevi ( E ) K.G. R&B Road to Mamidipudi of Kalawapudi Road from Narsapur Perupalem R&B Road to Melamvaripalem Perupalem Road from Perupalem-Dibbalapalem R&B Road to Mellapallavapalem Road from Perupalem beach R&B Road to Challavarimeraka via Mucheriavarimeraka Road from Perupalem R&B Road to Dindla Road from Narsapur Perupalem R&B Road to Nellipallipalem via Ambedkar colony Hajijanapeta Road from Perupalem R&B Road to Kouruvaripalem District West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari West Godavari

Page 122 of 159

Package Number NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka /008 NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka /008 NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka /008 NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka /010 NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka /010 NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka /008 NCRMP/B-W/AP/RCS/PRED/ 06/Nagayalanka /004 NCRMP/B-W/AP/RCS/PRED/ 06/Nagayalanka /004 NCRMP/B-W/AP/RCS/PRED/ 06/Nagayalanka /003 NCRMP/B-W/AP/RCS/PRED/ 06/Nagayalanka /003 NCRMP/B-W/AP/RHB/PRED/ 06/Koduru /004 NCRMP/B-W/AP/RHB/PRED/ 06/Nagayalanka /010 NCRMP/B-W/AP/RHB/PRED/ 06/Koduru/005 NCRMP/B-W/AP/RHB/PRED/ 06/Koduru/007 NCRMP/B-W/AP/RCS/PRED/ 06/Machilipatnam/008

Name of Work Road from Ganapeswaram R&B road to Pulliahgaridibba Road from R&B road to Pedagowdapalem Road from R&B road to Parrachivara Construction of Road from ST colony to Uppu drain in Dindi Road from Z.P road to Sorlagondi Road from R&B road to Mulapalem Road from Nali R&B Road to Barrankula CS Road from Uppu canal drain to CS at Nali Road from R&B Road to CS at Kothaupakali Road from R&B Road to Ramakrihsanpuram R&B Road via Pathaupakali Road from R&B road to Narasimhapuram Road from R&B road to MPUP School to Sangameswaram Road from R&B road to Krishnapuram Road from R&B road to Basavavanipalem Road from Kammavanicheruvu R&B Road to Venkatadurgambapuram

District Krishna Krishna Krishna Krishna Krishna Krishna Krishna Krishna Krishna Krishna Krishna Krishna Krishna Krishna Krishna

Page 123 of 159

Annexure - G
Photo Documentation

Page 124 of 159

TPQA-NCRMP inspection of Road from R&B road to MPUP School In Sangameswaram in Nagayalanka mandal in krishna dt CD work completed & GSB is in progress on 28.09.13

CD work completed on 01.10.13

GSB layer completed on 01.10.13

GSB thickness verified on 01.10.13

Page 125 of 159

TPQA Inspection of Narasimhapuram road in Koduru mandal in Krishna District on 09.08.13- SDBC work is in progress.

Rolling is in progress on 09.08.13.

SDBC work is in progress on 09.08.13.

Road width verified on 09.08.13.

Page 126 of 159

TPQA Inspection of Narasimhapuram road in Koduru mandal in Krishna District on 01.10.13- SDBC thickness verified.

Camber verified on 01.10.13.

SDBC completed on 01.10.13.

SDBC completed on 01.10.13.

Page 127 of 159

Page 128 of 159

Page 129 of 159

TPQA-NCRMP inspection of Road from Gokavaram R & B road to Baduguvaripalem in Machilipatnam mandal in krishna dt as on 05.10.13 GSB thickness verified.

GSB thickness verified on 05.10.13

GSB width verified on 05.10.13

GSB completed on 27.08.13 GSB completed on 05.10.13

Page 130 of 159

Page 131 of 159

TPQA-NCRMP inspection as on 03.10.13 Road from Manganepdudi R&B road to Pathareddypalem in machilipatnam Mandal in krishna dt WMM completed.

WMM thickness verified as on 03.10.13.

WMM width verified as on 03.10.13.

WMM layer completed as on 03.10.13.

Page 132 of 159

Page 133 of 159

Page 134 of 159

TPQA-NCRMP inspection as on 21.09.13 Road from R&B road to Parrachivara in Krishna District Road widening completed

GSB Gradation test done as on 21.09.13

GSB layer is in progress as on 23.09.13

600mm dia pipe culvert completed as on 21.09.13

Page 135 of 159

Page 136 of 159

Page 137 of 159

TPQA-NCRMP inspection as on 09.10.13 Road from R&B road to Mullapalem in Krishna District GSB Camber verified

GSB thickness verified as on 09.10.13

GSB thickness verified as on 09.10.13

GSB completed as on 09.10.13

Page 138 of 159

Page 139 of 159

Page 140 of 159

Page 141 of 159

Page 142 of 159

Page 143 of 159

TPQA-NCRMP inspection of Road from R & B road to Krishnapuram in Koduru mandal in krishna dt GSB completed as on 09.10.13.

GSB completed as on 0910.13

GSB completed as on 09.10.13

GSB completed as on 09.10.13

Page 144 of 159

Page 145 of 159

GSB from km 2.0 to 2.55

Page 146 of 159

Page 147 of 159

Page 148 of 159

Page 149 of 159

Page 150 of 159

Page 151 of 159

Page 152 of 159

Page 153 of 159

TPQA-NCRMP inspection of Road from R & B road to Krishnapuram in Koduru mandal in Krishna dt SDBC completed as on 17.10.13.From KM 0.0 to 0.600

SDBC completed as on 17.10.13 in the reach from km 0.0 to 0.600

SDBC completed as on 17.10.13 in the reach from km 0.0 to 0.600

SDBC completed as on 17.10.13 in the reach from km 0.0 to 0.600

Page 154 of 159

TPQA-NCRMP inspection Road from Narsapur Perupalem R&B road to Mandavarithota in West Godavari District on 19.10.2013. GSB completed

FDD test done as on 19.10.13

FDD test done as on 19.10.13

GSB completed as on 19.10.13

Page 155 of 159

Page 156 of 159

Page 157 of 159

Page 158 of 159

Page 159 of 159