C historically invested
Estimated growth rates of natural gas electricity generation 5-year CAGR Europe Middle East Rest of Asia Africa North America Latin America Total Current install base of GT filters by type Panel Cell 3,000.% Synth 4,000.% 2.4% 8.1% 5.2% 7.3% .4% 4.3% 3.3% Cartridge Cell 1,000.% Synth 2,000.% 10-year CAGR 1.1% 4.7% 4.5% 5.% .4% 3.8% 2.4%
Europe
Note: Synth = Synthetic filter technology, Cell = Cellulose filter technology High efficiency filter consideration set E9 E10 E12
Market status Filter price Filter replacement rate (months) Turbine wash time (hrs/year) Downtime for filter cleaning (hrs/year)
Available $300. 24
Testing $330. 24
Available $100. 12
90 60
120 20
180 300
Average turbine
160
150
160
180MW capacity
190MW
180MW
About Deloitte
Deloitte refers to one or more of Deloitte Touche Tohmatsu Limited, a UK private company limited by guarantee, and independent entity. Please see www.deloitte.com/about for a detailed description of the legal structure of Deloitte Tou www.deloitte.com/us/about for a detailed description of the legal structure of Deloitte LLP and its subsidiaries. Certain and regulations of public accounting. Copyright 2013 Deloitte Development LLC. All rights reserved. Member of Deloitte Touche Tohmatsu Limited
Current installed GT distribution by region Distribution of Turbine Installations by generation capacity (measured in MW)
Key filter statistics Panel Climate Cell Marine No. of filters per MW of 10 power generated Arid Mixed Arid Mixed Humid subtropical Filter lifetime (months) Avg. Price Average loss in power generation (%) Marine Arid Humid sub-tropical 8 $80. 12 $100. $100. 15 Synth Cell
800.% 200.% 600.% 500.% 400.% 400.% Note: 1 gigawat (GW) = 1,000 megawatts ((MW)
Competitor capabilities and sales Gas Filter Filter Filter turbine Gas turbine Product production installation servicing maintenance variant OEM X X X X X X X X X X X X
X X
Agent 200.% Turbine OEM Turbine 500.% Other 100.% Latin America 600.%
Asia 1,600.%
Other Other Client 2012 sales Latin America Client 2012 sales Agent Turbine OEM by customer type Middle East by region type Turbine maintenance provider Asia Turbine oper ator North America Distributor Europe Supply to competitors ailed description of the legal structure of Deloitte Touche Tohmatsu Limited and its member firms. Please see structure of Deloitte LLP and its subsidiaries. Certain services may not be available to attest clients under the rules
Cartridge Synth 12 10
12
Other 300.%
Europe 4,300.%
North America
3060 Europe Middle East Rest of Asia Africa North America Latin America 100.% World Assuming 100 turbines Panel Cell No of filters/MW Lifetime in months Avg Price 30-60 Europe Middle East Rest of Asia Africa North America Latin America World 29.3% 13.8% 24.6% 10.8% 4.6% 16.9%
60120 120180 >180 5.4% 6.9% 30.1% 41.4% 17.2% 16.1% 0.0 9.2% 43.% 16.1% 4.3% 10.3% 100.% 100.% 100.%
Synth 10 8 80 60-120 1318.5 621 1107 486 207 760.5 4500 486 2709 1548 0 3870 387 9000 15 12 100
Cell
10 24 300 Total 2016 2322 2034 0 10458 1170 18000 4855.5 11862 7104 1866 16950 3862.5 46500
Europe Middle East Rest of Asia Africa North America Latin America World
Overall InstallYear Capacity 0 971 7117 2131 560 8475 773 20027
Year 1 994 7694 2242 601 8509 806 20688 1018 8317 2359 645 8543 840 21370 North Am 24% 12 7 2 1 1 0 0 24
Year 2
Regions & Sales Breakup Europe Client Sales 43% Competitors 48% Distributors 28% Turbine Ops 10% Maint Prov 6% OEM 5% Agent 2% Others 1%
21 12 4 3 2 1 0 43
Year 3 Year 4 1043 1068 1093 8991 9719 10506 2481 2610 2746 692 742 796 8577 8611 8646 876 914 953 22076 22804 23557 Region Sales Asia Middle East Latam 16% 8% 6% 8 4 3 4 2 2 2 1 1 1 0 0 1 0 0 0 0 0 0 0 0 16 8 6
Future Focus Areas Europe Client Sales 5% Competitors 48% Distributors 28% Turbine Ops 10% Maint Prov 6% OEM 5%
Region Sales North Am Asia Middle East Latam 38% 11% 40% 4% 18.06 5.25 19.16 10.54 3.06 11.18 3.76 1.09 3.99 2.26 0.66 2.40 1.88 0.55 2.00
Agent Others
2% 1%
Avg. Turbine Cap. Avg. Uptime 160-180 98% 150-190 99% 160-180 96%
Points: 1) Power requirement peaks during summer times. Our new technology is capable to deliverying max power in the most extrem 2) Uptime is higher. Which translates to more energy generation in the same Power Plant. 3) Maintenance downtime is lowest among competitiors 4) Total Working Hrs is highest among competitiors 5) Avg loss in power generation is the lowest in terms of loss as well as no. of filters required.
330
Overall 971 7117 2131 560 8475 773 20027 Estimated potential unit sales Estimated Market Size Rank 7307 2411372 63700 21021036 17458 5761202 4889 1613419 60042 19813749 6157 2031898 159554 52652676
4 1 3 6 2 5
48 28 10 6 5 2 1 100
Other 3% 1.47 0.86 0.31 0.18 0.15 48.00 28.00 10.00 6.00 5.00
Replacement Cost/Year total Maintenance Time(hr/year) Total Working Hrs/Year 150 150 7500 165 140 14000 100 480 12000