Anda di halaman 1dari 1

Part No.

Section [mm]
Plate 100/300/10 Ri-Bar 16 l = 220 Plate 100/200/10 Ri-Bar 16 l = 220 Angle (spacer) 40/40/5 l = ......... Hex bolt M12 - 40 Hex nut M12 Ri - Bar 16 l = 1650 Ri-Bar 6 l = 320 Ri - Bar 16 l = ............

Quantity [nos]

Working Drawing

Weight
Kg/pc total Kg 2.35 4.70g 1.40g

Part No.

Section Quantity [mm] [nos] 13 ..... .....


12 ......... ......... 1

Working Drawing
for fixing & joining Fixation Cable 13mm for Handrail Cable 26 or 32mm for Walkway Cable 26 or 32mm Binding Wire
B = .......... kg. Total Structural Steel = (u+g) D = ......... kg Bulldog Grips g = 10.64 kg. Steel to be galvanized

Weight
Kg/pc total Kg 0.28 ....... ........ 1.00 3.36D ........D ........D 1.00 ............

2
150 150

1 2

2 holes 17

galvanized

b a

220

0.35

galvanized

2
45 55 100

2 holes 14 2 holes 17

1.57

3.14g

13 14 15 16

galvanized

0.35
220

1.40g

A = .................. kg. Total transportation Weight B+C+D+R+ 1.16 kg. C = 0.32 kg Nuts, Bolts, Washers

galvanized L X L 910 1270 X 740 1100 60 25 Weight/pc 2.73 kg 3.81 kg

R = ................. kg Reinforcement Steel

25 60

1a ........ ........U
untreated

8 8

3 4 5 6 7 8 9 10 11 12
Produced by

Width of walkway 70 5 holes 14 cm 106 cm

Part 1: Handrail Cable Saddle 1b 2a 2b 2b 5


8 8

4 4

40

galvanized

0.065 0.015

0.26c 0.06c

galvanized ri = 40 1300

Part 2 Walkway Cable Saddle

2.61

10.44R

10

200

ri = 40 L

0.07

0.70R

3
Transportation Weight of welded parts : - Part No. 1 = 3.10 kg

Width of walkway 70 cm 106 cm

L 2100 2500

Weight/pc 3.32 kg 3.95 kg

.......

........R

180 Related Construction Drawings are : - 20Dcon70 or 20Dcon106 - 21Dcon - 41Dcon - 22Dcon - 42Dcon - 23 Dcon - 24 Dcon - 25 Dcon - 26 Dcon Cable mm 26 32 Bulldog Grips for two cables 10 12

40 The following steelparts must be hot dip galvanized acc. to IS 2629 & 2633, min thickness = 80 m Part No. 1 & 2 All Nuts & Bolts must conform to IS 1363 and are galvanized acc. to IS 1367, Part XIII Weight. (kg/pc) 1.10 1.30 Total kg 11.00 15.60

- Part No. 2 = 2.30 kg All Structural steel must comply with : IS 226 - 1975 for structural steel. IS 800-1984 for general construction in steel.

Bulldog Grip .... Plain Rod 20 l = 3100 Ri-Bar 20 l = 2900 Ri - Bar 12 l = 2200

for fixing first suspender at handrail cable 26 or 32


MS forged, according to ISI standard, hot dip galvanized

....... ........D

ri =60 mm

*Erection Hooks needed at one bank only

HMG / Ministry of Local Development


DoLIDAR / Short SpanTrail Bridge Standard
Bridge Name: No: Bank: Span:

2* 4

1300

7.66 7.16

........R 28.64R

Steel Drawing:

2900

11

80 500

1.95

21.45R

Nos of Foundation required,1 or 2 :


Date : Nov. 05, 2001 Drawing No. 20D2

Set for one Foundation

Saddles & Reinforcement for RCC Deadman & Gravity Soil Anchor for 2 Walkway Cables Walkway Width : cm

Nepal

Swiss Association for International Cooperation, in partnership with His Majestys Government of Nepal, funded and supported by the Swiss Government (SDC Nepal).

11

Anda mungkin juga menyukai